3. Paving Technical Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Paving Indefinite Delivery/Indefinite Quantity (ID/IQ) Contract, newest first.
File Type Posted
Solicitation_FA9301-16-R-0011_Amendment_0003.pdf PDF
FA9301-16-R-0011_Questions_and_Answers_(Round_3_-_FINAL).pdf PDF
Atch_10_(L-4),_Seed_Project_Pricing_Template_(Rev2).xlsx XLSX spreadsheet
Atch_7_(L-1),_ELIN_Pricing_Template_(Rev2).xlsx XLSX spreadsheet
Atch_8_(L-2),_Estimated_Workload_(Rev2).xlsx XLSX spreadsheet
Atch_5_Wage_Determination_-_Kern_County_(Update_2).pdf PDF
FA9301-16-R-0011_Questions_and_Answers_(Round_2).pdf.pdf PDF
FA9301-16-R-0011_Amendment_0002.pdf PDF
Atch_9_(L-3)_Seed_Project_Statement_of_Work_(Revised).pdf PDF
FA9301-16-R-0011_Questions_and_Answers_-_Technical.pdf PDF
Atch_1_Basic_Contract_Statement_of_Work_(Revised).pdf PDF
Atch_9_(L-3)_Seed_Project_Statement_of_Work_(Revised).pdf PDF
Atch_8_(L-2)_Estimated_Workload_(Revised).xlsx XLSX spreadsheet
Atch_6_Wage_Determination_-_Los_Angeles_County_(Update).pdf PDF
FA9301-16-R-0011_Amendment_0001.pdf PDF
Atch_5_Wage_Determination_-_Kern_County_(Update).pdf PDF
Atch_10_(L-4)_Seed_Project_Pricing_Template_(Revised).xlsx XLSX spreadsheet
Atch_7_(L-1)_ELIN_Pricing_Template_(Revised).xlsx XLSX spreadsheet
4_-_Maintenance_Road_Markings.pdf PDF
11_-_Repair_Roads_1-30A_Test_Area_AFRL_.pdf PDF
6_-_Repair_Roads_at_South_Base_Compound.pdf PDF
7_-_Repair_Parking_Lot_at_Ridley_Building_1440.pdf PDF
9_-_Repair_Parking_Lot_at_Building_1400.pdf PDF
2_-_Maint_Crack_Seal_and_Slurry_Seal_S_Lancaster_Blvd.pdf PDF
1_-_Repair_South_Lancaster_Blvd.pdf PDF
12_-_Spall_Repair_Pad_15_Post_Jobwalk.pdf PDF
8_-_Minor_Construction_Expand_Parking_Lot_at_Building_605.pdf PDF
3_-_Maint_Crack_and_Slurry_Seal_Airfield_Multi_Locations.pdf PDF
10_-_Repair_Roads_Base_wide_Rosamond.pdf PDF
5_-_Maintenance_Traffic_Control_Signs_Basewide.pdf PDF
FA9301-16-R-0011_Questions_and_Answers_-_Contractual.pdf PDF
Pre-Proposal_Conference_Briefing_Slides_30_Mar_2017.pdf PDF
Pre-Proposal_Conference_Vendor_Sign-In_Sheet_30_Mar_2017.pdf PDF
Atch_11_(L-5)_Schedule_of_Material_Submittals_Template.xls XLS spreadsheet
Atch_14_(L-8)_Past_Performance_Questionnaire_(PPQ).pdf PDF
Atch_5_Wage_Determination_-_Kern_County.pdf PDF
Atch_10_(L-4)_Seed_Project_Pricing_Template.xlsx XLSX spreadsheet
Atch_15_(L-9)_Subcontractor_Teaming_Partner_Consent_Form.pdf PDF
Atch_1_Basic_Contract_Statement_of_Work.pdf PDF
Atch_2_2017_Edwards_AFB_Design_Standards.pdf PDF
Atch_8_(L-2)_Estimated_Workload.xlsx XLSX spreadsheet
Atch_12_(L-6)_Progress_Schedule_Template.xlsx XLSX spreadsheet
FA9301-16-R-0011_Paving_IDIQ_Solicitation_SF_1442.pdf PDF
Atch_4_Civil_Engineering_Provided_Plans.pdf PDF
Atch_6_Wage_Determination_-_Los_Angeles_County.pdf PDF
Atch_9_(L-3)_Seed_Project_Statement_of_Work.pdf PDF
Atch_13_(L-7)_Past_Performance_Information_Form_(PPIF).pdf PDF
Atch_7_(L-1)_ELIN_Pricing_Template.xlsx XLSX spreadsheet
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS

FOR

Indefinite Delivery/Indefinite Quantity (IDIQ) Contract for Asphalt, Pavement, and Concrete Repairs and

Improvements at Military Installations

PROJECT TABLE OF CONTENTS

DIVISION 02 - EXISTING CONDITIONS

02 41 00 Demolition

02 61 13 Excavation and Handling of Contaminated Materials

DIVISION 03 - CONCRETE

03 30 04 Concrete for Minor Structures

DIVISION 26 - ELECTRICAL

26 56 00 Exterior Lighting

26 56 20.00 10 Airfield and Heliport Lighting and Visual Navigation Aids

DIVISION 31 - EARTHWORK

31 00 00 Earthwork

31 11 00 Clearing and Grubbing

31 23 00.00 20 Excavation and Fill

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 11.52 Runway Rubber Removal

