Atch_7_(L-1)_ELIN_Pricing_Template.xlsx

XLSX spreadsheet 59 KB Posted

Attached to
Paving Indefinite Delivery/Indefinite Quantity (ID/IQ) Contract Federal contract opportunity
Solicitation number
FA9301-16-R-0011
Issued by
Department of the Air Force Materiel Command Test Center

About this file

7. (L-1) ELIN Pricing Template

View the file

Other files for this federal contract opportunity

Other files attached to Paving Indefinite Delivery/Indefinite Quantity (ID/IQ) Contract, newest first.
File Type Posted
Solicitation_FA9301-16-R-0011_Amendment_0003.pdf PDF
FA9301-16-R-0011_Questions_and_Answers_(Round_3_-_FINAL).pdf PDF
Atch_10_(L-4),_Seed_Project_Pricing_Template_(Rev2).xlsx XLSX spreadsheet
Atch_7_(L-1),_ELIN_Pricing_Template_(Rev2).xlsx XLSX spreadsheet
Atch_8_(L-2),_Estimated_Workload_(Rev2).xlsx XLSX spreadsheet
Atch_5_Wage_Determination_-_Kern_County_(Update_2).pdf PDF
FA9301-16-R-0011_Questions_and_Answers_(Round_2).pdf.pdf PDF
Atch_9_(L-3)_Seed_Project_Statement_of_Work_(Revised).pdf PDF
FA9301-16-R-0011_Amendment_0002.pdf PDF
FA9301-16-R-0011_Questions_and_Answers_-_Technical.pdf PDF
Atch_1_Basic_Contract_Statement_of_Work_(Revised).pdf PDF
Atch_9_(L-3)_Seed_Project_Statement_of_Work_(Revised).pdf PDF
Atch_8_(L-2)_Estimated_Workload_(Revised).xlsx XLSX spreadsheet
Atch_6_Wage_Determination_-_Los_Angeles_County_(Update).pdf PDF
Atch_7_(L-1)_ELIN_Pricing_Template_(Revised).xlsx XLSX spreadsheet
FA9301-16-R-0011_Amendment_0001.pdf PDF
Atch_5_Wage_Determination_-_Kern_County_(Update).pdf PDF
Atch_10_(L-4)_Seed_Project_Pricing_Template_(Revised).xlsx XLSX spreadsheet
4_-_Maintenance_Road_Markings.pdf PDF
11_-_Repair_Roads_1-30A_Test_Area_AFRL_.pdf PDF
6_-_Repair_Roads_at_South_Base_Compound.pdf PDF
7_-_Repair_Parking_Lot_at_Ridley_Building_1440.pdf PDF
9_-_Repair_Parking_Lot_at_Building_1400.pdf PDF
2_-_Maint_Crack_Seal_and_Slurry_Seal_S_Lancaster_Blvd.pdf PDF
8_-_Minor_Construction_Expand_Parking_Lot_at_Building_605.pdf PDF
3_-_Maint_Crack_and_Slurry_Seal_Airfield_Multi_Locations.pdf PDF
10_-_Repair_Roads_Base_wide_Rosamond.pdf PDF
5_-_Maintenance_Traffic_Control_Signs_Basewide.pdf PDF
1_-_Repair_South_Lancaster_Blvd.pdf PDF
12_-_Spall_Repair_Pad_15_Post_Jobwalk.pdf PDF
FA9301-16-R-0011_Questions_and_Answers_-_Contractual.pdf PDF
Pre-Proposal_Conference_Briefing_Slides_30_Mar_2017.pdf PDF
Pre-Proposal_Conference_Vendor_Sign-In_Sheet_30_Mar_2017.pdf PDF
Atch_11_(L-5)_Schedule_of_Material_Submittals_Template.xls XLS spreadsheet
Atch_14_(L-8)_Past_Performance_Questionnaire_(PPQ).pdf PDF
Atch_5_Wage_Determination_-_Kern_County.pdf PDF
Atch_10_(L-4)_Seed_Project_Pricing_Template.xlsx XLSX spreadsheet
Atch_15_(L-9)_Subcontractor_Teaming_Partner_Consent_Form.pdf PDF
Atch_1_Basic_Contract_Statement_of_Work.pdf PDF
Atch_3_Paving_Technical_Specifications.pdf PDF
Atch_2_2017_Edwards_AFB_Design_Standards.pdf PDF
Atch_8_(L-2)_Estimated_Workload.xlsx XLSX spreadsheet
Atch_9_(L-3)_Seed_Project_Statement_of_Work.pdf PDF
Atch_13_(L-7)_Past_Performance_Information_Form_(PPIF).pdf PDF
Atch_12_(L-6)_Progress_Schedule_Template.xlsx XLSX spreadsheet
FA9301-16-R-0011_Paving_IDIQ_Solicitation_SF_1442.pdf PDF
Atch_4_Civil_Engineering_Provided_Plans.pdf PDF
Atch_6_Wage_Determination_-_Los_Angeles_County.pdf PDF
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Year 1

