Roybal_DB_RFP_Amendment_04.pdf
PDF 25 KB Posted
- Solicitation number
- GS-09P-15-KT-C-0014
About this file
Amendment No. 04
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
See page 2.
GSA, PBS, DESIGN AND CONSTRUCTION DIV.
50 UNITED NATIONS PLAZA, 1ST FL.
SAN FRANCISCO, CA 94102
GS-09P-15-KT-C-0014
1 3
10/07/2015
Edward R. Roybal Federal Building and United States Courthouse Prospectus Tenant Improvement Design Build Project, Solicitation No. GS09P15KTC0014, Amendment No. 04
This Amendment No. 04 includes the following documents and information:
1. This solicitation is still being conducted subject to the availability of funds. This project has not been authorized by Congress at this time, and the GSA does not know when or if this project will be authorized. An award will not be made as a result of this solicitation if the project is not authorized.
2. Revised Scope of Work and Room Requirements for the USDC 6th Floor Grand Jury
Hearing Room, 7th Floor Jury Assembly, 8th Floor Grand Jury Hearing Rooms; 9th Floor, 10th Floor, 14th Floor, 15th Floor and 16th Floor USBC spaces.
3. Options A thru J have been deleted. However, Option A scope has been incorporated into the project base scope and henceforth referred to as Circuit Library. Option J scope has also been incorporated into the project base scope and henceforth referred to as Appendix C Swing Space/Moves. Both Circuit Library and Appendix C Swing Space/Moves require base bid line item schedule fully burdened stand alone costs since these will be tenant funded.
4. Updated A003, A004, A005, A006, A007, A012, A013, A203, A204, A205, A206, A207, A211, A212, A213, A403, A404, A405, A406, A407, A411, A412 and A413 Delta-1 drawings dated 8/31/15. Sensitive But Unclassified Building (SBU) Information to be sent to the short-listed firms on a CD.
5. To insure bidder project scope understanding and pricing, submit a brief 1-page (no more than front and back letter size sheet) narrative describing the contents for each line item on the lump sum base bid schedule. The narrative should reflect the basis of estimate for allocated costs of each line item including but not limited to key activities, cost drivers, related assumptions or constraints. This is due on Monday, October 19, 2015 at 12pm PT by email ONLY to krista.miller@gsa.gov.
6. The due date for requests for clarification or interpretation for this RFP has been extended to Monday, October 19, 2015 at 12pm PT by email ONLY to krista.miller@gsa.gov.
7. Revised bid sheet with new formula for calculating the total evaluated price.
8. A final proposal revision is due on Friday, November 6, 2015 at 12pm PT to Ms. Miller at
50 United Nations Plaza, San Francisco, CA 94102. If your firm intends to hand-deliver your final proposal revision, please be advised that due to security protocol, individuals delivering a proposal will not be permitted to enter the building beyond the lobby. Please contact Ms. Miller at 415-522-4157 upon arrival at the building for receipt of your proposal in the lobby. Offer due date and time requirements will be enforced the same regardless of delivery type, and offerors using hand delivery of proposals are cautioned to allow ample time to deliver the proposal once arriving at the building. You are responsible for allowing sufficient time for delivery by the due date and time.
Final proposal revisions must adhere to the following requirements:
1. Submission of one original technical proposal, and eight additional copies
2. All other requirements for content and format previously stated in the solicitation and prior amendment as were required for the initial proposal requirement, except it is not necessary to re-submit GSA Form 527 or the bid guarantee.
3. Final proposal revisions shall consist of complete, full proposals for both technical and price components. Submission of partial proposals containing only supplemental or new information is not sufficient, and will not be accepted.
4. All changed, deleted or additional information must be highlighted, clouded, or in some way clearly visually indicated for ease of Government review.
| Page 1 |
| a4 |
File details come from the government source that posted it. Updated .