Roybal_DB_Solicitation.pdf

PDF 389 KB Posted

Attached to
Edward R. Roybal Repair and Alteration Tenant Improvement Prospectus Project
Solicitation number
GS-09P-15-KT-C-0014
Issued by

View the file

Other files

File Type Posted
Roybal_DB_RFP_Amendment_06.pdf PDF
Roybal_DB_RFP_Amendment_05.pdf PDF
Roybal_DB_RFP_Amendment_04.pdf PDF
Roybal_DB_RFP_Amendment_04_14th_Fl_Room_Reqs.pdf PDF
Roybal_DB_RFP_Amendment_04_6th_FL_room_reqs.pdf PDF
Roybal_DB_RFP_Amendment_04_revised_bid_sheet.pdf PDF
Roybal_DB_RFP_Amendment_04_9th_Fl_Room_Reqs.pdf PDF
Roybal_DB_RFP_Amendment_04_scope_reductions.pdf PDF
Roybal_DB_RFP_Amendment_04_16th_Fl_Room_Reqs.pdf PDF
Roybal_DB_RFP_Amendment_04_8th_Fl_Room_Reqs.pdf PDF
Roybal_DB_RFP_Amendment_04_15th_Fl_Room_Reqs.pdf PDF
Roybal_DB_RFP_Amendment_04_10th_Fl_Room_Reqs.pdf PDF
Roybal_DB_RFP_Amendment_04_7th_Fl_Room_Reqs.pdf PDF
Roybal_DB_RFP_Certificate_of_Current_Cost_or_Pricing_Data_(1).pdf PDF
Roybal_DB_RFP_Amendment_03_SF30.pdf PDF
Roybal_DB_bid_sheet_Amendment_03.pdf PDF
Roybal_DB_RFP_PPQ_Amendment_02.docx DOCX document
Roybal_DB_bid_sheet_Amendment_02.pdf PDF
Roybal_DB_RFP_Offeror_Representations_and_Certifications.doc DOC document
Roybal_DB_RFP_Amendment_02_SF30.pdf PDF
Roybal_DB_RFP_Amendment_01.pdf PDF
08_Roybal_room_requirements_Pg_117-138.pdf PDF
Roybal_Pre_proposal_Conference_Final_05_28_2015_(1).pdf PDF
Appendix_C_Roybal_Swing_Space_Requirements_and_Move_Matrix_04_06_2015.pdf PDF
Roybal_Fed_Bldg_BER_Final_Submittal.pdf PDF
Roybal_Fed_Bldg_BER_Final_Submittal_Appendices.pdf PDF
AmendmenttoAppendixCSwingSpaceandMovesSOWFinal.doc.pdf PDF
Roybal_DB_RFP_preproposal_attendees.pdf PDF
Volume_3_-_References.pdf PDF
Past_Performance_Questionnaire.docx DOCX document
Volume_2B_Roybal_PDS_and_Appendix.pdf PDF
VOLUME_2A_SCOPE_OF_WORK.pdf PDF
Roybal_DB_1442.pdf PDF
Roybal_DB_RFP_Agreement.pdf PDF
Roybal_DB_Division_1.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GSA Solicitation No. GS-09P-15-KT-C-0014

Document: DB201A / Apr 2015 (The Solicitation) Pages 1 of 26

Design Build Contract for Edward R. Roybal Repair and Alteration Tenant Improvement Prospectus Project The Solicitation

552.219-71 Notice to Offerors of Subcontracting Plan Requirements (MAR 2012)

The General Services Administration (GSA) is committed to assuring that maximum practicable opportunity is provided to small, HUBZone small, small disadvantaged, women-owned, veteran-owned, and service-disabled veteran owned small business concerns to participate in the performance of this contract consistent with its efficient performance. GSA expects any subcontracting plan submitted pursuant to FAR 52.219-9, Small Business Subcontracting Plan, to reflect this commitment. Consequently, an offeror, other than a small business concern, before being awarded a contract exceeding $650,000 ($1,500,000 for construction), must demonstrate that its subcontracting plan represents a creative and innovative program for involving small, HUBZone small, small disadvantaged, women-owned, veteran-owned, and service-disabled veteran owned small business concerns as subcontractors in the performance of this contract.