32 01 13 Bituminous Seal and Fog Coats

32 01 16.17 Cold Milling of Bituminous Pavements

32 01 17.16 Sealing of Cracks in Bituminous Pavements

32 01 19 Field Molded Sealants for Sealing Joints in Rigid Pavements

32 01 22 Bituminous Rejuvenation

32 01 26.71 Grooving for Airfield Pavements

32 01 28 Partial Depth Patching of Rigid Pavements

32 01 29.62 Slab Jacking Rigid Pavements

32 11 10 Drainage Layer

32 11 16 Base Course for Rigid and Sub bases for Flexible Paving

32 11 23 Graded Crushed Aggregate Base Course

32 11 33 Cement Stabilized Base Course for Airfields and Roads

32 12 10 Bituminous Tack and Prime Coats

32 12 11 Bituminous Surface Treatment

32 12 15.13 Hot-Mix Asphalt Airfield Paving

32 12 16 Hot-Mix Asphalt (HMA) for Roads

32 13 11 Concrete Pavement for Airfields and Other Heavy-Duty Pavements

32 13 13.06 Portland Cement Concrete Pavement for Roads and Site Facilities

32 13 73 Compression Joint Seals for Concrete Pavements

32 15 00 Aggregate Surface Course

32 16 13 Concrete Sidewalks and Curbs and Gutters

32 17 24.00 10 Pavement Markings

32 31 13 Chain Link Fences and Gates

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

PAVING TECHNICAL SPECIFICATIONS

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

ATTACHMENT 3

DIVISION 33 - UTILITIES

33 05 23.19 Trenchless Excavation Using Microtunneling

33 40 01 Storm Drainage

33 46 16 Sub drainage System

33 71 02 Underground Electrical Distribution

DIVISION 34 - TRANSPORTATION

34 73 13 Mooring and Grounding Points for Aircraft

-- End of Project Table of Contents --

PAVING TECHNICAL SPECIFICATIONS

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

SECTION 02 41 00

DEMOLITION

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)

ASSE/SAFE A10.6 (2006) Safety Requirements for Demolition

Operations

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2008) Safety -- Safety and Health

Requirements

U.S. FEDERAL AVIATION ADMINISTRATION (FAA)

FAA AC 70/7460-1 (Rev K; Change 1) Obstruction Marking and

Lighting

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

40 CFR 61 National Emission Standards for Hazardous Air

Pollutants

1.2 GENERAL REQUIREMENTS

Do not begin demolition until authorization is received from the Contracting Officer. Remove rubbish and debris from the project site; do not allow accumulations on airfield pavements. The work includes demolition, salvage of identified items and materials, and removal of resulting rubbish and debris. Remove rubbish and debris from Government property daily, unless otherwise directed. Store materials that cannot be removed daily in areas specified by the Contracting Officer. In the interest of occupational safety and health, perform the work in accordance with EM 385-1-1, Section 23, Demolition, and other applicable Sections.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

Existing Conditions G

SD-07 Certificates

Demolition Plan G

Notifications G

Proposed salvage, demolition, and removal procedures for approval before work is started.

1.4 REGULATORY AND SAFETY REQUIREMENTS

Comply with federal, state, and local hauling and disposal regulations. In addition to the requirements of the "Contract Clauses," conform to the safety requirements contained in ASSE/SAFE A10.6.

1.4.1 Notifications

1.4.1.1 General Requirements

Furnish timely notification of demolition projects to Federal, State, regional, and local authorities in accordance with 40 CFR 61, Subpart M.

Notify the Contracting Officer in writing 10 working days prior to the commencement of work in accordance with 40 CFR 61, Subpart M.

1.5 DUST AND DEBRIS CONTROL

Prevent the spread of dust and debrison airfield and road pavements and avoid the creation of a nuisance or hazard in the surrounding area. Do not use water if it results in hazardous or objectionable conditions such as, but not limited to, ice, flooding, or pollution. Vacuum sweep airfield pavements as often as necessary to control the spread of debris that may result in foreign object damage potential to aircraft.

1.6 PROTECTION

1.6.1 Traffic Control Signs

Where pedestrian and driver or aircraft safety is endangered in the area of removal work, use traffic barricades with flashing lights. Anchor barricades in a manner to prevent displacement by wind, jet or prop blast.

Notify the Contracting Officer prior to beginning such work.

Contractor must provide a minimum of 2 aviation red or high intensity white obstruction lights on temporary structures (including cranes) over 100 feet 30 meter above ground level. Light construction and installation must comply with FAA AC 70/7460-1. Lights must be operational during periods of reduced visibility, darkness, and as directed by the Contracting Officer. Maintain the temporary services during the period of construction and remove only after permanent services have been installed and tested and are in operation.

1.6.2 Existing Conditions Documentation

Before beginning any demolition work, survey the site and examine the drawings and specifications to determine the extent of the work. Record existing conditions in the presence of the Contracting Officer showing the

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

PAVING TECHNICAL SPECIFICATIONS

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

condition of structures and other facilities adjacent to areas of alteration or removal. Photographs sized 4 inch will be acceptable as a record of existing conditions. Include in the record the elevation of the top of foundation walls, finish floor elevations, possible conflicting electrical conduits, plumbing lines, alarms systems, the location and extent of existing cracks and other damage and description of surface conditions that exist prior to before starting work. It is the Contractor's responsibility to verify and document all required outages which will be required during the course of work, and to note these outages on the record document.

1.6.3 Items to Remain in Place

Take necessary precautions to avoid damage to existing items to remain in place, to be reused, or to remain the property of the Government. Repair or replace damaged items as approved by the Contracting Officer. Coordinate the work of this section with all other work indicated. Construct and maintain shoring, bracing, and supports as required. Ensure that structural elements are not overloaded. Increase structural supports or add new supports as may be required as a result of any cutting, removal, or demolition work performed under this contract. Do not overload structural elements or pavements to remain. Provide new supports and reinforcement for existing construction weakened by demolition, or removal work. Repairs, reinforcement, or structural replacement require approval by the Contracting Officer prior to performing such work.

1.6.4 Existing Construction Limits and Protection

Do not disturb existing construction beyond the extent indicated or necessary for installation of new construction. Provide temporary shoring and bracing for support of structure components to prevent settlement or other movement. Remove snow, dust, dirt, and debris from work areas daily.

1.6.5 Weather Protection

For portions of a structure to remain, protect structures interior and materials and equipment from the weather at all times.

