ANNEX_E_-_ELECTRICAL_Part2.pdf

PDF 3 MB Posted

Attached to
Multiple Award Construction Contract (MACC) Italy Federal contract opportunity
Solicitation number
FA568219RA001
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

This notice is a draft request for proposal for multiple award construction contracts in Italy. The contracts will be for design-build construction services at Aviano Air Base and other locations, including grading, water and sewer lines, painting, roofing, building construction and renovation, HVAC, electrical, and other facility maintenance and repair work. The minimum contract value is $2,500 and the maximum total for all contracts combined is estimated at $96 million. The base contract term is one year with four option years and the minimum task order value is $2,500 with a maximum of $7 million. Comments on the draft RFP attachments are due by April 19, 2019. The anticipated RFP release date is May 2019. Evaluation will use a price-past performance tradeoff and awards will be fixed price with work ordered on an indefinite delivery indefinite quantity basis.

ANNEX E- ELECTRICAL PART 2

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC) Italy, newest first.
File Type Posted
Attachment 1 Section L REV 03.pdf PDF
Solicitation_Amendment_FA568219RA0010004_SF_30.pdf PDF
JA6P70~1.PDF PDF
ATTACH~3.PDF PDF
ATTACH~2.PDF PDF
Solicitation_Amendment_FA568219RA0010002_SF_30.pdf PDF
Attachment_1_Section_L_REV_02.pdf PDF
Attachment_9_Questions_and_Answers.docx DOCX document
ATTACH~3.DOC DOC document
ANNEX_S_-_STRUCTURAL_Part11.pdf PDF
ANNEX_E_-_ELECTRICAL_Part5.pdf PDF
ANNEX_E_-_ELECTRICAL_Part10.pdf PDF
ANNEX_S_-_STRUCTURAL_Part8.pdf PDF
ANNEX_E_-_ELECTRICAL_Part8.pdf PDF
ANNEX_S_-_STRUCTURAL_Part1.pdf PDF
ANNEX_E_-_ELECTRICAL_Part4.pdf PDF
Attachment_10_ASHE_18-1025_TS__Part6_Part5_Part2.pdf PDF
Attachment_10_ASHE_18-1025_TS__(Seed_project)_Part3.pdf PDF
Attachment_11_ASHE_18-1025_Drawings_(Seed_project)_Part10_Part1.pdf PDF
Attachment_11_ASHE_18-1025_Drawings_(Seed_project)_Part1_Part2.pdf PDF
Attachment_11_ASHE_18-1025_Drawings_(Seed_project)_Part17.pdf PDF
Attachment_13_Physical_Data.pdf PDF
Attachment_10_ASHE_18-1025_TS_(Seed_project)_Part6_Part6.pdf PDF
Attachment_11_ASHE_18-1025_Drawings_(Seed_project)_Part7.pdf PDF
Attachment_11_ASHE_18-1025_Drawings_(Seed_project)_Part2_Part5.pdf PDF
Attachment_10_ASHE_18-1025_TS_(Seed_project)_Part6_Part7.pdf PDF
Attachment_10_ASHE_18-1025_TS_(Seed_project)_Part6_Part4.pdf PDF
Attachment_10_ASHE_18-1025_TS_(Seed_Project)__Part1.pdf PDF
Attachment_10_ASHE_18-1025_TS_(Seed_project)_Part6_Part2.pdf PDF
Attachment_11_ASHE_18-1025_Drawings_(Seed_project)_Part5.pdf PDF
Attachment_11_ASHE_18-1025_Drawings_(Seed_project)_Part15_Part1.pdf PDF
Attachment_11_ASHE_18-1025_Drawings_(Seed_project)_Part13_Part2.pdf PDF
Attachment_11_ASHE_18-1025_Drawings_(Seed_project)_Part15_Part2.pdf PDF
Attachment_11_ASHE_18-1025_Drawings_(Seed_project)_Part1_Part1.pdf PDF
Attachment_11_ASHE_18-1025_Drawings_(Seed_project)_Part2_Part2.pdf PDF
Attachment_10_ASHE_18-1025_TS__(Seed_project)_Part5.pdf PDF
Attachment_11_ASHE_18-1025_Drawings_(Seed_project)_Part13_Part1.pdf PDF
Solicitation_-_FA568219RA001.pdf PDF
Attachment_3_CEN_-MACC_SOW_v3.pdf PDF
Attachment_2_Section_M.pdf PDF
Attachment_8_Client_Authorization_Letter.pdf PDF
Attachment_9_Questions_and_Answers.pdf PDF
Questions_and_Answers_draft_RFP_FA568219RA0001_May_03_2019.pdf PDF
Questions_and_Answers_draft_RFP_FA568219RA0001_May_02_2019.pdf PDF
(draft)_Attachment_6_Experience_Overview_Sheet.pdf PDF
(draft)_Attachment_9_Client_Authorization_Letter.pdf PDF
(draft)_Attachment_1_Section_L__20_March.pdf PDF
(draft)_Attachment_3_General_Requirements_and_Provisions.pdf PDF
(draft)_Attachment_10_Questions_and_Answers.pdf PDF
(draft)_Attachment_7_Experience_Information_Sheet.pdf PDF
Show all 50

