Edward R. Roybal Repair and Alteration Tenant Improvement Prospectus Project
Solicitation number
GS-09P-15-KT-C-0014
Issued by

About this file

Volume 2B Program Development Study and Appendices

View the file

Other files

File Type Posted
Roybal_DB_RFP_Amendment_06.pdf PDF
Roybal_DB_RFP_Amendment_05.pdf PDF
Roybal_DB_RFP_Amendment_04.pdf PDF
Roybal_DB_RFP_Amendment_04_14th_Fl_Room_Reqs.pdf PDF
Roybal_DB_RFP_Amendment_04_6th_FL_room_reqs.pdf PDF
Roybal_DB_RFP_Amendment_04_revised_bid_sheet.pdf PDF
Roybal_DB_RFP_Amendment_04_9th_Fl_Room_Reqs.pdf PDF
Roybal_DB_RFP_Amendment_04_scope_reductions.pdf PDF
Roybal_DB_RFP_Amendment_04_16th_Fl_Room_Reqs.pdf PDF
Roybal_DB_RFP_Amendment_04_8th_Fl_Room_Reqs.pdf PDF
Roybal_DB_RFP_Amendment_04_15th_Fl_Room_Reqs.pdf PDF
Roybal_DB_RFP_Amendment_04_10th_Fl_Room_Reqs.pdf PDF
Roybal_DB_RFP_Amendment_04_7th_Fl_Room_Reqs.pdf PDF
Roybal_DB_RFP_Certificate_of_Current_Cost_or_Pricing_Data_(1).pdf PDF
Roybal_DB_RFP_Amendment_03_SF30.pdf PDF
Roybal_DB_bid_sheet_Amendment_03.pdf PDF
Roybal_DB_RFP_PPQ_Amendment_02.docx DOCX document
Roybal_DB_bid_sheet_Amendment_02.pdf PDF
Roybal_DB_RFP_Offeror_Representations_and_Certifications.doc DOC document
Roybal_DB_RFP_Amendment_02_SF30.pdf PDF
Roybal_DB_RFP_Amendment_01.pdf PDF
08_Roybal_room_requirements_Pg_117-138.pdf PDF
Roybal_Pre_proposal_Conference_Final_05_28_2015_(1).pdf PDF
Appendix_C_Roybal_Swing_Space_Requirements_and_Move_Matrix_04_06_2015.pdf PDF
Roybal_Fed_Bldg_BER_Final_Submittal.pdf PDF
Roybal_Fed_Bldg_BER_Final_Submittal_Appendices.pdf PDF
AmendmenttoAppendixCSwingSpaceandMovesSOWFinal.doc.pdf PDF
Roybal_DB_RFP_preproposal_attendees.pdf PDF
Volume_3_-_References.pdf PDF
Past_Performance_Questionnaire.docx DOCX document
VOLUME_2A_SCOPE_OF_WORK.pdf PDF
Roybal_DB_1442.pdf PDF
Roybal_DB_RFP_Agreement.pdf PDF
Roybal_DB_Division_1.pdf PDF
Roybal_DB_Solicitation.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Volume 2B

Program Development Study

PROJECT IDENTIFICATION

Project Name: Roybal Repair and Alteration Prospectus Project

Project Number: TBD

Region: 09

Building Name: Edward R. Roybal Federal Building and Courthouse

Building Address: 255 E. Temple Street, Los Angeles, CA 90012

Contracting Officer: Greg McSweeney

Date: 5/15/15

SENSITIVE BUT UNCLASSIFIED (SBU)

PROPERTY OF THE UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

Do not remove this notice

Properly destroy or return documents when no longer needed

United States General Services Administration Edward R. Roybal Federal Building and U.S. Courthouse

Los Angeles, California

JOSEPH CHOW & ASSOCIATES, INC.

650 Delancey Street, Suite 211 - San Francisco, CA 94107

P: 415.777.1288 F: 415.777.2552 E: jca@jcaarchitects.com

Program Development Study Final Submi al

March 31, 2015

Joseph Chow & Associates, Inc. i PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY Do not remove this notice. Properly destroy documents when no longer required

PROGRAM DEVELOPMENT STUDY

Edward R. Roybal Federal Building and Courthouse

Final Submittal

TABLE OF CONTENTS

VOLUME 1

TABLE OF CONTENTS i

REFERENCE DOCUMENTS v

PROJECT CODES AND POLICIES vi

1.0 EXECUTIVE SUMMARY 1.0

1.1 Purpose 1.0 - 1

1.2 Scope of the Project 1.0 - 2

1.3 Project Goals 1.0 - 3

1.4 Implementation Strategy 1.0 - 3

1.5 Critical Delivery Dates 1.0 - 4

2.0 EXISTING CONDITIONS VALIDATION 2.0

2.1 Existing Building Systems Review 2.0 – 1

2.1.1 Architectural 2.0 - 1

2.1.2 Plumbing 2.0 - 2

2.1.3 HVAC 2.0 - 3

2.1.4 Fire Protection 2.0 - 4

2.1.5 Electrical 2.0 - 4

2.1.6 Telecommunication 2.0 - 4

3.0 PROJECT OBJECTIVES 3.0

3.1 Introduction and History 3.0 - 1

3.2 Project Drivers and Justifications 3.0 - 2

3.3 Building Operations Impacts 3.0 - 2

3.4 Project Goals 3.0 - 4

PROGRAM DEVELOPMENT STUDY – FINAL SUBMITTAL

Edward R. Roybal Federal Building and U.S. Courthouse TABLE OF CONTENTS

Joseph Chow & Associates, Inc. ii PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY

