This document is a draft request for proposal for a multiple award construction contract in Italy. The contract will provide design-build construction services at Aviano Air Base and other locations in Italy over a one-year base period with four option years. Services may include various construction, repair, renovation, and facility maintenance projects across multiple trades. The minimum guaranteed amount is $2,500 for attendance at a post-award orientation, and the total maximum value for all awarded contracts is estimated at $96 million. The solicitation will be issued through beta.SAM.gov and no paper copies will be provided. Comments on the draft attachments are due by April 19, 2019. The place of performance will primarily be Aviano Air Base but may include other locations in Italy.
AMENDMENT 0001 TO SOLICITATION FA568219RA0001
View the file
Other files for this federal contract opportunity
Show all 50
Multiple Award Construction Contract (MACC) Italy has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The Purpose of This Amendment Is: to change the solicitation closing date from October 04 2019 at
04.00 pm (Local Time/Central European Time) to October 18 2019 at 04.00 pm (Local Time/Central European Time).
to remove from Attachment 1 Section L Table L-1, Proposal Organization, Volume I Technical-Font & Size the words "Scale of 1:100 for any interior and technical equipment design drawings; 1:500 or less for any exterior design drawings".
to remove from Attachment 1 Section L Table L-1, Proposal Organization, Volume I - Technical-Page Limit the words : "Unlimited for Drawings & Bill of Quantities ".
to remove from Attachment 1 Section L Table L-1, Proposal Organization, Volume III -Price and Other Contracting Considerations the words: "1 redacted copy".
to change the title of Attachment 1 Section L to Attachment 1 Section L REV 01.
to change from Attachment 3 CEN-MACC SOW v3- para 9.3.2 (J) the term "German" with the term "Italian".
to change from Attachment 3 CEN-MACC SOW v3-para 17.2 the term "German" with the term "Italian".
to change the title of Attachment 3 CEN-MACC SOW v3 to Attachment 3 CEN-MACC SOW v3 REV 01.
Section C - Specification/SOW/SOO/ORD
The Requirements text has been modified to:
SEE SECTION J:
ATTACHMENT 3, CEN-MACC SOW REV01
ATTACHMENT 10, ASHE 18-1025 Technical Specifications (Seed project)
Section E - Inspection and Acceptance
Miscellaneous text in this section has been modified to:
E-1. Authorized representative from the 31 CES Engineering Sections, as applicable, will be responsible for inspection and/or acceptance. The inspectors will be identified by name at the task order site visit.
E-2. Notice of Completion of IDIQ Task Order/Pre-Final and Final Inspection: SEE ATTACHMENT 3
CEN-MACC SOW REV01
Section H - Special Contract Requirements
Miscellaneous text in this section has been modified to:
THE CEILING AMOUNT FOR THIS MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC)
CAN BE EXECUTED INDEPENDENT OF THE CONTRACT YEAR. THIS MEANS THAT THIS
CONTRACT IS NOT RESTRICTED BY THE PARTUCULAR ORDERING YEAR, IF REQUIRED, THE
REQUIRED $96M CAN BE UTILIZED IMMEDIATELY AFTER AWARD.
TO EACH OF THE 6 MACC AWARDEES A TASK ORDER FOR ATTENDANCE TO THE MACC
POST AWARD ORIENTATION TRAINING WILL BE ISSUED. EACH MACC ORIENTATION
FA568219RA0010001
TRAINING TASK ORDER WILL HAVE A VALUE OF $2,500 (EURO EQUIVALENT). THE
ORIENTATION TRAINING WILL BE HELD AT AVIANO AIR BASE, ITALY, BY 31ST CONTRACTING
SQUADRON IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THE CONTRACT.
EACH MACC CONTRACTOR SHALL PROVIDE PERSONNEL (NO MORE THAN TWO PEOPLE)
TO ATTEND THE MACC POST AWARD ORIENTATION TRAINING AS WILL BE DESCRIBED IN
THE POST AWARD MACC TASK ORDER.
