CTIMR_WA_3_Recompete_Technical_Site_Visit_13_August_2015_HH.pptx

PPTX presentation 8 MB Posted

Attached to
CTIMR Work Area 3 Recompete (Summary of Changes) Federal contract opportunity
Solicitation number
HSBP1015R0040
Issued by
Department of Homeland Security Customs and Border Protection

About this file

CTIMR WA 3 Technical Site Visit held on 11-13 August 2015 informational Brief

View the file

Other files for this federal contract opportunity

Other files attached to CTIMR Work Area 3 Recompete (Summary of Changes), newest first.
File Type Posted
Amendment_0004_CTIMR_Work_Area_3_date_changed_on_Question_1POST9SEP2015.docx DOCX document
CTIMR_WA_3_SF1442-14aREVISEDAW992015.pdf PDF
Amendment_A0004_CTIMR_WA_3_SF1442-14a.pdf PDF
Amendment_A0004_Sample_Work_Plan_Request_CTIMR_WA3_(Attachment_3).docx DOCX document
Amendment_0004_CTIMR_Work_Area_3_FINAL_Questions_and_Responses_9-2-15_(3).docx DOCX document
Amendment_A00004_for_CTIMR_WA_3_HSBP1015R0040_FINAL_Solicitation_2_September_2015_.docx DOCX document
Amendment_0004_CTIMR_WA_3_New_Mexico_Wage_Determination_(3).txt TXT text file
Amendment_0004_CTIMR_WA_3_Wage_Determination_Dona_Ana_New_Mexico_NM14.txt TXT text file
Amendment_0004_CTIMR_WA_3_Wage_Determination_Otero_NM8.txt TXT text file
Amendment_0004_ATTACH_12-_WA3RecompetePre-Award_LTR_to_Contractor_HSBP1015R0040_(2).docx DOCX document
Amendment_A0004_Pictures_of_Legacy_PF_Fence.docx DOCX document
CTIMR_WA3_HSBP1015R0040_Offeror_Bidder's_Question_Template_dated_13_August_2015.doc DOC document
CTIMR_WA_3_SITE_VIST_ATTENDEES_11-13_August_2015.xlsx XLSX spreadsheet
CTIMR_CTIMR_WA_3_HSBP1015R0040_A00003_13_August_2015_RA-_Copy.docx DOCX document
CTIMR_WA3_Contract_Site_Visit_Slide_Information_13_August_2015_RA.pptx PPTX presentation
CTIMRWA3_Attachment_5_Cost_Template__CTIMR_WA3_RecompeteUPDATE5AUG.xlsx XLSX spreadsheet
CTIMR_CTIMRWork_Area_(WA)_3_Solicitation__HSBP1015R0040_Amendment_0002_FINAL_RS.docx DOCX document
CTIMR_WA3_Recompete_SF1449_Cover_Page_SOLICITATION.docx DOCX document
ATTACH 15 Site Visit Notice_WA_3_Recompete HSBP1015R0040.docx DOCX document
ATTACH 9 - WA3RecompeteGFM Instruc-HSBP1015R0040.docx DOCX document
Attachment 5_Cost Template_ CTIMR WA3 Recompete_72915.xlsx XLSX spreadsheet
ATTACH 11 EL Paso Texas Wage Determination TX150052 WA 3 HSBP1015R0040.docx DOCX document
ATTACH 12- WA3RecompetePre-Award LTR to Contractor_HSBP1015R0040.docx DOCX document
ATTACH 8- WA3RecompeteClient Authorization Letter_HSBP1015R0040.docx DOCX document
ATTACH 7- WA3RecompeteConsent Letter HSBP1015R0040.docx DOCX document
ATTACH 13- WA3Recompete Pre-Award Survey-SF-1408_Hsbp1015R0040.docx DOCX document
ATTACHMENT 4Instructions to the Cost Template_CTIMR WA3Recompete.docx DOCX document
ATTACH 2-WA 3 Notice Regarding Landlord-HSBP1015R0040.docx DOCX document
ATTACH 14- CTIMR WA 3 RECOMPETE HSBP1015R0040 Appendix A_Road Maintenanc....docx DOCX document
ATTACH 10 CTIMR Recompete HSBP1015R0040 CBP TI Standard Designs pdf.pdf PDF
ATTACH 3 Sample Work Plan Request_CTIMR WA3_Recompete HSBP1015R0040.docx DOCX document
ATTACH 1- CTIMRWorkArea3RecompeteHSBP1015R0040 TX TIMR BMPs.pdf PDF
CTIMR Work Area —
ATTACH 6- WA3Recompete Past Perf Questionaire _HSBP10154R000040.docx DOCX document
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Comprehensive Tactical Infrastructure Maintenance and Repair (CTIMR) Work Area 3 (El Paso and Big Bend Sectors)