3.5 Pre-Design Field Investigation and Survey 3.0 - 4

4.0 GENERAL BUILDING REQUIREMENTS 4.0

4.1 Existing Housing Plan/Space Allocation 4.0 - 1

4.2 Proposed Housing Plan/Space Allocation – With OPTIONS 4.0 - 2

4.3 Proposed Housing Plan/Space Allocation – Without OPTIONS 4.0 - 3

4.4 Life Safety 4.0 - 6

4.5 Fire Protection 4.0 - 8

4.6 Plumbing 4.0 - 9

4.7 Heating, Ventilation and Air Conditioning 4.0 - 9

4.8 Electrical 4.0 - 10

4.9 Telecommunications 4.0 - 11

4.10 Security 4.0 - 12

4.11 Environmental Remediation 4.0 - 12

4.12 Accessibility 4.0 - 12

4.13 Warranties, Systems Maintenance, and Commissioning 4.0 - 12

5.0 SITE DESCRIPTION 5.0

5.1 Site Description 5.0 - 1

5.2 Off-site Work and Underground Utilities 5.0 - 1

5.3 Existing Site and Floor Plans 5.0 - 1

5.4 Photographic Survey 5.0 - 1

5.5 Existing Studies 5.0 - 1

6.0 PROGRAM GOALS 6.0

6.1 Sustainable Design 6.0 - 1

6.1.1 Energy Efficiency 6.0 - 1

6.1.2 Water Conservation 6.0 - 2

6.2 Acoustic Quality 6.0 - 2

6.3 Indoor Air Quality 6.0 - 3

6.4 Safety 6.0 - 3

6.4.1 Building Perimeter Security 6.0 - 3

6.4.2 Seismic and Progressive Collapse 6.0 - 3

6.4.3 Emergency Systems/Reliability 6.0 - 4

6.4.4 Physical Security 6.0 - 4

6.4.5 Blast Protection 6.0 - 5

6.4.6 Chemical and Bio-Hazard Protection 6.0 - 5

6.4.7 Fire / Life Safety 6.0 - 5

6.4.8 Health / Environmental Safety 6.0 - 5

6.5 Efficient Operations and Maintenance 6.0 - 6

6.5.1 Building Automation 6.0 - 6

6.5.2 Materials Handling 6.0 - 6

6.5.3 Innovative Technologies 6.0 - 6

6.5.4 Life Cycle Cost Effectiveness 6.0 - 6

6.6 Accessibility 6.0 - 7

Joseph Chow & Associates, Inc. iii PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY

6.7 Space Planning 6.0 - 7

6.8 Signage 6.0 - 8

6.9 Preservation 6.0 - 8

7.0 BUILDING SYSTEMS DESIGN DIRECTIVES 7.0

7.1 A - Substructure 7.0 - 2

7.1.1 A10 Foundations 7.0 - 2

7.1.2 A20 Basement Construction 7.0 - 2

7.2 B - Shell 7.0 - 2

7.2.1 B10 Superstructure 7.0 - 2

7.2.2 B30 Roofing 7.0 - 3

7.3 C - Interiors 7.0 - 3

7.3.1 Interior Realignment and Renovation of Permanent 7.0 - 3 Space

7.3.2 C10 Interior Construction 7.0 - 4

7.3.3 C30 Interior Finishes 7.0 - 10

7.4 D – Services 7.0 - 13

7.4.1 D20 Plumbing 7.0 - 13

7.4.2 D30 Heating, Ventilating, and Conditioning 7.0 - 16

7.4.3 D40 Fire Protection 7.0 - 18

7.4.4 D50 Electrical 7.0 - 22

7.5 E – Equipment and Furnishings 7.0 - 26

7.5.1 E10 Equipment 7.0 - 26

7.5.2 E20 Furnishings 7.0 - 27

7.6 F – Special Construction and Demolition 7.0 - 28

7.6.1 F20 Selective Demolition 7.0 - 28

8.0 IMPLEMENTATION PLAN 8.0

8.1 Swing Space 8.0 - 1

8.2 Government Approvals 8.0 - 1

8.3 Agency Mission Interruption 8.0 - 1

8.4 Building Operation 8.0 - 2

8.5 Construction Phasing 8.0 - 2

8.6 Quality Assurance 8.0 - 14

8.7 Tenant Requirements for Permanent Space 8.0 - 14

8.8 Room Requirements 8.0 - 14

9.0 PHOTOGRAPHIC SURVEY 9.0

10.0 EXISTING AND PROPOSED NEW FLOOR PLANS 10.0

Joseph Chow & Associates, Inc. iv PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY

See Separate Drawing Package for Existing and Proposed New Plans.

11.0 PROJECT TEAM 11.0

12.0 APPENDIX A 12.0

USMS OSS Security Plan Drawings

13.0 APPENDIX B 13.0

USMS 6th and 8th Floor Sound Locks

14.0 APPENDIX C 14.0

Swing Space and Move Requirements

Edward R. Roybal Federal Building and U.S. Courthouse REFERENCE DOCUMENTS

Joseph Chow & Associates, Inc. v PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY

REFERENCE DOCUMENTS

Roybal Campus Program of Requirements - completed by CRA Architecture, October 4, 2013.

Roybal Campus Master Plan Housing Study - completed by CRA Architecture, October 4, 2013

Pre-Programming Data Report, completed by Administrative Office of the U.S. Courts, July 16, 2013

Edward R. Roybal Repair and Alteration Feasibility Summary, completed by GSA Region 9 Project Team, November, 20, 2012.

Building Engineering Report (BER) completed by The R.E.M. Engineering Co., Inc. March 2005.

Note: The above referenced documents will be available subject to GSA’s Unclassified Sensitive Building

Information Policy.

Edward R. Roybal Federal Building and U.S. Courthouse PROJECT CODES AND POLICIES

Joseph Chow & Associates, Inc. vi PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY

PROJECT CODES AND POLICIES

The latest edition of the nationally recognized standards and GSA/US Courts Publications herein, in effect at the time of design contract award shall be used during design and construction. If a newer code than those listed below are adopted nationally, by GSA, or a tenant, the Design/Build team shall use the newer publication in lieu of the publication cited below.

APPLICABLE NATIONAL CODES AND STANDARDS

The latest edition of the following nationally recognized codes:

International Building Code (IBC)

International Fire Code (IFC)

International Plumbing Code (IPC)

International Mechanical Code (IMC)

International Energy Conservation Code (IECC)

National Fire Protection Association, Life Safety Code (NFPA 101)

National Fire Protection Association, Electrical Code (NFPA 70)

National Fire Protection Associates, Fire Alarm Systems (NFPA 72)

Architectural Barriers Act Accessibility Standards (ABAAS)

International Energy Conservation Code (IECC) 2003 & ASHRAE/IESNA Standards 90.1

IEEE Recommended Practice Color Book Series published by the Institute of Electrical and Electronics

Engineers

OSHA Regulations for Construction

Environmental Protection Agency (EPA) – 29 CFR 1926.52, 40 CFR 61.140-157, and 49 CFR 171-180

Illuminating Engineering Society of North America (IESNA) Lighting Handbook, 9th ed., Chapter 10, “Lighting Design Guide.”