1.6.6 Trees

Protect trees within the project site which might be damaged during demolition, and which are indicated to be left in place, by a 6 foot high fence. Erect and secure fence a minimum of 5 feet from the trunk of individual trees or follow the outer perimeter of branches or clumps of trees. Replace any tree designated to remain that is damaged during the work under this contract with like-kind or as approved by the Contracting Officer.

1.6.7 Utility Service

Maintain existing utilities indicated to stay in service and protect against damage during demolition operations. Prior to start of work, utilities serving each area of alteration or removal will be shut off by the Government and disconnected and sealed by the Contractor.

1.6.8 Facilities

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

Protect electrical and mechanical services and utilities. Where removal of existing utilities and pavement is specified or indicated, provide approved barricades, temporary covering of exposed areas, and temporary services or connections for electrical and mechanical utilities. Floors, roofs, walls, columns, pilasters, and other structural components that are designed and constructed to stand without lateral support or shoring, and are determined to be in stable condition, must remain standing without additional bracing, shoring, or lateral support until demolished or deconstructed, unless directed otherwise by the Contracting Officer. Ensure that no elements determined to be unstable are left unsupported and place and secure bracing, shoring, or lateral supports as may be required as a result of any cutting, removal, or demolition work performed under this contract.

1.6.9 Protection of Personnel

Before, during and after the demolition work the Contractor shall continuously evaluate the condition of the structure being demolished and take immediate action to protect all personnel working in and around the project site. No area, section, or component of floors, roofs, walls, columns, pilasters, or other structural element will be allowed to be left standing without sufficient bracing, shoring, or lateral support to prevent collapse or failure while workmen remove debris or perform other work in the immediate area.

1.7 BURNING

The use of burning at the project site for the disposal of refuse and debris will not be permitted

1.8 FOREIGN OBJECT DAMAGE (FOD)

Aircraft and aircraft engines are subject to FOD from debris and waste material lying on airfield pavements. Remove all such materials that may appear on operational aircraft pavements due to the Contractor's operations.

If necessary, the Contracting Officer may require the Contractor to install a temporary barricade at the Contractor's expense to control the spread of FOD potential debris. The barricade must include a fence covered with a fabric designed to stop the spread of debris. Anchor the fence and fabric to prevent displacement by winds or jet/prop blasts. Remove barricade when no longer required.

1.9 RELOCATIONS

Perform the removal and reinstallation of relocated items as indicated with workmen skilled in the trades involved. Items to be relocated which are damaged by the Contractor shall be repaired or replaced with new undamaged items as approved by the Contracting Officer.

1.10 REQUIRED DATA

Prepare a Demolition Plan. Include in the plan procedures for careful removal and disposition of materials specified to be salvaged, coordination with other work in progress, a disconnection schedule of utility services, and airfield lighting, a detailed description of methods and equipment to be used for each operation and of the sequence of operations. Coordinate with Waste Management Plan. Provide procedures for safe conduct of the work in

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

PAVING TECHNICAL SPECIFICATIONS

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

accordance with EM 385-1-1. Plan shall be approved by the Contracting Officer prior to work beginning.

1.11 ENVIRONMENTAL PROTECTION

Comply with the Environmental Protection Agency requirements specified.

1.12 USE OF EXPLOSIVES

Use of explosives will not be permitted.

PART 2 PRODUCTS

2.1 FILL MATERIAL

Comply with excavating, backfilling, and compacting procedures for soils used as backfill material to fill basements, voids, depressions or excavations resulting from demolition of structures.

PART 3 EXECUTION

3.1 EXISTING FACILITIES TO BE REMOVED

Inspect and evaluate existing structures on site for reuse. Existing construction scheduled to be removed for reuse shall be disassembled.

Dismantled and removed materials are to be separated, set aside, and prepared as specified, and stored or delivered to a collection point for reuse, remanufacture, recycling, or other disposal, as specified. Materials shall be designated for reuse on site whenever possible.

3.1.1 Structures

a. Remove existing structures including foundations indicated to be removed entirely.

3.1.2 Utilities and Related Equipment

3.1.2.1 General Requirements

Do not interrupt existing utilities serving occupied or used facilities, except when authorized in writing by the Contracting Officer. Do not interrupt existing utilities serving facilities occupied and used by the Government except when approved in writing and then only after temporary utility services have been approved and provided. Do not begin demolition work until all utility disconnections have been made. Shut off and cap utilities for future use, as indicated.

3.1.2.2 Disconnecting Existing Utilities

Remove existing utilities , as indicated and terminate in a manner conforming to the nationally recognized code covering the specific utility and approved by the Contracting Officer. When utility lines are encountered that are not indicated on the drawings, the Contracting Officer shall be notified prior to further work in that area. Remove meters and related equipment and deliver to a location in accordance with instructions of the Contracting Officer.

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

3.1.3 Chain Link Fencing

Where indicated, remove chain link fencing, gates and other related salvaged items scheduled for removal and transport to designated areas. Remove gates as whole units. Cut chain link fabric to 25 foot lengths and store in rolls off the ground.

3.1.4 Paving and Slabs

Remove concrete and asphaltic concrete paving and slabs as indicated to a depth indicated When existing concrete pavement is to be removed and adjacent concrete is to be left in place, first cut the joint between the removal area and adjoining pavement to stay in place full depth with a standard diamond-type concrete saw. Next, make a full depth saw cut parallel to the joint at least 24 inches from the joint and at least 6 inches from the end of any dowels. Remove all pavement to be removed beyond this last saw cut in accordance with the approved demolition work plan.

Remove all pavement between this last saw cut and the joint line by carefully pulling pieces and blocks away from the joint face with suitable equipment and then picking them up for removal. In lieu of this method, this strip of concrete may be carefully broken up and removed using hand-held jackhammers, 30 lb or less, or other approved light-duty equipment which will not cause stress to propagate across the joint saw cut and cause distress in the pavement which is to remain in place. Ensure equipment for sawing of concrete is standard diamond-type concrete saws mounted on a wheeled chassis which can be easily guided to follow the required alignment.