Table of Contents

I. General Information A. The Solicitation and Contract B. List of Solicitation Documents C. Authorized Representatives D. Pre-Proposal Conference E. Estimated Price Range F. FAR 52.228-1 Bid Guarantee

G. FAR 52.236-27 Site Visit - Construction H. Receipt of Offers

II. Proposals A. Proposal Contents B. Proposal Format

C. Price Proposal D. Technical Proposal E. Other Information to Submit with Proposal F. Contractor Team Arrangements

III. Solicitation Provisions

A. Availability of Funds B. Requests for Clarification or Interpretation C. Notice to Small Business Firms D. Information Concerning the Disclosure of Solicitation Results E. Affirmative Procurement Program F. Notice Concerning Preparation of Proposals G. Bond Requirements H. Contractor Performance Information I. Safeguarding Documents Designated as Sensitive But Unclassified

IV. FAR/GSAR Solicitation Provisions

(The Solicitation) Pages 2 of 26

A. FAR 52.215-1 Instructions to Offerors—Competitive Acquisition B. FAR 52.216-1 Type of Contract C. FAR 52.222-5 Construction Wage Rate Requirements—Secondary Site of the

Work D. FAR 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal

Employment Opportunity for Construction E. FAR 52.233-2 Service of Protest F. Buy American G. Buy American Exceptions H. Small Business Subcontracting Plan I. Project Labor Agreements J. GSAR 552.252-5 Authorized Deviations in Provisions K. FAR 52.252-1 Solicitation Provisions Incorporated by Reference

V. Additional Solicitation Provisions and Instructions

A. FAR 52.211-1 Availability of Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-

B. FAR 52.211-3 Availability of Specifications Not Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions

C. Additional Solicitation Provisions

VI. Method of Award A. Evaluation of Offers B. Determination of Responsibility C. Price Evaluation D. Unbalanced Prices E. Total Evaluated Price

(The Solicitation) Pages 3 of 26

I. General Information

I.A. The Solicitation and Contract

(1) This Solicitation sets forth requirements for proposals for a Contract to design and construct the Project described in the Solicitation Documents. Proposals conforming to the Solicitation requirements will be evaluated in accordance with the Method of Award set forth herein. The Government will award the Contract to the selected Offeror, subject to the conditions set forth herein.

(2) Neither the Solicitation nor any part of an Offeror's proposal shall be part of the Contract except to the extent expressly incorporated therein by the Contracting Officer.

(3). The Offeror's proposal submitted in response to this Solicitation shall constitute a firm offer. No contract shall be formed unless and until the Contracting Officer has countersigned the SF 1442 submitted by an Offeror, and delivered to the Contractor a copy of the SF 1442 with original signatures together with the Agreement reflecting the Offeror's proposed prices.

I.B. List of Solicitation Documents

The Solicitation Documents are comprised of:

(1) The Solicitation including Standard Form (SF) 1442 – Solicitation Offer and Award Division 1, Past Performance Questionnaire

(2) Vol 1: The Agreement and Division 01

(3) Vol 2A Scope of Work

(4) VOL 2B Program Development Study and Appendices

(5) Additional drawings not included herein which contain Sensitive But Unclassified Business information. Such documents may be obtained by sending an email request to Contract Specialist, Krista Miller at krista.miller@gsa.gov. Please include business name, DUNS number and proof of current registration in the System for Award Management in the request.

I.C. Authorized Representatives

The following individuals are designated as the authorized GSA representatives under this Solicitation:

(1) Contracting Officer

Name: Greg McSweeney Address: 50 United Nations Plaza, San Francisco, CA 94102, 1st floor

Telephone: 415-522-3121 Email: greg.mcsweeney@gsa.gov

(2) Alternate Point of Contact

Name: Krista Miller, Contract Specialist Address: 50 United Nations Plaza, Room 1256

Telephone: 415-522-4157 Email: krista.miller@gsa.gov mailto:krista.miller@gsa.gov

(The Solicitation) Pages 4 of 26

I.D. Pre-Proposal Conference

A pre-proposal conference regarding this Solicitation is scheduled as follows:

Date: Thursday, May 28, 2015 Time: 10am-11am

Location: Edward R. Roybal Federal Building and Courthouse, 255 East Temple St., Los Angeles, CA 90012, room to be announced. All attendees will need to come through the security checkpoint at the building entrance. Please allow ample time for this process.

