Atch_9_(L-3)_Seed_Project_Statement_of_Work.pdf

PDF 7 MB Posted

Attached to
Paving Indefinite Delivery/Indefinite Quantity (ID/IQ) Contract Federal contract opportunity
Solicitation number
FA9301-16-R-0011
Issued by
Department of the Air Force Materiel Command Test Center

About this file

9. (L-3) Seed Project Statement of Work (SOW)

View the file

Other files for this federal contract opportunity

Other files attached to Paving Indefinite Delivery/Indefinite Quantity (ID/IQ) Contract, newest first.
File Type Posted
Solicitation_FA9301-16-R-0011_Amendment_0003.pdf PDF
FA9301-16-R-0011_Questions_and_Answers_(Round_3_-_FINAL).pdf PDF
Atch_10_(L-4),_Seed_Project_Pricing_Template_(Rev2).xlsx XLSX spreadsheet
Atch_7_(L-1),_ELIN_Pricing_Template_(Rev2).xlsx XLSX spreadsheet
Atch_8_(L-2),_Estimated_Workload_(Rev2).xlsx XLSX spreadsheet
Atch_5_Wage_Determination_-_Kern_County_(Update_2).pdf PDF
FA9301-16-R-0011_Questions_and_Answers_(Round_2).pdf.pdf PDF
FA9301-16-R-0011_Amendment_0002.pdf PDF
Atch_9_(L-3)_Seed_Project_Statement_of_Work_(Revised).pdf PDF
FA9301-16-R-0011_Amendment_0001.pdf PDF
Atch_5_Wage_Determination_-_Kern_County_(Update).pdf PDF
Atch_10_(L-4)_Seed_Project_Pricing_Template_(Revised).xlsx XLSX spreadsheet
FA9301-16-R-0011_Questions_and_Answers_-_Technical.pdf PDF
Atch_1_Basic_Contract_Statement_of_Work_(Revised).pdf PDF
Atch_9_(L-3)_Seed_Project_Statement_of_Work_(Revised).pdf PDF
Atch_8_(L-2)_Estimated_Workload_(Revised).xlsx XLSX spreadsheet
Atch_6_Wage_Determination_-_Los_Angeles_County_(Update).pdf PDF
Atch_7_(L-1)_ELIN_Pricing_Template_(Revised).xlsx XLSX spreadsheet
4_-_Maintenance_Road_Markings.pdf PDF
11_-_Repair_Roads_1-30A_Test_Area_AFRL_.pdf PDF
6_-_Repair_Roads_at_South_Base_Compound.pdf PDF
7_-_Repair_Parking_Lot_at_Ridley_Building_1440.pdf PDF
9_-_Repair_Parking_Lot_at_Building_1400.pdf PDF
1_-_Repair_South_Lancaster_Blvd.pdf PDF
12_-_Spall_Repair_Pad_15_Post_Jobwalk.pdf PDF
2_-_Maint_Crack_Seal_and_Slurry_Seal_S_Lancaster_Blvd.pdf PDF
8_-_Minor_Construction_Expand_Parking_Lot_at_Building_605.pdf PDF
3_-_Maint_Crack_and_Slurry_Seal_Airfield_Multi_Locations.pdf PDF
10_-_Repair_Roads_Base_wide_Rosamond.pdf PDF
5_-_Maintenance_Traffic_Control_Signs_Basewide.pdf PDF
FA9301-16-R-0011_Questions_and_Answers_-_Contractual.pdf PDF
Pre-Proposal_Conference_Vendor_Sign-In_Sheet_30_Mar_2017.pdf PDF
Pre-Proposal_Conference_Briefing_Slides_30_Mar_2017.pdf PDF
Atch_11_(L-5)_Schedule_of_Material_Submittals_Template.xls XLS spreadsheet
Atch_14_(L-8)_Past_Performance_Questionnaire_(PPQ).pdf PDF
Atch_5_Wage_Determination_-_Kern_County.pdf PDF
Atch_10_(L-4)_Seed_Project_Pricing_Template.xlsx XLSX spreadsheet
Atch_15_(L-9)_Subcontractor_Teaming_Partner_Consent_Form.pdf PDF
Atch_12_(L-6)_Progress_Schedule_Template.xlsx XLSX spreadsheet
FA9301-16-R-0011_Paving_IDIQ_Solicitation_SF_1442.pdf PDF
Atch_4_Civil_Engineering_Provided_Plans.pdf PDF
Atch_6_Wage_Determination_-_Los_Angeles_County.pdf PDF
Atch_1_Basic_Contract_Statement_of_Work.pdf PDF
Atch_3_Paving_Technical_Specifications.pdf PDF
Atch_2_2017_Edwards_AFB_Design_Standards.pdf PDF
Atch_8_(L-2)_Estimated_Workload.xlsx XLSX spreadsheet
Atch_13_(L-7)_Past_Performance_Information_Form_(PPIF).pdf PDF
Atch_7_(L-1)_ELIN_Pricing_Template.xlsx XLSX spreadsheet
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TASK ORDER SCOPE OF WORK