Use diamond tipped blades. If demonstrated to operate properly, abrasive blades may be used. Provide spares as required to maintain the required sawing rate. Wheel saws used in the removal of concrete shall be saws with large diameter tungsten carbide tipped blades mounted on a heavy-duty chassis which will produce a saw kerf at least 1-1/2 inch wide. Use saws capable of sawing to the full depth required. Early-entry saws may be used, subject to demonstration and approval of the Contracting Officer. No change to the initial saw cut depth is permitted. In lieu of the above specified removal method, the slab may be saw cut full depth to divide it into several pieces and each piece lifted out and removed. Use suitable equipment to provide a truly vertical lift, and use safe lifting devices for attachment to the slab. Pavement and slabs not to be used in this project shall be removed from the Installation at Contractor's expense.

3.2 CONCURRENT EARTH-MOVING OPERATIONS

Do not begin excavation, filling, and other earth-moving operations that are sequential to demolition work in areas occupied by structures to be demolished until all demolition in the area has been completed and debris removed. Fill holes, open basements and other hazardous openings.

3.3 DISPOSITION OF MATERIAL

3.3.1 Title to Materials

Except for salvaged items specified in related Sections, and for materials or equipment scheduled for salvage, all materials and equipment removed and not reused or salvaged, shall become the property of the Contractor and shall be removed from Government property. Title to materials resulting from demolition, and materials and equipment to be removed, is vested in the Contractor upon approval by the Contracting Officer of the Contractor's

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

PAVING TECHNICAL SPECIFICATIONS

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

demolition, and removal procedures, and authorization by the Contracting Officer to begin demolition. The Government will not be responsible for the condition or loss of, or damage to, such property after contract award.

Showing for sale or selling materials and equipment on site is prohibited.

3.3.2 Reuse of Materials and Equipment

Remove and store materials and equipment indicated to be reused or relocated to prevent damage, and reinstall as the work progresses.

3.3.3 Salvaged Materials and Equipment

Remove materials and equipment that are indicated and specified to be removed by the Contractor and that are to remain the property of the Government, and deliver to a storage site , as directed within 10 miles of the work site.

a. Salvage items and material to the maximum extent possible.

b. Store all materials salvaged for the Contractor as approved by the Contracting Officer and remove from Government property before completion of the contract. Material salvaged for the Contractor shall not be sold on the site.

c. Remove salvaged items to remain the property of the Government in a manner to prevent damage, and packed or crated to protect the items from damage while in storage or during shipment. Items damaged during removal or storage must be repaired or replaced to match existing items. Properly identify the contents of containers. Deliver the indicated items reserved as property of the Government to the areas designated by the Contracting Officer.

d. Remove the indicated items reserved as property of the using service prior to commencement of work under this contract.

3.3.4 Unsalvageable and Non-Recyclable Material

Dispose of unsalvageable and non-recyclable combustible material in the sanitary fill area located off the site.

3.4 CLEANUP

Remove debris and rubbish from basement and similar excavations. Remove and transport the in a manner that prevents spillage on streets or adjacent areas. Apply local regulations regarding hauling and disposal.

3.5 DISPOSAL OF REMOVED MATERIALS

3.5.1 Regulation of Removed Materials

Dispose of debris, rubbish, scrap, and other non salvageable materials resulting from removal operations with all applicable federal, state and local regulations as contractually specified off Government controlled property. Storage of removed materials on the project site is prohibited.

3.5.2 Burning on Government Property

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

Burning of materials removed from demolished and deconstructed structures will not be permitted on Government property.

3.5.3 Removal to Spoil Areas on Government Property

Transport noncombustible materials removed from demolished structures to designated spoil areas on Government property.

3.5.4 Removal from Government Property

Transport waste materials removed from demolished structures, except waste soil, from Government property for legal disposal. Dispose of waste soil as directed.

3.6 REUSE OF SALVAGED ITEMS

Recondition salvaged materials and equipment designated for reuse before installation. Replace items damaged during removal and salvage operations or restore them as necessary to usable condition.

-- End of Section --

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

SECTION 02 61 13

EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL

1.1 MEASUREMENT AND PAYMENT

1.1.1 Measurement

1.1.2 Payment

1.1.2.1 Excavation and Transportation

1.1.2.2 Backfilling

1.1.2.3 Stockpiling

1.2 REFERENCES

1.3 DESCRIPTION OF WORK

1.3.1 Scheduling

1.3.2 Work Plan

1.3.3 Other Submittal Requirements

1.4 SUBMITTALS

1.5 REGULATORY REQUIREMENTS

1.5.1 Permits and Licenses

1.5.2 Air Emissions

2.1 SPILL RESPONSE MATERIALS

2.2 BACKFILL

3.1 SURVEYS

3.2 EXISTING STRUCTURES AND UTILITIES

3.3 CLEARING

3.4 CONTAMINATED MATERIAL REMOVAL

3.4.1 Excavation

3.4.2 Shoring

3.4.3 Dewatering

3.5 CONFIRMATION SAMPLING AND ANALYSIS

3.6 CONTAMINATED MATERIAL STORAGE

3.6.1 Stockpiles

3.6.2 Roll-Off Units

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

PAVING TECHNICAL SPECIFICATIONS

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

3.6.3 Liquid Storage

3.7 SAMPLING

3.7.1 Sampling of Stored Material

3.7.2 Sampling Liquid

3.7.3 Sampling Beneath Storage Units

3.8 SPILLS

3.9 BACKFILLING

3.9.1 Confirmation Test Results

3.9.2 Compaction

3.10 DISPOSAL REQUIREMENTS

3.11 CLOSURE REPORT

-- End of Section Table of Contents --

PAVING TECHNICAL SPECIFICATIONS

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

SECTION 02 61 13

EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL

1.1 MEASUREMENT AND PAYMENT

1.1.1 Measurement

Measurement for excavation and onsite transportation shall be based on the actual number of cubic yards of contaminated material in-place prior to excavation. Determination of the volume of contaminated material excavated shall be based on cross-sectional volume determination reflecting the differential between the original elevations of the top of the contaminated material and the final elevations after removal of the contaminated material. Measurement for backfilling of excavated areas shall be based on in-place cubic yards of compacted fill. Measurement for construction of stockpile areas shall be based on the number of square yards of stockpile liner constructed.