THE ATTACHMENT 12 OF THIS REQUEST FOR PROPOSAL ENTITLED CONSTRUCTION COST
ESTIMATE BREAKDOWN ASHE 18-1025 SEED PROJECT IS THE ONLY DOCUMENT IN WHICH
THE OFFERORS WILL INSERT THEIR PRICE PROPOSAL TO BID ON THE SEED PROJECT. NO
OTHER DOCUMENT WILL BE USED EXCEPT THAT ONE.
1. PROCEDURES FOR ISSUING TASK ORDERS (TOs):
1.1. Orders will be placed in accordance with the terms and conditions of the contract and FAR 16.505(b), as supplemented. As requirements are identified, the government will issue a task order request for proposal (TORFP) to all MACC (Multiple Award Construction Contract) awardees, describing the government's requirements, proposal response time, and any additional terms and conditions or additional evaluation criteria.
1.2. Contractors shall respond within the number of calendar days stated in the TORFP by submitting a proposal to the Contracting Officer in accordance with requirements stated in the TORFP.
Response time requirements are:
a. Response Requirements: it will be determined at discretion of the Contracting Officer based on complexity, magnitude and urgency of the requirement.
1.3. Proposals submitted in response to a TORFP must be in compliance with the terms and conditions of the contract, its attachments, and any attachments to the TORFP. Non-conformance with these instructions may result in rejection of the proposal, an unfavorable proposal evaluation, or being deemed ineligible for award. Proposals shall clearly identify any exception to the terms and conditions and shall provide complete supporting rationale. The Government reserves the right to determine any such exceptions are unacceptable. Any exception determined unacceptable by the Government may result in the Offeror's proposal being determined unacceptable and ineligible for award.
1.4. TORFP will result in a firm-fixed priced TO as the project award document. The government intends to award a single TO without interchanges; therefore, MACC offerors should propose their best price. However, the Government reserves the right to conduct interchanges if deemed in its best interest. Interchanges are fluid interaction(s) between the Contracting officer (CO) and the MACC contractors and may address any aspect of the proposal and may or may not be documented in real time. Interchanges may be conducted using interchange notices (IN). Offeror responses to INs will be considered in making the award selection decision. Interchanges may be conducted with one, some or all offerors as the Government is not required to conduct interchanges with any or all contractors responding to a TORFP.
1.5. TORFP s will identify the information below, as applicable. Late proposals will be handled in accordance with FAR 52.215-1, Instructions to Offerors - Competitive Acquisition. Changes to TORFP s will be accomplished via amendments to the TORFP.
--Submission requirements
--TORFP number, project title, project number, location, point(s) of contact (POCs)
--Whether project is design build, design build with partial design provided or construction effort only
--Performance time and whether it is mandatory or negotiable
--Site visit date
--Specifications, statement of work (SOW), and/or statement of objectives (SOO)
--Drawings
--Magnitude or budgetary amount
--Offer acceptance period
--Closing date
--Pricing schedule
--Bonding requirements
--Any project specific liquidated damages
--Applicable wage determination
--Funding/Authority
--Submittal list
--Evaluation criteria
--Project specific proposal preparation instructions
--When notice(s) to proceed will be issued if other than stated in the contract
1.6. Bid-build procedures will normally be used when project specifications and/or drawings exist and the source selection approach will be based on price only unless otherwise noted.
1.7. Design-build procedures are designed to streamline the design process and the source selection approach will be low price, technically acceptable unless otherwise noted. Proposals will require the following, as applicable.
--Preliminary design is required (percentage per Attachment 3 MACC SOW REV01)
--SOW
--Site plan, floor plan, elevation and cross section drawings
--Detailed technical approach
--Proposed period of performance for design, unless a required period is stated
--Proposed period of performance for construction, unless a required period is stated
--Design cost
--Construction cost broken down in CSI or similar division breakdown
1.8. The construction phase and funding for the project will be added by modification when not included in the initial TO award. After which the contractor will submit the additional documents.