To request a reasonable accommodation due to a disability, contact the Contract Specialist.

I.E. Estimated Price Range or Budget Amount

The Design/Build budget amount is $15 to 18 million.

I.F. FAR 52.228-1 Bid Guarantee (SEP 96)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

I.G. FAR 52.236-27 Site Visit - Construction (FEB 95)

(1) The clauses at FAR 52.236-2, Differing Site Conditions, and FAR 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, Offerors are urged and expected to inspect the site where the work will be performed.

(2) Pre-registration is required for all attendees to the pre-proposal Site Visit. Those offerors seeking to attend the Site Visit must email the Contract Specialist at krista.miller@gsa.gov by http://www.acquisition.gov/far/current/html/52_233_240.html#wp1113365 http://www.acquisition.gov/far/current/html/52_233_240.html#wp1113375 mailto:krista.miller@gsa.gov

(The Solicitation) Pages 5 of 26

May 25, 2015 at 3pm PT with the names and titles of individuals who will attend. The Site Visit shall be limited to not more than two (2) representatives from each Offeror. Participants must have a valid, Government issued picture identification, driver’s license preferred, to gain access for the pre-proposal Site Visit. Notification of the location of entry, where attendees are required to meet, and all other requirements for the Site Visit will be issued to the Offerors.

(2) Site visits will be held at the following dates and times:

Date: May 28, 2015, Edward R. Roybal Federal Building and Courthouse, 255 East Temple St., Los Angeles, CA 90012.

Time: 11am – 12pm

If necessary to accommodate all attendees, a second Site Visit will be scheduled for:

Date: May 28, 2015, Edward R. Roybal Federal Building and Courthouse, 255 East Temple St., Los Angeles, CA 90012.

Time: 12pm – 1pm

The Site Visit(s) on May 28, 2015 are intended primarily for potential prime construction and/or Architect/Engineer offerors to attend. Additional Site Visits for potential subcontractors, or any other interested prime contractors will be scheduled on later dates. Upon submission of a request to attend a Site Visit to the Contract Specialist, attendees will receive confirmation of their scheduled attendance at either the 11am or 12pm Site Visit. All attendees will need to come through the security checkpoint at the building entrance. Please allow ample time for this process.

I.H. Receipt of Offers

(1) In order to be considered for award, offers conforming to the requirements of the Solicitation must be received at the following office no later than 12:00 pm local time on the following date and at the following address:

Date: July 14, 2015 Address: Krista Miller, Contract Specialist

50 United Nations Plaza, Room 1256, San Francisco, CA 94102, CA 415-522-4157

(2) Offers sent by commercial package delivery and hand delivery shall be deemed received as of the date and time of delivery to the office designated for receipt of offers.

(3) Offers sent by United States Mail shall be deemed timely if delivered to the address of the office designated for receipt of offers on or before the date established for receipt of offers.

(4) Proposals hand delivered by either the offeror or a hired local courier will not be permitted to be hand delivered to Room 1256. For hand delivery, please call Contract Specialist, Ms. Krista Miller once in the building lobby. Offer due date and time requirements will be enforced the same regardless of delivery type, and offerors using hand delivery of proposals are cautioned to allow ample time to deliver the proposal once arriving at the building.

II. Proposals

II.A. Proposal Contents

Proposals shall consist of the following documents, completed and executed in accordance with this Solicitation:

(The Solicitation) Pages 6 of 26

(1) Price Proposal

(2) Technical Proposal

(3) Representations and Certifications (C301)

(4) Bid Guarantee, using Standard Form 24

(5) GSA Form 527 – Contractor’s Qualifications and Financial Information

II.B. Proposal Format Utilizing the format prescribed below, Offerors are to provide the requested technical proposal information in a brief and succinct manner making every effort to present information clearly and concisely. All information shall be submitted in English. Proposals that do not follow these Instructions, or otherwise include documentation that is difficult to read, may result in a lower evaluation rating or ultimately be found unresponsive, resulting in disqualification.