1.1.2 Payment

1.1.2.1 Excavation and Transportation

Compensation for excavation and onsite transportation of contaminated material will be paid as a unit cost. This unit cost shall include any other items incidental to excavation and handling not defined as having a specific unit cost.

1.1.2.2 Backfilling

Compensation for backfill soil, transportation of backfill, backfill soil conditioning, backfilling, compaction, and geotechnical testing will be paid as a single unit cost.

1.1.2.3 Stockpiling

Compensation for construction of stockpile areas will be paid for as a unit cost. This unit cost shall include all aspects of grading, preparation, handling, placement, maintenance, removal, treatment, and disposal of stockpile cover materials and liner materials and all other items incidental to construction of stockpiles.

1.2 REFERENCES

The publications listed below form a part of this specification to the

ASTM INTERNATIONAL (ASTM)

ASTM D1556 (2007) Density and Unit Weight of Soil in

Place by the Sand-Cone Method

ASTM D1557 (2012) Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3)

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

ASTM D2167 (2008) Density and Unit Weight of Soil in Place by the Rubber Balloon Method

ASTM D2487 (2011) Soils for Engineering Purposes

(Unified Soil Classification System)

ASTM D422 (1963; R 2007) Particle-Size Analysis of Soil s

ASTM D5434 (2012) Field Logging of Subsurface

Explorations of Soil and Rock

ASTM D6938 (2010) Standard Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth

ASTM D698 (2012) Laboratory Compaction

Characteristics of Soil Using Standard Effort (12,400 ft-lbf/cu. ft. (600 kN-m/cu. m.))

EM 385-1-1 (2008; Errata 1-2010; Changes 1-3

2010; Changes 4-6 2011; Change 7 2012) Safety and Health Requirements Manual

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION

(NARA)

29 CFR 1926 Safety and Health Regulations for Constructio n

40 CFR 302 Designation, Reportable Quantities, and Notificatio n

1.3 DESCRIPTION OF WORK

The work consists of excavation and transportation of contaminated material. Approximate locations of contaminated material are shown on the drawings. Characterization data on the nature and extent of the contaminated material shall be determined by sampling and chemical analysis. Submit a Work Plan as specified below. Notify the Contracting Officer within 24 hours, and before excavation, if contaminated material is discovered that has not been previously identified or if other discrepancies between data provided and actual field conditions are discovered. Backfill material is not available onsite. Required sampling and chemical analysis shall be conducted in accordance with Section 01 45

10 CONTRACTOR QUALITY CONTROL.

1.3.1 Scheduling

Notify the Contracting Officer 30 calendar days prior to the start of excavation of contaminated material. The Contractor shall be responsible for contacting regulatory agencies in accordance with the applicable reporting requirements.

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

1.3.2 Work Plan

Submit a Work Plan within 30 calendar days after notice to proceed. No work at the site, with the exception of site inspections and surveys, shall be performed until the Work Plan is approved. Allow 30 calendar days in the schedule for the Government's review. No adjustment for time or money will be made if re submittals of the Work Plan are required due to deficiencies in the plan. At a minimum, the Work Plan shall include:

a. Schedule of activities.

b. Method of excavation and equipment to be used.

c. Shoring or side-wall slopes proposed.

d. Dewatering plan.

e. Storage methods and locations for liquid and solid contaminated material.

f. Borrow sources and haul routes.

g. Decontamination procedures.

h. Spill contingency plan.

1.4 SUBMITTALS

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Surveys; G

SD-03 Product Data

Work Plan; G Closure Report; G

SD-06 Test Reports

Backfill Surveys Confirmation Sampling and Analysis Sampling of Stored Material Sampling Liquid Compaction

1.5 REGULATORY REQUIREMENTS

1.5.1 Permits and Licenses

Obtain required federal, state, and local permits for excavation and storage of contaminated material. Permits shall be obtained at no additional cost to the Government.

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

1.5.2 Air Emissions

Air emissions shall be monitored and controlled in accordance with Section

01 57 20 ENVIRONMENTAL PROTECTION.

2.1 SPILL RESPONSE MATERIALS

Provide appropriate spill response materials including, but not limited to the following: containers, adsorbents, shovels, and personal protective equipment. Spill response materials shall be available at all times when contaminated materials/wastes are being handled or transported. Spill response materials shall be compatible with the type of materials and contaminants being handled.

2.2 BACKFILL

Backfill material shall be obtained from offsite sources approved by the Contracting Officer. Backfill shall be classified in accordance with ASTM D2487 as GW, GP, GM, GC, SW, SP, SM, SC, ML, MH, CL, or CH and shall be free from roots and other organic matter, trash, debris, snow, ice or frozen materials. Do not use material for backfill until borrow source chemical and physical test results have been submitted and approved.

3.1 SURVEYS

Surveys shall be performed immediately prior to and after excavation of contaminated material to determine the volume of contaminated material removed. Surveys shall also be performed immediately after backfill of each excavation. Provide cross-sections on 25 foot intervals and at break points for all excavated areas. Locations of confirmation samples shall also be surveyed and shown on the drawings.

3.2 EXISTING STRUCTURES AND UTILITIES

No excavation shall be performed until site utilities have been field located. Take the necessary precautions to ensure no damage occurs to existing structures and utilities. Damage to existing structures and utilities resulting from the Contractor's operations shall be repaired at no additional cost to the Government. Utilities encountered that were not previously shown or otherwise located shall not be disturbed without approval from the Contracting Officer.

