Roybal_DB_RFP_Amendment_06.pdf

PDF 291 KB Posted

Attached to
Edward R. Roybal Repair and Alteration Tenant Improvement Prospectus Project
Solicitation number
GS-09P-15-KT-C-0014
Issued by

About this file

Amendment 06

View the file

Other files

File Type Posted
Roybal_DB_RFP_Amendment_05.pdf PDF
Roybal_DB_RFP_Amendment_04.pdf PDF
Roybal_DB_RFP_Amendment_04_14th_Fl_Room_Reqs.pdf PDF
Roybal_DB_RFP_Amendment_04_6th_FL_room_reqs.pdf PDF
Roybal_DB_RFP_Amendment_04_revised_bid_sheet.pdf PDF
Roybal_DB_RFP_Amendment_04_9th_Fl_Room_Reqs.pdf PDF
Roybal_DB_RFP_Amendment_04_scope_reductions.pdf PDF
Roybal_DB_RFP_Amendment_04_16th_Fl_Room_Reqs.pdf PDF
Roybal_DB_RFP_Amendment_04_8th_Fl_Room_Reqs.pdf PDF
Roybal_DB_RFP_Amendment_04_15th_Fl_Room_Reqs.pdf PDF
Roybal_DB_RFP_Amendment_04_10th_Fl_Room_Reqs.pdf PDF
Roybal_DB_RFP_Amendment_04_7th_Fl_Room_Reqs.pdf PDF
Roybal_DB_RFP_Certificate_of_Current_Cost_or_Pricing_Data_(1).pdf PDF
Roybal_DB_RFP_Amendment_03_SF30.pdf PDF
Roybal_DB_bid_sheet_Amendment_03.pdf PDF
Roybal_DB_RFP_PPQ_Amendment_02.docx DOCX document
Roybal_DB_bid_sheet_Amendment_02.pdf PDF
Roybal_DB_RFP_Offeror_Representations_and_Certifications.doc DOC document
Roybal_DB_RFP_Amendment_02_SF30.pdf PDF
Roybal_DB_RFP_Amendment_01.pdf PDF
08_Roybal_room_requirements_Pg_117-138.pdf PDF
Roybal_Pre_proposal_Conference_Final_05_28_2015_(1).pdf PDF
Appendix_C_Roybal_Swing_Space_Requirements_and_Move_Matrix_04_06_2015.pdf PDF
Roybal_Fed_Bldg_BER_Final_Submittal.pdf PDF
Roybal_Fed_Bldg_BER_Final_Submittal_Appendices.pdf PDF
AmendmenttoAppendixCSwingSpaceandMovesSOWFinal.doc.pdf PDF
Roybal_DB_RFP_preproposal_attendees.pdf PDF
Volume_3_-_References.pdf PDF
Past_Performance_Questionnaire.docx DOCX document
Volume_2B_Roybal_PDS_and_Appendix.pdf PDF
VOLUME_2A_SCOPE_OF_WORK.pdf PDF
Roybal_DB_1442.pdf PDF
Roybal_DB_RFP_Agreement.pdf PDF
Roybal_DB_Division_1.pdf PDF
Roybal_DB_Solicitation.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Edward R. Roybal Federal Building and United States Courthouse Prospectus Tenant Improvement Design Build Project, Solicitation No. GS09P15KTC0014, Amendment No. 06

This Amendment No. 06 includes the following information:

1. The DB Contractor is responsible for "speed packing" and moving the belongings of the USBC existing tenants from 300 NLA to their permanent locations at Roybal as well as the swing space moves listed under #13 of Amendment #5 and shown on the Move Table issued under Amendment #1. However, the DB Contractor is not responsible for moving existing USBC workstation furniture from 300 NLA to Roybal permanent workstations.

2. For Section V of the final proposal revision, Technical Evaluation Factor 4: Small Business Subcontracting Plan, the submitted draft plan must address and include all information as required by FAR 19.704, except that the draft plan need not address use of ANCs or Indian tribes. The draft plan does need to address veteran-owned small businesses (in addition to addressing service-disabled veteran-owned small businesses).

3. The due date for final proposal revisions has been extended to Tuesday, November 24, 2015 at 12pm PT, and is only open to firms which bid previously and are in the competitive range.

4. This project is being solicited subject to the availability of funds. Congress has not yet authorized funding for this project.

SF 30
Roybal DB RFP Amendment 06 (1)

File details come from the government source that posted it. Updated .