Proposals shall be submitted in the following format. Pages shall be 8.5x11 inch white paper, with lettered/numbered dividers for each section as directed below. Proposal text shall be in a standard font a minimum of ten (10) points or a maximum of twelve (12) points in height, single-spaced. Proposal submissions must include one (1) original and six (6) copies. The external cover of each proposal (original and copies) shall clearly identify the Offeror’s name, clearly be labeled “Proposal for Solicitation: GS-09P-15-KT-C-0014” and clearly state the time and date for the receipt of proposals. Each copy shall be identified on its cover as “Copy of 6 Copies.”

Additionally one (1) electronic copy shall be submitted via compact disc (CD).

All signatures on all documents, originals and copies, must be original signatures in ink and in a color other than black.

RFP proposals shall be submitted using the following organizational structure:

Section I – Cover Letter: Provide a letter consisting of no more than two (2) pages on letterhead identifying a single point of contact, address, phone and fax numbers, and e- mail address (if any) where the GSA inquiries or notices should be directed.

Section II – Technical Evaluation Factor 1: Past Experience on Similar Projects Section III – Technical Evaluation Factor 2: Past Performance Section IV – Technical Evaluation Factor 3: Key Personnel Section V – Technical Evaluation Factor 4: Small Business Subcontracting Plan

II.C. Price Proposal

(1) Contents

The Price Proposal shall consist of the SF 1442 and the Agreement, with prices and/or rates indicated for each price element shown on the pricing form included in Section II of the Agreement. Indicate the Base Contract Price, or if no such distinction is made, the Contract Price, in Block 17 of the SF 1442, which must be fully executed by the Offeror. Offerors shall also submit a Certificate of Current Cost and Pricing.

(2) Qualifications, Exclusions and Conditions

If the Offeror communicates in its proposal any qualifications, exclusions, or conditions to the proposed prices not provided for in the Contract Documents, the Contracting Officer may reject the proposal and exclude the Offeror from further discussions.

(The Solicitation) Pages 7 of 26

II.D. Technical Proposal

The Technical Proposal shall include the information requested below for the non-price factors described in Section VI.

(1) Past Experience on Similar Projects

Submittal Requirements: Proposals must include information on a total of six (6) past Similar Projects. Three (3) of the projects must have been ones in which the construction contractor performed, and three (3) of the projects must have been ones on which the A/E performed.

Each project’s information must be contained on no more than two sides of an 8.5 x 11 inch sheet of paper, and must include a description of the construction project scope, the final contract value, identification of contract type (design, design-build, build, etc), pricing terms (firm-fixed price, time and materials, etc.), dates of contract award and substantial completion, identification of owner and contact information, summary or lists of work tasks performed by the Offeror, and challenges and how the Offeror addressed them.

(2) Past Performance

Submittal Requirements: The Offeror must submit at least three (3) but no more than five (5) Past Performance Questionnaires (PPQ), provided herein, completed by the applicable client, for each project included in its proposal for this Factor, for both the proposed construction contractor and the proposed A/E. In other words, a total of 6 to 10 completed PPQs must be submitted. The PPQs submitted for this factor are not required to be in reference to the projects which were submitted for Factor 1. Completed PPQs should be submitted with the proposal.

Ensure correct phone numbers and email addresses are provided for the client point of contract.

Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, the client may submit a questionnaire directly to the Government’s point of contact via email prior to proposal closing date and time. Offerors may resubmit questionnaires completed in this same PPQ format, previously submitted with other proposals or may obtain an updated/new PPQ from a client for any submission. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs.

Also include performance recognition documents received within the last 10 years, such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition.

(3) Key Personnel

1. Provide a resume for each person listed below, not to exceed in length two sides of an 8.5 x 11 inch sheet of paper for each of the personnel listed here. Include level of education, special training and highlight previous work experience relevant to this project. For each proposed key person, identify his or her proposed duties on the project. Identify the person as a part-time or full-time employee; whether that person is an individual consultant or firm employee; and the firm that employs this key person (i.e. subcontractor).