3.3 CLEARING

Clearing shall be performed to the limits shown on the drawings in accordance with Section 31 11 00 CLEARING AND GRUBBING.

3.4 CONTAMINATED MATERIAL REMOVAL

3.4.1 Excavation

Areas of contamination shall be excavated to the depth and extent shown on the drawings and not more than 0.2 ft beyond the depth and extent shown on the drawings unless directed by the Contracting Officer. Excavation shall be performed in a manner that will limit spills and the potential for contaminated material to be mixed with uncontaminated material. An

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

PAVING TECHNICAL SPECIFICATIONS

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

excavation log describing visible signs of contamination encountered shall be maintained for each area of excavation. Excavation logs shall be prepared in accordance with ASTM D5434.

3.4.2 Shoring

If workers must enter the excavation, it shall be evaluated, shored, sloped or braced as required by EM 385-1-1 and 29 CFR 1926 section 650.

3.4.3 Dewatering

Surface water shall be diverted to prevent entry into the excavation.

Dewatering shall be limited to that necessary to assure adequate access, a safe excavation, prevent the spread of contamination, and to ensure that compaction requirements can be met.

3.5 CONFIRMATION SAMPLING AND ANALYSIS

The Contracting Officer shall be present to inspect the removal of contaminated material from each site. After all material suspected of being contaminated has been removed, the excavation shall be examined for evidence of contamination. If the excavation appears to be free of contamination, field analysis shall be used to determine the presence of contamination using immunoassay field kits. Excavation of additional material shall be as directed by the Contracting Officer. Samples shall be collected at a frequency of one per 10 square yards or as directed by the Contracting Officer. Based on test results, propose any additional excavation which may be required to remove material which is contaminated above action levels. Additional excavation shall be subject to approval by the Contracting Officer. Locations of samples shall be marked in the field and documented on the as-built drawings.

3.6 CONTAMINATED MATERIAL STORAGE

Material shall be placed in temporary storage immediately after excavation. The following paragraphs describe acceptable methods of material storage. Storage units shall be in good condition and constructed of materials that are compatible with the material or liquid to be stored. If multiple storage units are required, each unit shall be clearly labeled with an identification number and a written log shall be kept to track the source of contaminated material in each temporary storage unit.

3.6.1 Stockpiles

Stockpiles shall be constructed to isolate stored contaminated material from the environment. The maximum stockpile size shall be 100 cubic yards. Stockpiles shall be constructed to include:

a. A chemically resistant geo membrane liner free of holes and other damage. Non-reinforced geo membrane liners shall have a minimum thickness of 20] mils. Scrim reinforced geo membrane liners shall have a minimum weight of 40 lbs/1000 square feet. The ground surface on which the geo membrane is to be placed shall be free of rocks greater than 0.5 inches in diameter and any other object which could damage the membrane.

b. Geo membrane cover free of holes or other damage to prevent precipitation from entering the stockpile. Non-reinforced geo membrane covers shall have a minimum thickness of 10 mils. Scrim reinforced geo membrane covers shall have a minimum weight of 26 lbs/1000 square feet. The cover material shall be extended over the berms and anchored

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

PAVING TECHNICAL SPECIFICATIONS

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

or ballasted to prevent it from being removed or damaged by wind.

c. Berms surrounding the stockpile, a minimum of 12 inches in height.

Vehicle access points shall also be bermed.

d. The liner system shall be sloped to allow collection of leachate.

Storage and removal of liquid which collects in the stockpile, in accordance with paragraph Liquid Storage.

3.6.2 Roll-Off Units

Roll-off units used to temporarily store contaminated material shall be water tight. A cover shall be placed over the units to prevent precipitation from contacting the stored material. The units shall be located as shown on the drawings. Liquid which collects inside the units shall be removed and stored in accordance with paragraph Liquid Storage.

3.6.3 Liquid Storage

Liquid collected from excavations and stockpiles shall be temporarily stored in 55 gallon barrels. Liquid storage containers shall be water-tight and shall be located as indicated.

3.7 SAMPLING

3.7.1 Sampling of Stored Material

Samples of stored material shall be collected at a frequency of once per 100 cubic yards. Stored material with contaminant levels that exceed the action levels shall be treated offsite. Analyses for contaminated material to be taken to an offsite treatment facility shall conform to local, state, and federal criteria as well as to the requirements of the treatment facility. Documentation of all analyses performed shall be furnished to the Contracting Officer. Additional sampling and analyses to the extent required by the approved offsite treatment, storage or disposal (TSD) facility shall be the responsibility of the Contractor and shall be performed at no additional cost to the Government.

3.7.2 Sampling Liquid

Liquid collected from excavations and storage areas shall be sampled at a frequency of once for every 500 gal of liquid collected. Liquid with contaminant levels that exceed action levels shall be treated offsite. Analyses for contaminated liquid to be taken to an offsite treatment facility shall conform to local, state, and federal criteria as well as to the requirements of the treatment facility. Documentation of all analyses performed shall be furnished to the Contracting Officer. Additional sampling and analysis to the extent required by the approved offsite treatment, storage or disposal (TSD) facility receiving the material shall be the responsibility of the Contractor and shall be performed at no additional cost to the Government.

3.7.3 Sampling Beneath Storage Units

Samples from beneath each storage unit shall be collected prior to construction of and after removal of the storage unit. Samples shall be collected at a frequency of one per each 10 square yards from a depth interval of 0 to 0.5 feet. Based on test results, soil which has become contaminated above action levels shall be removed at no additional cost to the Government. Contaminated material which is removed from beneath

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

PAVING TECHNICAL SPECIFICATIONS

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

the storage unit shall be handled in accordance with paragraph Sampling of Stored Material. As directed by the Contracting Officer and at no additional cost to the Government, additional sampling and testing shall be performed to verify areas of contamination found beneath stockpiles have been cleaned up to below action levels.

