Edward R. Roybal Federal Building and CourthouseBuilding and Courthouse
Pre-proposal Conference
May 28, 2015
10:00 – 10:45 AM
Agenda
• 10:00 – 10:20 AM:
• Project Team
• Project Overview: Scope and Schedule
• PDS Construction Phasing• PDS Construction Phasing
• Site Visits
• 10:20 – 10:30 AM: Procurement Notes and Dates
• 10:30 – 10:45 AM: Questions
• 10:45 – 11:55 AM: Walking Tour 1
• Noon – 1:10 PM: Walking Tour 2
GSA Project Team
Region 9 Team:
• Richard Fallejo, Project Manager
• Mario Ramirez, Project Executive
• Monica Cater, Project Architect
• William Gacutan, Construction Engineer
• Reggie McNulty and Robert Miller, Property Managers
• Greg McSweeney, Contracting Officer
• Krista Miller, Contracting Specialist
• Ana Lau, Regional Architect
Project Scope
Design Build Project Scope of Work:
• Develop Design Development (DD) and Construction Documents (CD) for items below.
• Repurpose existing courtrooms for general office space for the U.S. Bankruptcy Court (USBC), U.S.
District Court (USDC), Circuit Library, and Pretrial Services to consolidate Court operations from 312
North Spring Street, 300 North Los Angeles Street and Roybal that will not be housed in new Los
Angeles Courthouse.
• Adjustments to HVAC, plumbing, and electrical systems to support tenant improvement work.• Adjustments to HVAC, plumbing, and electrical systems to support tenant improvement work.
• Fire Life and Safety will also be reconfigured to accommodate space changes.
• Options A thru J: See next slide.
• Swing space will be located within Roybal and in adjacent 300 NLA Federal Building.
• Multi-phased work to occur after hours in occupied building.
• Design Excellence and Construction Excellence.
• LEED rating is NOT required. However, GSA is committed to incorporating principles of sustainable design and energy efficiency.
• Volume 2B Roybal PDS, 8th Floor room requirements pages 117-138 missing--to be issued as amendment.
Project Scope (continued)
Design Build Project Scope of Work, Options:
Option A: Circuit Library – Minor tenant improvement, finish replacement, and repurposing of one (1) existing courtroom and ancillary spaces. Includes: removal of fixed courtroom furnishings, provide convenience power, telephone and data infrastructure, AV infrastructure, patch and repair existing walls, and new carpet.
Option B: USDC Finish Modifications - Provide finish replacements only for two (2) conference rooms, 1 jury lounge, 2 toilet rooms, and an adjacent corridor.
Option C: USDC Finish Modifications - Provide finish replacement only for 1 jury lounge, 2 toilet rooms, 1 lactation room, and 1 excuse room.
Option D: USDC Finish Modifications - Provide finish replacement only for 2 jury lounges, four (4) toilet rooms, 2 conference rooms, 2 witness rooms, and 1 adjacent corridor.witness rooms, and 1 adjacent corridor.
Option E: USDC Judges Chamber - Build-out of 1 USDC Judges Chamber.
Option F: USBC Space - Repurpose 1 existing courtroom for flexible office use. Includes removal of fixed courtroom furnishing, providing convenience power, telephone and data infrastructure, AV infrastructure, patch and repair existing walls, and new carpet.
Option G: USBC General Assembly – Repurpose 1 existing courtroom for general assembly space. Includes removal of fixed courtroom furnishing, providing convenience power, telephone and data infrastructure, AV infrastructure, patch and repair existing walls, and new carpet.
Option H: USBC Joint Use Operations - Repurpose 1 existing courtroom for flexible office use. Includes removal of fixed courtroom furnishing, providing convenience power, telephone and data infrastructure, AV infrastructure, patch and repair existing walls, and new carpet.
Option I: USBC Board of Judges – Repurpose 1existing courtroom for board of judges space. Includes removal of fixed courtroom furnishing, providing convenience power, telephone and data infrastructure, AV infrastructure, patch and repair existing walls, and new carpet.
Option J: Appendix C Swing Space and Move Requirements – Refer to Volume 2B Program Development Study Appendix C for requirements.
NOTE: The Options are not listed in any particular order. Options do not have to be awarded sequentially.
Project Schedule
Project Milestones:
From Volume 2A SOW, Section 2.6:
Total Maximum Duration to Substantial Completion 24 months
Design-Build Team Selection 4th Qtr FY15
DESIGN STARTS 1st Qtr FY16
CONSTRUCTION STARTS 2ND Qtr FY16
(Contract performance period is 720 calendar days or 24 months)
Design and Construction:
• From Volume 2A, Section 2.10.5: Two rounds of design submissions (DD and CDs):
• Project Phases 1 to 3 to commence after DB contract award.
• Project Phases 4 to 5 to commence after Phase 1-3 construction start.