Resumes for each KEY PERSONNEL position on the proposed Project Team as identified below:

Construction Firm shall include:

Principal-In-Charge

(The Solicitation) Pages 8 of 26

Project Manager Construction Superintendent Design Coordinator Move Coordinator

A/E Design Firm shall include:

Principal-in-Charge A-E Project Manager Project Architect/Designer Lead Mechanical Engineer Lead Electrical Engineer Lead Civil/Structural Engineer

(4) Small Business Subcontracting Plan

Submittal requirements:

1. Provide a “Draft” Small Business Subcontracting Plan reflecting the GSA percentage goals as required by the GSA. They are as follows:

Total Subcontracted to Small Business 29% Small Disadvantaged Business (SDB) 5% Women-owned Small Business 5% HUBZone Small Business 3% Service Disabled Veteran Owned Small Business (SDVOSB) 3%

Draft plans must adhere to the requirements stated in FAR 19.704.

Note that per FAR 52.219-8, Utilization of Small Business Concerns; “The Contractor hereby agrees to carry out this policy in the awarding of subcontracts to the fullest extent consistent with efficient contract performance.”

2. Provide at least one (1), but no more than three (3) past historical examples in which the Offeror was able to meet the small business subcontracting goals for that or those past projects.

3. Documents submitted for this factor for items 1 and 2 may not exceed a combined total of 25 sides of 8.5 x 11 inch sheets of paper.

II.E. Other Information to Submit with Proposal

(1) Representations and Certifications

Offerors submitting a proposal in response to this Solicitation shall complete electronic Annual Representations and Certifications in conjunction with required Entity registration in the System for Award Management accessed via https://www.sam.gov. Offerors shall also submit with their proposal, the Annual Representations and Certifications (FAR 52.204-8), using the attached Offeror’s Representations and Certifications (C301).

(2) Qualifications of Offerors

Offerors submitting a proposal in response to this Solicitation shall submit with their proposal evidence of their financial responsibility and capacity to perform the Contract. Offerors shall submit this information on GSA Form 527 – Contractor’s Qualifications and Financial https://www.sam.gov/

(The Solicitation) Pages 9 of 26

Information. Where applicable, point of contact, including names and telephone numbers, are required for all contracts listed.

II.F. Contractor Team Arrangements

(1) Joint Ventures.

All offers submitted by joint ventures must include a copy of the joint venture agreement which fully discloses the legal identity of each member of the joint venture, the relationship between the members, the form of ownership of each member, and any limitations on liability or authority for each member.

An authorized representative of each member of the joint venture must sign the SF 1442 accompanying an offer regardless of any agency relationship established between the members.

In the case of corporations that are joint venture members, the corporation secretary must certify that the corporation is authorized to participate in the joint venture, either by so certifying in the joint venture agreement, or by submitting a separate certification to the Government. The joint venture must also provide a certificate that identifies a principal representative of the joint venture with full authority to bind the joint venture.

Representations and certifications, financial information, and past performance information must be submitted for each member of the joint venture. If the Offeror is a joint venture, information submitted for a party to the joint venture will only be evaluated to the extent that the terms of the joint venture agreement do not limit such party's performance or financial obligations as a party to the Contract contemplated by this Solicitation.

It should be noted that if an Offeror is responding to the RFP as a Joint Venture that entity must be certified and provide the necessary documentation prior to the proposals due date. Additionally the Joint Venture entity must also be registered in System for Award Management (SAM) by the date proposals are due.

(2) Prime/sub-contractors

Contractor team arrangements consisting of a prime and sub-contractor(s) are also permitted to submit proposals for this project.

III. General Provisions

III.A. Availability of Funds

Issuance of this Solicitation is being done subject to the availability of funds. Funding has not been authorized yet for this project. Award of the Contract shall be subject to the availability of appropriated funds, and the Government shall incur no obligation under this Solicitation in advance of such time as funds are made available to the Contracting Officer for the purpose of Contract award.

III.B. Requests for Clarification or Interpretation

The Government will attempt to answer all requests for clarifications or interpretations of the Solicitation Documents prior to the date set for receipt of offers, but will not warrant that all such requests will be answered prior to proposal due date. All questions are due by June 19, 2015 at 12pm PT by email ONLY to krista.miller@gsa.gov. The Government will issue one or more

(The Solicitation) Pages 10 of 26 amendments which will strive to answer all questions received by this due date. All questions and all answers will be made available publicly on fedbizopps.gov.

Only questions asked and answered by this process will become part of the Request for Proposal (RFP). Any oral questions asked and/or answered at the pre-proposal conference or Site Visit(s) must also be submitted by email by the due date and time for questions. Only answers provided by GSA through a written amendment available to all potential offerors will be considered part of the RFP.