FA9301-16-R-0011 PAVING ID/IQ SOLITICATION
EXHIBIT LINE ITEM NUMBER (ELIN) PRICING TEMPLATE
YEAR 1
Offeror Name:
ELINDESCRIPTIONUNIT OF MEASUREPROPOSED PRICE
Sub-Base Course
A001Each 6'' of Sub-base preparationSY
A002Each added inch of Sub-base preparationSY
Base Course
A0036'' BaseSY
A004Added Base Inch 1"-5"SY
ACC Pavement
A005Each 3'' AC (64/28 Polymer Modified Mix)SY
A006Airfield Roadways, Each 3'' AC (64/28 Polymer Modified Mix, no RAP)SY
A007Airfield Shoulders, Each 3'' AC (64/28 Polymer Modified Mix, no RAP)SY
A008Each Added Inch (64/28 Polymer Modified Mix)SY
A009Airfield Roadways, Each Added Inch (64/28 Polymer Modified Mix, no RAP)SY
A00AAirfield Shoulders, Each Added Inch (64/28 Polymer Modified Mix, no RAP)SY
A00BAirfield - Load Bearing, Each 3'' AC (64/28 Polymer Modified Mix, no RAP)SY
A00CAirfield - Load-Bearing Each Added Inch (64/28 Polymer Modified Mix, no RAP)SY
ACC Milling
A00DMill ACC, first inchSY
A00EMilling, each added inchSY
ACC Pulverization
A00FPulverize ACC and incorporate on-site into base course, each 3"SY
A00GPulverize ACC and dispose off-baseSY
Base and Sub-Base Reinforcement Measures
A00HCement Treated Soil Treatment @ 6% portland cement, top 8" inchesSY
Bituminous Surface Treatment
A00JSingle Coat TreatmentSY
A00KDouble Coat TreatmentSY
ACC Spray Applications
A00LTack CoatSY
A00MFog SealsSY
A00NPrime CoatSY
A00PGSB-88 RejuvenatorSY
ACC Crack Seal
A00QACC Crack Seal, Wide Cracks (1'' to 4'')LF
A00RACC Crack Seal, Medium Cracks (1/2" to 1'')LF
A00SACC Crack Seal, Narrow Cracks (1/16" to 1/2'')LF
Slurry Seal
A00TSingle Application, with Tack CoatSY
A00USingle Application, without Tack CoatSY
ACC Patching
A00VACC Patch < 100SYSY
A00WACC Patch >100SYSY
Roadway and Airfield Markings
A00XRoadway Striping, 4'' Line, with A/F Type 1 BeadsSF
A00YRoadway Striping, 4'' Line, with A/F Type 4 BeadsSF
A00ZRoadway MARKING REFLECTIVE with A/F Type 1 BeadsSF
A010Roadway MARKING REFLECTIVE with A/F Type 4 BeadsSF
A011Roadway Marking, Thermoplastic MaterialSF
A012Airfield Striping, 30" Line total - on Full-Width Black Background, with A/F Type 1 BeadsLF
A013Airfield Striping, 30" Line total - on Full-Width Black Background, with A/F Type 3 BeadsLF
A014Airfield Markings, with A/F Type 1 BeadsSF
A015Airfield Markings, with A/F Type 3 BeadsSF
A016Airfield, Thermoplastic Material Airfield RatedSF
A017Non-Lead-Based Paint RemovalSF
A018Temporary Construction-use ReflectorsEA
A019Permanent, Type D Two-Way Reflective MarkersEA
A01APermanent, Type G One-Way ReflectorsEA
A01BRumble Strips, rubberized material purchased and installed post-constructionEA
A01CRumble Strips, created in ACC at constructionLF
Concrete Work
A01DReinforced PCC Airfield, 650 psi Flexural Strength (ASR Free Aggregate)CY
A01EUnreinforced PCC Airfield, 650 psi Flexural Strength (ASR Free Aggregate)CY
A01FPCC Roadway, Roadway Use, SlipformCY
A01GReinforced Concrete Pad, Formed and Cast in-placeCY
A01HReinforced PCC Headwall, Formed and Cast-in-placeCY
A01JPCC Valley GuttersCF
A01KPCC SpandrelsCF
A01L6" Curb with 18" GutterLF
A01M6" Curb, Curb OnlyLF
A01NSidewalks 6" thick, unreinforced, 5' wideLF
A01PADA Entrances/Exits, Constructed in Existing Sidewalks, including demolition and disposalEA
A01QCorner-Wide ADA Entrances/Exits, Constructed in Existing Sidewalks, including demolition and disposalEA
A01RADA Entrances/Exits, with new Sidewalk ConstructionEA
A01SCorner-Wide ADA Entrances/Exits, with new Sidewalk ConstructionEA
A01THandicap Ramp 1:12 Maximum, 5' wide, with handrail both sidesLF
A01UPCC Crack Seal, Rout and Seal Includes all preparation and pressure-applied epoxy sealantLF
A01VSpall Repair, PCC PavementSF
Culverts
A01WCulvert, 30'' Remove OnlyLF
A01XCulvert, 36'' Remove OnlyLF
A01YCulvert, 30'' CMP Install Only including end treatmentLF
A01ZCulvert, 36'' CMP Install Only including end treatmentLF
A020Culvert, 24'' RCP Install Only including end treatmentLF
A021Culvert, 30'' RCP Install Only including end treatmentLF
A022Culvert, 36'' RCP Install Only including end treatmentLF
Handling of Government Furnished Material
A023Material TruckingTON/MI
A024On-Base Bulk Material Loading & UnloadingCY
A025Placement of government furnished base 6"SY
A026Each added inch of government furnished base 1"-5"SY
A027Placement of government furnished Sub-base 6"SY
A028Each added inch of goverment furnished Sub-baseSY
Professional and Speciality Services
A029Exploratory Drilling per hole, in earth or AC, each footEA
A02AExploratory Drilling, per hole, in rock or through PCC, each 6'' deepEA
A02BDrive Sample, Testing, and a ReportEA
A02CSoil Sampling, Testing, and a ReportEA
A02D2-Man Survey Team, In-Field Marking and Report (These items are for additional surveying, as required, above and beyond a standard paving project. Surveying incidental to a standard paving project is to be included in the line items associated with the standard paving project.)HR
A02EPot-holing for utilities (These items are for additional pot-holing, as required, above and beyond a standard paving project. Pot-holing incidental to a standard paving project is to be included in the line items associated with the standard paving project.)HR
A02FUnder-Roadway Tunneling for Utility Placement, up to 12" DiameterLF
Material Handling
A02GMaintenance and Reconstruction of SHOULDERS using existing on-site materials onlyLF
A02HMaintenance and reconstruction of ditches using existing, on-site materials onlyLF
A02JCommon ExcavationCY
A02KRock ExcavationCY
A02LExcavation of Unsuitable MaterialsCY
A02MOff-Base Material DisposalCY
A02NSelect Fill MaterialCY
A02PRaise or Lower Utility CoversEA
Gates, Walls, and Fencing
A02Q8' Chain Link FenceLF
A02R3 Fencing Wire outriggersLF
A02S8' Pedestrian GateLF
A02T8' Rolling Vehicle GateLF
A02U8' Vehicle Swing GateLF
A02V8' Heavy-Duty Vehicle Swing GateLF
A02WCMU wall, 2' High, split-face blockLF
A02XTortoise Fence, Erection and Removal per plan provided by EMLF
A02YConstruction of Protective Berms 95% compacted cohesive soil, 8" lifts, graded to smooth finishCY
A02ZK-RAILS, for use during construction, installation and removalLF
A030Reduced Height airfield barriers, for use during construction, installation and removalLF
Lights and Signage
A031New Installation of Regulatory and Warning Signs, including single postEA
A032Directional Signs, sign-face manufacture and installation on existing posts. Type III or Higher micro prismatic reflective sign panels. ASTM D4956-13 and AASHTO M 268-13.SF
A033Remove and Replace Standard Signs on existing posts. Type III or Higher micro prismatic reflective sign panels. ASTM D4956-13 and AASHTO M 268-13.EA
A034Steel Breakaway Sign posts, 2" square, frangibly mounted up to 10' above grade. Anodized brown iaw the Edwards Base Design Standards. ASTM A653/A653M, ASTM A1011/A1011M, ASTM A123/A123M.EA
A035Treated Wooden 8"x8" Sign Posts, up to 20' above grade Painted brown iaw the Edwards Base Design Standards. ASTM D4444, AWPA U1, AWPA.EA
A036Lighting or Utility Pole, breakaway, up to 40' above grade (To Include Alumin. Pole, One Arm Bracket, Up To 6' Deep Conc Base, Wire, and Conduit)EA
A037Single LED LuminaireEA
A038Double LED LuminaireEA
Joint Repair & Rubber Removal
A039Silicone Joint RepairLF
A03AJet Fuel Resistant Joint Repair (DLA SS-S-200)LF
A03BCompression Joint SealLF
A03CAirfield Rubber Removal - WATERSF
Demolition and Disposal
A03DDemo Curb and GutterLF
A03EDemo AsphaltCY
A03FDemo ConcreteCY
Guardrails and Barriers
A03GGuardrailsLF
A03HTL3 Energy Absorbing Barrier EndsEA
A03JTL2 Energy Absorbing Barrier EndsEA
A03KNon-Energy Absorbing Gating EndsEA
A03LEnergy Absorbing Barrels, Installed and FilledEA
A03MTemporary, Changeable Message Signage for Traffic ControlDAY
FOD Control
A03NManual FOD ControlHR
A03PMechanical FOD ControlHR
Non-Prepriced Items
A03QNon-Priced Item (To Be Negotiated Per Task Order)EA
TOTAL