Multiple Award Construction Contract (MACC) Italy has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Aviano Air Base - Building 939 22.02.2018

Redattore Bruno Benincà Telefono 348 7494611

Fax e-Mail

Room #02 OFFICE - 80% lumen / Riepilogo

Altezza locale: 2.700 m, Altezza di montaggio: 2.712 m, Fattore di manutenzione: 0.85

Valori in Lux, Scala 1:63

Superficie r [%] Em [lx] Emin [lx] Emax [lx] Emin / Em

Workplane / 401 232 524 0.578

Floor 25 331 193 411 0.582

Ceiling 80 91 68 98 0.747

Pareti (4) 55 181 88 273 /

Workplane:

Altezza: 0.850 m Reticolo: 64 x 32 Punti Zona margine: 0.200 m

UGR Longitudinale- Trasversale verso l'asse lampadeParete sinistra 18 18

Parete inferiore 17 17

(CIE, SHR = 0.25.)

Rapporto di illuminamento (secondo LG7): Pareti / superficie utile: 0.451, Soffitto / superficie utile: 0.227.

Distinta lampade

Potenza allacciata specifica: 4.49 W/m² = 1.12 W/m²/100 lx (Base: 41.02 m²)

No. Pezzo Denominazione (Fattore di correzione) F (Lampada) [lm] F (Lampadine) [lm] P [W]

1 6 Thorn 96628244 BETA OFFICE LED4000- 840 HF Q597 [STD] (Tipo 1)* (1.000)

3300 3300 30.7

*Dati tecnici modificati Totale: 19800 Totale: 19800 184.2

Pagina 14

Redattore Bruno Benincà Telefono 348 7494611

Fax e-Mail

Room #02 OFFICE - 80% lumen / Lista pezzi lampade

6 Pezzo Thorn 96628244 BETA OFFICE LED4000-840 HF Q597 [STD] (Tipo 1) Articolo No.: 96628244 Flusso luminoso (Lampada): 3300 lm Flusso luminoso (Lampadine): 3300 lm Potenza lampade: 30.7 W Classificazione lampade secondo CIE: 100 CIE Flux Code: 58 87 97 100 100 Dotazione: 1 x Definito dall'utente (Fattore di correzione 1.000).

Pagina 15

Redattore Bruno Benincà Telefono 348 7494611

Fax e-Mail

Room #02 OFFICE - 80% lumen / Risultati illuminotecnici

Flusso luminoso sferico: 19800 lm Potenza totale: 184.2 W Fattore di manutenzione:

0.85

Zona margine: 0.200 m

Superficie Illuminamenti medi [lx] Coefficiente di riflessione [%] Luminanza medio [cd/m²] diretto indiretto totale

Workplane 316 85 401 / /

Floor 242 89 331 25 26

Ceiling 0.00 91 91 80 23

Wall 1 101 85 186 55 32

Wall 2 89 85 174 55 30

Wall 3 101 85 185 55 32

Wall 4 89 85 174 55 30

Regolarità sulla superficie utile Emin / Em: 0.578 (1:2)

Emin / Emax: 0.442 (1:2)

UGR Longitudinale- Trasversale verso l'asse lampadeParete sinistra 18 18

Parete inferiore 17 17

(CIE, SHR = 0.25.)