III.C. Notice to Small Business Firms

A program for the purpose of assisting qualified small business concerns in obtaining certain bid, payment, or performance bonds that are otherwise not obtainable is available through the Small Business Administration (SBA) (www.sba.gov). For information concerning SBA's surety bond guarantee assistance, contact your SBA District Office.

III.D. Information Concerning the Disclosure of Solicitation Results

This acquisition is being conducted under the provisions of FAR Part 15 as a negotiated procurement. In accordance with FAR 3.104 and FAR 15.207, after receipt of proposals, no information regarding the identity of those submitting offers, the number of offers received, or the information contained in such offers will made available until after award except as provided by FAR 15.503.

III.E. Affirmative Procurement Program

GSA has implemented an Affirmative Procurement Program (APP) intended to maximize the use of recovered materials, environmentally preferable, and bio-based products. Offerors should familiarize themselves with the requirements for using and reporting on the use of such materials in performance as set forth in the Agreement. Refer to clauses FAR 52.204-4 requiring double sided printing on recycled paper for all reports and FAR 52.223-10 encouraging vendors to practice waste reduction.

III.F. Notice Concerning Preparation of Proposals

Offerors are cautioned to carefully read the entire Solicitation and the Agreement to be included in the Contract contemplated by the Solicitation in order to be fully aware of all requirements and clauses in the contemplated Contract. Verify that all blanks requiring information to be supplied in an Offer have been properly filled out, that all pricing and other numerical data is accurately calculated, and that all copies of the Offer contain the same information.

III.G. Bond Requirements

If a bid guarantee is required to be submitted with your offer, any contract awarded will require a performance bond as specified in the Agreement. Offerors who utilize individual sureties should note the requirement for a certified, audited, financial statement for each person acting as an individual surety under clause FAR 52.228-1 Bid Guarantee and the requirements of clause FAR 52.228-11 Pledge of Assets.

III.H. Contractor Performance Information

(1) Evaluating Contractor Performance: The General Services Administration is using the Contractor Performance Assessment Reporting System (CPARS) module as the secure, (The Solicitation) Pages 11 of 26 confidential, information management tool to facilitate the performance evaluation process.

CPARS enables a comprehensive evaluation by capturing comments from both GSA and the contractor. The website for CPARS is http://www.cpars.gov

Completed CPARS evaluations are sent to the Past Performance Information Retrieval System (PPIRS) which may then be used by Federal acquisition community for use in making source selection decisions. PPIRS assists acquisition officials by serving as the single source for contractor past performance data.

(2) CPARS Registration: Each award requiring an evaluation must be registered in CPARS.

The contractor will receive several automated emails. Within thirty days of award, the contractor will receive an e-mail that contains user account information, as well as the applicable contract and order number(s) assigned. Contractors will be granted one user account to access all evaluations.

(3) Contractor CPARS Training: Contractors may sign up for CPARS training. A schedule of classes will be posted to the CPARS training site (http://www.cpars.gov/allapps/cpcbtdlf.htm) and updated as needed.

(4) Contractor Representative (CR) Role: All evaluations will be sent the Contractor Representative (CR) named on your award. The CR will be able to access CPARS to review and comment on the evaluation. If your CR is not already in the CPARS system, the contracting officer will request the name and email address of the person that will be responsible for the CR role on your award.

Once an evaluation is ready to be released the CR will receive an email alerting them the evaluation is ready for their review and comment. The email will indicate the time frame the CR has to respond to the evaluation; however, the CR may return the evaluation earlier than this date.

GSA shall provide for review at a level above the contracting officer (i.e., contracting director) to consider any disagreement between GSA and the contractor regarding GSA’s evaluation of the contractor. Based on the review, the individual at a level above the contracting officer will issue the ultimate conclusion on the performance evaluation.

Copies of the evaluations, contractor responses, and review comments, if any, will be retained as part of the contract file.

III.I. Safeguarding Documents Designated as Sensitive But Unclassified

Certain information contained in the Solicitation Documents may have been designated as Sensitive but Unclassified (SBU) building information. With respect to such information, Offerors shall agree to the terms for receipt of such information, as set forth in the provision “Administrative Matters” in Section III of the Agreement, as a condition of receipt of such information.