PERFORMANCE AND PAYMENT BONDS - CONSTRUCTION:
Modifies FAR 52.228-15 Performance and Payment Bonds-Construction (Oct 2010) as follows: "The bonds shall be in the form of a firm commitment supported by a registered and recognized financial institution and shall be in the amount of 10% of submitted price proposal". THIS RULE APPLIES
TO MACC (IT SHALL BE DETERMINED AT TASK ORDER LEVEL) AND SEED PROJECT. THE
OFFEROR AWARDED THE SEED PROJECT (IF FUNDED) WILL BE REQUIRED TO SECURE
A PERFORMANCE BOND IN ACCORDANCE WITH FAR 52.228-15 THEREFORE, WRITTEN
ASSURANCE FROM A FINANCIAL INSTITUTION THAT THE OFFEROR COULD SECURE SUCH A
BOND AT THE TIME OF PROPOSAL SUBMISSION MUST BE PROVIDED.
INSURANCE AMOUNTS SHALL BE DETERMINED AT TASK ORDER LEVEL DEPENDING ON
PROJECT COMPLEXITY, MAGNITUDE AND URGENCY.
WITH REFERENCE TO PROJECT ASHE 18-1025 (SEED PROJECT) THE INSURANCE AMOUNTS
ARE THE FOLLOWING:
Pursuant to contract clause 52.228-5, Insurance-Work on a Government Installation, the following are the kinds and minimum amounts of insurance that are required for performance of this contract.
Employee and third party bodily injury (in addition to the mandatory contractor's country social insurance).
(i) Per Person: EURO 1,000,000.00
Per Occurrence: EURO 5,000,000.00
(ii) Third Party Property Damages, Per Occurrence: EURO 1,500,000.00
Vehicle Liability Insurance in accordance with the mandatory requirements of the contractor's country and those of the European Common Market for work outside of the contractor's country. Insurance policies may be denominated in other than currency of the contractor's country provided the amount is equivalent to those stated above and the insurance policies are valid in the country where work is to be performed.
FAR 52.236-1 APPLIES TO CONTRACTS OVER 1,5 MILION ONLY AND IT WILL BE DETERMINED
AT TASK ORDER LEVEL.
WITH REFERENCE TO PROJECT ASHE 18-1025 (SEED PROJECT) AND FAR 52.236-1 THE
PERCENTAGE THAT APPLIES IS 12%.
PREPARATION OF MATERIAL APPROVAL SUBMITTALS
The submittals contemplated by the clause FAR 52.236-5 entitled "Material and Workmanship" shall be accomplished on and in accordance with the instructions pertaining to AF Form 3000, Material Approval Submittal.
PREPARATION OF PROGRESS SCHEDULES AND REPORTS
The reports contemplated by the clause FAR 52.236-15 herein entitled: "Schedules for Construction Contracts" shall be accomplished on and in accordance with the instructions pertaining to AF Form 3064, Contract Progress Schedule, and AF Form 3065, Contract Progress Report.
WITH REFERENCE TO CLAUSE FAR 52.246-21 OF THIS REQUEST FOR PROPOSAL, CHANGE
ALL REFERENCE TO ONE (1) YEAR TO READ TWO (2) YEARS.
OBSERVANCE OF HOST COUNTRY SOCIAL CONTRIBUTION LABOR LAW
(a) The Contractor throughout the life of this contract shall scrupulously observe the requirements of Italian Law regarding the payment of social contributions for Italian national employees as well as the similar laws/directives for all legally employed workers. The contractor shall require subcontractors at all tiers to also comply with the payment requirements of this law and those of the European Community member nations. The Contractor shall on a yearly basis, provide copies of the certifications (DURC) issued by the appropriate host nation authority attesting compliance with regular payment requirements of this law and/or corresponding documentation issued for employees that are citizens of other European Community member countries. The certifications shall be provided any time a new employee or subcontractor performs work under this contract or upon expiration of any previously provided certifications. Failure of the Contractor to strictly observe this special contract requirement shall be sufficient reason for the U.S. Government to terminate this contract for Cause.