&"Arial,Regular"&8FOR OFFICIAL USE ONLY Source Selection Sensitive Information See FAR 2.101 and 3.104

&"Arial,Regular"&8FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

ATTACHMENT 7 (L-1)

ELIN PRICING TEMPLATE (YEAR 1) &8FOR OFFICIAL USE ONLY

See FAR 2.101 and 3.104

Year 2

FA9301-16-R-0011 PAVING ID/IQ SOLITICATION
EXHIBIT LINE ITEM NUMBER (ELIN) PRICING TEMPLATE
YEAR 2
Offeror Name:
ELINDESCRIPTIONUNIT OF MEASUREPROPOSED PRICE
Sub-Base Course
B001Each 6'' of Sub-base preparationSY
B002Each added inch of Sub-base preparationSY
Base Course
B0036'' BaseSY
B004Added Base Inch 1"-5"SY
ACC Pavement
B005Each 3'' AC (64/28 Polymer Modified Mix)SY
B006Airfield Roadways, Each 3'' AC (64/28 Polymer Modified Mix, no RAP)SY
B007Airfield Shoulders, Each 3'' AC (64/28 Polymer Modified Mix, no RAP)SY
B008Each Added Inch (64/28 Polymer Modified Mix)SY
B009Airfield Roadways, Each Added Inch (64/28 Polymer Modified Mix, no RAP)SY
B00AAirfield Shoulders, Each Added Inch (64/28 Polymer Modified Mix, no RAP)SY
B00BAirfield - Load Bearing, Each 3'' AC (64/28 Polymer Modified Mix, no RAP)SY
B00CAirfield - Load-Bearing Each Added Inch (64/28 Polymer Modified Mix, no RAP)SY
ACC Milling
B00DMill ACC, first inchSY
B00EMilling, each added inchSY
ACC Pulverization
B00FPulverize ACC and incorporate on-site into base course, each 3"SY
B00GPulverize ACC and dispose off-baseSY
Base and Sub-Base Reinforcement Measures
B00HCement Treated Soil Treatment @ 6% portland cement, top 8" inchesSY
Bituminous Surface Treatment
B00JSingle Coat TreatmentSY
B00KDouble Coat TreatmentSY
ACC Spray Applications
B00LTack CoatSY
B00MFog SealsSY
B00NPrime CoatSY
B00PGSB-88 RejuvenatorSY
ACC Crack Seal
B00QACC Crack Seal, Wide Cracks (1'' to 4'')LF
B00RACC Crack Seal, Medium Cracks (1/2" to 1'')LF
B00SACC Crack Seal, Narrow Cracks (1/16" to 1/2'')LF
Slurry Seal
B00TSingle Application, with Tack CoatSY
B00USingle Application, without Tack CoatSY
ACC Patching
B00VACC Patch < 100SYSY
B00WACC Patch >100SYSY
Roadway and Airfield Markings
B00XRoadway Striping, 4'' Line, with A/F Type 1 BeadsSF
B00YRoadway Striping, 4'' Line, with A/F Type 4 BeadsSF
B00ZRoadway MARKING REFLECTIVE with A/F Type 1 BeadsSF
B010Roadway MARKING REFLECTIVE with A/F Type 4 BeadsSF
B011Roadway Marking, Thermoplastic MaterialSF
B012Airfield Striping, 30" Line total - on Full-Width Black Background, with A/F Type 1 BeadsLF
B013Airfield Striping, 30" Line total - on Full-Width Black Background, with A/F Type 3 BeadsLF
B014Airfield Markings, with A/F Type 1 BeadsSF
B015Airfield Markings, with A/F Type 3 BeadsSF
B016Airfield, Thermoplastic Material Airfield RatedSF
B017Non-Lead-Based Paint RemovalSF
B018Temporary Construction-use ReflectorsEA
B019Permanent, Type D Two-Way Reflective MarkersEA
B01APermanent, Type G One-Way ReflectorsEA
B01BRumble Strips, rubberized material purchased and installed post-constructionEA
B01CRumble Strips, created in ACC at constructionLF
Concrete Work
B01DReinforced PCC Airfield, 650 psi Flexural Strength (ASR Free Aggregate)CY
B01EUnreinforced PCC Airfield, 650 psi Flexural Strength (ASR Free Aggregate)CY
B01FPCC Roadway, Roadway Use, SlipformCY
B01GReinforced Concrete Pad, Formed and Cast in-placeCY
B01HReinforced PCC Headwall, Formed and Cast-in-placeCY
B01JPCC Valley GuttersCF
B01KPCC SpandrelsCF
B01L6" Curb with 18" GutterLF
B01M6" Curb, Curb OnlyLF
B01NSidewalks 6" thick, unreinforced, 5' wideLF
B01PADA Entrances/Exits, Constructed in Existing Sidewalks, including demolition and disposalEA
B01QCorner-Wide ADA Entrances/Exits, Constructed in Existing Sidewalks, including demolition and disposalEA
B01RADA Entrances/Exits, with new Sidewalk ConstructionEA
B01SCorner-Wide ADA Entrances/Exits, with new Sidewalk ConstructionEA
B01THandicap Ramp 1:12 Maximum, 5' wide, with handrail both sidesLF
B01UPCC Crack Seal, Rout and Seal Includes all preparation and pressure-applied epoxy sealantLF
B01VSpall Repair, PCC PavementSF
Culverts
B01WCulvert, 30'' Remove OnlyLF
B01XCulvert, 36'' Remove OnlyLF
B01YCulvert, 30'' CMP Install Only including end treatmentLF
