Roybal_DB_RFP_Amendment_04_scope_reductions.pdf
PDF 115 KB Posted
- Solicitation number
- GS-09P-15-KT-C-0014
About this file
Roybal U.S. Bankruptcy Court (USBC) and U.S. District Courts (USDC) Scope Reductions
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 4: Roybal U.S. Bankruptcy Court (USBC) and U.S. District Courts (USDC) Scope Reductions. Circuit Library and Swing Space/Moves Into Project Base Scope; and Deletion of all Project Options.
1. Statement of Work, Part 1: Contractor shall provide all labor, material and equipment for reduced demolition and associated line items of work as depicted with “clouded” changes in revised Roybal drawings referenced below on Roybal floors 6, 7, 8, 9 and 10. This amendment scope represents reductions in work included in the RFP that shall be incorporated into Lump Sum Base Bid.
1.1. Grand Jury Room on 6th Floor: Minimize repurposing of USDC Courtroom 650 by retaining Courtroom walls and millwork.
1.1.1. Refer to Amendment 4 drawings A003, A203 and A403 that indicate clouded change areas with “Delta1” revision.
1.1.2. Judges Bench, Courtroom Deputy Station; Witness Box; Jury Box; and Spectator benches and spectator railing will remain. Refer to Uniformat Section F2010 and Building Demolition line item indicated with Delta1 revision of room requirement sheet from Volume 2B, Roybal Program Development Study (PDS). Additionally, drawing T001 Note 4 is not applicable since these items will remain.
1.1.3. Perform all other work as indicated in Volume 2B, Roybal PDS room requirements.
1.1.4. Note that loose furniture items such as podium, counsel tables and chairs will be removed and replaced by others.
1.2. Grand Jury Rooms on 8th Floor: Minimize repurposing of USDC Courtrooms 840 and 850 by retaining Courtroom walls and millwork.
1.2.1. Refer to Amendment 4 drawings A005, A205 and A405 that indicate
1.2.2. Judges Bench, Courtroom Deputy Station; Witness Box; Jury Box; and Spectator benches and spectator railing will remain. Refer to Uniformat Section F2010 and Building Demolition line item indicated with Delta1 revision of room requirement sheet from Volume 2B, Roybal PDS.
Additionally, drawing T001 Note 4 is not applicable since these items will remain.
1.2.3. Perform all other work as indicated in Volume 2B, Roybal PDS room requirements.
1.2.4. Note that loose furniture items such as podium, counsel tables and chairs
1.3. Jury Assembly Room on 7th Floor: Minimize repurposing of USDC Courtroom
740 by retaining Courtroom walls and fixed millwork.
1.3.1. Refer to Amendment 4 drawings A004, A204 and A404 that indicate
1.3.2. Judges Bench, Courtroom Deputy Station; Witness Box; and Jury Box to remain. Refer to Uniformat Section F2010 and Building Demolition line item indicated with Delta1 revision of room requirement sheet from Volume 2B, Roybal PDS. Drawing T001 Note 4 is not applicable to these items that will remain.
1.3.3. Per Volume 2B PDS room requirement sheets, spectator benches and spectator railing will still be removed and stored per Drawing T001 Note 4 where GSA will indicate project onsite storage location later.
1.3.4. Perform all other work as indicated in Volume 2B, Roybal PDS room requirements.
1.3.5. Note that loose furniture items such as podium, counsel tables and chairs
1.4. 9th Floor, USBC: Maximize reuse of existing rooms, walls and any associated code compliant building systems, utilities or equipment (i.e. HVAC, electrical, plumbing, fire systems, etc.) as practical.
1.4.1. Refer to Amendment 4 drawings A006, A206 and A406 that indicate clouded change areas with Delta1 revision.
1.4.2. Refer to indicated Delta1 revision of room requirement sheets (Volume
2B, Roybal PDS) for multiple work line item changes related to reuse of existing rooms resulting in less demolition and less construction work.
1.5. 10th Floor, USBC: Maximize reuse of existing rooms, walls and any associated code compliant building systems, utilities or equipment (i.e. HVAC, electrical, plumbing, fire systems, etc.) as practical.