FOR

FSPM 16-1608

REPAIR TAXIWAY C AT 22L

EDWARDS AIR FORCE BASE, CALIFORNIA

04 JANUARY 2017

PREPARED BY:

BAYRAM KURBANOV

412 CEG/CENMP

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

SEED PROJECT STATEMENT OF WORK

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

ATTACHMENT 9 (L-3)

SEED PROJECT STATEMENT OF WORK

1269221280C Typewritten Text

1269221280C Typewritten Text

1269221280C Typewritten Text

GENERAL SCOPE:

Contractor shall furnish all management, personnel, vehicles, supplies, equipment, etc. required to perform work described below. Project shall be accomplished in accordance with all Paving ID/IQ basic contract documents as well as this Statement of Work and all negotiated submittals.

TASK ORDER REQUREMENTS:

Edwards AFB, CA requires the Paving ID/IQ Contractor to accomplish the following work:

Replace approximately 19-inch thick concrete panels highlighted on the attached exhibits. These panels are located on the either side of Taxiway C hold-short line. Please be advised that irregular shaped panels need to be reinforced with 4x4 -W4xW4 WWF in addition to doweling to prevent odd-shaped panels from developing cracks in the future. Place the WWF at the depth of 5-inches.

Contractor shall remain in direct radio contact with the Control Tower. All work shall be conducted in accordance with an approved Airfield Construction Waiver.

PERIOD OF PERFORMANCE:

Construction work shall take no more than 150 calendar days to complete the project. This work needs to be accomplished no later than 30 September 2018.

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

SEED PROJECT STATEMENT OF WORK

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

MINIMIZATION MEASURES

This project (Control No. 16-0423 Repair Taxiway C at Hold Short Marker to Runway 22L) is covered by the Environmental Assessment for the Repair or Replacement of the Main Base

Runway, Edwards Air Force Base, California (AFFTC 2003), prepared in support of Control No.

01-0896, and is being categorically excluded (A2.3.14) off this document. The project is approved contingent upon compliance with the following minimization measures.

1. The proponent/contractor shall inform Environmental Management’s EIAP Planners of all changes to the project scope. The proponent/contractor shall also provide the Statement of

Work to ensure that the National Environmental Policy Act (NEPA) analysis stays current and that all environmental issues are addressed. Contact Environmental Management at

(661) 277-1442, 277-9225 or e-mail 412TW.CEV.EIAP@us.af.mil for more information.

2. Reduce or suspend all grading, disking, and other earth working projects when wind speeds exceed 25 miles per hour.

3. Apply water or chemical stabilizers to suppress dust on unpaved roads and disturbed areas where work is performed. Wind barriers must be erected when winds generate dust that reduces visibility.

4. All bulk materials or debris must be covered while being transported.

5. Any portable internal combustion engine (ICE) operated on Edwards AFB requires a permit from the local air agency. All portable engines and equipment with a rating of 50 brake horsepower and greater must either have an air permit, be registered under the California Air

Resources Board (CARB) Statewide Portable Equipment Registration Program (PERP).

Contact 412 CEG/CEVC at (661) 277-1457 for permit/registration requirements.

6. Owners or operators of in-use off-road diesel, gasoline, liquefied petroleum gas (LPG) and other alternate fuels vehicles 25 horsepower (hp) or greater (for example, loaders, crawlers tractors, skid steers, backhoes and forklifts) may be subject to California Air Resources

Board (CARB) fleet requirements. For additional information, contact Environmental

Management at (661) 277-1457.

7. Proposed projects that use coatings must comply with volatile organic compound (VOC) content limitations at levels ranging between 50 to 730 grams/liter, depending upon the application and regulating authority. Additionally, any type of coating operation may require a permit to operate. Coatings used in some applications may qualify as a specialty coating and may be allowed a higher VOC content. Contact Environmental Management at

(661) 277-1457 for additional guidance.

8. Major noise sources on the flightline are from aircraft and helicopter operations, engine testing, and the operation of powered tactical support equipment (TSE). As such, workers along the flightline may be exposed to increased noise levels that may be above acceptable levels established by AFOSH and federal and state OSHA regulations. The contractor shall be responsible for implementing OSHA hearing protection measures for their employees.

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

SEED PROJECT STATEMENT OF WORK

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

mailto:412TW.CEV.EIAP@us.af.mil

Where federal employees are involved in project work, contact Bioenvironmental

Engineering (412 AMDS/SGPB) at (661) 277-3272 for specific requirements.

