Roybal_DB_bid_sheet_Amendment_03.pdf

PDF 151 KB Posted

Attached to
Edward R. Roybal Repair and Alteration Tenant Improvement Prospectus Project
Solicitation number
GS-09P-15-KT-C-0014
Issued by

About this file

Amendment 03 Revised Bid Sheet

View the file

Other files

File Type Posted
Roybal_DB_RFP_Amendment_06.pdf PDF
Roybal_DB_RFP_Amendment_05.pdf PDF
Roybal_DB_RFP_Amendment_04.pdf PDF
Roybal_DB_RFP_Amendment_04_14th_Fl_Room_Reqs.pdf PDF
Roybal_DB_RFP_Amendment_04_6th_FL_room_reqs.pdf PDF
Roybal_DB_RFP_Amendment_04_revised_bid_sheet.pdf PDF
Roybal_DB_RFP_Amendment_04_9th_Fl_Room_Reqs.pdf PDF
Roybal_DB_RFP_Amendment_04_scope_reductions.pdf PDF
Roybal_DB_RFP_Amendment_04_16th_Fl_Room_Reqs.pdf PDF
Roybal_DB_RFP_Amendment_04_8th_Fl_Room_Reqs.pdf PDF
Roybal_DB_RFP_Amendment_04_15th_Fl_Room_Reqs.pdf PDF
Roybal_DB_RFP_Amendment_04_10th_Fl_Room_Reqs.pdf PDF
Roybal_DB_RFP_Amendment_04_7th_Fl_Room_Reqs.pdf PDF
Roybal_DB_RFP_Certificate_of_Current_Cost_or_Pricing_Data_(1).pdf PDF
Roybal_DB_RFP_Amendment_03_SF30.pdf PDF
Roybal_DB_RFP_PPQ_Amendment_02.docx DOCX document
Roybal_DB_bid_sheet_Amendment_02.pdf PDF
Roybal_DB_RFP_Offeror_Representations_and_Certifications.doc DOC document
Roybal_DB_RFP_Amendment_02_SF30.pdf PDF
Roybal_DB_RFP_Amendment_01.pdf PDF
08_Roybal_room_requirements_Pg_117-138.pdf PDF
Roybal_Pre_proposal_Conference_Final_05_28_2015_(1).pdf PDF
Appendix_C_Roybal_Swing_Space_Requirements_and_Move_Matrix_04_06_2015.pdf PDF
Roybal_Fed_Bldg_BER_Final_Submittal.pdf PDF
Roybal_Fed_Bldg_BER_Final_Submittal_Appendices.pdf PDF
AmendmenttoAppendixCSwingSpaceandMovesSOWFinal.doc.pdf PDF
Roybal_DB_RFP_preproposal_attendees.pdf PDF
Volume_3_-_References.pdf PDF
Past_Performance_Questionnaire.docx DOCX document
Volume_2B_Roybal_PDS_and_Appendix.pdf PDF
VOLUME_2A_SCOPE_OF_WORK.pdf PDF
Roybal_DB_1442.pdf PDF
Roybal_DB_RFP_Agreement.pdf PDF
Roybal_DB_Division_1.pdf PDF
Roybal_DB_Solicitation.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOTAL EVALUATED PRICE FORM

GS-09P-15-KT-C-0014

OFFEROR: ________________________________________________________________

I. LUMP SUM BASE BID: ________________________________________________

(Does include price of 828 LF of Wall Type B, but does not include price of 828 LF of Wall Type C, Options, Estimated Modification Costs, or Evaluated Compensable Delay Costs.

Does include A/E costs for base contract work only. A/E costs for Options shall be included in the bids for Options in Section III of this bid sheet.)

II. UNIT PRICES

A. Description: Wall Type C – Drywall metal partition to 6” above ACT ceiling with soundproofing insulation to achieve:

Reverberation Time in seconds = 0.5 – 0.7

Background Noise Room Criterion curve = 30

Noise Isolation Class in decibels = 55

Unit Price: _____________ per LF X 828 LF = $________________

B. Description: Wall Type B – Ceiling height, demountable, modular furniture partition withcustom panel width, transoms and burrowed lights should have :

Speech Intelligibility Index (STI) without sounds system enhancement = 45.

