5_-_Maintenance_Traffic_Control_Signs_Basewide.pdf

PDF 676 KB Posted

Attached to
Paving Indefinite Delivery/Indefinite Quantity (ID/IQ) Contract Federal contract opportunity
Solicitation number
FA9301-16-R-0011
Issued by
Department of the Air Force Materiel Command Test Center

About this file

5 - Maintenance Traffic Control Signs Basewide

View the file

Other files for this federal contract opportunity

Other files attached to Paving Indefinite Delivery/Indefinite Quantity (ID/IQ) Contract, newest first.
File Type Posted
Solicitation_FA9301-16-R-0011_Amendment_0003.pdf PDF
FA9301-16-R-0011_Questions_and_Answers_(Round_3_-_FINAL).pdf PDF
Atch_5_Wage_Determination_-_Kern_County_(Update_2).pdf PDF
Atch_10_(L-4),_Seed_Project_Pricing_Template_(Rev2).xlsx XLSX spreadsheet
Atch_7_(L-1),_ELIN_Pricing_Template_(Rev2).xlsx XLSX spreadsheet
Atch_8_(L-2),_Estimated_Workload_(Rev2).xlsx XLSX spreadsheet
FA9301-16-R-0011_Questions_and_Answers_(Round_2).pdf.pdf PDF
FA9301-16-R-0011_Amendment_0002.pdf PDF
Atch_9_(L-3)_Seed_Project_Statement_of_Work_(Revised).pdf PDF
FA9301-16-R-0011_Amendment_0001.pdf PDF
Atch_5_Wage_Determination_-_Kern_County_(Update).pdf PDF
Atch_10_(L-4)_Seed_Project_Pricing_Template_(Revised).xlsx XLSX spreadsheet
Atch_7_(L-1)_ELIN_Pricing_Template_(Revised).xlsx XLSX spreadsheet
FA9301-16-R-0011_Questions_and_Answers_-_Technical.pdf PDF
Atch_1_Basic_Contract_Statement_of_Work_(Revised).pdf PDF
Atch_9_(L-3)_Seed_Project_Statement_of_Work_(Revised).pdf PDF
Atch_8_(L-2)_Estimated_Workload_(Revised).xlsx XLSX spreadsheet
Atch_6_Wage_Determination_-_Los_Angeles_County_(Update).pdf PDF
4_-_Maintenance_Road_Markings.pdf PDF
11_-_Repair_Roads_1-30A_Test_Area_AFRL_.pdf PDF
6_-_Repair_Roads_at_South_Base_Compound.pdf PDF
7_-_Repair_Parking_Lot_at_Ridley_Building_1440.pdf PDF
9_-_Repair_Parking_Lot_at_Building_1400.pdf PDF
1_-_Repair_South_Lancaster_Blvd.pdf PDF
12_-_Spall_Repair_Pad_15_Post_Jobwalk.pdf PDF
8_-_Minor_Construction_Expand_Parking_Lot_at_Building_605.pdf PDF
3_-_Maint_Crack_and_Slurry_Seal_Airfield_Multi_Locations.pdf PDF
10_-_Repair_Roads_Base_wide_Rosamond.pdf PDF
2_-_Maint_Crack_Seal_and_Slurry_Seal_S_Lancaster_Blvd.pdf PDF
FA9301-16-R-0011_Questions_and_Answers_-_Contractual.pdf PDF
Pre-Proposal_Conference_Vendor_Sign-In_Sheet_30_Mar_2017.pdf PDF
Pre-Proposal_Conference_Briefing_Slides_30_Mar_2017.pdf PDF
Atch_11_(L-5)_Schedule_of_Material_Submittals_Template.xls XLS spreadsheet
Atch_14_(L-8)_Past_Performance_Questionnaire_(PPQ).pdf PDF
Atch_5_Wage_Determination_-_Kern_County.pdf PDF
Atch_10_(L-4)_Seed_Project_Pricing_Template.xlsx XLSX spreadsheet
Atch_15_(L-9)_Subcontractor_Teaming_Partner_Consent_Form.pdf PDF
Atch_12_(L-6)_Progress_Schedule_Template.xlsx XLSX spreadsheet
FA9301-16-R-0011_Paving_IDIQ_Solicitation_SF_1442.pdf PDF
Atch_4_Civil_Engineering_Provided_Plans.pdf PDF
Atch_6_Wage_Determination_-_Los_Angeles_County.pdf PDF
Atch_9_(L-3)_Seed_Project_Statement_of_Work.pdf PDF
Atch_13_(L-7)_Past_Performance_Information_Form_(PPIF).pdf PDF
Atch_7_(L-1)_ELIN_Pricing_Template.xlsx XLSX spreadsheet
Atch_1_Basic_Contract_Statement_of_Work.pdf PDF
Atch_3_Paving_Technical_Specifications.pdf PDF
Atch_2_2017_Edwards_AFB_Design_Standards.pdf PDF
Atch_8_(L-2)_Estimated_Workload.xlsx XLSX spreadsheet
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