Edward R. Roybal Federal Building and U.S. Courthouse PROJECT CODES AND POLICIES

Joseph Chow & Associates, Inc. vii PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY

GSA/TENANT AGENCY POLICIES

The latest edition of the following GSA publications:

GSA P100– Facility Standards for Public Buildings

GSA Security Criteria

Interagency Security Committee (ICS) - Security Design Criteria

GSA P-120 – Project Estimating Requirements

GSA The Building Commissioning Guide

GSA Value Engineering Guide Volumes 1 and II

U.S. Courts Design Guide and Revisions, 2007

U.S. Courts Courtroom Technology Manual

U.S. Marshals Service Requirements and Specifications for Special Purpose and Support Space Manual – sections 1, 2, & 3

U.S. Marshals Service Judicial Security Systems Requirements and Specifications, volume 3, Publication 64, Courthouse Project Handbook

GSA CADD Standards

GSA Design Excellence Program

High Performance and Sustainable Buildings Guidance

To ensure flexibility, it is GSA policy to make maximum use of equivalency clauses in all nationally recognized codes. Should a conflict exist between GSA requirements and the GSA adopted nationally recognized codes, the GSA requirement shall prevail. All code conflicts shall be brought to the attention of the GSA Project Manager for resolution.

The construction documents will require approval from GSA’s regional Fire and Life Safety Group prior to proceeding with any construction work.

Edward R. Roybal Federal Building and U.S. Courthouse PROJECT CODES AND POLICIES

Joseph Chow & Associates, Inc. 3 PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY

- Page Left Intentionally Blank -

Edward R. Roybal Federal Building and U.S. Courthouse 1.0 EXECUTIVE SUMMARY

Joseph Chow & Associates, Inc. PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY

1.0 EXECUTIVE SUMMARY

Edward R. Roybal Federal Building and U.S. Courthouse 1.0 EXECUTIVE SUMMARY

United States General Service Administration

Edward R. Roybal Federal Building and U.S. Courthouse 2.0 EXISTING CONDITIONS VALIDATION

Joseph Chow & Associates, Inc. 1.0 - 1 PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY

1.0 EXECUTIVE SUMMARY

1.1 Purpose

The purpose of this Program Development Study (PDS) is to describe the scope, schedule and budget for the

Edward R. Roybal Federal Building and Courthouse Renovation and Alteration Project (Roybal FBCT R&A

Project). Design directives shall identify work items that will allow for the consolidation of court operations currently housed in Roybal, 312 North Spring Street (312 NSS), and 300 North Los Angeles (NLA).

The renovated building will provide safe, efficient and appropriate housing for occupancy of the Courts and other building occupants. The PDS serves as the technical foundation for the project’s scope of work for the

Design Build award. The PDS further serves as an information gathering and documenting effort, facilitating the Design/Build team’s early mobilization.

The PDS is a GSA-led effort prepared with the input from the various stakeholders, including the United

States Bankruptcy Court, the United States District Court, Circuit Library, Pretrial, and the United States

Marshals.

Edward R. Roybal Federal Building and Courthouse

Joseph Chow & Associates, Inc. (JCA) and its team members conducted PDS field investigations on May 7, 2013 and June 5, 2014. During these investigations, a visual inventory was taken of all areas included in this tenant improvement project.

Edward R. Roybal Federal Building and U.S. Courthouse 1.0 EXECUTIVE SUMMARY

Joseph Chow & Associates, Inc. 1.0 - 2 PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY

1.2 Scope of the Project

The project includes repurposing existing courtrooms for general office space in order to reduce the footprint of the U.S. Bankruptcy Court (USBC), the U.S. District Court (USDC), Circuit Library, and Pretrial Services.

In addition, renovation of existing Court and Pretrial tenant spaces will occur to create more efficient work spaces. This project will also allow the USDC to consolidate in three locations (Roybal, the new LA

Courthouse (LACH) and 300 NLA). Build out within existing courtrooms will be consistent with the U.S.

Courts Design Guide, 2007.

The purpose of this Program Development Study (PDS) is to describe the scope, schedule and budget for the renovation of Roybal. Specific descriptions of new work included in “Design Directives” shall identify work items that are needed to provide adequate tenant spaces.

This project includes a Base Scope of work as well as Options. The work areas include the following:

Base Scope of Work includes the following floors

Temple Level

Terrace Level

6th Floor

7th Floor

8th Floor

9th Floor

10th Floor

11th Floor

12th Floor

13th Floor

14th Floor

Options

Option A: Circuit Library.

Option B: 6th Floor Finish Modifications (Rooms: 651, 652, 657, 664, 653-01, 664-01, 664-02, and

664-03).

Option C: 7th Floor Finish Modifications (Rooms: 741, 741-01, 741-02, 744, and 746)

Option D: 8th Floor Finish Modifications (Rooms: 841, 844, 851, 852, 854, 864, 864-01, and 864-

02).

Joseph Chow & Associates, Inc. 1.0 - 3 PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY

Option E: 14th Floor USDC Chambers Build-out.

Option F: 15th Floor USBC TBD Space.

Option G: 15th Floor USBC General Assembly.

Option H: 16th Floor USBC Joint Use Operations.

Option I: 16th Floor USBC Board of Judges.

The options are not listed in any particular order. Options do not have to be awarded sequentially.

1.3 Project Goals

This project will create a building suitable for occupancy for the long term. The PDS accounts for the 10-year growth projections for Courts’ staff and provides courtrooms and chambers sufficient to meet the judiciary’s current needs per assumptions consistent with current policies related to senior district judges, courtroom sharing, and the deferral of construction of spaces for projected judgeships. The PDS team has identified the following critical programming issues in the project area only.