(b) The contractor shall be responsible for complying with any and all Italian labor laws, relations and standards in effect or which shall come into effect during the term of this contract. Such compliance shall pertain to: hours of work, wages, salaries, working conditions, labor relations (including collective bargaining, union agreements etc.), particular workmen's compensation, social security contributions for all categories of dependents and professionals.
The Contractor and all subcontractors are required to adhere with all safety laws in effect (I.L. 626, Legislative Decree 9 April 2008, n. 81) and that may come into effect of the Italian Government. The Contracting Officer reserves the right to suspend work until such time as adherence to the laws is assured and to remove from the work site any worker found to ignore required safety practices. Such suspensions of work or removal of employees shall be at no cost to the Government. Failure by the contractor to correct deficiencies in reasonable time shall be cause for Termination for Default.
(c) Furthermore the contractor shall safeguard his firm with additional insurance against the risks of monetary recovery by Italian authorities and workers for accidents, injuries or deaths which are imputable to the contractor for failure to observe required safety practices and/or any requirement of paragraph a. above.
(d) The contractor shall be totally responsible and shall save harmless the U.S. Government from any and all disputes, claims, or grievance initiated by employees or third parties because of failure to comply with this special contract requirement.
(e) Construction contractors shall be responsible for written notification to the local labor benefits office of site work initiation under this contract and shall produce copy of such notice to the Contracting Officer.
(f) With each base pass request the Contractor shall furnish the health insurance and labor benefits employee number.
(g) With signature of the offer the contractor warrants that the proposed price(s) include all costs in effect or which shall come into effect during the term of the contract for compliance with this contract requirement and also for all responsibilities and risks as indicated herein.
THE FOLLOWING CLAUSES AND PROVISIONS INSERTED IN THE REQUEST FOR PROPOSAL
DO NOT APPLY:
FAR 52.232-21
FAR 52.232-11
FAR 52.207-6
FAR 52.232-40
FAR 52.226-26
DFARS 252.217-7027
Section J - List of Attachments
The following attachments were added:
Attachment 1 Section L REV 01
Attachment 3 CEN -MACC SOW v3 REV 01
The following attachments were deleted:
Attachment 1 Section L
Attachment 3 CEN -MACC SOW v3
Section L - Instructions, Conditions, & Notices to Offerors or Quoters
Miscellaneous text in this section has been modified to:
Attachment 1 Section L REV01: refer to Section J
| IDCode: |
| Page: 1 |
| Pages: 6 |
| AmendNo: 0001 |
| EffDate: 9/30/2019 |
| ReqNo: A001351 |
| ProjNo: MACC |
| IssCode: FA5682 |
| AdmCode: |
| IssuedBy: FA5682 31 CONS DA LGC |
UNIT 6102 BOX 140
APO AE 09604-6102
APO, AE 09604-6102
United States Melissa Maurhart, Telephone: 00390434304318 Email: melissa.maurhart.it@us.af.mil
| AdminBy: |
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: FA568219RA001 |
| SolDate: 8/28/2019 |
| AwardChg: |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: See Section G |
| ChgeOrd: |
| ChgeOrder: |
| Modify: |
| SuppAgre: |
| SuppAuth: |
| ModOthr: |
| OthrSpec: |
| NoReq: Off |
| Require: |
| Copies: |
| Descript: |
SEE CONTINUATION PAGE
| ContNameTitle: |
| CoNameTitle: Christian M Ruefer |
Email: christian.ruefer.1@us.af.mil Telephone: 632-7080
| ContDate: |
| CODate: |