B01ZCulvert, 36'' CMP Install Only including end treatmentLF
B020Culvert, 24'' RCP Install Only including end treatmentLF
B021Culvert, 30'' RCP Install Only including end treatmentLF
B022Culvert, 36'' RCP Install Only including end treatmentLF
Handling of Government Furnished Material
B023Material TruckingTON/MI
B024On-Base Bulk Material Loading & UnloadingCY
B025Placement of government furnished base 6"SY
B026Each added inch of government furnished base 1"-5"SY
B027Placement of government furnished Sub-base 6"SY
B028Each added inch of goverment furnished Sub-baseSY
Professional and Speciality Services
B029Exploratory Drilling per hole, in earth or AC, each footEA
B02AExploratory Drilling, per hole, in rock or through PCC, each 6'' deepEA
B02BDrive Sample, Testing, and a ReportEA
B02CSoil Sampling, Testing, and a ReportEA
B02D2-Man Survey Team, In-Field Marking and Report (These items are for additional surveying, as required, above and beyond a standard paving project. Surveying incidental to a standard paving project is to be included in the line items associated with the standard paving project.)HR
B02EPot-holing for utilities (These items are for additional pot-holing, as required, above and beyond a standard paving project. Pot-holing incidental to a standard paving project is to be included in the line items associated with the standard paving project.)HR
B02FUnder-Roadway Tunneling for Utility Placement, up to 12" DiameterLF
Material Handling
B02GMaintenance and Reconstruction of SHOULDERS using existing on-site materials onlyLF
B02HMaintenance and reconstruction of ditches using existing, on-site materials onlyLF
B02JCommon ExcavationCY
B02KRock ExcavationCY
B02LExcavation of Unsuitable MaterialsCY
B02MOff-Base Material DisposalCY
B02NSelect Fill MaterialCY
B02PRaise or Lower Utility CoversEA
Gates, Walls, and Fencing
B02Q8' Chain Link FenceLF
B02R3 Fencing Wire outriggersLF
B02S8' Pedestrian GateLF
B02T8' Rolling Vehicle GateLF
B02U8' Vehicle Swing GateLF
B02V8' Heavy-Duty Vehicle Swing GateLF
B02WCMU wall, 2' High, split-face blockLF
B02XTortoise Fence, Erection and Removal per plan provided by EMLF
B02YConstruction of Protective Berms 95% compacted cohesive soil, 8" lifts, graded to smooth finishCY
B02ZK-RAILS, for use during construction, installation and removalLF
B030Reduced Height airfield barriers, for use during construction, installation and removalLF
Lights and Signage
B031New Installation of Regulatory and Warning Signs, including single postEA
B032Directional Signs, sign-face manufacture and installation on existing posts. Type III or Higher micro prismatic reflective sign panels. ASTM D4956-13 and AASHTO M 268-13.SF
B033Remove and Replace Standard Signs on existing posts. Type III or Higher micro prismatic reflective sign panels. ASTM D4956-13 and AASHTO M 268-13.EA
B034Steel Breakaway Sign posts, 2" square, frangibly mounted up to 10' above grade. Anodized brown iaw the Edwards Base Design Standards. ASTM A653/A653M, ASTM A1011/A1011M, ASTM A123/A123M.EA
B035Treated Wooden 8"x8" Sign Posts, up to 20' above grade Painted brown iaw the Edwards Base Design Standards. ASTM D4444, AWPA U1, AWPA.EA
B036Lighting or Utility Pole, breakaway, up to 40' above grade (To Include Alumin. Pole, One Arm Bracket, Up To 6' Deep Conc Base, Wire, and Conduit)EA
B037Single LED LuminaireEA
B038Double LED LuminaireEA
Joint Repair & Rubber Removal
B039Silicone Joint RepairLF
B03AJet Fuel Resistant Joint Repair (DLA SS-S-200)LF
B03BCompression Joint SealLF
B03CAirfield Rubber Removal - WATERSF
Demolition and Disposal
B03DDemo Curb and GutterLF
B03EDemo AsphaltCY
B03FDemo ConcreteCY
Guardrails and Barriers
B03GGuardrailsLF
B03HTL3 Energy Absorbing Barrier EndsEA
B03JTL2 Energy Absorbing Barrier EndsEA
B03KNon-Energy Absorbing Gating EndsEA
B03LEnergy Absorbing Barrels, Installed and FilledEA
B03MTemporary, Changeable Message Signage for Traffic ControlDAY
FOD Control
B03NManual FOD ControlHR
B03PMechanical FOD ControlHR
Non-Prepriced Items
B03QNon-Priced Item (To Be Negotiated Per Task Order)EA
TOTAL