IV. FAR/GSAR Solicitation Provisions

IV.A. FAR 52.215-1 Instructions to Offerors—Competitive Acquisition (JAN 04)

(a) Definitions. As used in this provision— “Discussions” are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer’s discretion, result in the offeror being allowed to revise its proposal.

http://www.cpars.gov/ http://www.cpars.gov/allapps/cpcbtdlf.htm

(The Solicitation) Pages 12 of 26

“In writing,” “writing,” or “written” means any worded or numbered expression that can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.

“Proposal modification” is a change made to a proposal before the solicitation’s closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.

“Proposal revision” is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.

“Time,” if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.

(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).

(c) Submission, modification, revision, and withdrawal of proposals.

(1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and

(ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror. Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs (c)(1)(i) and (c)(1)(ii) of this provision.

(2) The first page of the proposal must show—

(i) The solicitation number;

(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);

(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation; and

(v) Name, title, and signature of person authorized to sign the proposal.

Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.

(3) Submission, modification, revision, and withdrawal of proposals.

(i) Offerors are responsible for submitting proposals, and any modifications or revisions, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.

(ii)(A) Any proposal, modification, or revision received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and—

(1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or

(The Solicitation) Pages 13 of 26

(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government’s control prior to the time set for receipt of offers; or

(3) It is the only proposal received.

(B) However, a late modification of an otherwise successful proposal that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.

(iii) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.

(iv) If an emergency or unanticipated event interrupts normal Government processes so that proposals cannot be received at the office designated for receipt of proposals by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.

(v) Proposals may be withdrawn by written notice received at any time before award. Oral proposals in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile proposals, proposals may be withdrawn via facsimile received at any time before award, subject to the conditions specified in the provision at 52.215-5, Facsimile Proposals. Proposals may be withdrawn in person by an offeror or an authorized representative, if the identity of the person requesting withdrawal is established and the person signs a receipt for the proposal before award.

(4) Unless otherwise specified in the solicitation, the offeror may propose to provide any item or combination of items.

(5) Offerors shall submit proposals in response to this solicitation in English, unless otherwise permitted by the solicitation, and in U.S. dollars, unless the provision at FAR 52.225- 17, Evaluation of Foreign Currency Offers, is included in the solicitation.

(6) Offerors may submit modifications to their proposals at any time before the solicitation closing date and time, and may submit modifications in response to an amendment, or to correct a mistake at any time before award.

(7) Offerors may submit revised proposals only if requested or allowed by the Contracting Officer.

(8) Proposals may be withdrawn at any time before award. Withdrawals are effective upon receipt of notice by the Contracting Officer.

(d) Offer expiration date. Proposals in response to this solicitation will be valid for the number of days specified on the solicitation cover sheet (unless a different period is proposed by the offeror).

(e) Restriction on disclosure and use of data. Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, shall—

(1) Mark the title page with the following legend:

This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed—in whole or in part—for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this offeror as a result of—or in connection with—the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government's right to use information contained in this data if it is obtained from

(The Solicitation) Pages 14 of 26 another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets]; and

(2) Mark each sheet of data it wishes to restrict with the following legend:

Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.

(f) Contract award.

(1) The Government intends to award a contract or contracts resulting from this solicitation to the responsible offeror(s) whose proposal(s) represents the best value after evaluation in accordance with the factors and subfactors in the solicitation.

(2) The Government may reject any or all proposals if such action is in the Government’s interest.

(3) The Government may waive informalities and minor irregularities in proposals received.

(4) The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

(5) The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit cost or prices offered, unless the offeror specifies otherwise in the proposal.

(6) The Government reserves the right to make multiple awards if, after considering the additional administrative costs, it is in the Government’s best interest to do so.

(7) Exchanges with offerors after receipt of a proposal do not constitute a rejection or counteroffer by the Government. (f)(4) The Government intends to evaluate proposals and award a contract after conducting discussions with offerors whose proposals have been determined to be within the competitive range. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals. Therefore, the offeror's initial proposal should contain the offeror's best terms from a price and technical standpoint.

(8) The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.

(9) If a cost realism analysis is performed, cost realism may be considered by the source selection authority in evaluating performance or schedule risk.