REQUEST FOR PROPOSAL

REPAIR TRAFFIC SIGNS BASE WIDE

PROJECT EXECUTION OFFICE

412 CEG / CENMP

EDWARDS AIR FORCE BASE, CALIFORNIA 93523-8540

INDEX

PART 1 – GENERAL REQUIREMENTS

1. SCOPE

1.1. GOVERNMENT FURNISHED UTILITIES

1.2. WORK HOURS

1.3. BASE ACCESS

1.4. HAZARDOUS NOISE

1.5. DISPOSAL OF WASTE/EXCESS MATERIAL

1.6. SPILLAGE

1.7. REGULATIONS AND STANDARDS

1.8. ENVIRONMENTAL PROTECTION

1.9. WELDING PERMITS

1.10. USE OF RADIOACTIVE ISOTOPES

1.11. NO SMOKING POLICY

1.12. TRASH AND LITTER CONTROL

1.13. POST-CONSTRUCTION CLEANUP

1.14. PROHIBITED ITEMS

1.15. SAFETY

1.16. DIGGING PERMIT

2. REQUIREMENTS GENERAL

2.1. PROJECT REQUIREMENTS

2.2. SECURITY REQUIREMENTS

2.3. CONSTRUCTION WORK PLAN REPORTS, DRAWINGS & SUBMITTALS

2.4. ENVIRONMENTAL REQUIREMENTS CHECKLIST

3. PERFORMANCE REQUIREMENTS AND CRITERIA:

3.1. REFERENCE

3.2. INSTRUCTIONS AND ADMINISTRATION:

3.3. FIELD MEASUREMENTS AND VERIFICATION:

3.4. CONSTRUCTION DOCUMENTS:

3.5. FINAL CONSTRUCTION SUBMITTALS

MINIMIZATIONS MEASURES

CONSTRUCTION AREA

PART 1 – GENERAL REQUIREMENTS

1. SCOPE

The work covered by, but not limited to this statement of work consists of furnishing all supervision, labor, design, engineering, equipment, and materials necessary to perform all operations to construct the projects detailed in Section

2.1. Provide barricades in construction area to prevent hazardous conditions. Repair/replace any items damaged by contractor employees and/or any sub-contractors while working on this project. Contractor shall field verify all dimensions and site conditions prior to start of work.

1.1. GOVERNMENT FURNISHED UTILITIES

Water and electricity will be furnished to the Contractor from existing Base systems/outlets at no cost to the Contractor.

The Contractor shall furnish all equipment, material and labor necessary to obtain the utilities from the existing systems/outlets.

1.2. WORK HOURS

The hours of work for this project shall be from 7:00 A.M. to 5:00 P.M. Monday through Friday, excluding Federal holidays. No work shall commence without prior coordination with the project manager Ms. Hoai Vu (661-277-1482).

Site work outside of these stated hours shall be submitted to in advance and contingent upon approval by the CE Project

Manager Hoai Vu.

1.3. BASE ACCESS

Proof of current vehicle registration, driver’s license and vehicle insurance must be made available prior to issuance of the base access permits. The Contractor shall obtain base access for his personnel, subcontractors, vehicles and equipment by submitting the following information to the xxx within five (5) working days prior to commencing work for base entry coordination:

Name of Individual, Date of Birth, & (U.S.) Citizenship Status (if not, provide Legal Alien Registration No.)

Social Security Number

Drivers License Number

Vehicle License Number

1.4. HAZARDOUS NOISE

Jet aircraft operating on the runway and/or taxiways make the contract area a zone of high-level noise. The contractor is advised to take the necessary precautions to protect him and his workers against ear injury while in the area.

1.5. DISPOSAL OF WASTE/EXCESS MATERIAL

Any waste or excess material resulting from any contract requirement shall be removed and disposed of at a proper disposal site off Edwards Air Force Base by the Contractor in strict accordance with applicable Federal, State, County and local laws. Disposal, discharge, deposit, dumping, spilling, leaking, or placing of any material, wastes, effluents, trash, garbage, oil, grease, paint, chemicals, etc. in areas other than proper disposal sites off Edwards Air Force Base shall be subject to the approval of the Contracting Officer. If any waste material is dumped in unauthorized areas, the contractor shall remove the material and restore the area to the condition of the adjacent undisturbed area. Contaminated ground shall be excavated, disposed of as directed by the Contracting Officer, and replaced with suitable fill material, compacted and finished to match adjoining surfaces. The Contractor shall comply with all Federal, State, County and Air

Force regulations pertaining to disposal of construction debris.

1.5.1. Submittal Requirements: The contractor shall furnish the following information to the Contracting Officer:

Name and address of the proposed landfill to be used for disposal of project related waste.

Landfill class.

Proposed materials to be disposed of at this location.

This information is to be submitted for all materials to be disposed of by the contractor, including hazardous waste as well as demolition debris, and will be submitted and approved before construction work begins. Copies of manifests and inventories of hazardous wastes that were disposed of during the course of the contract must be provided to 412

CEG/CEV at the conclusion of the contract. The closeout submittal must contain all information required by the initial submittal.

1.5.2. Disposal of Hazardous Material: The contractor shall comply with all local, State, and Federal laws pertaining to the protection of the environment and emission of hazardous pollutants in the performance of this contract. The

Contractor shall also provide a copy to the Contracting Officer and the Base Environmental Protection Monitor of all correspondence with local, State, or Federal pollution control authorities. Any hazardous waste generated by the

Contractor shall be the Contractor's responsibility to dispose of in accordance with the above mentioned laws. This will include hauling all paint determined as hazardous waste to the nearest Hazardous Waste Dump. The contractor shall coordinate all movement of hazardous waste with 412 CEG/CEV Hazardous Manager at (661) 277-1909 prior to movement.

1.6. SPILLAGE

Special measures shall be taken to prevent paints, chemicals, fuels, oils, grease, etc., from being spilled and particularly from entering surface or groundwater. In the event of paint, fuel, oils, or chemical spill the Contractor shall immediately take containment measures to prevent the spill from migrating and/or entering the base drainage system. Hazardous spill residue shall be disposed of in accordance with all local, State, and Federal laws pertaining to the protection of the environmental and emission of hazardous pollutants in the performance of this contract. Non-hazardous spillage shall be disposed of off base in accordance with paragraph 1.10. All spills shall be reported as soon as possible to Environmental

Compliance Branch and Base Safety at (661) 277-1401 and (661) 277-4640 respectively.

1.7. REGULATIONS and STANDARDS

The contractor shall comply with EM 385-1-1 U.S. Army Corps of Engineers Safety and Health Requirements manual

(Latest Edition), Edwards Air Force Base safety standards and all OSHA standards. Resolution of citations for violations of Occupational Safety, Health Act Safety, and Health Standards is the contractor’s responsibility.