See FAR 2.101 and 3.104

&"Arial,Regular"&8FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

ATTACHMENT 7 (L-1)

ELIN PRICING TEMPLATE (YEAR 2) &"Arial,Regular"&8FOR OFFICIAL USE ONLY

Year 3

FA9301-16-R-0011 PAVING ID/IQ SOLITICATION
EXHIBIT LINE ITEM NUMBER (ELIN) PRICING TEMPLATE
YEAR 3
Offeror Name:
ELINDESCRIPTIONUNIT OF MEASUREPROPOSED PRICE
Sub-Base Course
C001Each 6'' of Sub-base preparationSY
C002Each added inch of Sub-base preparationSY
Base Course
C0036'' BaseSY
C004Added Base Inch 1"-5"SY
ACC Pavement
C005Each 3'' AC (64/28 Polymer Modified Mix)SY
C006Airfield Roadways, Each 3'' AC (64/28 Polymer Modified Mix, no RAP)SY
C007Airfield Shoulders, Each 3'' AC (64/28 Polymer Modified Mix, no RAP)SY
C008Each Added Inch (64/28 Polymer Modified Mix)SY
C009Airfield Roadways, Each Added Inch (64/28 Polymer Modified Mix, no RAP)SY
C00AAirfield Shoulders, Each Added Inch (64/28 Polymer Modified Mix, no RAP)SY
C00BAirfield - Load Bearing, Each 3'' AC (64/28 Polymer Modified Mix, no RAP)SY
C00CAirfield - Load-Bearing Each Added Inch (64/28 Polymer Modified Mix, no RAP)SY
ACC Milling
C00DMill ACC, first inchSY
C00EMilling, each added inchSY
ACC Pulverization
C00FPulverize ACC and incorporate on-site into base course, each 3"SY
C00GPulverize ACC and dispose off-baseSY
Base and Sub-Base Reinforcement Measures
C00HCement Treated Soil Treatment @ 6% portland cement, top 8" inchesSY
Bituminous Surface Treatment
C00JSingle Coat TreatmentSY
C00KDouble Coat TreatmentSY
ACC Spray Applications
C00LTack CoatSY
C00MFog SealsSY
C00NPrime CoatSY
C00PGSB-88 RejuvenatorSY
ACC Crack Seal
C00QACC Crack Seal, Wide Cracks (1'' to 4'')LF
C00RACC Crack Seal, Medium Cracks (1/2" to 1'')LF
C00SACC Crack Seal, Narrow Cracks (1/16" to 1/2'')LF
Slurry Seal
C00TSingle Application, with Tack CoatSY
C00USingle Application, without Tack CoatSY
ACC Patching
C00VACC Patch < 100SYSY
C00WACC Patch >100SYSY
Roadway and Airfield Markings
C00XRoadway Striping, 4'' Line, with A/F Type 1 BeadsSF
C00YRoadway Striping, 4'' Line, with A/F Type 4 BeadsSF
C00ZRoadway MARKING REFLECTIVE with A/F Type 1 BeadsSF
C010Roadway MARKING REFLECTIVE with A/F Type 4 BeadsSF
C011Roadway Marking, Thermoplastic MaterialSF
C012Airfield Striping, 30" Line total - on Full-Width Black Background, with A/F Type 1 BeadsLF
C013Airfield Striping, 30" Line total - on Full-Width Black Background, with A/F Type 3 BeadsLF
C014Airfield Markings, with A/F Type 1 BeadsSF
C015Airfield Markings, with A/F Type 3 BeadsSF
C016Airfield, Thermoplastic Material Airfield RatedSF
C017Non-Lead-Based Paint RemovalSF
C018Temporary Construction-use ReflectorsEA
C019Permanent, Type D Two-Way Reflective MarkersEA
C01APermanent, Type G One-Way ReflectorsEA
C01BRumble Strips, rubberized material purchased and installed post-constructionEA
C01CRumble Strips, created in ACC at constructionLF
Concrete Work
C01DReinforced PCC Airfield, 650 psi Flexural Strength (ASR Free Aggregate)CY
C01EUnreinforced PCC Airfield, 650 psi Flexural Strength (ASR Free Aggregate)CY
C01FPCC Roadway, Roadway Use, SlipformCY
C01GReinforced Concrete Pad, Formed and Cast in-placeCY
C01HReinforced PCC Headwall, Formed and Cast-in-placeCY
C01JPCC Valley GuttersCF
C01KPCC SpandrelsCF
C01L6" Curb with 18" GutterLF
C01M6" Curb, Curb OnlyLF
C01NSidewalks 6" thick, unreinforced, 5' wideLF
C01PADA Entrances/Exits, Constructed in Existing Sidewalks, including demolition and disposalEA
C01QCorner-Wide ADA Entrances/Exits, Constructed in Existing Sidewalks, including demolition and disposalEA
C01RADA Entrances/Exits, with new Sidewalk ConstructionEA
C01SCorner-Wide ADA Entrances/Exits, with new Sidewalk ConstructionEA
C01THandicap Ramp 1:12 Maximum, 5' wide, with handrail both sidesLF
C01UPCC Crack Seal, Rout and Seal Includes all preparation and pressure-applied epoxy sealantLF
C01VSpall Repair, PCC PavementSF
Culverts
C01WCulvert, 30'' Remove OnlyLF
C01XCulvert, 36'' Remove OnlyLF
C01YCulvert, 30'' CMP Install Only including end treatmentLF
C01ZCulvert, 36'' CMP Install Only including end treatmentLF
C020Culvert, 24'' RCP Install Only including end treatmentLF
C021Culvert, 30'' RCP Install Only including end treatmentLF
C022Culvert, 36'' RCP Install Only including end treatmentLF
Handling of Government Furnished Material
C023Material TruckingTON/MI
C024On-Base Bulk Material Loading & UnloadingCY
C025Placement of government furnished base 6"SY
C026Each added inch of government furnished base 1"-5"SY
C027Placement of government furnished Sub-base 6"SY
C028Each added inch of goverment furnished Sub-baseSY
Professional and Speciality Services
C029Exploratory Drilling per hole, in earth or AC, each footEA
C02AExploratory Drilling, per hole, in rock or through PCC, each 6'' deepEA
C02BDrive Sample, Testing, and a ReportEA
C02CSoil Sampling, Testing, and a ReportEA
C02D2-Man Survey Team, In-Field Marking and Report (These items are for additional surveying, as required, above and beyond a standard paving project. Surveying incidental to a standard paving project is to be included in the line items associated with the standard paving project.)HR
C02EPot-holing for utilities (These items are for additional pot-holing, as required, above and beyond a standard paving project. Pot-holing incidental to a standard paving project is to be included in the line items associated with the standard paving project.)HR
C02FUnder-Roadway Tunneling for Utility Placement, up to 12" DiameterLF
Material Handling
C02GMaintenance and Reconstruction of SHOULDERS using existing on-site materials onlyLF
C02HMaintenance and reconstruction of ditches using existing, on-site materials onlyLF
C02JCommon ExcavationCY
C02KRock ExcavationCY
C02LExcavation of Unsuitable MaterialsCY
C02MOff-Base Material DisposalCY
C02NSelect Fill MaterialCY
C02PRaise or Lower Utility CoversEA
Gates, Walls, and Fencing
C02Q8' Chain Link FenceLF
C02R3 Fencing Wire outriggersLF
C02S8' Pedestrian GateLF
C02T8' Rolling Vehicle GateLF
C02U8' Vehicle Swing GateLF
C02V8' Heavy-Duty Vehicle Swing GateLF
C02WCMU wall, 2' High, split-face blockLF
C02XTortoise Fence, Erection and Removal per plan provided by EMLF
C02YConstruction of Protective Berms 95% compacted cohesive soil, 8" lifts, graded to smooth finishCY
C02ZK-RAILS, for use during construction, installation and removalLF
C030Reduced Height airfield barriers, for use during construction, installation and removalLF
Lights and Signage
C031New Installation of Regulatory and Warning Signs, including single postEA
C032Directional Signs, sign-face manufacture and installation on existing posts. Type III or Higher micro prismatic reflective sign panels. ASTM D4956-13 and AASHTO M 268-13.SF
C033Remove and Replace Standard Signs on existing posts. Type III or Higher micro prismatic reflective sign panels. ASTM D4956-13 and AASHTO M 268-13.EA
C034Steel Breakaway Sign posts, 2" square, frangibly mounted up to 10' above grade. Anodized brown iaw the Edwards Base Design Standards. ASTM A653/A653M, ASTM A1011/A1011M, ASTM A123/A123M.EA
C035Treated Wooden 8"x8" Sign Posts, up to 20' above grade Painted brown iaw the Edwards Base Design Standards. ASTM D4444, AWPA U1, AWPA.EA
C036Lighting or Utility Pole, breakaway, up to 40' above grade (To Include Alumin. Pole, One Arm Bracket, Up To 6' Deep Conc Base, Wire, and Conduit)EA
C037Single LED LuminaireEA
C038Double LED LuminaireEA
Joint Repair & Rubber Removal
C039Silicone Joint RepairLF
C03AJet Fuel Resistant Joint Repair (DLA SS-S-200)LF
C03BCompression Joint SealLF
C03CAirfield Rubber Removal - WATERSF
Demolition and Disposal
C03DDemo Curb and GutterLF
C03EDemo AsphaltCY
C03FDemo ConcreteCY
Guardrails and Barriers
C03GGuardrailsLF
C03HTL3 Energy Absorbing Barrier EndsEA
C03JTL2 Energy Absorbing Barrier EndsEA
C03KNon-Energy Absorbing Gating EndsEA
C03LEnergy Absorbing Barrels, Installed and FilledEA
C03MTemporary, Changeable Message Signage for Traffic ControlDAY
FOD Control
C03NManual FOD ControlHR
C03PMechanical FOD ControlHR
Non-Prepriced Items
C03QNon-Priced Item (To Be Negotiated Per Task Order)EA
TOTAL