(10) A written award or acceptance of proposal mailed or otherwise furnished to the successful offeror within the time specified in the proposal shall result in a binding contract without further action by either party.

(11) If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:

(i) The agency’s evaluation of the significant weak or deficient factors in the debriefed offeror’s offer.

(The Solicitation) Pages 15 of 26

(ii) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.

(iii) The overall ranking of all offerors, when any ranking was developed by the agency during source selection.

(iv) A summary of the rationale for award.

(v) For acquisitions of commercial items, the make and model of the item to be delivered by the successful offeror.

(vi) Reasonable responses to relevant questions posed by the debriefed offeror as to whether source-selection procedures set forth in the solicitation, applicable regulations, and other applicable authorities were followed by the agency.

IV.B. FAR 52.216-1 Type of Contract (APR 84)

The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.

IV.C. FAR 52.222-5 Construction Wage Rate Requirements—Secondary Site of the Work

(MAY 14)

(a) (1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b) (1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror’s request for a wage determination for a secondary site of the work.

IV.D. FAR 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (FEB 1999)

(Applicable to solicitations resulting in construction contracts in excess of $10,000.)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative

Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for Minority Participation for Each Trade

Goals for Female Participation for Each Trade

28.3%

6.9%

(The Solicitation) Pages 16 of 26

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for

Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the--

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the

"covered area" is:

Los Angeles, California

IV.E. FAR 52.233-2 Service of Protest (SEP 06)

(a) Protests, as defined in section 31.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from the Contracting Officer at the address provided in the provision “Receipt of Offers” in Section I (General Information).

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(The Solicitation) Pages 17 of 26

IV. F. Buy American

52.225-11 Buy American-Construction Materials under Trade Agreements.

As prescribed in 25.1102(c), insert the following clause:

Buy American-Construction Materials under Trade Agreements (May 2014)

(a) Definitions. As used in this clause- “Caribbean Basin country construction material” means a construction material that-

(1) Is wholly the growth, product, or manufacture of a Caribbean Basin country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a Caribbean Basin country into a new and different construction material distinct from the materials from which it was transformed.

“Commercially available off-the-shelf (COTS) item”-

(1) Means any item of supply (including construction material) that is-

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

“Component” means an article, material, or supply incorporated directly into a construction material.

“Construction material” means an article, material, or supply brought to the construction site by the Contractor or subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies.

However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

“Cost of components” means-

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

“Designated country” means any of the following countries:

(1) A World Trade Organization Government Procurement Agreement country (Armenia, Aruba, Austria, Belgium, Bulgaria, Canada, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hong Kong, Hungary, Iceland, Ireland, Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan, or United Kingdom);

(2) A Free Trade Agreement country (Australia, Bahrain, Canada, Chile, Colombia, Costa Rica, Dominican Republic, El Salvador, Guatemala, Honduras, Korea (Republic of), Mexico, Morocco, Nicaragua, Oman, Panama, Peru, or Singapore);

https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2025_11.html#wp1078063 https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%202_1.html#wp1145508 http://uscode.house.gov/

(The Solicitation) Pages 18 of 26

(3) A least developed country (Afghanistan, Angola, Bangladesh, Benin, Bhutan, Burkina Faso, Burundi, Cambodia, Central African Republic, Chad, Comoros, Democratic Republic of Congo, Djibouti, Equatorial Guinea, Eritrea, Ethiopia, Gambia, Guinea, Guinea-Bissau, Haiti, Kiribati, Laos, Lesotho, Liberia, Madagascar, Malawi, Mali, Mauritania, Mozambique, Nepal, Niger, Rwanda, Samoa, Sao Tome and Principe, Senegal, Sierra Leone, Solomon Islands, Somalia, South Sudan, Tanzania, Timor-Leste, Togo, Tuvalu, Uganda, Vanuatu, Yemen, or Zambia); or

(4) A Caribbean Basin country (Antigua and Barbuda, Aruba, Bahamas, Barbados, Belize, Bonaire, British Virgin Islands, Curacao, Dominica, Grenada, Guyana, Haiti, Jamaica, Montserrat, Saba, St. Kitts and Nevis, St. Lucia, St. Vincent and the Grenadines, Sint Eustatius, Sint Maarten, or Trinidad and Tobago).