Rapporto di illuminamento (secondo LG7): Pareti / superficie utile: 0.451, Soffitto / superficie utile: 0.227.

Potenza allacciata specifica: 4.49 W/m² = 1.12 W/m²/100 lx (Base: 41.02 m²)

Pagina 16

Redattore Bruno Benincà Telefono 348 7494611

Fax e-Mail

Room #02 OFFICE - 80% lumen / Rendering 3D

Pagina 17

Redattore Bruno Benincà Telefono 348 7494611

Fax e-Mail

Room #02 OFFICE - 80% lumen / Workplane / Isolinee (E)

Valori in Lux, Scala 1 : 61 Posizione della superficie nel locale:

Superficie utile con 0.200 m Zona margine Punto contrassegnato:

(2.472 m, 9.472 m, 0.850 m)

Reticolo: 64 x 32 Punti

Em [lx] Emin [lx] Emax [lx] Emin / Em Emin / Emax

401 232 524 0.578 0.442

Pagina 18

Redattore Bruno Benincà Telefono 348 7494611

Fax e-Mail

Room #02 OFFICE - 80% lumen / Workplane / Livelli di grigio (E)

Scala 1 : 61 Posizione della superficie nel locale:

Superficie utile con 0.200 m Zona margine Punto contrassegnato:

(2.472 m, 9.472 m, 0.850 m)

Reticolo: 64 x 32 Punti

Em [lx] Emin [lx] Emax [lx] Emin / Em Emin / Emax

401 232 524 0.578 0.442

Pagina 19

Redattore Bruno Benincà Telefono 348 7494611

Fax e-Mail

Room #03 OFFICE - 80% lumen / Riepilogo

Altezza locale: 2.700 m, Altezza di montaggio: 2.712 m, Fattore di manutenzione: 0.85

Valori in Lux, Scala 1:64

Superficie r [%] Em [lx] Emin [lx] Emax [lx] Emin / Em

Workplane / 399 239 486 0.599

Floor 25 324 193 391 0.596

Ceiling 80 91 68 101 0.739

Pareti (4) 55 183 87 266 /

Workplane:

Altezza: 0.760 m Reticolo: 64 x 64 Punti Zona margine: 0.200 m

UGR Longitudinale- Trasversale verso l'asse lampadeParete sinistra 17 17

Parete inferiore 17 17

(CIE, SHR = 0.25.)

Rapporto di illuminamento (secondo LG7): Pareti / superficie utile: 0.463, Soffitto / superficie utile: 0.229.

Distinta lampade

Potenza allacciata specifica: 4.79 W/m² = 1.20 W/m²/100 lx (Base: 25.66 m²)

No. Pezzo Denominazione (Fattore di correzione) F (Lampada) [lm] F (Lampadine) [lm] P [W]

1 4 Thorn 96628244 BETA OFFICE LED4000- 840 HF Q597 [STD] (Tipo 1)* (1.000)

3300 3300 30.7

*Dati tecnici modificati Totale: 13200 Totale: 13200 122.8

Pagina 20

Redattore Bruno Benincà Telefono 348 7494611

Fax e-Mail

Room #03 OFFICE - 80% lumen / Lista pezzi lampade

4 Pezzo Thorn 96628244 BETA OFFICE LED4000-840 HF Q597 [STD] (Tipo 1) Articolo No.: 96628244 Flusso luminoso (Lampada): 3300 lm Flusso luminoso (Lampadine): 3300 lm Potenza lampade: 30.7 W Classificazione lampade secondo CIE: 100 CIE Flux Code: 58 87 97 100 100 Dotazione: 1 x Definito dall'utente (Fattore di correzione 1.000).

Pagina 21

Redattore Bruno Benincà Telefono 348 7494611

Fax e-Mail

Room #03 OFFICE - 80% lumen / Risultati illuminotecnici

Flusso luminoso sferico: 13200 lm Potenza totale: 122.8 W Fattore di manutenzione:

0.85

Zona margine: 0.200 m

Superficie Illuminamenti medi [lx] Coefficiente di riflessione [%] Luminanza medio [cd/m²] diretto indiretto totale

Workplane 310 88 399 / /

Floor 232 92 324 25 26

Ceiling 0.00 91 91 80 23

Wall 1 99 86 185 55 32

Wall 2 94 87 181 55 32

Wall 3 99 87 186 55 33

Wall 4 94 86 181 55 32

Regolarità sulla superficie utile Emin / Em: 0.599 (1:2)

Emin / Emax: 0.492 (1:2)

UGR Longitudinale- Trasversale verso l'asse lampadeParete sinistra 17 17

Parete inferiore 17 17

(CIE, SHR = 0.25.)