3.8 SPILLS

In the event of a spill or release of a hazardous substance (as designated in 40 CFR 302), pollutant, contaminant, or oil (as governed by the Oil Pollution Act (OPA), 33 U.S.C. 2701 et seq.), notify the Contracting Officer immediately. If the spill exceeds the reporting threshold, follow the pre-established procedures as described in the RCRA Contingency Plan for immediate reporting and containment. Immediate containment actions shall be taken to minimize the effect of any spill or leak. Cleanup shall be in accordance with applicable federal, state, and local regulations. As directed by the Contracting Officer, additional sampling and testing shall be performed to verify spills have been cleaned up. Spill cleanup and testing shall be done at no additional cost to the Government.

3.9 BACKFILLING

3.9.1 Confirmation Test Results

Excavations shall be backfilled immediately after all contaminated materials have been removed and confirmation test results have been approved. Backfill shall be placed and compacted to the lines and grades shown on the drawings.

3.9.2 Compaction

Approved backfill shall be placed in lifts with a maximum loose thickness of 8 inches. Soil shall be compacted to 90 percent of maximum dry density.

Density tests shall be performed at a frequency of once per 10,000 square feet per lift. A minimum of one density test shall be performed on each lift of backfill placed. Field in-place dry density shall be determined in accordance with ASTM D1556, ASTM D2167, or ASTM D6938. If ASTM D6938 is used, a minimum of one in ten tests shall be checked using ASTM D1556 or ASTM D2167. Test results from ASTM D1556 or ASTM D2167 shall govern if there is a discrepancy with the ASTM D6938 test results.

3.10 CLOSURE REPORT

Three copies of a Closure Report shall be prepared and submitted within 14 calendar days of completing work at the site. The report shall be labeled with the contract number, project name, location, date, name of general Contractor, and the Corps of Engineers District contracting for the work. The Closure Report shall include the following information as a minimum:

a. A cover letter signed by a responsible company official certifying that all services involved have been performed in accordance with the terms and conditions of the contract documents and regulatory requirements.

b. A narrative report including, but not limited to, the following:

(1) site conditions, ground water elevation, and cleanup criteria;

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

PAVING TECHNICAL SPECIFICATIONS

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

(2) excavation logs;

(3) field screening readings;

(4) quantity of materials removed from each area of contamination;

(5) quantity of water/product removed during dewatering;

(6) sampling locations and sampling methods;

(7) sample collection data such as time of collection and method of preservation;

(8) sample chain-of-custody forms; and

(9) source of backfill.

c. Copies of all chemical and physical test results.

d. Copies of all manifests and land disposal restriction notifications.

e. Copies of all certifications of final disposal signed by the responsible disposal facility official.

f. Waste profile sheets.

g. Scale drawings showing limits of each excavation, limits of contamination, known underground utilities within 50 feet of excavation, sample locations, and sample identification numbers.

On-site stockpile, storage, treatment, loading, and disposal areas shall also be shown on the drawings.

h. Progress Photographs. Color photographs shall be used to document progress of the work. A minimum of four views of the site showing the location of the area of contamination, entrance/exit road, and any other notable site conditions shall be taken before work begins. After work has been started, activities at each work location shall be photographically recorded [daily] [weekly]. Photographs shall be a minimum of 3 by 5 inches and shall include:

(1) Soil removal and sampling.

(2) Dewatering operations.

(3) Unanticipated events such as spills and the discovery of additional contaminated material.

(4) Contaminated material/water storage, handling, treatment, and transport.

(5) Site or task-specific employee respiratory and personal protection.

(6) Fill placement and grading.

(7) Post-construction photographs. After completion of work at each site, take a minimum of four views of each excavation site. A digital version of all photos shown in the report shall be included with the Closure Report. Photographs shall be a minimum of 3 inches by 5 inches and shall be mounted back-to-back in double face plastic sleeves punched to fit standard three ring

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

PAVING TECHNICAL SPECIFICATIONS

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

binders. Each print shall have an information box attached. The box shall be typewritten and arranged as follows:

Project Name: Direction of View:

Location: Date/Time:

Photograph No.: Description of View:

PAVING TECHNICAL SPECIFICATIONS

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

SECTION 03 30 04

CONCRETE FOR MINOR STRUCTURES

The publications listed below form a part of this specification to the

ACI INTERNATIONAL (ACI)

ACI 308R (2001) Guide to Curing Concrete

ACI 318/318R (2008; Errata 2008) Building Code

Requirements for Structural Concrete and Commentary

ACI 347 (2004) Guide to Formwork for Concrete

ASTM A 185/A 185M (2007) Standard Specification for Steel

Welded Wire Reinforcement, Plain, for Concrete

ASTM A 615/A 615M (2008) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement

ASTM C 1260 (2007) Standard Test Method for Potential

Alkali Reactivity of Aggregates (Mortar-Bar Method)

ASTM C 143/C 143M (2008) Standard Test Method for Slump of

Hydraulic-Cement Concrete

ASTM C 150 (2007) Standard Specification for Portland

Cement

ASTM C 1567 (2004) Standard Test Method for Potential

Alkali-Silica Reactivity of Combinations of Cementitious Materials and Aggregate (Accelerated Mortar-Bar Method)