CONSTRUCTION STARTS 2ND Qtr FY16
SUBSTANTIAL COMPLETION 4th Qtr FY17
Existing Stacking Plan
FLOOR EXISTING ROYBAL STACKING PLAN
Mechanical/Non-Court
Non-Court: USMS
Non-Court: DEA
Non-Court: DEA
Non-Court: DEA
Non-Court: DEA
USBC 4 Courtrooms & 4 Chambers
USBC 4 Courtrooms & 4 Chambers
USBC 4 Courtrooms & 4 Chambers
Volume 2B - Program Development Study (PDS) Section 4.1
USBC 4 Courtrooms & 4 Chambers
Non-Court: State Dept. USBC
Non-Court: Tax Court USDC - Clerk Pretrial
Shared
USDC
Judges' Fitness
USBC
USBC
USDC 4 Courtrooms & 4 Chambers
USDC 4 Courtrooms & 4 Chambers
USDC 2 Courtrooms & 2 Chambers USDC Magistrate - 2 Courtrooms & 2 Chambers
USDC 4 Courtrooms & 4 Chambers
Non-Court
USDC Arraignment CR
Non-Court Arraignment CR
2 Mech/Non-Court
SHARED USBC
Staff Gym Clerk
Terrace Staff Entry Lobby Non-Court USDC
Temple St. USDC Circuit Library Non-Court Mech/Non-Court Public Entry
B1 Sally Port Parking
B2 Parking
B3 Parking
USBC= U.S. Bankruptcy Court
USDC= U.S. District Court
U.S. Circuit Library
U.S. Pretrial Services
Existing Spaces to be Renovated
Volume 2B - PDS Section 8.5
PDS Construction Phasing Plan
PDS Construction Phasing Plan (continued)
Proposed Stacking Plan with Options
FLOOR PROPOSED ROYBAL STACKING PLAN - WITH OPTIONS
Mechanical/Non-Court
Non-Court: USMS
Non-Court: DEA
Non-Court: DEA
Non-Court: DEA
Non-Court: DEA
USBC 2 CH USBC 2 CR
USBC BOJ Conf. Rm. USBC
USBC 2 CH
USBC (Judicial Conf. Rm.) Joint Use Operations
USBC 2 CH USBC 2 CR
USBC Clerk
USBC - TBD USBC 2 CH
USBC Gen. Assembly Room
USDC 2 CH Pretrial Services
USDC 1
CH
1 Ch
Volume 2B - PDS Section 4.2
1 Ch
USBC 2 CH USBC 2 CR DC Clerk: IT USBC 2 CH
Non-Court: State Dept. DC Clerk: CRDs DC Clerk USDC 2 CH
DC Clerk Non-Court: US Tax Court
SHARED USDC
Judges Fitness Clerk Training
USBC Clerk
SHARED
Server Room
USBC Clerk
USDC 2 CH USDC 2 CR USDC Grand Jury Suites (2) USDC 2 CH
USDC 2 CH USDC 2 CR
USDC USDC
USDC 2 CH
Jury Assembly Jury Assembly - Overflow
USDC 2 CH USDC 2 CR Circuit Library
USDC
USDC 2 CH
Grand Jury Suite (1)
USDC 2 CH USDC 4 CR USDC 2 CH
Non-Court
USDC Arraignment CR
Non-Court Arraignment CR
2 Mech/Non-Court
SHARED SHARED
Staff Gym Training Center
Terrace Staff Entry Lobby/Non-Court
USBC USBC USDC USDC
Clerk: ProSe Clinic Clerk: Intake Clerk: Intake Clerk: ProSe Clinic
Temple St. USDC: TBD
USBC USBC USDC USDC
Mech/Non-Court Public Entry Data Clos Clerk: Storage Attny. Workrm. Press Rm.
B1 Sally Port Parking
B2 Parking
B3 Parking
Site Visits: Walking and Subcontractor Tours
• Walking Tour 1: May 28, 2015 from 10:45 to 11:55 AM. Photos ok.
• Walking Tour 2: May 28, 2015 from Noon to 1:10 PM. Photos ok.
1:10 PM. Photos ok.
• Additional tours for subcontractors & others.
Meet in Roybal main lobby. Photos ok.
• Tour 3: June 2, 2015 at 9 AM.
• Tour 4: June 9, 2015 at 1 PM.
• Tour 5: June 16, 2015 at 1 PM.
Procurement Notes and Dates
• This solicitation is issued subject to the availability of funds. Congress has appropriated but not yet authorized funding for this project at this time.
funding for this project at this time.
• Be sure to read instructions carefully, and submit ALL of the required documents for both price and technical proposals.
• All bids must include pricing for the base as well as ALL options.
Procurement Notes and Dates (continued)
• Bid bond is required
• Completed and signed Form 1442 for Offer
• Award may be made with or without discussions discussions
• Make sure SAM account, including representations and certifications are current
• There is no requirement for a Project Labor Agreement (PLA) for the anticipated contract
Procurement Notes and Dates (continued)
• All questions about the RFP must be submitted to krista.miller@gsa.gov by 12pm PT on June 19, 2015.
• Proposals are due:
• Proposals are due:
July 14, 2015, 12pm PT Krista Miller, Contract Specialist 50 United Nations Plaza, Room 1256, San Francisco, CA 94102, CA 415-522-4157
Walking Tour Plan
• Start on 11th floor.
• Go to 14th floor, down to 12th & 9th floor.
• Take freight elevator to 6th floor.
• Go to Temple Level.
•Visit loading dock and go to 2nd floor lay
•Visit loading dock and go to 2nd floor lay down area.
•Go to Terrace level then end first tour.
•Back to Room 1145 for second/same tour.
•End