August 11, 2015 For Official Use Only

CBP Office of Administration Facilities Management and Engineering

CTIMR Work Area 3 Introduction/Agenda Overview of Tactical Infrastructure (TI) and Mission Support

TI Under Attack

Work Requirements

TI supports U.S. Border Patrol mission to guard U.S. Southwest Border against illegal entry Includes an inventory of:

Fences and Gates Roads and Bridges Grates and Drainage structures Lighting and Electrical systems Lands TI spans lands owned by:

U.S. Government, often under other agency control Tribal nations Private landowners (under agreements, easements, and leases) Lands encumbered by significant environment constraints such as endangered species, cultural and historic requirements Requires very special steps to avoid violations

Overview: Tactical Infrastructure (TI)

Overview: Tactical Infrastructure (TI)

Big Bend El Paso 268 miles of border 190 miles of fencing 427 miles of roads

Big Bend 510 miles of border

5.40 miles of fencing

23.4 miles of roads

From the Pacific Ocean to the Gulf of Mexico, the 2000 miles of the Southwest Border has a significant mixture of TI across its length

CTIMR Work Area 3 Inventory: Fence and Gates

K1_A

STN Gate

Anapra

Lopez Gate

VF Normandy

DMN

Fence Breach

Repair

Fort Hancock K-5

El Paso Fence K1_A

L-1 Big Bend

Inventory: Fence and Gates (Cont’d)

Inventory: Roads and Bridges

DMN

DMN

L-1

Columbus

DMN

Drainage structures require repairs and routine inspection and maintenance CTIMR Work Area 3 Inventory: Drainage Structures and Grates

Hill St. Drain

Cement Storm Drain

Customs Storm Drain

Inventory: Lighting and Electrical Systems

Columbus

Maintenance and repair requirements stem from willful destruction, weather, normal aging Typical causes for M&R in each work category include:

Fence and Gates Fence fabric cut, bollards removed, or sections pushed away Burrowing or tunneling below the fence Roads and Bridges Roads and bridges washed out/damaged by storms Drainage and Grates Grates removed or cut, debris builds up Lighting and Electrical Lighting often vandalized, also requires routine maintenance Vegetation Control and Debris Removal Vegetation growth must be controlled

TI Under Attack

Maintenance, repair and improvement support is required in 5 work categories:

Fence and Gates Roads and Bridges Drainage and Grate Systems Lighting and Electrical Systems Vegetation Control and Debris Removal Program Management CLIN will capture labor, equipment, and material costs for:

Mobilization Work plan development Program oversight activities of key personnel described in Section H Government information management/reporting requirements and meeting requirements Transportation and storage of Government furnished materials Improvement Activity CLIN (Optional) is included for:

Performance of specific improvement activities relative to the program Each improvement shall not exceed a dollar level threshold of $750,000 per activity

Work Requirements

Work requirements will vary based on:

Inventory quantities for each work category Number and type of incidents Type and recurrence of road washouts/deterioration Time of year (variances in illegal border traffic fluctuate with the time of year) Economic conditions Weather events Location There is typically a higher frequency of damage in and around more urbanized areas Contractor will be required to develop an appropriate work plan The performance period for the work plan:

Will typically be in sequential 90 day performance periods May be extended to 180, 270 or 365 days Work plan will serve as the basis for routine M&R work requirements

Work Requirements (Continued)

M&R work is classified as either urgent or routine for Work Categories 1-5 Urgent work Resulting from:

Willful or other destruction Natural event such as severe weather Premature failure of the TI asset Poses immediate risk to operations, systems, equipment or components May be performed five (5) days a week, as required Majority of urgent work will be completed during normal business hours.

Based on mission requirements, limited amount of urgent work may be required after normal business hours Routine work Non-urgent M&R work that can be planned or scheduled at a designated frequency.

Does not pose an immediate risk to systems, equipment or components Will be performed five (5) days a week from Monday to Friday.

Work Requirements (Continued) image2.png image3.png image5.png image6.jpeg image7.jpeg image8.png image9.jpeg image10.jpeg image11.jpeg image12.jpeg image13.png image14.png image15.jpeg image16.jpeg image17.jpeg image18.jpeg image19.jpeg image20.jpeg image21.emf image22.jpeg image23.jpeg image24.jpeg image25.jpeg image26.jpeg image27.jpeg image1.png image4.png