1.07A Health & Accident Safety Plan (HASP): The contractor shall furnish their HASP for xxx review and information prior to start of construction.

1.07B Quality Control Plan: The contractor shall furnish their Quality Control Plan for CE review and information.

1.8. ENVIRONMENTAL PROTECTION

For the purpose of this specification, environmental pollution is defined as a presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances of importance to human life; affect other species of importance to man; or degrade the utility of the environment for aesthetic and recreational purposes. The control of environmental pollution requires consideration of air, water, and land, and involves noise, solid-waste management, as well as pollutants.

1.8.1. Applicable Regulations: In order to prevent and to provide for abatement and control of any environmental pollution arising from the construction activities of the Contractor and any subcontractor employed by the Contractor in the performance of this contract, they shall comply with the applicable Federal, State, and local laws and regulations concerning environmental; pollution control and abatement in effect on the date of the solicitation

1.8.2 Protection of Land Resources: It is intended the land resources within the project boundaries of work performed under this contract be preserved in their present condition or be restored to a condition after completion of construction that will appear to be natural and not detract from the appearance of the project. Insofar as possible, the Contractor shall confine activities to areas defined by plans and specifications.

1.8.3 Training: The Contractor shall implement an employee’s environmental awareness program which will be provided to construction and operation employees with information to encourage awareness and preservation of the desert ecosystem and the resources found in the Western Mojave Desert. This information shall be distributed to and discussed with all employees during employee orientation sessions. This information shall also be provided to all visitors and subcontractors that will be on site. The Contractor shall have all persons participating in the environmental awareness program to sign an affidavit declaring that the individual understands and shall adhere to the guidelines set forth in the program material.

1.8.4 Protection of Water Resources: The Contractor shall not pollute streams, lakes, or reservoirs with fuels, oils, bitumen, calcium chloride, painting materials, acids, or other harmful materials. It is the responsibility of the Contractor to investigate and comply with all applicable Federal, State, County, and Municipal laws concerning pollution of rivers and streams. All work under this contract shall be performed in such a manner that objectionable conditions will not be created in streams through or adjacent to the project area.

1.8.5 Protection of Fish and Wildlife: The contractor shall at all times perform all work, taking all such steps required to prevent any interference or disturbance to fish and/or wildlife. Fouling or polluting of water will not be tolerated. Wash waters and waste shall be processed, filtered, ponded, or effectively treated prior to their release into any body of water.

1.8.6. Protection of Air Quality: Contractor shall comply with all air pollution restrictions applicable to this project.

Waste materials shall not be burned on Government premises. If the contractor elects to dispose of waste materials, (other than hazardous waste) off Government premises, by burning, he shall make his own arrangements for such burning area and shall be responsible for all permits and conformance to all local, state, and federal regulations.

1.8.7 Protection of Desert Tortoise: Contractor personnel shall not touch, harm, harass, or kill desert tortoise. Notify the

Contracting Officer immediately of all desert tortoise sightings. The Contractor will be responsible for removing desert tortoises out of immediate danger. Should construction activities threaten the survival of any desert tortoises, those activities shall immediately cease until the Contracting Officer safely removes the tortoise(s). The Contracting Officer shall perform clearance surveys in all areas of planned disturbance. The Contractor will be available to accompany construction crews during period of tortoise activity to provide protection of these animals and their burrows.

1.8.8 AF Form 813: Contractor shall comply with the most current AF Form 813 requirements checklist.

1.9. WELDING PERMITS

The contractor shall obtain a welding permit from the Edwards Fire Department, Building 3760, (661) 277-3124, before welding equipment or a cutting torch is used. Request permits 24 hours in advance of need date.

1.10. USE OF RADIOACTIVE ISOTOPES

Use of equipment containing radioactive isotopes or any nuclear source (such as density testers, moisture detectors, etc.)

must be approved by the USAF Radioisotope Committee through the installation Radiological Protection Officer (RPO).

If such equipment is to be used in the work, the contractor must notify the RPO, through the Contracting Officer’s designated representative, no less than 14 days before the anticipated use of such equipment, in order that the required approval is obtained. Additionally, during the period of use of such equipment, the RPO is authorized to make periodic checks to insure that proper radiological health precautions are being followed. If the RPO determines that these precautions are not being followed, he will immediately notify the Contracting Officer to initiate corrective action.

1.11. NO SMOKING POLICY

There is an Air Force Policy of NO SMOKING in any Government vehicle or buildings in accordance with AFI 40-102

(4 March 2015). Smoking is permitted in designated areas only.

1.12. TRASH AND LITTER CONTROL

The Contractor shall develop a strict trash and litter control program. The litter control program shall consist of supplying an adequate number of covered trash and litter receptacles in all appropriate locations. The contractor shall take precautions to prevent Foreign Object Debris (FOD) while working on or around the flight line. All equipment entering designated areas must be inventoried before and prior to leaving the designated areas.

1.13. POST-CONSTRUCTION CLEANUP

The Contractor shall remove and clean up all signs of temporary construction facilities such as haul roads, work areas, structures, foundations of temporary structures, or any vestiges of construction resulting from this contract, upon completion of work as directed by the 412 CEG/CENMP Project Manager.

1.14. PROHIBITED ITEMS

The following items are prohibited from the work site: Cameras, computers, weapons, video and audio cassette players, recorders and tapes, binoculars, film and computer media.

1.15. SAFETY

The contractor shall ensure that job site cleanliness will be maintained at all times and barricades/safety cones will be utilized to isolate the job site from normal personnel traffic. Contractor shall follow most current version of the ACOE safety manual.

1.16. DIGGING PERMIT

No excavation of any kind shall be performed prior to contractor obtaining a completed AF Form 103, Base Civil

Engineering Work Clearance Request. Contractor shall be responsible for coordinating all signatures on the AF Form 103, and for submitting a completed copy of the form to the 412 CEG Project Manager.