Rapporto di illuminamento (secondo LG7): Pareti / superficie utile: 0.463, Soffitto / superficie utile: 0.229.

Potenza allacciata specifica: 4.79 W/m² = 1.20 W/m²/100 lx (Base: 25.66 m²)

Pagina 22

Redattore Bruno Benincà Telefono 348 7494611

Fax e-Mail

Room #03 OFFICE - 80% lumen / Rendering 3D

Pagina 23

Redattore Bruno Benincà Telefono 348 7494611

Fax e-Mail

Room #03 OFFICE - 80% lumen / Workplane / Isolinee (E)

Valori in Lux, Scala 1 : 39 Posizione della superficie nel locale:

Superficie utile con 0.200 m Zona margine Punto contrassegnato:

(5.686 m, 2.722 m, 0.760 m)

Reticolo: 64 x 64 Punti

Em [lx] Emin [lx] Emax [lx] Emin / Em Emin / Emax

399 239 486 0.599 0.492

Pagina 24

Redattore Bruno Benincà Telefono 348 7494611

Fax e-Mail

Room #03 OFFICE - 80% lumen / Workplane / Livelli di grigio (E)

Scala 1 : 42 Posizione della superficie nel locale:

Superficie utile con 0.200 m Zona margine Punto contrassegnato:

(5.686 m, 2.722 m, 0.760 m)

Reticolo: 64 x 64 Punti

Em [lx] Emin [lx] Emax [lx] Emin / Em Emin / Emax

399 239 486 0.599 0.492

Pagina 25

Redattore Bruno Benincà Telefono 348 7494611

Fax e-Mail

Room #04 OFFICE / Riepilogo

Altezza locale: 2.700 m, Altezza di montaggio: 2.708 m, Fattore di manutenzione: 0.85

Valori in Lux, Scala 1:63

Superficie r [%] Em [lx] Emin [lx] Emax [lx] Emin / Em

Workplane / 415 212 591 0.512

Floor 25 335 194 417 0.580

Ceiling 80 91 67 106 0.738

Pareti (4) 55 180 90 305 /

Workplane:

Altezza: 0.850 m Reticolo: 64 x 64 Punti Zona margine: 0.200 m

UGR Longitudinale- Trasversale verso l'asse lampadeParete sinistra 18 18

Parete inferiore 18 18

(CIE, SHR = 0.25.)

Rapporto di illuminamento (secondo LG7): Pareti / superficie utile: 0.426, Soffitto / superficie utile: 0.220.

Distinta lampade

Potenza allacciata specifica: 4.64 W/m² = 1.12 W/m²/100 lx (Base: 33.05 m²)

No. Pezzo Denominazione (Fattore di correzione) F (Lampada) [lm] F (Lampadine) [lm] P [W]

1 4 Thorn 96628244 BETA OFFICE LED4000-

840 HF Q597 [STD] (1.000)

4127 4127 38.3

Totale: 16508 Totale: 16508 153.2

Pagina 26

Redattore Bruno Benincà Telefono 348 7494611

Fax e-Mail

Room #04 OFFICE / Lista pezzi lampade

4 Pezzo Thorn 96628244 BETA OFFICE LED4000-840

HF Q597 [STD]

Articolo No.: 96628244 Flusso luminoso (Lampada): 4127 lm Flusso luminoso (Lampadine): 4127 lm Potenza lampade: 38.3 W Classificazione lampade secondo CIE: 100 CIE Flux Code: 58 87 97 100 100 Dotazione: 1 x LED 38 W (Fattore di correzione 1.000).