Tenant Improvements for the U.S. Bankruptcy Courts, the U.S. District Courts, Circuit Library, and Pretrial

Fire/Life Safety

Code Compliance

Accessibility (in areas of renovation as noted only)

The project is required for the consolidation of the Courts functions (that will not be housed in the new

LACH).

1.4 Implementation Strategy

GSA will be using the Design Build method of implementation. The Design/Build Team shall be responsible for the construction and design of the Roybal Renovation project. The PDS serves as a guideline. During the

Construction Design Phase, there may be variations in the design than to what is included in this document. It shall be the Design/Build Team’s responsibility to implement the changes in the final design with the approval of GSA, applicable agencies, and all affected tenants.

Construction management services will be procured by GSA and the Design/Build team shall work with the

Construction manager (CM) during the design and construction phases of the project.

Joseph Chow & Associates, Inc. 1.0 - 4 PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY

1.5 Critical Delivery Dates

Milestone Date

Award of Design/Build Contract: Fourth Quarter FY15

Design/Build Construction Start: December 2015

Design/Build Contract Complete: June 2017

Edward R. Roybal Federal Building and U.S. Courthouse 2.0 EXISTING CONDITIONS VALIDATION

2.0 EXISTING CONDITIONS VALIDATION

Joseph Chow & Associates, Inc. 2.0 - 1 PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY

2.1 EXISTING BUILDING SYSTEMS REVIEW

2.1.1 Architectural

Roybal is located on 255 E. Temple Street in Los Angeles, California. There are entrances on Temple Street or off of Alameda Street. See Figure 1.

Figure 1 – Area Map

Roybal is located in the civic center of downtown Los Angeles, in proximity to the 300 N. Los Angeles

Federal Office Building (300 NLA), the new Los Angeles Courthouse (LACH), 312 North Spring Street (312

NSS), the Los Angeles City Hall, the County Courts Buildings and the Metropolitan Detention Center. The

Roybal FBCT occupies 3.68 acres of an 8.08 acre parcel shared with 300 NLA. The two buildings share a common mechanical plant. The Roybal building is a Class A stand-alone structure occupied primarily occupied by the U.S. District Courts, United States Bankruptcy Court (USBC), court-related agencies, and the

Drug Enforcement Agency (DEA).

Constructed in 1993, the building is of steel-frame construction with exterior granite cladding. The building has 22 stories, with three below-grade basement levels, including an underground parking facility. The

Edward R. Roybal Federal Building & U.S. Courthouse

300 N. LA Building

North

Joseph Chow & Associates, Inc. 2.0 - 2 PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY building was named for Edward Roybal, a city councilman in Los Angeles in the 1950s and U.S.

Congressman from 1963-1993.

The building is shaped like an octagon with eight sides. There are four sets of exit stairs, one each on the north, south, east, and west. There are three banks of public elevators serving different floors, one set of restricted Judge’s elevators, a freight elevator, a parking transfer elevator, and USMS elevators.

The interior of the building consists of various finishes. In the public areas, finishes mainly include granite floors and wall paneling as well as wood paneling.

Interior office areas finishes mainly include carpet, vinyl wall base, gypsum wall board, suspended acoustic tile ceilings and paint.

Judges’ chamber finishes include upgraded carpet, wood doors and paneling, wall fabric, and special ceilings.

Courtroom finishes include carpet, wood paneling, and acoustic wall panels, and a combination of gypsum board and suspended acoustic ceilings.

The building’s architectural systems are in overall good condition. Observed deficiencies are limited to cosmetic damage to finishes due to normal wear and tear, areas of accessibility non-compliance, and exit signage.

In areas of renovation, the Design/Build Contractor shall complete work as specified in Section 8.0 and other parts of this PDS.

2.1.2 Plumbing

City water is supplied through a 6” main that enters mechanical room P-123 located on parking level P-1 of the Roybal Building. Three variable speed booster pumps and a water softener supply domestic cold water to four pressure zones in the building, by means of three Pressure Reducing Valve stations.

Domestic hot water (DWH) is generated from 180°F heating hot water supplied from the central plant in the

300 North Los Angeles Building by means of eight (8) heat exchangers, two for each pressure zone. Re-circulating pumps for each pressure zone maintain DHW temperature at 140°F.

Joseph Chow & Associates, Inc. 2.0 - 3 PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY

Sanitary waste is collected from each floor in 6” waste pipe risers and conveyed to parking level P-3 where two 6” laterals connect to the public street sewer system. Vent pipe risers are connected in the same shafts to vent the plumbing fixtures on each floor.

Rain water is collected from the roof, terrace level, and other exterior spaces to 4” and 6” storm water risers.

A 2” medium pressure gas main serves all cooking appliances in the terrace level cafeteria.

Public restrooms are located on each floor. Private restrooms are located in judges’ chambers throughout the building.

The condition of the plumbing systems appears to be good and in functional operation.

2.1.3 HVAC

A central utility plant in the 300 North Los Angeles Building provides chilled water and heating hot water to the Roybal Building.

The building is provided with multiple dual duct Variable Air Volume (VAV) systems with outside air economizers. Exterior zones are provided with dual duct VAV boxes with Direct Digital Controls (DDC).

Interior zones are provided with single duct VAV boxes with DDC.

Typical floors above level two are provided with two fan rooms, one at the north end and one at the south end of the building. Each supply and return fan is provided with a Variable Frequency Drive (VFD).

Electrical and telephone rooms are provided with exhaust ventilation.

Stair pressurization fans are provided for smoke control.

The central Energy Management Control System (EMCS) system controlling the main HVAC systems and lighting is Seimens Apogee and the VAV controllers are Johnson Controls – both systems communicate through an interface.

The condition of the HVAC systems and controls is good.

Joseph Chow & Associates, Inc. 2.0 - 4 PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY

2.1.4 Fire Protection

The building is provided with an automatic wet-pipe sprinkler system and wet standpipe hose system.

Fire water is supplied from the city water main with a supplemental storage tank and fire and jockey pumps located in the P-1 parking level.

The kitchen grease hoods are provided with a dry chemical suppression system.

The condition of the fire protection system is good.

2.1.5 Electrical

The main electrical service serving the Roybal building enters the main electrical room on the Temple Street level. Los Angeles Department of Water and Power provides a primary medium voltage of 34kV to the utility vault from two separate feeds. The utility vault then converts voltage to 480V via a transformer and feeds two busway systems and normal power to the building emergency power system.