1.5.1. Refer to Amendment 4 drawings A007, A207 and A407 that indicate
1.5.2. Refer to indicated Delta1 revision of room requirement sheets (Volume
2B, Roybal PDS) for multiple work line item changes related to reuse of existing rooms resulting in less demolition and less construction work.
2. Statement of Work, Part 2: Contractor shall provide all labor, material and equipment for Circuit Library minor tenant improvement, finish replacement and repurposing of (1) existing Courtroom Room 68001 and ancillary spaces, specifically Rooms 610, 627, 682, 686 and 699 depicted with “clouded” changes in revised drawings referenced below on Roybal 6th floor previously referred to as Option A, but now superseded by this amendment scope that shall be incorporated into the Lump Sum Base Bid.
2.1. 6th Floor, Circuit Library includes removal of fixed Courtroom furnishings, provide convenience power, telephone and data infrastructure, AV infrastructure, patch and repair existing walls and new carpet.
2.1.1. Refer to Amendment 4 drawings A003, A203 and A403 that indicate
2.1.2. Refer to indicated Delta1 revision of room requirement sheets (Volume
2B, Roybal PDS) for the locations listed above in Part 2.
2.1.3. Since this Circuit Library work will be tenant funded, provide a fully burdened stand alone cost in the base bid line item schedule.
3. Statement of Work, Part 3: Contractor shall provide all labor, material and equipment for Appendix C Swing Space and Move Requirements from Volume 2B, Roybal PDS previously referred to as Option J, but now superseded by this amendment scope that shall be incorporated into the “Bid Breakdown of Base Contract Work Only” bid schedule which will be funded by tenant agency.
3.1. Per Volume 2B, Appendix C, temporary swing space will be needed to house portions of the Bankruptcy Court Clerk’s Office in the 14th floor of Roybal and the first floor and basement of adjacent 300 North Los Angeles Street Federal Building during the multiphase renovation project at Roybal.
3.1.1. Refer also to project move exclusions under Volume 2B, PDS, Appendix
C Section 5 from Amendment 1 and Amendment 2.
3.1.2. Refer to the Swing Space Requirements and Move Table with associated drawings that primarily involve the U.S. Bankruptcy Court tenant.
3.1.3. Since this Appendix C Swing Space/Moves work will be tenant funded, provide a fully burdened stand alone cost in the base bid line item schedule.
4. Deletion of all Project Options, Part 4: Project Options A thru J have been deleted as summarized below. However, note that Option A and Option J work scope has been incorporated into the project base scope.
4.1. Option A, Circuit Library scope has been incorporated into the project base scope and referred to as Circuit Library (see Part 2 above).
4.2. Option B, USDC Finish Modifications: Deleted work scope from 6th Floor Volume
2B Room Requirements and Delta1 drawings A003, A203 and A403.
4.3. Option C, USDC Finish Modifications: Deleted work scope from 7th Floor Volume
2B Room Requirements and Delta1 drawings A004, A204 and A404.
4.4. Option D, USDC Finish Modifications: Deleted work scope from 8th Floor Volume
2B Room Requirements and Delta1 drawings A005, A205 and A405.
4.5. Option E, USDC Judges Chambers: Deleted work scope from 14th Floor Volume
2B Room Requirements and Delta1 drawings A211 and A411.
4.6. Option F, USBC Space: Deleted work scope from 15th Floor Volume 2B Room
Requirements and Delta1 drawings A012, A212 and A412.
4.7. Option G, USBC General Assembly: Deleted work scope from 15th Floor Volume
2B Room Requirements and Delta1 drawings A012, A212 and A412.
4.8. Option H, USBC Joint Use Operations: Deleted work scope from 16th Floor
Volume 2B Room Requirements and Delta1 drawings A013, A213 and A413.
4.9. Option I, USBC Board of Judges: Deleted work scope from 16th Floor Volume 2B
Room Requirements and Delta1 drawings A013, A213 and A413.
4.10. Option J, Appendix C Swing Space and Move Requirements scope has been incorporated into the project base scope and referred to as Appendix C Swing Space/Moves (see Part 3 above).
END SOW
File details come from the government source that posted it. Updated .