Pagina 27

Redattore Bruno Benincà Telefono 348 7494611

Fax e-Mail

Room #04 OFFICE / Risultati illuminotecnici

Flusso luminoso sferico: 16508 lm Potenza totale: 153.2 W Fattore di manutenzione:

0.85

Zona margine: 0.200 m

Superficie Illuminamenti medi [lx] Coefficiente di riflessione [%] Luminanza medio [cd/m²] diretto indiretto totale

Workplane 330 85 415 / /

Floor 245 90 335 25 27

Ceiling 0.18 91 91 80 23

Wall 1 103 85 188 55 33

Wall 2 83 86 169 55 30

Wall 3 103 85 188 55 33

Wall 4 83 86 169 55 30

Regolarità sulla superficie utile Emin / Em: 0.512 (1:2)

Emin / Emax: 0.359 (1:3)

UGR Longitudinale- Trasversale verso l'asse lampadeParete sinistra 18 18

Parete inferiore 18 18

(CIE, SHR = 0.25.)

Rapporto di illuminamento (secondo LG7): Pareti / superficie utile: 0.426, Soffitto / superficie utile: 0.220.

Potenza allacciata specifica: 4.64 W/m² = 1.12 W/m²/100 lx (Base: 33.05 m²)

Pagina 28

Redattore Bruno Benincà Telefono 348 7494611

Fax e-Mail

Room #04 OFFICE / Rendering 3D

Pagina 29

Redattore Bruno Benincà Telefono 348 7494611

Fax e-Mail

Room #04 OFFICE / Workplane / Isolinee (E)

Valori in Lux, Scala 1 : 49 Posizione della superficie nel locale:

Superficie utile con 0.200 m Zona margine Punto contrassegnato:

(11.232 m, 9.472 m, 0.850 m)

Reticolo: 64 x 64 Punti

Em [lx] Emin [lx] Emax [lx] Emin / Em Emin / Emax

415 212 591 0.512 0.359

Pagina 30

Redattore Bruno Benincà Telefono 348 7494611

Fax e-Mail

Room #04 OFFICE / Workplane / Livelli di grigio (E)

Scala 1 : 49 Posizione della superficie nel locale:

Superficie utile con 0.200 m Zona margine Punto contrassegnato:

(11.232 m, 9.472 m, 0.850 m)

Reticolo: 64 x 64 Punti

Em [lx] Emin [lx] Emax [lx] Emin / Em Emin / Emax

415 212 591 0.512 0.359

Pagina 31

Redattore Bruno Benincà Telefono 348 7494611

Fax e-Mail

Room #05 OFFICE / Riepilogo

Altezza locale: 2.700 m, Altezza di montaggio: 2.708 m, Fattore di manutenzione: 0.85

Valori in Lux, Scala 1:64

Superficie r [%] Em [lx] Emin [lx] Emax [lx] Emin / Em

Workplane / 391 148 581 0.378

Floor 25 281 138 398 0.491

Ceiling 80 76 51 103 0.674

Pareti (4) 55 148 61 358 /

Workplane:

Altezza: 0.800 m Reticolo: 32 x 32 Punti Zona margine: 0.300 m

UGR Longitudinale- Trasversale verso l'asse lampadeParete sinistra 17 17

Parete inferiore 17 17

(CIE, SHR = 0.25.)

Rapporto di illuminamento (secondo LG7): Pareti / superficie utile: 0.365, Soffitto / superficie utile: 0.194.

Distinta lampade

Potenza allacciata specifica: 4.38 W/m² = 1.12 W/m²/100 lx (Base: 17.50 m²)

No. Pezzo Denominazione (Fattore di correzione) F (Lampada) [lm] F (Lampadine) [lm] P [W]

1 2 Thorn 96628244 BETA OFFICE LED4000-

840 HF Q597 [STD] (1.000)

4127 4127 38.3

Totale: 8254 Totale: 8254 76.6

Pagina 32

Redattore Bruno Benincà Telefono 348 7494611

Fax e-Mail

Room #05 OFFICE / Lista pezzi lampade

2 Pezzo Thorn 96628244 BETA OFFICE LED4000-840

HF Q597 [STD]

Articolo No.: 96628244 Flusso luminoso (Lampada): 4127 lm Flusso luminoso (Lampadine): 4127 lm Potenza lampade: 38.3 W Classificazione lampade secondo CIE: 100 CIE Flux Code: 58 87 97 100 100 Dotazione: 1 x LED 38 W (Fattore di correzione 1.000).

Pagina 33

File details come from the government source that posted it. Updated .