Unit Price: _____________per LF X 828 LF = $________________

III. OPTIONS

Option A: Circuit Library – Minor tenant improvement, finish replacement, and repurposing of one (1) existing courtroom and ancillary spaces. Includes: removal of fixed courtroom furnishings, provide conveyance power, telephone and data infrastructure, AV infrastructure, patch and repair existing walls, and new carpet.

Option B: USDC Finish Modifications - Provide finish replacements only for two (2) conference rooms, 1 jury lounge, 2 toilet rooms, and an adjacent corridor.

Option C: USDC Finish Modifications - Provide finish replacement only for 1 jury lounge, 2 toilet rooms, 1 lactation room, and 1 excuse room.

Option D: USDC Finish Modifications - Provide finish replacement only for 2 jury lounges, four (4) toilet rooms, 2 conference rooms, 2 witness rooms, and 1 adjacent corridor.

Option E: USDC Judges Chamber - Build-out of 1 USDC Judges Chamber.

Option F: USBC Space - Repurpose 1 existing courtroom for flexible office use.

Includes removal of fixed courtroom furnishing, providing conveyance power, telephone and data infrastructure, AV infrastructure, patch and repair existing walls, and new carpet.

Option G: USBC General Assembly – Repurpose 1 existing courtroom for general assembly space. Includes removal of fixed courtroom furnishing, providing convenience power, telephone and data infrastructure, AV infrastructure, patch and repair existing walls, and new carpet.

Option H: USBC Joint Use Operations - Repurpose 1 existing courtroom for flexible office use. Includes removal of fixed courtroom furnishing, providing convenience power, telephone and data infrastructure, AV infrastructure, patch and repair existing walls, and new carpet.

Option I: USBC Board of Judges – Repurpose 1existing courtroom for board of judges space. Includes removal of fixed courtroom furnishing, providing convenience power, telephone and data infrastructure, AV infrastructure, patch and repair existing walls, and new carpet.

Option J: Appendix C Swing Space and Move Requirements – Refer to Volume 2B Program Development Study Appendix C for requirements.

IV.A. ESTIMATED MODIFICATION COSTS:

Provide your mark-up rate that will be in the form of a single mark-up to be applied to the total direct cost of any modification. This rate offered by the contractor shall be accepted by the Government and used in contract modifications as described. For purposes of evaluation of offers, it is multiplied by the government estimated sum for direct costs for future modifications (based on agency precedent) to arrive at the evaluated future modification mark-up cost, and is added to contractor’s offer for evaluation purposes only in determining the low offeror.

Contract Modification Mark-Up Rate.

MARK-UP RATE ESTIMATED DIRECT TOTAL ESTIMATED

COSTS MARK-UP

____________% X $1,000,000.00 = $_____________________

B. EVALUATED COMPENSABLE DELAY COSTS:

Provide your daily delay rate to be used as the sole daily delay cost to include all contractor and subcontractor (at any tier) field overhead, home office overhead, general overhead, general and administrative costs, commissions, profits, bonds, insurance fees, and any other direct and indirect costs which are the result of delays caused solely by the Government. This rate offered by the contractor shall be accepted by the Government and used in contract modifications as described. For purposes of evaluation of offers, it is multiplied by the government estimated calendar days of delay (based on agency precedent) to arrive at the evaluated total estimated delay cost, and is added to contractor’s offer for evaluation purposes only in determining the low offeror.

Evaluated Compensable Delay Costs:

CONTRACTOR OFFERED EST. DELAY TOTAL ESTIMATED

DAILY RATE DELAY COST

$___________/Day X 30 Calendar Days = $_________________________

TOTAL EVALUATED PRICE: $_________________________________________________

(Sum of I, II.A, III, IV.A, and IV.B)

BID BREAKDOWN OF BASE CONTRACT WORK ONLY

RFP GS-09P-15-KT-C-0014

OFFEROR: __________________________________________________________

ARCHITECTURAL/ENGINEER: $____________________________________

DIVISION 1: $____________________________________

INTERIOR CONSTRUCTION: $____________________________________

INTERIOR FINISHES: $____________________________________

PLUMBING: $____________________________________

HVAC: $____________________________________

FIRE PROTECTION: $____________________________________

ELECTRICAL: $____________________________________

EQUIPMENT: $____________________________________

FURNISHINGS: $____________________________________

SELECTIVE BUILDING DEMOLITION: $____________________________________

OTHER: $____________________________________

TOTAL LUMP SUM BASE BID: $__________________________________________

File details come from the government source that posted it. Updated .