See FAR 2.101 and 3.104

&"Arial,Regular"&8FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

ATTACHMENT 7 (L-1)

ELIN PRICING TEMPLATE (YEAR 3) &"Arial,Regular"&8FOR OFFICIAL USE ONLY

Year 4

FA9301-16-R-0011 PAVING ID/IQ SOLITICATION
EXHIBIT LINE ITEM NUMBER (ELIN) PRICING TEMPLATE
YEAR 4
Offeror Name:
ELINDESCRIPTIONUNIT OF MEASUREPROPOSED PRICE
Sub-Base Course
D001Each 6'' of Sub-base preparationSY
D002Each added inch of Sub-base preparationSY
Base Course
D0036'' BaseSY
D004Added Base Inch 1"-5"SY
ACC Pavement
D005Each 3'' AC (64/28 Polymer Modified Mix)SY
D006Airfield Roadways, Each 3'' AC (64/28 Polymer Modified Mix, no RAP)SY
D007Airfield Shoulders, Each 3'' AC (64/28 Polymer Modified Mix, no RAP)SY
D008Each Added Inch (64/28 Polymer Modified Mix)SY
D009Airfield Roadways, Each Added Inch (64/28 Polymer Modified Mix, no RAP)SY
D00AAirfield Shoulders, Each Added Inch (64/28 Polymer Modified Mix, no RAP)SY
D00BAirfield - Load Bearing, Each 3'' AC (64/28 Polymer Modified Mix, no RAP)SY
D00CAirfield - Load-Bearing Each Added Inch (64/28 Polymer Modified Mix, no RAP)SY
ACC Milling
D00DMill ACC, first inchSY
D00EMilling, each added inchSY
ACC Pulverization
D00FPulverize ACC and incorporate on-site into base course, each 3"SY
D00GPulverize ACC and dispose off-baseSY
Base and Sub-Base Reinforcement Measures
D00HCement Treated Soil Treatment @ 6% portland cement, top 8" inchesSY
Bituminous Surface Treatment
D00JSingle Coat TreatmentSY
D00KDouble Coat TreatmentSY
ACC Spray Applications
D00LTack CoatSY
D00MFog SealsSY
D00NPrime CoatSY
D00PGSB-88 RejuvenatorSY
ACC Crack Seal
D00QACC Crack Seal, Wide Cracks (1'' to 4'')LF
D00RACC Crack Seal, Medium Cracks (1/2" to 1'')LF
D00SACC Crack Seal, Narrow Cracks (1/16" to 1/2'')LF
Slurry Seal
D00TSingle Application, with Tack CoatSY
D00USingle Application, without Tack CoatSY
ACC Patching
D00VACC Patch < 100SYSY
D00WACC Patch >100SYSY
Roadway and Airfield Markings
D00XRoadway Striping, 4'' Line, with A/F Type 1 BeadsSF
D00YRoadway Striping, 4'' Line, with A/F Type 4 BeadsSF
D00ZRoadway MARKING REFLECTIVE with A/F Type 1 BeadsSF
D010Roadway MARKING REFLECTIVE with A/F Type 4 BeadsSF
D011Roadway Marking, Thermoplastic MaterialSF
D012Airfield Striping, 30" Line total - on Full-Width Black Background, with A/F Type 1 BeadsLF
D013Airfield Striping, 30" Line total - on Full-Width Black Background, with A/F Type 3 BeadsLF
D014Airfield Markings, with A/F Type 1 BeadsSF
D015Airfield Markings, with A/F Type 3 BeadsSF
D016Airfield, Thermoplastic Material Airfield RatedSF
D017Non-Lead-Based Paint RemovalSF
D018Temporary Construction-use ReflectorsEA
D019Permanent, Type D Two-Way Reflective MarkersEA
D01APermanent, Type G One-Way ReflectorsEA
D01BRumble Strips, rubberized material purchased and installed post-constructionEA
D01CRumble Strips, created in ACC at constructionLF
Concrete Work
D01DReinforced PCC Airfield, 650 psi Flexural Strength (ASR Free Aggregate)CY
D01EUnreinforced PCC Airfield, 650 psi Flexural Strength (ASR Free Aggregate)CY
D01FPCC Roadway, Roadway Use, SlipformCY
D01GReinforced Concrete Pad, Formed and Cast in-placeCY
D01HReinforced PCC Headwall, Formed and Cast-in-placeCY
D01JPCC Valley GuttersCF
D01KPCC SpandrelsCF
D01L6" Curb with 18" GutterLF
D01M6" Curb, Curb OnlyLF
D01NSidewalks 6" thick, unreinforced, 5' wideLF
D01PADA Entrances/Exits, Constructed in Existing Sidewalks, including demolition and disposalEA
D01QCorner-Wide ADA Entrances/Exits, Constructed in Existing Sidewalks, including demolition and disposalEA
D01RADA Entrances/Exits, with new Sidewalk ConstructionEA
D01SCorner-Wide ADA Entrances/Exits, with new Sidewalk ConstructionEA
D01THandicap Ramp 1:12 Maximum, 5' wide, with handrail both sidesLF
D01UPCC Crack Seal, Rout and Seal Includes all preparation and pressure-applied epoxy sealantLF
D01VSpall Repair, PCC PavementSF
Culverts
D01WCulvert, 30'' Remove OnlyLF
D01XCulvert, 36'' Remove OnlyLF
D01YCulvert, 30'' CMP Install Only including end treatmentLF
D01ZCulvert, 36'' CMP Install Only including end treatmentLF
D020Culvert, 24'' RCP Install Only including end treatmentLF
D021Culvert, 30'' RCP Install Only including end treatmentLF
D022Culvert, 36'' RCP Install Only including end treatmentLF
Handling of Government Furnished Material
D023Material TruckingTON/MI
D024On-Base Bulk Material Loading & UnloadingCY
D025Placement of government furnished base 6"SY
D026Each added inch of government furnished base 1"-5"SY
D027Placement of government furnished Sub-base 6"SY
D028Each added inch of goverment furnished Sub-baseSY
Professional and Speciality Services
D029Exploratory Drilling per hole, in earth or AC, each footEA
D02AExploratory Drilling, per hole, in rock or through PCC, each 6'' deepEA
D02BDrive Sample, Testing, and a ReportEA
D02CSoil Sampling, Testing, and a ReportEA
D02D2-Man Survey Team, In-Field Marking and Report (These items are for additional surveying, as required, above and beyond a standard paving project. Surveying incidental to a standard paving project is to be included in the line items associated with the standard paving project.)HR
D02EPot-holing for utilities (These items are for additional pot-holing, as required, above and beyond a standard paving project. Pot-holing incidental to a standard paving project is to be included in the line items associated with the standard paving project.)HR
D02FUnder-Roadway Tunneling for Utility Placement, up to 12" DiameterLF
Material Handling
D02GMaintenance and Reconstruction of SHOULDERS using existing on-site materials onlyLF
D02HMaintenance and reconstruction of ditches using existing, on-site materials onlyLF
D02JCommon ExcavationCY
D02KRock ExcavationCY
D02LExcavation of Unsuitable MaterialsCY
D02MOff-Base Material DisposalCY
D02NSelect Fill MaterialCY
D02PRaise or Lower Utility CoversEA
Gates, Walls, and Fencing
D02Q8' Chain Link FenceLF
D02R3 Fencing Wire outriggersLF
D02S8' Pedestrian GateLF
D02T8' Rolling Vehicle GateLF
D02U8' Vehicle Swing GateLF
D02V8' Heavy-Duty Vehicle Swing GateLF
D02WCMU wall, 2' High, split-face blockLF
D02XTortoise Fence, Erection and Removal per plan provided by EMLF
D02YConstruction of Protective Berms 95% compacted cohesive soil, 8" lifts, graded to smooth finishCY
D02ZK-RAILS, for use during construction, installation and removalLF
D030Reduced Height airfield barriers, for use during construction, installation and removalLF
Lights and Signage
D031New Installation of Regulatory and Warning Signs, including single postEA
D032Directional Signs, sign-face manufacture and installation on existing posts. Type III or Higher micro prismatic reflective sign panels. ASTM D4956-13 and AASHTO M 268-13.SF
D033Remove and Replace Standard Signs on existing posts. Type III or Higher micro prismatic reflective sign panels. ASTM D4956-13 and AASHTO M 268-13.EA
D034Steel Breakaway Sign posts, 2" square, frangibly mounted up to 10' above grade. Anodized brown iaw the Edwards Base Design Standards. ASTM A653/A653M, ASTM A1011/A1011M, ASTM A123/A123M.EA
D035Treated Wooden 8"x8" Sign Posts, up to 20' above grade Painted brown iaw the Edwards Base Design Standards. ASTM D4444, AWPA U1, AWPA.EA
D036Lighting or Utility Pole, breakaway, up to 40' above grade (To Include Alumin. Pole, One Arm Bracket, Up To 6' Deep Conc Base, Wire, and Conduit)EA
D037Single LED LuminaireEA
D038Double LED LuminaireEA
Joint Repair & Rubber Removal
D039Silicone Joint RepairLF
D03AJet Fuel Resistant Joint Repair (DLA SS-S-200)LF
D03BCompression Joint SealLF
D03CAirfield Rubber Removal - WATERSF
Demolition and Disposal
D03DDemo Curb and GutterLF
D03EDemo AsphaltCY
D03FDemo ConcreteCY
Guardrails and Barriers
D03GGuardrailsLF
D03HTL3 Energy Absorbing Barrier EndsEA
D03JTL2 Energy Absorbing Barrier EndsEA
D03KNon-Energy Absorbing Gating EndsEA
D03LEnergy Absorbing Barrels, Installed and FilledEA
D03MTemporary, Changeable Message Signage for Traffic ControlDAY
FOD Control
D03NManual FOD ControlHR
D03PMechanical FOD ControlHR
Non-Prepriced Items
D03QNon-Priced Item (To Be Negotiated Per Task Order)EA
TOTAL