One 3000A, 480V, 3-Phase busway rises through the north electrical rooms and a 1600A, 480V, 3-Phase busway rises through the south electrical rooms. Every floor has two electrical rooms, a north and south.

Each electrical room has a 480/277V, 3-Phase panels for building lighting and mechanical loads, that is powered via a 100A, 480/277V, 3-Phase, 4-Wire bus-mounted disconnect; and 120/208V, 3-Phase panels for receptacle loads. The 120/208V panels are powered via 225kVA, 480-208/120V, 3-Phase transformers that are located at four floor intervals; and can be found at floors 2, 5, 8, 11, 14, 17, and 21.

All of the equipment in the main electrical room and the subsequent electrical rooms on each floor are in good condition.

The building lighting consists mostly of 2’x4’ and 2’x2’ fixtures with T8 or T5 fluorescent lamps, and fluorescent down lights. Each electrical room on each floor contains a low-voltage lighting control panel that is tied into the building BMS system. There have been various projects over the years to update the lighting and lighting controls within the building. The majority of the lighting is in good condition.

2.1.6 Telecommunication

The main telecommunication system serving the building is in good condition. However, the Courts will upgrade the existing system to meet the demands of current and future technology during this construction

Joseph Chow & Associates, Inc. 2.0 - 5 PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY project. The Design Build Contractor is required to provide the infrastructure to support the new telecommunication system. The Design Build Contractor is also required to coordinate with the Court’s hired telecommunication vendor.

Joseph Chow & Associates, Inc. 2.0 - 6 PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY

Edward R. Roybal Federal Building and U.S. Courthouse 3.0 PROJECT OBJECTIVES

3.0 PROJECT OBJECTIVES

Joseph Chow & Associates, Inc. 3.0 - 1 PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY

3.0 PROJECT OBJECTIVES

3.1 Introduction and History

Since the early 1990s, the General Services Administration (GSA) and the federal judiciary have been carrying out a multibillion dollar courthouse construction initiative to address the judiciary's spatial needs. To plan for and make funding decisions on projects, Congress, the Office of Management and Budget, and GSA have relied on a rolling 5-year plan prepared annually by the judiciary that prioritizes new courthouse projects based on an urgency score. The urgency score is based on the year a courthouse runs out of space, the number of judges without courtrooms, security concerns, and operational inefficiencies.

The Los Angeles Courthouse was the number one priority of any project in the 5 year plan in 1996 due to the space, security, and operational inefficiencies presented by the 312 NSS and was declared a judicial space emergency in 2003. To address these concerns, GSA and the judiciary prepared a series of feasibility studies looking at different options for accommodating the Court's long-term needs. One option involved constructing a stand-alone building that would consolidate all of the court operations into a single building. GSA and the judiciary also considered constructing a companion building physically connected to the Roybal building. A third alternative that was studied involved the partial or complete demolition of an existing federal building to provide a site for a new courthouse.

After years of study and debate, these options were not selected because of cost or space limitations. GSA has selected to construct a new 24-courtroom building to house district court judges and related operations at a location approximately 6/10 of a mile from the Roybal building. Under this proposal, the judiciary would use the Roybal building for all senior district judges, magistrate judges, bankruptcy judges, and all related operations which cannot be housed in the new courthouse.

In partnership with the Ninth Circuit, Central District of California, and the AOUSC, GSA proposes to complete this design-build project. The project is required to consolidate the Court’s operations that will not be housed in the new Los Angeles Courthouse (LACH). The project scope includes only the minimum tenant improvements (TI) in Roybal that are required for this consolidation. These alterations of Roybal must be undertaken at this time to enable two concurrent projects. The reconfiguration of space is required to accommodate the consolidation to occur concurrently with the occupancy of the new LACH.

Joseph Chow & Associates, Inc. 3.0 - 2 PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY

3.2 Project Drivers and Justification

When the new LACH is complete in 2016, the active District judges and a portion of the senior District judges and their support functions will be consolidated in the new LACH. The remaining Bankruptcy Court operations will be consolidated in the Roybal, thereby justifying the need for this project. The proposed

Roybal alteration project provides only the minimum tenant improvements required for this consolidation.

Roybal alterations are also required so court functions currently located in 312 NSS can be relocated to

Roybal. Prior to the start of construction for this project, the Court, with the assistance from AO/GSA, will vacate sufficient space to repurpose existing court spaces and provide space for the consolidation of ancillary functions. The vacation of space will be accomplished through consolidation using advanced workplace strategies including optimizing their workplace, courtroom sharing, hoteling and teleworking. Efforts shall be made to prevent disruption of official Court business, and shall require the worksite to be subject to shut-down, should activities become disruptive.

3.3 Building Operations Impacts

Impacted Client Agencies

The impacted agencies are as follows:

United States Bankruptcy Courts (USBC)

The United States Bankruptcy Courts are courts created under Article I of the United States

Constitution. They function as units of the district courts and have subject matter jurisdiction over bankruptcy cases. The federal districts have original and exclusive jurisdiction over all cases arising under the bankruptcy code and bankruptcy cases cannot be filed in state court.

United States District Courts (USDC)

The United States District Courts are the trial courts of the federal court system. Within limits set by

Congress and the Constitution, the district courts have jurisdictions to hear nearly all categories of federal cases, including both civil and criminal matters.

United States Pretrial (Pretrial)

The United States Pretrial Services System carry out pretrial services functions in the U.S. District

Courts. Through its officers and other employees, the system works to make the criminal justice process effective and the public safe.

Joseph Chow & Associates, Inc. 3.0 - 3 PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY

Circuit Library

The United States Ninth Circuit Library serves the information needs of the circuit, district, bankruptcy, and magistrate judges. In addition, they provide assistance with legal research which is available on a limited basis to other government personnel, members of the local bar, and public patrons. Circuit libraries include work space for library staff, photocopy equipment, and study areas and computer access for judges and staff.