PART 2 – REQUIREMENTS

2. REQUIREMENTS GENERAL

The following requirements have been identified and are the basis for work to be designed and constructed: Performance period for contract shall be 180 days (30 days for shop drawing submittal and 150 days for construction); Contractor shall hold a weekly meeting with customer, CE, during project construction (date and time of meeting shall be agreed upon by contractor, customer, CE); Contractor shall provide and submit shop drawings for approval for construction; Contractor shall provide a project schedule and temporary traffic control plan prior to the start of construction.

2.1. PROJECT REQUIREMENTS

The following work follows the standards in the California MUTCD 2014 Edition, Part 2 - Signs. Refer to Part 2A, 2B, 2C, and 2D for specifications on general requirements, regulatory signs, warning signs, guide signs, respectively.

Contractor shall provide and submit a cost proposal with separated costs for each of the following scopes of works listed below:

2.1.1. Contractor shall remove and replace 642 existing sign panels: 577 are regular-size for street, regulatory and warning sign classification; 61 are various-size special guide sign classification that are over 20 square foot; 4 that are various-size special guide sign classification that are less than 20 square foot. Map of the construction area can be shown on page 16. Given the counts of signs, contractors are to field verify the wordings of the signs.

2.1.2 Contractor shall provide and install 17 new sign panels with 17 new breakaway posts (additional signage and post) for the following:

Four L-1(CA) warning markers on the outer curve located on Laboratory Rd.

One W8-3(CA) 100 ft before pavement ends on Laboratory Rd.

One W8-8(CA) at the beginning of Lakeshore Dr.

One W14-1a(CA) 500 ft before road ends on Laboratory Rd.

Two signs. One W1-2 (CA) and One W13-1P (CA) before the East-Bound curve on Jones Rd.

Two signs. One W1-2A (CA) and One W13-1P (CA) before the West-Bound curve on Jones Rd.

Three W1-8 (CA) on the outbound of the Curve on Jones Rd.

One W31A (CA), 500 ft before the end of Scout Rd.

One W14-1a (CA), at the K-rail where Scout Rd is intersecting Mercury Blvd.

One W1-5 (CA) with W1-5P-TEA Plaque at the South Gate on Lancaster Blvd, 500 ft before Chicanes start.

2.1.3 Contractor shall install new mile markers, G11(CA), as a replacement of missing markers and those that are no longer legible. The mile markers shall indicate the route, county, and mile post marker of the installation; only mile post markers shall contain the route and county designation. Markers shall be placed 1 mile apart on both side of the road at the same mile post marker location. The markers shall be done in English units (miles). Current mile post marker letter prefix and suffix codes are listed in the State Highway Log, they are also defined in the Caltrans’

TASAS Manuals. Refer to Section 1a.11 of the manuals for more details on this topic.

2.1.4 Contractor shall change all of existing regulatory signs “STOP AHEAD” and “REDUCE SPEED AHEAD” to warning signs W3-1A and W3-5, respectively. In addition, contractor shall change any existing guide signs from the gates to base boundary from white lettering/legends/border on brown background to white lettering/legends/border on green background.

2.1.5 Contractor shall remove and relocate existing supporting posts of regulatory and warning signs, to where appropriate, if they don’t meet the dimensions required by the California MUTCD. Contractor shall field verify if existing posts need to be relocated.

2.1.6 Contractor shall install warning object Type R(CA) at both ends of any guardrail missing the warning signs that are located in the locations of work.

2.1.7 Contractor shall relocate all speed limits sign R2-1(CA) to be displayed in multiples of 5mph on longer roads including South Lancaster Blvd and South Rosamond Blvd. If the existing quantity of the speed limit sign is not suffice to the current specification, contractor shall provide new sign panels and supports for new installation.

2.1.8 Contractor shall remove and not reinstall 3 railroad crossing signs (two of R15-1P(CA) and one of W10-1(CA)) located on Rosamond Blvd near the intersection of Lancaster Blvd.

2.1.8 Contractor shall remove sign panels and posts of the 2 railroad crossing signs and 2 railroad warning signs located near the railroad cross portion on Rosamond Blvd at Lancaster Blvd. No replacement required.

2.1.9 Contractor shall rename the Spanish Translation of the Warning Signs: WARNING - U.S. AIR FORCE

INSTALLATION VALID MILITARY, CIVILIAN, OR CONTRACTOR IDENTIFICATION REQUIRED FOR

ENTRY to the following “AVISO – BASE AEREA MILITAR PARA ACCESO SE REQUIERE IDENTIFICACION

MILITAR, CIVIL, O DE CONTRATISTA”

2.1.10 Placement of all signs shall have the following dimensions and orientations:

2.1.10 a) All signs shall have the following orientation. Signs should be vertically mounted at right angles to the direction of, and facing, the traffic that they are intended to serve. Where mirror reflection from the sign face is encountered to such a degree as to reduce legibility, the sign should be turned slightly away from the road. Signs that are placed 30 feet or more from the pavement edge should be turned toward the road. On curved alignments, the angle of placement should be determined by the direction of approaching traffic rather than by the roadway edge at the point where the sign is located.

2.1.10 b) All signs shall conform to the minimum lateral offset of 12 feet from the edge of the traveled way. If a shoulder wider than 6 feet exists, the minimum lateral offset for post-mounted signs should be 6 feet from the edge of the shoulder.

2.1.10 c) All signs shall comply with the following mounting height. The minimum height, measured vertically from the bottom of the sign to the elevation of the near edge of the pavement, of signs installed at the side of the road shall be 5 feet. The height to the bottom of a secondary sign mounted below another sign may be 1 foot less than the height specified. Where the view of the sign might be obstructed, shall be 7 feet.

2.1.10 d) The minimum height, measured vertically from the bottom of the sign to the sidewalk, of signs installed above sidewalks shall be 7 feet.