See FAR 2.101 and 3.104

&"Arial,Regular"&8FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

ATTACHMENT 7 (L-1)

ELIN PRICING TEMPLATE (YEAR 4) &"Arial,Regular"&8FOR OFFICIAL USE ONLY

Year 5

FA9301-16-R-0011 PAVING ID/IQ SOLITICATION
EXHIBIT LINE ITEM NUMBER (ELIN) PRICING TEMPLATE
YEAR 5
Offeror Name:
ELINDESCRIPTIONUNIT OF MEASUREPROPOSED PRICE
Sub-Base Course
E001Each 6'' of Sub-base preparationSY
E002Each added inch of Sub-base preparationSY
Base Course
E0036'' BaseSY
E004Added Base Inch 1"-5"SY
ACC Pavement
E005Each 3'' AC (64/28 Polymer Modified Mix)SY
E006Airfield Roadways, Each 3'' AC (64/28 Polymer Modified Mix, no RAP)SY
E007Airfield Shoulders, Each 3'' AC (64/28 Polymer Modified Mix, no RAP)SY
E008Each Added Inch (64/28 Polymer Modified Mix)SY
E009Airfield Roadways, Each Added Inch (64/28 Polymer Modified Mix, no RAP)SY
E00AAirfield Shoulders, Each Added Inch (64/28 Polymer Modified Mix, no RAP)SY
E00BAirfield - Load Bearing, Each 3'' AC (64/28 Polymer Modified Mix, no RAP)SY
E00CAirfield - Load-Bearing Each Added Inch (64/28 Polymer Modified Mix, no RAP)SY
ACC Milling
E00DMill ACC, first inchSY
E00EMilling, each added inchSY
ACC Pulverization
E00FPulverize ACC and incorporate on-site into base course, each 3"SY
E00GPulverize ACC and dispose off-baseSY
Base and Sub-Base Reinforcement Measures
E00HCement Treated Soil Treatment @ 6% portland cement, top 8" inchesSY
Bituminous Surface Treatment
E00JSingle Coat TreatmentSY
E00KDouble Coat TreatmentSY
ACC Spray Applications
E00LTack CoatSY
E00MFog SealsSY
E00NPrime CoatSY
E00PGSB-88 RejuvenatorSY
ACC Crack Seal
E00QACC Crack Seal, Wide Cracks (1'' to 4'')LF
E00RACC Crack Seal, Medium Cracks (1/2" to 1'')LF
E00SACC Crack Seal, Narrow Cracks (1/16" to 1/2'')LF
Slurry Seal
E00TSingle Application, with Tack CoatSY
E00USingle Application, without Tack CoatSY
ACC Patching
E00VACC Patch < 100SYSY
E00WACC Patch >100SYSY
Roadway and Airfield Markings
E00XRoadway Striping, 4'' Line, with A/F Type 1 BeadsSF
E00YRoadway Striping, 4'' Line, with A/F Type 4 BeadsSF
E00ZRoadway MARKING REFLECTIVE with A/F Type 1 BeadsSF
E010Roadway MARKING REFLECTIVE with A/F Type 4 BeadsSF
E011Roadway Marking, Thermoplastic MaterialSF
E012Airfield Striping, 30" Line total - on Full-Width Black Background, with A/F Type 1 BeadsLF
E013Airfield Striping, 30" Line total - on Full-Width Black Background, with A/F Type 3 BeadsLF
E014Airfield Markings, with A/F Type 1 BeadsSF
E015Airfield Markings, with A/F Type 3 BeadsSF
E016Airfield, Thermoplastic Material Airfield RatedSF
E017Non-Lead-Based Paint RemovalSF
E018Temporary Construction-use ReflectorsEA
E019Permanent, Type D Two-Way Reflective MarkersEA
E01APermanent, Type G One-Way ReflectorsEA
E01BRumble Strips, rubberized material purchased and installed post-constructionEA
E01CRumble Strips, created in ACC at constructionLF
Concrete Work
E01DReinforced PCC Airfield, 650 psi Flexural Strength (ASR Free Aggregate)CY
E01EUnreinforced PCC Airfield, 650 psi Flexural Strength (ASR Free Aggregate)CY
E01FPCC Roadway, Roadway Use, SlipformCY
E01GReinforced Concrete Pad, Formed and Cast in-placeCY
E01HReinforced PCC Headwall, Formed and Cast-in-placeCY
E01JPCC Valley GuttersCF
E01KPCC SpandrelsCF
E01L6" Curb with 18" GutterLF
E01M6" Curb, Curb OnlyLF
E01NSidewalks 6" thick, unreinforced, 5' wideLF
E01PADA Entrances/Exits, Constructed in Existing Sidewalks, including demolition and disposalEA
E01QCorner-Wide ADA Entrances/Exits, Constructed in Existing Sidewalks, including demolition and disposalEA
E01RADA Entrances/Exits, with new Sidewalk ConstructionEA
E01SCorner-Wide ADA Entrances/Exits, with new Sidewalk ConstructionEA
E01THandicap Ramp 1:12 Maximum, 5' wide, with handrail both sidesLF
E01UPCC Crack Seal, Rout and Seal Includes all preparation and pressure-applied epoxy sealantLF
E01VSpall Repair, PCC PavementSF
Culverts
E01WCulvert, 30'' Remove OnlyLF
E01XCulvert, 36'' Remove OnlyLF
E01YCulvert, 30'' CMP Install Only including end treatmentLF
E01ZCulvert, 36'' CMP Install Only including end treatmentLF
E020Culvert, 24'' RCP Install Only including end treatmentLF
E021Culvert, 30'' RCP Install Only including end treatmentLF