Owner’s Agreements

GSA owns, operates, and maintains Roybal. When planning and programming the design of the tenant relocation, a programming and planning analysis is required to determine the proposed building area provided for all tenants and adjacencies. The Design/Build Contractor shall provide building area information and coordinate the information with GSA. Once GSA and the tenants have agreed upon the agency’s square footage, GSA will issue a draft Owner’s Agreement to obtain Tenant’s Agreement upon their likely rent in the renovated building.

Tenant Relocations

During the different construction phases, displaced tenants will be located on various floors and within 300

NLA. Where feasible, the goal is to move each tenant only once. The phasing of the project shall minimize operational impacts as much as possible. The contractor shall be aware that they will be required to coordinate in advance all tenant interruptions with GSA Property Managers and the affected tenants. Some tenant spaces must remain in continuous operation such as USBC. The USBC and USDC plan court hearings

60 days or more in advance. For this project, the contractor notification period shall be a minimum 60 days.

The USBC and USDC will require a written schedule before any work can be performed, and a minimum of

60 days’ notice should there be any deviations from the agreed upon schedule.

Other Impacted Projects

The Courts will concurrently upgrade the existing telephone/data and cabling during this construction project.

The Design/Build Contractor is required to provide all infrastructure for all new telephone/data and security work as part of this project. The Design/Build Contractor is also required to coordinate the scope and construction work with the USBC and USDC contractor(s) and the USMS. The Design/Build Contractor shall provide access and schedule time to accommodate the USBC and USDC contracted contractor(s).

Joseph Chow & Associates, Inc. 3.0 - 4 PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY

Need for Project Phasing and Off Hours Work

The building provides an important service to its constituents and must remain operational during construction; therefore, phased construction scheduling is required and all work must be done during Off

Hours so that construction does not interfere nor disrupt the normal and sensitive operations of the building.

See Section 8.0, Implementation Plan for more information.

3.4 Project Goals

The Roybal project scope is limited to the minimum work required to house the consolidated Court functions

(that are not housed in the new LACH). The courts project goals are the following:

Consolidate space using advanced workplace strategies including optimizing the workplace, sharing, hoteling, teleworking and optimizing their utilization rate.

Create new space for the Circuit Library.

Provide space for 5 senior judges, 17 magistrate judges, and 11 bankruptcy judges.

There will be efforts to create needed program space through courtroom sharing and by remodeling space previously used as courtrooms into office areas, grand jury, and assembly space. The extent of reconfiguration and alteration work will vary by courtroom and will take into account initial costs, the need for long-term suitability and operational efficiency for the repurposed uses, and will preserve the possibility that such spaces could one day be remodeled back into courtrooms should the housing requirements beyond the time frame of the renovation project support such a need. Refer to Section

10.0 Existing and Proposed New Floor Plans for additional information.

The General Services Administration (GSA) leverages the buying power of the Federal government to acquire best value for taxpayers and their Federal customers. GSA exercises responsible asset management and they deliver superior workplaces, quality acquisition services, and expert business solutions. GSA also develops innovative and effective management policies.

3.5 Pre-Design Field Investigation and Survey

The existing as built drawing information on Roybal may be insufficient or obsolete at the time of award.

There are original construction documents available for Roybal. However, not all documents are updated to the current conditions of the Building. The existing physical condition of the building requires a thorough investigation and survey by the Design/Build Contractor. The Design/Build Contractor must determine the actual condition and make sure that the design and construction submittals are based on fact. The Drawings included in this PDS are for reference only and are not for construction.

Edward R. Roybal Federal Building and U.S. Courthouse 4.0 GENERAL BUILDING REQUIREMENTS

4.0 GENERAL BUILDING REQUIREMENTS

Joseph Chow & Associates, Inc. 4.0 - 1 PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY

4.0 GENERAL BUILDING REQUIREMENTS

4.1 Existing Housing Plan/Space Allocation

FLOOR

Non-Court: DEA

USDCNon-CourtLobby

EXISTING ROYBAL STACKING PLAN

Mechanical/Non-Court

Non-Court: USMS

Non-Court: DEA

Non-Court: DEA

Non-Court: DEA

USBC 4 Courtrooms & 4 Chambers

Non-Court: Tax Court USDC - Clerk Pretrial

USBC

Non-Court

3 USDC Non-CourtArraignment CR

USBCMech/Non-Court SHARED Staff Gym

Terrace Staff Entry

B3

Temple St. Circuit LibraryUSDC Non-Court

B1

B2

USDC

USBC

USDC 4 Courtrooms & 4 Chambers

USDC 4 Courtrooms & 4 Chambers

Shared Judges' Fitness

USBC 4 Courtrooms & 4 Chambers

USBC 4 Courtrooms & 4 Chambers

USBC 4 Courtrooms & 4 Chambers

Non-Court: State Dept. USBC

USDC Magistrate - 2 Courtrooms & 2 Chambers

USDC 4 Courtrooms & 4 Chambers

USDC 2 Courtrooms & 2 Chambers

Public Entry

Parking

Parking

Parking

Sally Port

Mech/Non-Court

Clerk

Joseph Chow & Associates, Inc. 4.0 - 2 PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY

4.2 Proposed Housing Plan/Space Allocation – With OPTIONS

Joseph Chow & Associates, Inc. 4.0 - 3 PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY

4.3 Proposed Housing Plan/Space Allocation – Without OPTIONS

Joseph Chow & Associates, Inc. 4.0 - 4 PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY

Base Scope of Work - Square footage of the Existing Project Area vs. New Program Area

(Approximate). Square footage includes associated circulation spaces. Note: Existing project area calculated includes area occupied by new project area only. The proposed square footage includes only areas of construction. Tenant areas within Roybal, but not part of this PDS are not included in the existing area nor the proposed areas.

Tenant Existing Tenant Proposed

Temple Level

Library 1,076 - -

Data Closet 101

Press Room 683

USDC Space 143

Terrace Level

USDC 9,450 USDC 5,705

USBC 6,604

Sixth Floor

USDC 5,528 USDC 2,269

Seventh Floor

USDC 2,140 USDC 2,096

Eighth Floor

USDC 4,263 USDC 4,287

Ninth Floor

USBC 23,652 USBC 24,496

Tenth Floor

USBC 21,155 USBC 21,737

Computer Server Room: 843 Computer Server Room: 843

Note: The Computer Server Room is a shared space.