2.1.11 Sign panels shall conform to the following specifications:

2.1.11 a) For flat aluminum sign panels, aluminum sign panels must conform to ASTM B209M, alloy-temper 6061-

T6 or 5052-H38. The blanks must be free from laminations, blisters, open seams, pits, holes, other defects that may affect their appearance or use. The thickness must be uniform and the blank commercially flat.

2.1.11 b) For extruded aluminum sign panels, extruded aluminum panels must conform to ASTM B221, alloy 6063-

T6. The maximum allowable deviation from flat on the face is 0.05 inches per foot. [Aluminum edge molding must be in accordance with ASTM A320/A320M or SAE J405d austenitic steel, minimum yield strength of 30,000 psi.]

2.1.11 c) All new signs are to be Type III, High-Intensity sheeting with certified expected life of 12 years or greater.

Retro-reflective sheeting materials shall conform to ASTM D4956-13 and AASHTO M 268-13 sign sheeting specification. Refer to Table 2A-3 of the California MUTCD 2014 Edition Manual for Minimum Maintained Retro-reflectivity level. Retroreflective sheeting must be high intensity that is an unmetallized micro prismatic reflective material. Retroreflective sheeting must have sufficient adhesion, strength and flexibility such that the sheeting can be handled, processed and applied according to the manufacturer's recommendations without appreciable stretching, tearing, cracking or other damage.

2.1.11 d) All signs shall have 3M engineer grade brown reflective sheeting applied to the backside.

2.1.11 e) All sign panels shall comply with particular shapes according to the class of signs. Refer to Table 2A-4 of the California MUTCD 2014 Edition Manual for more information.

2.1.11 f) All sign panel colors to be used on standard signs and their specific use shall comply with Table 2A-5(CA) and 23 CFR, Part 655, Subpart F, Appendix of the California MUTCD 2014 Edition Manual.

2.1.11 g) All sign panel dimensions shall comply with the sign size tables according to their sign classifications per

Tables 2B-1 and 2C-2 of the California MUTCD 2014 Edition Manual.

2.1.12 Sign supports shall conform to the following specifications:

2.1.12 a) Sign posts, foundations, and mountings shall be so constructed as to hold signs in a proper and permanent position, and to resist swaying in the wind or displacement by vandalism. Sign post installation shall be plum. Post color shall be Big Stone Brown (in accordance with Edwards AFB Design Standards, Base Facility Color Scheme, Page 15, Paragraph 2.1).

2.1.12 b) Ground-mounted sign posts located within the clear zone of roads and streets must be a breakaway or yielding design meeting the crashworthiness criteria of NCHRP 350 or the Manual for Assessing Safety of

Hardware (MASH) or must be shielded by guardrail, barrier, or an energy absorbing system meeting the requirements of NRCRP 350 or AASHTO MASH. FHWA acceptance letters for various breakaway supports for signs are available on the FHWA Safety Program webpage. Base supports shall be the same material and be driven into the ground. Do not place concrete around post unless the existing sign is located on a concrete area. Details of sign posts must be included in the drawings. Breakaway support anchor posts must extend no more than 100 mm 4 inches above grade to lessen the probability of snagging the undercarriage of a vehicle after a support has broken away from its base. Anchor posts must extend at least 18 inches below grade. Breakaway supports shall conform to the design standards in Section 12 of the 2013 Standard Specifications for Structural Supports for Highway Signs, Luminaires, and Traffic Signs, 6th Edition.

2.1.12 c) Perforated Steel Tubes shall be used for any installation of new post, if necessary. Fabricate steel posts from steel conforming to either ASTM A653/A653M, structural steel, Grade 340 50, Class 1, coating designation

G90 or ASTM A1011/A1011M, structural steel, Grade 340 50, hot-dip galvanized after punching in accordance with ASTM A123/A123M. Pre-punch holes approximately 7/16 inch in diameter spaced at approximately 1 inch centers along each side of the tube for the entire length of the post.

2.1.12 d) Where permitted, signs may be placed on existing supports used for other purposes, such as highway traffic signal supports, highway lighting supports, and utility poles.

2.1.12 e) For any sign panels attached to the existing wood posts that are larger than 4 x 4 inches, wood posts shall have drilled holes perpendicular to the way of traffic, at the bottom of the existing wood posts, to serve as a breakaway feature. Refer to Caltrans 2013 Standard Plan RS2 for two-post installation.

2.1.12 f) For any existing signs that required replacement of new wood posts. Wood post installation, embedment, and post spacing shall comply with Caltrans 2013 Standard Plan RS2 for typical installation of roadside signs with wood post. Wood Posts shall have the allowable grade and species for the nominal size 4 x 4 inch according to table on page # 998 of Caltrans 2015 Standard Specifications. When delivered to the job site, treated posts shall comply with the specified grading requirements and have a moisture content of not more than 25 percent when tested under

ASTM D4444 with an authorized moisture meter. Douglas fir and Hem-Fir posts must be treated under section 57-

2.01B(3) of Caltrans 2015 Standard Specifications and under AWPA U1, Use Category UC4A, Commodity

Specification A. Posts must be incised, and the minimum retention of preservative must comply with AWPA requirements.

2.1.13 Signage bolts, fasteners, washers and other hardware shall be anti-theft, high–strength, and corrosion resistance.

High strength bolts must conform to ASTM A325M/ASTM A325. Nuts must conform to ASTM A563M ASTM

A563. Washers must conform to ASTM F436M/ASTM F436. High strength bolts, nuts and washers shall be commercial-quality steel and hot-dip galvanized after fabrication.

2.1.14 Lettering and legends displayed on signs shall conform to the following:

2.1.13 a) All new signs shall comply with the following typography and type size. Helvetica Medium font is to be used for major information on all signs while Helvetica Regular font is to be used for secondary information on identification signs and as required on other miscellaneous signs. Helvetica Regular font (all caps) should also be used for all individually mounted, dimensional letters. Helvetica Medium should always be used when directional arrows are required in the sign message. Letter spacing standards must be IAW Unified Facilities Guide

Specifications (UFGS) 10440 and UFC 3-120-01, Air Force Sign Standards.