9. If the proponent/contractor notices soil discoloration or odors during activities, they shall report this observation immediately to Bioenvironmental Engineering (412 AMDS/SGPB) at

(661) 277-3272. Contact Paul Schiff at (661) 277-1469 or 277-1401 for additional information about this ERP site.

10. This project has the potential to encounter or disturb asbestos-containing material (ACM) and/or lead paint. Contact 412 CES/CEOER (661) 277-4475 for survey data and potential survey requirements. If additional information is still required regarding Edwards AFB rules and regulations, contact 412 CEG/CEV Toxics (asbestos and lead) department at

(661) 277-7167.

11. This project has the potential to encounter asbestos-containing material (ACM) and/or lead-based paint (LBP) during excavation. If excavation uncovers any buried debris/materials or disturbs utilities, contact 412 CES/CEOER (661) 277-4475 for asbestos/lead material testing and potential additional abatement and disposal requirements.

12. The proponent/contractor shall ensure all hazardous materials are authorized and managed in compliance with applicable sections of Air Force Instruction (AFI) 32-7086, Hazardous

Materials Management. The contractor/proponent should contact 412 CEG/CEVC at

(661) 277-1909 for guidance regarding tracking of hazardous material usage.

13. The proponent/contractor shall ensure that all solid and hazardous waste management on this project complies with all applicable sections of AFI 32-7042, Waste Management and the

Edwards Air Force Base Hazardous Waste Management Plan (HWMP). Contact

412 CEG/CEVC’s Hazardous Waste Support contractor at (661) 277-3681 or

412 CEG/CEVC at 277-1909 for questions and guidance.

14. The customer shall handle, store, and manage its solid wastes in a manner consistent with the

Base’s procedures including transfer of all solid waste generated to an off-base state licensed landfill. Contact 412 CEG/CEO at (661) 277-1167 or 412 CEG/CEVC at (661) 277-1411 for information on segregation requirements for recyclables and for solid waste disposal.

15. The proponent/contractor shall be responsible for collection and disposal of inert debris to include waste concrete, asphalt and concrete rinsate generated from project activities. These shall be collected in a designated area within the project work site. At project completion, inert debris must be removed from project site, concrete rinsate must be dry, and disposal of waste will be in an approved base inert debris location or off base landfill. Contact

412 CEG/CEO at (661) 277-1167 for information on base inert debris locations. Contact

412 CEG/CEVC at 277-1411 for inert debris disposal requirements.

16. The proposed project, Repair Taxiway C at Hold Short Marker to Runway 22L, is an undertaking in accordance with 36 Code of Federal Regulations §800.16(y). As such, and in accordance with Section 106 of the National Historic Preservation Act, as amended (NHPA), the Edwards AFB Cultural Resources Manager (CRM) for archaeology or qualified personnel under the direction or supervision of the CRM has reviewed the proposed

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

SEED PROJECT STATEMENT OF WORK

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

undertaking and determined that the actions constituted therein will not adversely affect historic properties.

17. If the undertaking is modified subsequent to this review, the proponent shall coordinate with

Cultural Resources to ensure compliance with Section 106 of the NHPA. Coordination can be accomplished by contacting 412 CEG/CEVA at (661) 277-1413.

18. Based upon the information provided there is no requirement to consult with the California

State Historical Preservation Office.

19. The project is located in close proximity to ERP monitoring wells. Prior to starting work on the project, the proponent shall contact AFCEC Installation Support Team EAFB

(AFCEC/CZOW) at (661) 277-1401 so the location of the ERP equipment can be clearly identified to the proponent. Damage to ERP equipment and infrastructure must be avoided.

20. This project will need to obtain an Edwards AFB Civil Engineering Work Clearance Request

(digging permit). The proponent/contractor shall coordinate the digging permit with the Base

Civil Engineer Execution Support by contacting 412 CEG/CENME at (661) 277-1530 for specific requirements.

21. In the event you are unable to contact an environmental person at one of the numbers above, please call (661) 277-1401.

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

SEED PROJECT STATEMENT OF WORK

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

1521720154C Oval

1521720154C Callout

PROJECT LOCATION

1521720154C Callout

TAXIWAY C

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

Callout

PANELS TO BE REPLACED

1521720154C Callout

HOLD-SHORT LINE

1521720154C Callout

PANELS TO BE REPLACED

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

PANELS TO BE REPLACED BEFORE HOLD SHORT LINE

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

PANELS TO BE REPLACED PAST HOLD SHORT LINE

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

20170104_SOW_FSPM161608_Repair Taxiway C at 22L
20170104_EXHIBITS_FSPM161608_Repair Taxiway C at 22L
Airfield
taxiway side
taxiway side highlighted
runway side
runway side highlighted
Binder1
DSC_0048
DSC_0050
DSC_0051
DSC_0052
DSC_0054
DSC_0055
DSC_0056

File details come from the government source that posted it. Updated .