Joseph Chow & Associates, Inc. 4.0 - 5 PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY

Eleventh Floor

USDC 3,654 USDC 8,578

Pretrial 2,862

Twelfth Floor

USBC 7,943 USDC 9,445

Thirteenth Floor

USBC 3,358 USDC 3,964

Fourteenth Floor

USBC 1,737 USDC 1,929 (Shell Space)

USBC 10,160 PreTrial 14,018

Total approximate square footage:

Existing 97,821 Proposed 106,898

OPTIONS

Tenant Existing Tenant Proposed

OPTION A

USDC 3,581 Circuit Library 3,581

OPTION B

USDC 868 USDC 868

OPTION C

Seventh Floor

USDC 791 USDC 791

Joseph Chow & Associates, Inc. 4.0 - 6 PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY

OPTION D

Eighth Floor

USDC 1,222 USDC 1,222

OPTION E

Fourteenth Floor

USBC 1,983 USDC 1,983

OPTION F

Fifteenth Floor

USBC 1,653 USBC 1,653

OPTION G

Fifteenth Floor

USBC 1,642 USBC 1,642

OPTION H

Sixteenth Floor

USBC 1,653 USBC 1,653

OPTION I

Sixteenth Floor

USBC 1,642 USBC 1,642

Total approximate square footage of OPTIONS:

Existing 15,035 Proposed 15,035

The options are not listed in any particular order. Options do not have to be awarded sequentially. GSA can choose any option in any order.

4.4 Life Safety

The building construction is Type I-A construction and considered a high-rise building.

Joseph Chow & Associates, Inc. 4.0 - 7 PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY

The building is protected throughout with an automatic sprinkler system designed and installed in accordance with NFPA 13. Class III standpipe hose systems (1-1/2” and 2-1/2” hose outlet connections) are provided throughout the building.

A fire alarm system is present throughout the building.

The high-rise tower is provided with three (3) exit stair enclosures. Two of the three enclosures transfer on

Level 8. One of the three exit stair enclosures discharges on Level 0 (i.e., Basement) while the other two enclosures discharge on Level 1.

The building has a stairwell pressurization system and floor smoke exhaust system, which was designed in accordance with the 1991 Uniform Building Code (UBC) applicable at the time of construction. It has been deemed by GSA to be code compliant.

This Tenant Improvement project shall comply with all life safety code requirements per all applicable codes and standards.

The overall life safety requirements shall meet the requirements in IBC while the technical egress requirements will comply with NFPA 101.

Fire safety during construction will comply with the requirements in the IBC, IFC and 2013 NFPA 241 –

Standard for Safeguarding Construction, Alteration, and Demolition Operations.

One-hour fire-rated corridors are not required since the building is protected throughout by an automatic sprinkler system as permitted by the GSA P100 Version 1.

Exit enclosures shall be equipped with exit stairway identification signage meeting the requirements in NFPA

101 and made of a material having a luminescent background.

The interior finish requirements for walls, ceilings, floors, draperies, curtains, and movable partitions will meet the requirements in the IBC.

Adhesives and other materials used for the installation of carpets will be limited to those having a flash point of 140° F or higher.

Joseph Chow & Associates, Inc. 4.0 - 8 PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY

4.5 Fire Protection

The automatic sprinkler system modifications shall be prepared and installed by a contractor holding a valid

C-16 California State contractor’s license. The Design/Build Contractor’s Engineer of Record (EOR) shall provide the services of a Registered Fire protection Engineer (DB FPE) through design and construction.

This EOR shall prepare working drawings, hydraulic calculations, specifications, and submittal booklet for plan review and approval.

Analyze and provide criteria for the following:

Building Construction

Occupancy Classification

Means of Egress

Fire Alarm System

Fire Extinguishing System

Calculations for the following:

Egress

Water Supply

Smoke Control

Audibility of the Fire Alarm System

Design of all fire protection and life safety systems including but not limited to:

Modified Fire Alarm System to accommodate the new construction.

Any new fire sprinkler heads shall integrate with the building system. All work to the existing fire sprinkler system shall comply with current code regulations.

The Fire Protection Drawings shall be submitted to GSA Fire Protection Division for review and approval prior to starting any fire protection installation work. The GSA Fire Protection Engineer will have 21 calendar days to review the drawings and reject or approve the submittal. If the GSA Fire Protection

Engineer rejects a portion (or all) of the submitted drawings, the rejected drawings shall be resubmitted for approval within 10 calendar days.

Joseph Chow & Associates, Inc. 4.0 - 9 PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY

4.6 Plumbing

The new program is of the same type as the existing construction, i.e. courts and offices. No major new plumbing requirements are anticipated other than the plumbing for new break rooms.

Any new 24 hour DX cooling systems will require condensate drains.

The Design Build contractual documents shall conform to the all applicable GSA Criteria, Building Codes, federal regulations and requirements as outlined in this Program Development Study.

Provide working space around all equipment. Working space shall meet OSHA requirements. Working space shall allow space to perform maintenance functions as well as pull all pumps, heat transfer surfaces, valves, valve operators, controls, wiring, conduit, motors, etc. Provide concrete pads under all equipment. Provide all required fittings, connections and accessories required for a complete and usable system. All equipment shall be installed per the manufacturer’s recommendations.

The intent of the plumbing system design for this project is to provide a system that meets all applicable codes and standards for federal buildings. Design and installation shall be in accordance with the latest IPC, IMC, NFPA Standards, and GSA design publications. Where the word "should" is used in the manufacturer’s recommendations, substitute the word "shall".

For domestic hot water generation utilize existing building systems. Provide balancing valves at the connections of the recirculation piping to the domestic hot water piping. Reset (1) of (2) DHW pressure zone loop temperature setpoints from the current 140° F to 105° F, or as otherwise required by the IPC based upon the most critical fixture served.

All plumbing calculations shall be submitted for approval with all design submissions.

Include the domestic hot water system in the list of systems to be commissioned.

4.7 Heating, Ventilation, and Air Conditioning

The new program is of the same type as the existing construction, i.e. courts and offices. The design of the mechanical systems will be in accordance with the U.S. Courts Design Guide 2007.