2.1.14 b) Background colors for street name signs shall be brown, and the legend shall be white. The lettering for names of streets and highways on Street Name signs shall be composed of a combination of lower-case letters with initial upper-case letters (see MUTCD Section 2A.13). Lettering on post-mounted Street Name signs should be composed of initial upper-case letters at least 6 inches in height and lower-case letters at least 4.5 inches in height.

On multi-lane streets with speed limits greater than 40 mph, the lettering on post-mounted Street Name signs should be composed of initial upper-case letters at least 8 inches in height and lower-case letters at least 6 inches in height.

For local roads with speed limits of 25 mph or less, the lettering on post-mounted Street Name signs may be composed of initial upper-case letters at least 4 inches in height and lower-case letters at least 3 inches in height.

Supplementary lettering to indicate the type of street (such as Street, Avenue, or Road) or the section of the city

(such as NW) on the D3-1 and D3-1a signs may be in smaller lettering, composed of initial upper-case letters at least

3 inches in height and lower-case letters at least 2.25 inches in height. Conventional abbreviations (see Section

1A.15) may be used except for the street name itself. Signs shall be mounted with their faces parallel to the streets they name.

2.1.14 c) All Street name signs shall be double-faced.

2.1.14 d) Lettering and symbols of street guide signs will conform to the following: for speed of 25 mph or less, use a letter size of 4 inches in height and arrow 6x6 inches. For speeds of 30 mph or higher, use a letter size of 6 inches in height and arrows 9x9 inches.

2.2. SECURITY REQUIREMENTS

Contractor personnel may be subject to inspection upon entering or leaving Edwards AFB.

2.3. CONSTRUCTION WORK PLAN REPORTS, DRAWINGS & SUBMITTALS

2.3.1. All reports, drawings and submittals by the contractor shall be submitted to the Contracting Officer. All as built drawings shall be provided in the latest Auto-CAD software and turned over to CE and OSAM.

2.3.2. Provide manufacturers catalog cut sheets with printed specifications and installation instructions which furnish a detailed sequence of operation (description of system) for the new overhead hangar lighting system.

2.3.3. Provide submittals for government approval for the following items:

i. Project construction schedule

ii. Personnel and vehicle list

iii. Operating Manuals

iv. Temporary traffic control plan

v. Signs panels, hardware, and posts certificate of compliance

2.4. ENVIRONMENTAL REQUIREMENTS CHECKLIST

The contractor will comply with the environmental requirements checklist attached to this scope of work. During the course of construction the contractor will have a quality control and oversight procedure to insure the requirements of the environmental checklist are met and documented.

PART 3 – WORK PLAN REQUIREMENTS

3. PERFORMANCE REQUIREMENTS AND CRITERIA:

The work plan shall conform to Standard Air Force Criteria and other applicable Air Force regulations, manuals, and pamphlets, including the Edwards AFB Design Standards. Contractor shall conduct all work in accordance with but not limited to the National Electrical Code, Uniform Building Code, NFPA, NPC, AFOSHA, CALOSHA, MUTCD, FHWA and other regulations where applicable. Latest construction techniques and architectural sensitivity will be considered and incorporated to obtain both quality and economy. The work plan shall also be in accordance with all environmental requirements of governing authorities including, but not limited to Federal, State of California, Kern County, and EAFB.

Performance Period for this work is 180 days.

3.1. REFERENCE

Air Force manuals, publications, and guide specifications will not be furnished. They may be acquired from the

Government web sites or other base agencies. The Edwards AFB design standard criteria and applicable chapters of additional security requirements must be received from the civil engineering project manager.

“As-Built” utilities maps of the existing conditions are available for review at the Civil Engineering GIS Section, Building 3500. These drawings are for reference only and are not to be used as the basis for design until they have been verified in the field by the A-E.

Base specific design and materials information can be obtained through the assigned project manager from the Project

Management Office, Building 3500 at (661) 886-1100.

List the specific, latest versions of all codes and guidance reference used for design in the specifications.

3.2. INSTRUCTIONS AND ADMINISTRATION:

The Contractor is responsible for preparing written memoranda of all conferences, pertinent instructions, and information received verbally or otherwise. Copies of the memoranda shall be transmitted to the attendees for information and record, and where necessary, for confirmation within five (5) working days. Data submittals shall be by dated transmittal letter. A transmittal letter is also required to accompany all submissions.

3.3. FIELD MEASUREMENTS AND VERIFICATION:

The Contractor shall be responsible for making field measurements to verify any dimensions shown on Government-furnished for information only drawings. The Government does not guarantee the accuracy of the for information only drawings.

3.4. CONSTRUCTION DOCUMENTS:

A. Shop Drawings shall show (If applicable):

a. Demo plan with details

b. Civil plans with details

c. Electrical, Mechanical, Fire suppression system drawings with details

d. Site plan referencing new buildings

B. Cover sheet shall show (If applicable):

a. Project name, FSPM number, number of sheets in set.

b. Signature block, A-E stamp, signed and dated if required.

c. Location map, base map and site map.

d. Sheet index, abbreviations, true north and project north.

e. Scale in feet with project arrow pointing north

3.5. FINAL CONSTRUCTION SUBMITTALS

3.8.1. CONSTRUCTION RECORD DRAWINGS: Submit to EAFB construction record drawings (as-built drawings) for all new construction performed. Submit drawings two (2) weeks prior to acceptance of the project by the government. If, upon review, the drawings are found to be in error or omissions, they will be returned to the Contractor for corrections.

The Contractor will complete the corrections and return the drawings to EAFB within 10 calendar days. Submit one (1) reproducible set of paper drawings on 30” x 42” paper and one (1) set of C-D ROMS with the complete set of construction drawings in ‘AutoCAD’ version 2006 (or greater) format. Use a standard Corps of Engineers layering convention.