E022Culvert, 36'' RCP Install Only including end treatmentLF
Handling of Government Furnished Material
E023Material TruckingTON/MI
E024On-Base Bulk Material Loading & UnloadingCY
E025Placement of government furnished base 6"SY
E026Each added inch of government furnished base 1"-5"SY
E027Placement of government furnished Sub-base 6"SY
E028Each added inch of goverment furnished Sub-baseSY
Professional and Speciality Services
E029Exploratory Drilling per hole, in earth or AC, each footEA
E02AExploratory Drilling, per hole, in rock or through PCC, each 6'' deepEA
E02BDrive Sample, Testing, and a ReportEA
E02CSoil Sampling, Testing, and a ReportEA
E02D2-Man Survey Team, In-Field Marking and Report (These items are for additional surveying, as required, above and beyond a standard paving project. Surveying incidental to a standard paving project is to be included in the line items associated with the standard paving project.)HR
E02EPot-holing for utilities (These items are for additional pot-holing, as required, above and beyond a standard paving project. Pot-holing incidental to a standard paving project is to be included in the line items associated with the standard paving project.)HR
E02FUnder-Roadway Tunneling for Utility Placement, up to 12" DiameterLF
Material Handling
E02GMaintenance and Reconstruction of SHOULDERS using existing on-site materials onlyLF
E02HMaintenance and reconstruction of ditches using existing, on-site materials onlyLF
E02JCommon ExcavationCY
E02KRock ExcavationCY
E02LExcavation of Unsuitable MaterialsCY
E02MOff-Base Material DisposalCY
E02NSelect Fill MaterialCY
E02PRaise or Lower Utility CoversEA
Gates, Walls, and Fencing
E02Q8' Chain Link FenceLF
E02R3 Fencing Wire outriggersLF
E02S8' Pedestrian GateLF
E02T8' Rolling Vehicle GateLF
E02U8' Vehicle Swing GateLF
E02V8' Heavy-Duty Vehicle Swing GateLF
E02WCMU wall, 2' High, split-face blockLF
E02XTortoise Fence, Erection and Removal per plan provided by EMLF
E02YConstruction of Protective Berms 95% compacted cohesive soil, 8" lifts, graded to smooth finishCY
E02ZK-RAILS, for use during construction, installation and removalLF
E030Reduced Height airfield barriers, for use during construction, installation and removalLF
Lights and Signage
E031New Installation of Regulatory and Warning Signs, including single postEA
E032Directional Signs, sign-face manufacture and installation on existing posts. Type III or Higher micro prismatic reflective sign panels. ASTM D4956-13 and AASHTO M 268-13.SF
E033Remove and Replace Standard Signs on existing posts. Type III or Higher micro prismatic reflective sign panels. ASTM D4956-13 and AASHTO M 268-13.EA
E034Steel Breakaway Sign posts, 2" square, frangibly mounted up to 10' above grade. Anodized brown iaw the Edwards Base Design Standards. ASTM A653/A653M, ASTM A1011/A1011M, ASTM A123/A123M.EA
E035Treated Wooden 8"x8" Sign Posts, up to 20' above grade Painted brown iaw the Edwards Base Design Standards. ASTM D4444, AWPA U1, AWPA.EA
E036Lighting or Utility Pole, breakaway, up to 40' above grade (To Include Alumin. Pole, One Arm Bracket, Up To 6' Deep Conc Base, Wire, and Conduit)EA
E037Single LED LuminaireEA
E038Double LED LuminaireEA
Joint Repair & Rubber Removal
E039Silicone Joint RepairLF
E03AJet Fuel Resistant Joint Repair (DLA SS-S-200)LF
E03BCompression Joint SealLF
E03CAirfield Rubber Removal - WATERSF
Demolition and Disposal
E03DDemo Curb and GutterLF
E03EDemo AsphaltCY
E03FDemo ConcreteCY
Guardrails and Barriers
E03GGuardrailsLF
E03HTL3 Energy Absorbing Barrier EndsEA
E03JTL2 Energy Absorbing Barrier EndsEA
E03KNon-Energy Absorbing Gating EndsEA
E03LEnergy Absorbing Barrels, Installed and FilledEA
E03MTemporary, Changeable Message Signage for Traffic ControlDAY
FOD Control
E03NManual FOD ControlHR
E03PMechanical FOD ControlHR
Non-Prepriced Items
E03QNon-Priced Item (To Be Negotiated Per Task Order)EA
TOTAL

&8FOR OFFICIAL USE ONLY

See FAR 2.101 and 3.104

&"Arial,Regular"&8FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

ATTACHMENT 7 (L-1)

ELIN PRICING TEMPLATE (YEAR 5) &"Arial,Regular"&8FOR OFFICIAL USE ONLY

File details come from the government source that posted it. Updated .