Joseph Chow & Associates, Inc. 4.0 - 10 PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY

Use U.S. Courts Design Guide 2007 for repurposing of existing courtrooms for general office spaces. Each enclosed room will be provided with separate supply and return.

HVAC Systems for the new spaces shall be designed with variable air volume (VAV) and variable air volume with reheat (VAVR) systems to provide off-hours flexibility, individual room temperature control, and humidity control. All new VAV and VAVR boxes shall comply with the Building’s standards.

All court and court related offices will have individual HVAC controls monitored from existing Building

Management System BMS. All new controls will be compatible with existing controls (ex. VAV with DDC controls – by Siemens Apogee compatible).

The new areas HVAC systems serving repurposed rooms shall be designed to ensure that Maximum

Mechanical Noise (RC/NC) levels are not exceeded for each room function, in accordance with U.S. Courts

Design Guide 2007. For example, the RC/NC level for Private offices, normal speech privacy, low voice level is 35 and the RC/NC level for Meeting rooms, Training Facilities is 25.

The HVAC system shall provide proper air flow in all areas including all areas offices and spaces with demountable partitions.

HVAC calculations shall include ASHRAE 90.1 analyses. Calculations shall include industry standard safety factors.

4.8 Electrical

The new program is of the same type as the existing construction, i.e. courts and offices. In all areas that require demolition, outlets and wiring will be removed in demolished walls, while maintaining power to unaffected areas. In areas with minimal remodeling, an attempt will be made to keep as many outlets in remaining walls as possible. New receptacles in existing walls shall be added as required to support the intended use of the space. New areas will have receptacles and connection to equipment installed based on

GSA guidelines. IT equipment will have isolated ground (IG) type receptacles and an additional isolated ground conductor. Receptacles will connect to existing 120/208V panelboards.

Where ceilings are being removed, light fixtures and associated controls and wiring will be removed. Light fixtures will be kept as much as possible in areas where ceilings are retained. New areas will have new light fixtures installed in order to produce light levels in accordance with IES recommendations. Light fixtures

Joseph Chow & Associates, Inc. 4.0 - 11 PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY will connect to existing 277/480V panelboards. New lighting controls will be installed to reduce energy usage when spaces are not occupied and to take advantage of daylight when available. All new light fixtures shall comply with the latest building specifications.

Demolished materials will be recycled in a responsible manner, with hazardous materials (such as fluorescent lamps) properly disposed of.

There is emergency power available in the building from a generator only used for life safety related loads such as egress lighting. Backup power is required for IT related equipment, it shall be on a “standby” system which requires a separate distribution system and additional transfer switch(es). The existing generator has capacity available for these additional loads.

All court and court related offices will have individual HVAC controls monitored from existing Building

Management System BMS. All new controls will be compatible with existing controls (ex. VAV with DDC controls – by Siemens Apogee compatible Johnson Controls).

Refer to GSA P100 for additional guidelines.

4.9 Telecommunications

New telecom closets will be constructed per PDS requirements. The Courts' Telecom Vendor will provide all cabling from the Termination Room to the Point of Connection (POC) in renovated space on each floor. The reconfiguration of existing data is required for the new layouts. The Design/Build Contractor will provide telecommunication closets and infrastructure for all new spaces and where the existing infrastructure is not capable of supporting the new design, per the requirements in Section 8.0 of this document. The

Design/Build Contractor shall work with the Courts to design the room to accommodate the infrastructure, and telecommunication equipment; this includes, but is not limited to ventilation, backer boards to support equipment, etc.

Note: The Courts will upgrade all of their existing cabling. The Courts will be responsible for providing the design and specifications. When this work is executed the Design/Build Contractor shall be responsible for providing the entire infrastructure to support the new cabling system, which will be addressed as a modification to this contract.

Joseph Chow & Associates, Inc. 4.0 - 12 PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY

4.10 Security

The U.S. Marshal Service (USMS) is responsible for providing the location, type of equipment, and specifications of all security related equipment and infrastructure. Security requirements mentioned in this

PDS reflect locations where the specified security is required (i.e. cameras, duress alarms, motion sensors, etc.). All final locations and equipment requirements shall be verified and approved by the USMS. The

Design/Build Contractor shall be responsible for providing all infrastructure including conduit and power to support the new security system. The Design/Build Contractor shall submit shop drawings showing all infrastructure routing, points of connections, etc. for review and approval by the USMS prior to starting any work.

Refer to Appendix A for additional USMS security requirements.

4.11 Environmental Remediation

Previous environmental reports did not discover any hazardous materials. If hazardous materials are found during construction, the Design/Build Contractor shall cease all work in the area and inform the

Government’s representative and request direction.

4.12 Accessibility

Architectural Barriers Act Accessibility Standard (ABAAS) shall be implemented in the areas of renovation only unless otherwise indicated in this document.

For new construction provide a barrier-free design in accordance with the requirements of ABAAS as well as the U.S. Court Design Guide 2007.

4.13 Warranties, Systems Maintenance, and Commissioning

If highly sophisticated systems are specified in the course of design, it may be necessary to obtain special contracts for the maintenance of those systems. GSA typically contracts with outside firms for routine systems maintenance. It will be an operational management issue to determine the structure of maintenance systems contracts for the facility and will depend on the final design. No matter how the maintenance system contracts are structured, the Design/Build Contractor shall provide architectural and engineering specifications which demand industry-standard warranties for all products and systems selected.

Extended warranties are required whenever the installed equipment will be used before substantial completion is achieved.

Joseph Chow & Associates, Inc. 4.0 - 13 PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICE USE ONLY

Data and Operations Manual

An operations manual shall be prepared and 40 hours of training provided for the building Operations and

Maintenance personnel describing the design objectives and how to operate the building. The training sessions shall be conducted in 3 separate sessions, minimum. The operations manual shall include: as-built drawings, equipment data, model numbers for the equipment, parts lists, equipment options, operating manuals for each piece of equipment, testing and balancing reports and certifications, maintenance schedules, videos, warranty schedules, vendor names, and contacts that include phone numbers and addresses. The

Operations and Maintenance manuals shall be complete, approved and issued to GSA at least one month before commissioning of the building.

Building Commissioning

In order to ensure that all systems are functioning…

This is the start of the file's text. The full file is on GovTribe.