3.8.2. SPARE PARTS LIST AND MAINTENANCE AND OPERATIONS MANUALS: Submit to EAFB within 30 days of approved shop drawings 3 copies of spare parts list and operating and maintenance manuals for all equipment installed under this contract. Submit one (1) reproducible copy of any documents larger than 8 ½” x 11” (this does not apply to standard manufacturer’s data) and one (1) set of C-D ROM’S with the complete set of O&M manuals in Portable

Document Format (PDF).

MINIMIZATIONS MEASURES

Current 24 February 2016

This project (Control No. 16-0082, Replace Traffic Signs Base Wide) qualifies for a categorical exclusion A2.3.10

(Routine facility maintenance and repair…). The project is approved contingent upon compliance with the following minimization measures.

1. The proponent/contractor shall inform Environmental Management’s EIAP Planners of all changes to the project scope. The proponent/contractor shall also provide the Statement of Work to ensure that the National

Environmental Policy Act (NEPA) analysis stays current and that all environmental issues are addressed. Contact

Environmental Management at (661) 277-1442, 277-9225 or e-mail 412TW.CEV.EIAP@us.af.mil.

2. Owners/operators of in-use off-road diesel, gasoline, liquefied petroleum gas and other alternate fuels vehicles 25 horsepower or greater (for example loaders, crawlers tractors, skid steers, backhoes and forklifts) may be subject to California Air Resources Board fleet requirements. For additional information, contact Environmental

Management at (661) 277-1457.

3. The proponent/contractor shall ensure that all solid and hazardous waste management on this project complies with all applicable sections of AFI 32-7042, Waste Management and the Edwards Air Force Base Hazardous

Waste Management Plan (HWMP). Contact 412 CEG/CEVC’s J-TECH Hazardous Waste Support contractor at

(661) 277-3681 or 412 CEG/CEVC at 277-1909 for questions and guidance.

4. The proposed project, Replace Traffic Signs Base Wide, is an undertaking in accordance with 36 Code of Federal

Regulations §800.16(y). As such, and in accordance with Section 106 of the National Historic Preservation Act, as amended (NHPA), Edwards AFB Cultural Resources (Base Historic Preservation Officer [BHPO] or qualified personnel under the direction or supervision of the BHPO) has reviewed the proposed undertaking and determined that the actions constituted therein will not adversely affect historic properties provided the following measures are adhered to:

All construction equipment must be staged within existing road margins.

Construction equipment is not authorized to work or drive outside of existing road margins.

Construction activities must not widen existing road margins

5. If the undertaking is modified subsequent to this review, the proponent shall coordinate with Cultural Resources to ensure compliance with Section 106 of the NHPA. Coordination can be accomplished by contacting 412

CEG/CEVA at (661) 277-1413.

6. If inadvertent above- or below-ground discoveries (for example artifacts or bones) are made during the project’s execution:

The contractor shall:

Immediately cease activity in the area of the discovery.

Notify the supervising project manager.

Secure the discovery location and establish a 50-foot buffer zone around the discovery.

The project manager shall:

mailto:412TW.CEV.EIAP@us.af.mil

Immediately notify the BHPO of the discovery at (661) 277-1413.

Confirm that the activity has ceased within 50 feet of the discovery.

Examine the location of the discovery to ensure that it has been properly secured. Take appropriate measures to further secure the location, if needed.

Await review by 412 CEG/CEVA before returning to work in the area of discovery.

The project manager is advised that:

Cultural resources are protected by AFI 32-7065 and numerous Federal regulations. The stewardship of cultural resources is ultimately the responsibility of the base commander.

Although inadvertent discoveries are rare, if encountered, they may require coordination with the State Historic

Preservation Officer. This process can take up to 12 months or longer depending on the resource affected.

If the proponent has questions or concerns, contact the Base Historic Preservation Officer for archaeology at

(661) 277-1413 or email roscoe.loetzerich.1@us.af.mil.

7. Based upon the information provided, and so long as the above avoidance measures are followed, there is no requirement to consult with the California State Historic Preservation Officer.

8. In the event you are unable to contact an environmental person at one of the numbers above, please call (661)

277-1401.

CONSTRUCTION AREA

FSPM 16-2006

140TH ST ( FROM MERCURY TO BASE BOUNDARY) HOAI ASHLEY VU

REGULATORY SIGNS 0 9/13/2016

WARNING SIGNS 2

STREET SIGNS 0 TOTAL OF REGULAR SIZE SIGN PANELS 577

SPECIAL GUIDE SIGN 2 TOTAL OF LARGE SPECIAL GUIDE SIGN PANELS 61

TOTAL 4 TOTAL OF SMALL GUIDE SIGN PANELS 4

WARNING TYPE QUANTITY

INTERSECTION W2-4 1 TOTAL NEW SIGNS WITH BREAKAWAY METAL POSTS 17

STOP AHEAD W3-1A 1

MERCURY BLVD

MILE MARKERS 12

TOTAL 12

BRANCH PARK ROAD

REGULATORY SIGNS 1

TOTAL 1

REGULATORY TYPE QUANTITY

STOP R1-1 1

RICH RD ( FROM MERCURY BLVD TO BASE BOUNDARY)

REGULATORY SIGNS 27

WARNING SIGNS 15

MILE MARKERS 4

STREET SIGNS 2

SPECIAL GUIDE SIGN 9

TOTAL 57

REGULATORY TYPE QUANTITY

YIELD R1-2 2

SPEED LIMIT R2-1 6

STOP R1-1 2

DO NOT PASS R4-1 6

PASS WITH CARE R4-2 6

RADAR ENFORCED R48-1 2

WEIGHT LIMIT 3 TONS R12-1 1

DO NOT ENTER R5-1 2

WARNING TYPE QUANTITY

CHEVRON W1-8 4

INTERSECTION W2-4 1

STOP AHEAD W3-1A 2

RAIL ROAD W10-1 1

NO PASSING ZONE W14-3 5

REDUCE SPEED LIMIT W3-5 2

LANCASTER BLVD( FROM ROSAMOND BLVD TO BASE BOUNDARY)

REGULATORY SIGNS 81

WARNING SIGNS 44

STREET SIGNS 13

MILE MARKERS 4

SPECIAL GUIDE SIGNS 14

TOTAL 156

REGULATORY TYPE QUANTITY

YIELD R1-2 3

SPEED LIMIT R2-1 26

STOP R1-1 28

NO RIGHT TURN R3-1 4

NO LEFT TURN R3-2 1

TRUCK USE RIGHT LANE R4-5 1

WRONG WAY R5-1A 2

ONE WAY R6-1 4

STOP HERE ON RED R10-6 2

USE SEAT BELT SR15 1

USE SEAT BELT SR15A 1

Grade Crossing (Crossbuck) R15-1 2

LANE SPLITS AHEAD N/A 1

DO NOT ENTER R5-1 5

WARNING TYPE QUANTITY

Grade Crossing Advance Warning (railroad) W10-1 2

DIP W8-2 2

CHICANE S CURVE W1-5 1

U TURN OK W1-11 1

TRIP OVER W1-13 1

STOP AHEAD W3-1A 8

OFFICIAL VEHICLE ONLY W3-3A-TEA 1

ACTIVE BARRIER W3-3A-TEA 8

BE PREPARE TO STOP W3-4 1

REDUCE SPEED LIMIT W3-5 3

MERGE LEFT W4-2 2

CHECKPOINT W3-10A-TEA 1

500 METROS W16-2P 1

200 FT W16-2P 1

300 FT W16-2P 1

OBEY W16-18P-TEA 1

INTERSECTION W2-4 2

right turn W1-1 2 bicycle W11-1 2 pedestrian W11-2 2

1400 FT W16-2AP 1

ROSAMOND BLVD

REGULATORY SIGNS 73

WARNING SIGNS 158

STREET SIGNS 29

MILE MARKERS 20

SPECIAL GUIDE SIGNS 30

TOTAL 310

WARNING TYPE QUANTITY REGULATORY TYPE QUANTITY

stop ahead W3-1A 10 stop R1-1 40

T INTERSECTION W2-4 6 speed limit R2-1 40 obey signal W16-18P-TEA 8 truck use right lane R4-5 5 active barrier W3-3A-TEA 8 stop here on red R10-6 3

XXX ft W16-2AP 6 no left turn R3-2 3 chicanue W1-5 2 wrong way R5-1A 9 barrier is active when flashing W3-3A-TEA 1 no right turn R3-1 11

4 ways intersection W2-1 1 one way R6-1 7 island separator W6-1 2 radar enforced R48-1 1 soft shoulder W8-4 2 enter R81B-TEA 1 left curve W1-2 2 seatbelt SR15 2 be prepare to stop W3-4 5 seat belts law enforced SR15A 2 split arrows W12-1 2 do not enter R5-1 15 reduce speed ahead W3-5 3 4 way R1-3 17 official vehicle only W3-3A-TEA 1 YIELD R1-2 2 stop ahead with flashing W3-1A-TEA 2 RAILROAD R15-1P 2 pedestrian W11-2 2

CHEVRON W1-8 5

RAILROAD W10-1 2

RIGHT LANE END W9-1 2

RIGHT LANE MERGE W4-2 1

caution left turn ahead W1-1 1

LAKESHORE DR

REGULATORY SIGNS 1

TOTAL 1

REGULATORY TYPE QUANTITY

speed limit R2-1 1

LABORATORY DRIVE

REGULATORY SIGNS 1

WARNING SIGNS 1

TOTAL 2

REGULATORY TYPE QUANTITY

SPEED LIMIT R2-1 1

WARNING TYPE QUANTITY

RIGHT CURVE W1-2A 1

NORTH BASE ROAD

REGULATORY SIGNS 9

WARNING SIGNS 7

STREET SIGNS 4

SPECIAL GUIDE SIGNS 1

TOTAL 21

REGULATORY TYPE QUANTITY

SPEED LIMIT R2-1 6

RAILROAD CROSSING R15-1P 2

STOP R1-1 1

WARNING TYPE QUANTITY

RIGHT CURVE W1-2A 1

LEFT CURVE W1-2 1

STOP AHEAD W3-1A 2

4 WAYS INTERSECTION W2-1 2

T INTERSECTION W2-4 1

SCOUT ROAD

REGULATORY SIGNS 2

WARNING SIGNS 11

STREET SIGNS 1

SPECIAL GUIDE SIGNS 0

TOTAL 14

REGULATORY TYPE QUANTITY

YIELD R1-2 1

SPEED LIMIT R2-1 1

WARNING TYPE QUANTITY

ROUGH ROAD W8-8 1

OBJECT MARKERS OM2-2V 10

JONES ROAD

REGULATORY SIGNS 28

WARNING SIGNS 25

STREET SIGNS 2

SPECIAL GUIDE SIGNS 5

SMALL GUIDE SIGNS 4

TOTAL 64

REGULATORY TYPE QUANTITY

YIELD R1-2 4

SPEED LIMIT R2-1 18

STOP R1-1 4

DO NOT ENTER R5-1 2

WARNING TYPE QUANTITY

STOP AHEAD W3-1A 1

REDUCE SPEED LIMIT W3-5 2

NO PASSING ZONE W14-3 1

INTERSECTION W2-2 2

2 WAYS W1-7 1

MERGING W4-1 2

LEFT W1-2 2

CHEVRON W1-8 11

LEFT CURVE W1-2 1

SPLIT LANE WARNING W1-10A 1

RIGHT LANE MERGE W4-2 1

File details come from the government source that posted it. Updated .