ASTM C 171 (2007) Standard Specification for Sheet

Materials for Curing Concrete

ASTM C 172 (2007a) Standard Practice for Sampling

Freshly Mixed Concrete

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

ASTM C 231 (2008) Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method

ASTM C 260 (2006) Standard Specification for Air-

Entraining Admixtures for Concrete

ASTM C 309 (2007) Standard Specification for Liquid

Membrane-Forming Compounds for Curing Concrete

ASTM C 31/C 31M (2008) Standard Practice for Making and

Curing Concrete Test Specimens in the Field

ASTM C 33 (2007) Standard Specification for Concrete

Aggregates

ASTM C 39/C 39M (2005e1) Standard Test Method for Compressive

Strength of Cylindrical Concrete Specimens

ASTM C 494/C 494M (2008) Standard Specification for Chemical

Admixtures for Concrete

ASTM C 618 (2008) Standard Specification for Coal Fly

Ash and Raw or Calcined Natural Pozzolan for Use in Concrete

ASTM C 685/C 685M (2007) Concrete Made by Volumetric Batching and Continuous Mixing

ASTM C 920 (2005) Standard Specification for Elastomeric

Joint Sealants

ASTM C 94/C 94M (2007) Standard Specification for Ready-Mixed

Concrete

ASTM D 1752 (2004a) Standard Specification for Preformed

Sponge Rubber Cork and Recycled PVC Expansion

ASTM D 75 (2003) Standard Practice for Sampling

Aggregates

ASTM E 96/E 96M (2005) Standard Test Methods for Water Vapor

Transmission of Materials

COE CRD-C 400 (1963) Requirements for Water for Use in

Mixing or Curing Concrete

COE CRD-C 572 (1974) Specifications for Polyvinylchloride

Water stops

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

PAVING TECHNICAL SPECIFICATIONS

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

Air-Entraining Admixture

Water-Reducing or Retarding Admixture Curing Materials Reinforcing Steel Expansion Joint Filler Strips, Premolded Joint Sealants - Field Molded Sealants Water stops

Manufacturer's literature is available from suppliers which demonstrates compliance with applicable specifications for the above materials.

Batching and Mixing Equipment

Batching and mixing equipment will be accepted on the basis of manufacturer's data which demonstrates compliance with the applicable specifications.

Conveying and Placing Concrete

The methods and equipment for transporting, handling, depositing, and consolidating the concrete shall be submitted prior to the first concrete placement.

Formwork

Formwork design shall be submitted prior to the first concrete placement.

SD-06 Test Reports

Aggregates

Aggregates will be accepted on the basis of certificates of compliance and test reports that show the material(s) meets the quality and grading requirements of the specifications under which it is furnished.

Concrete Mixture Proportions

Ten days prior to placement of concrete, the contractor shall submit the mixture proportions that will produce concrete of the quality required. Applicable test reports shall be submitted to verify that the concrete mixture proportions selected will produce concrete of the quality specified.

Cementitious Materials

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

Certificates of compliance attesting that the concrete materials meet the requirements of the specifications shall be submitted in accordance with the Special Clause "CERTIFICATES OF COMPLIANCE".

Cementitious material will be accepted on the basis of a manufacturer's certificate of compliance, accompanied by mill test reports that the material(s) meet the requirements of the specification under which it is furnished.

Aggregates

Aggregates will be accepted on the basis of certificates of compliance and tests reports that show the material(s) meet the quality and grading requirements of the specifications under which it is furnished.

1.3 UNIT PRICES

1.3.1 Concrete

1.3.1.1 Payment

All costs associated with manufacturing, furnishing, delivering, placing, finishing, and curing of concrete for the various items of the schedule, which price shall include the cost of all formwork. Payment for grout, preformed expansion joints, field-molded sealants, waterstops, reinforcing steel bars or wire reinforcement is to be included in this unit price payment item.

1.3.1.2 Measurement

Concrete will be measured for payment on the basis of the actual volume of concrete within the pay lines of the structures as indicated. Measurement of concrete placed against the sides of any excavation without the use of intervening forms will be made only within the pay lines of the structure.

No deductions will be made for rounded or beveled edge, for space occupied by meal work, for electrical conduits or timber, or for voids or embedded items that are either less than 5 cubic feet in volume or 1 square foot in cross section.

1.3.1.3 Unit of Measure

Unit of measure: cubic yard.

1.4 DESIGN AND PERFORMANCE REQUIREMENTS

The Government will maintain the option to sample and test joint sealer, joint filler material, water stop, aggregates and concrete to determine compliance with the specifications. The Contractor shall provide facilities and labor as may be necessary to assist the Government in procurement of representative test samples. Samples of aggregates will be obtained at the point of batching in accordance with ASTM D 75. Concrete will be sampled in accordance with ASTM C 172. Slump and air content will be determined in accordance with ASTM C 143/C 143M and ASTM C 231, respectively, when cylinders are molded. Compression test specimens will be made, cured, and transported in accordance with ASTM C 31/C 31M. Compression test specimens will be tested in accordance with ASTM C 39/C 39M. Samples for strength tests will be taken not less than once each shift in which concrete is

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

PAVING TECHNICAL SPECIFICATIONS

FA9301-16-R-0011 PAVING ID/IQ SOLICITATION

produced from each class of concrete required. A minimum of three specimens will be made from each sample; two will be tested at 28 days (90 days if pozzolan is used) for acceptance, and one will be tested at 7 days for information.

1.4.1 Strength

Acceptance test results will be the average strengths of two specimens tested at 28 days (90 days if pozzolan is used). The strength of the concrete will be considered satisfactory so long as the average of three consecutive acceptance test results equal or exceed the specified compressive strength, f'c, and no individual acceptance test result falls below f'c by more than 500 psi.

1.4.2 Construction Tolerances

A Class "C" finish shall apply to all surfaces except those specified to receive a Class "D" finish. A Class "D" finish shall apply to all surfaces which will be permanently concealed after construction. The surface requirements for the classes of finish required shall be as specified in ACI 347.

1.4.3 Concrete Mixture Proportions

Concrete mixture proportions shall be the responsibility of the Contractor.

Mixture proportions shall include the dry weights of cementitious material(s); the nominal maximum size of the coarse aggregate; the specific gravities, absorptions, and saturated surface-dry weights of fine and coarse aggregates; the quantities, types, and names of admixtures; and quantity of water per cubic yard of concrete.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .