TOTAL EVALUATED PRICE FORM
GS-09P-15-KT-C-0014
OFFEROR: ________________________________________________________________
I. LUMP SUM BASE BID: ________________________________________________
(Does include price of 828 LF of Wall Type B, but does not include price of 828 LF of Wall Type C, Options, Estimated Modification Costs, or Evaluated Compensable Delay Costs.)
II. UNIT PRICES
A. Description: Wall Type C – Drywall metal partition to 6” above ACT ceiling with soundproofing insulation to achieve:
Reverberation Time in seconds = 0.5 – 0.7
Background Noise Room Criterion curve = 30
Noise Isolation Class in decibels = 55
Unit Price: _____________ per LF X 828 LF = $________________
B. Description: Wall Type B – Ceiling height, demountable, modular furniture partition withcustom panel width, transoms and burrowed lights should have :
Speech Intelligibility Index (STI) without sounds system enhancement = 45.
Unit Price: _____________per LF X 828 LF = $________________
III. OPTIONS
Option A: Circuit Library – Minor tenant improvement, finish replacement, and repurposing of one (1) existing courtroom and ancillary spaces. Includes: removal of fixed courtroom furnishings, provide conveyance power, telephone and data infrastructure, AV infrastructure, patch and repair existing walls, and new carpet.
Option B: USDC Finish Modifications - Provide finish replacements only for two (2) conference rooms, 1 jury lounge, 2 toilet rooms, and an adjacent corridor.
Option C: USDC Finish Modifications - Provide finish replacement only for 1 jury lounge, 2 toilet rooms, 1 lactation room, and 1 excuse room.
Option D: USDC Finish Modifications - Provide finish replacement only for 2 jury lounges, four (4) toilet rooms, 2 conference rooms, 2 witness rooms, and 1 adjacent corridor.
Option E: USDC Judges Chamber - Build-out of 1 USDC Judges Chamber.
Option F: USBC Space - Repurpose 1 existing courtroom for flexible office use.
Includes removal of fixed courtroom furnishing, providing conveyance power, telephone and data infrastructure, AV infrastructure, patch and repair existing walls, and new carpet.
Option G: USBC General Assembly – Repurpose 1 existing courtroom for general assembly space. Includes removal of fixed courtroom furnishing, providing convenience power, telephone and data infrastructure, AV infrastructure, patch and repair existing walls, and new carpet.
Option H: USBC Joint Use Operations - Repurpose 1 existing courtroom for flexible office use. Includes removal of fixed courtroom furnishing, providing convenience power, telephone and data infrastructure, AV infrastructure, patch
Option I: USBC Board of Judges – Repurpose 1existing courtroom for board of judges space. Includes removal of fixed courtroom furnishing, providing convenience power, telephone and data infrastructure, AV infrastructure, patch
Option J: Appendix C Swing Space and Move Requirements – Refer to Volume 2B Program Development Study Appendix C for requirements.
IV.A. ESTIMATED MODIFICATION COSTS:
Provide your mark-up rate that will be in the form of a single mark-up to be applied to the total direct cost of any modification. This rate offered by the contractor shall be accepted by the Government and used in contract modifications as described. For purposes of evaluation of offers, it is multiplied by the government estimated sum for direct costs for future modifications (based on agency precedent) to arrive at the evaluated future modification mark-up cost, and is added to contractor’s offer for evaluation purposes only in determining the low offeror.
Contract Modification Mark-Up Rate.
MARK-UP RATE ESTIMATED DIRECT TOTAL ESTIMATED
COSTS MARK-UP
____________% X $1,000,000.00 = $_____________________
B. EVALUATED COMPENSABLE DELAY COSTS:
Provide your daily delay rate to be used as the sole daily delay cost to include all contractor and subcontractor (at any tier) field overhead, home office overhead, general overhead, general and administrative costs, commissions, profits, bonds, insurance fees, and any other direct and indirect costs which are the result of delays caused solely by the Government. This rate offered by the contractor shall be accepted by the Government and used in contract modifications as described. For purposes of evaluation of offers, it is multiplied by the government estimated calendar days of delay (based on agency precedent) to arrive at the evaluated total estimated delay cost, and is added to contractor’s offer for evaluation purposes only in determining the low offeror.
Evaluated Compensable Delay Costs:
CONTRACTOR OFFERED EST. DELAY TOTAL ESTIMATED
DAILY RATE DELAY COST
$___________/Day X 30 Calendar Days = $_________________________
TOTAL EVALUATED PRICE: $_________________________________________________
(Sum of I, II.A, III, IV.A, and IV.B)
BID BREAKDOWN
RFP GS-09P-15-KT-C-0014
OFFEROR: __________________________________________________________
DIVISION 1: $____________________________________
INTERIOR CONSTRUCTION: $____________________________________
INTERIOR FINISHES: $____________________________________
PLUMBING: $____________________________________
HVAC: $____________________________________
FIRE PROTECTION: $____________________________________
ELECTRICAL: $____________________________________
EQUIPMENT: $____________________________________
FURNISHINGS: $____________________________________
SELECTIVE BUILDING DEMOLITION: $____________________________________
OTHER: $____________________________________
TOTAL LUMP SUM BASE BID: $__________________________________________