ATTACH~4.PDF

PDF 2 MB Posted

Attached to
Multiple Award Construction Contract (MACC) Italy Federal contract opportunity
Solicitation number
FA568219RA001
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

This notice announces a draft request for proposal for multiple award construction contracts to provide design-build construction services in Italy. Work will include grading, utility infrastructure, buildings, electrical systems, HVAC, refrigeration, fire suppression, fuel storage, generators, communication systems, and environmental remediation. The base period of performance is one year with four optional one-year extensions. The minimum guaranteed amount per contract is €2,500 and the maximum combined value of all contracts is estimated at €88 million. The minimum task order value is €2,500 and maximum is €7 million. The solicitation will be issued through www.fbo.gov in May 2019. Interested parties must submit any comments on the draft attachments by 19 April 2019 to the 31st Contracting Squadron at Aviano Air Base.

Attachment 10 ASHE 18-1025 Technical Specifications (Seed Project) Rev.1 Part 5

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC) Italy, newest first.
File Type Posted
Attachment 1 Section L REV 03.pdf PDF
Solicitation_Amendment_FA568219RA0010004_SF_30.pdf PDF
JA6P70~1.PDF PDF
ATTACH~3.PDF PDF
ATTACH~2.PDF PDF
Solicitation_Amendment_FA568219RA0010002_SF_30.pdf PDF
Attachment_1_Section_L_REV_02.pdf PDF
Attachment_9_Questions_and_Answers.docx DOCX document
ATTACH~3.DOC DOC document
ANNEX_S_-_STRUCTURAL_Part11.pdf PDF
ANNEX_E_-_ELECTRICAL_Part5.pdf PDF
ANNEX_E_-_ELECTRICAL_Part10.pdf PDF
ANNEX_S_-_STRUCTURAL_Part8.pdf PDF
ANNEX_E_-_ELECTRICAL_Part8.pdf PDF
ANNEX_S_-_STRUCTURAL_Part1.pdf PDF
ANNEX_E_-_ELECTRICAL_Part2.pdf PDF
ANNEX_E_-_ELECTRICAL_Part4.pdf PDF
ANNEX_E_-_ELECTRICAL_Part3.pdf PDF
Attachment_10_ASHE_18-1025_TS__Part6_Part5_Part2.pdf PDF
Attachment_10_ASHE_18-1025_TS__(Seed_project)_Part3.pdf PDF
Attachment_11_ASHE_18-1025_Drawings_(Seed_project)_Part10_Part1.pdf PDF
Attachment_11_ASHE_18-1025_Drawings_(Seed_project)_Part1_Part2.pdf PDF
Attachment_11_ASHE_18-1025_Drawings_(Seed_project)_Part17.pdf PDF
Attachment_13_Physical_Data.pdf PDF
Attachment_10_ASHE_18-1025_TS_(Seed_project)_Part6_Part6.pdf PDF
Attachment_11_ASHE_18-1025_Drawings_(Seed_project)_Part7.pdf PDF
Attachment_11_ASHE_18-1025_Drawings_(Seed_project)_Part2_Part5.pdf PDF
Attachment_10_ASHE_18-1025_TS_(Seed_project)_Part6_Part7.pdf PDF
Attachment_10_ASHE_18-1025_TS_(Seed_project)_Part6_Part4.pdf PDF
Attachment_10_ASHE_18-1025_TS(Seed_project)_Part6_Part8.pdf PDF
Attachment_11_ASHE_18-1025_Drawings_(Seed_project)_Part2_Part4.pdf PDF
Attachment_11_ASHE_18-1025_Drawings_(Seed_project)_Part3.pdf PDF
Attachment_10_ASHE_18-1025_TS_(Seed_project)_Part6_Part3.pdf PDF
Attachment_11_ASHE_18-1025_Drawings_(Seed_project)_Part2_Part3.pdf PDF
Attachment_11_ASHE_18-1025_Drawings_(Seed_project)_Part15_Part3.pdf PDF
Attachment_11_ASHE_18-1025_Drawings_(Seed_project)_Part11.pdf PDF
Attachment_11_ASHE_18-1025_Drawings_(Seed_project)_Part16_Part3.pdf PDF
Solicitation_-_FA568219RA001.pdf PDF
Attachment_3_CEN_-MACC_SOW_v3.pdf PDF
Attachment_6_Experience_Overview_Sheet.pdf PDF
Attachment_5_Past_Performance_Questionnaire_(PPQ).pdf PDF
Attachment_1_Section_L.pdf PDF
Questions_and_Answers_draft_RFP_FA568219RA0001_May_03_2019.pdf PDF
(draft)_Attachment_6_Experience_Overview_Sheet.pdf PDF
(draft)_Attachment_9_Client_Authorization_Letter.pdf PDF
(draft)_Attachment_1_Section_L__20_March.pdf PDF
(draft)_Attachment_3_General_Requirements_and_Provisions.pdf PDF
(draft)_Attachment_2_Section_M_20_March.pdf PDF
(draft)_Attachment_11_Construction_Cost_Estimate_Breakdown.xls XLS spreadsheet
(draft)_Attachment_4_Past_Performance_Information_(PPI).pdf PDF
Show all 50

Multiple Award Construction Contract (MACC) Italy has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RENOVATE/EXPAND FAC. 939 ASHE18-1025

FINAL (100% design) SCHEDULE OF WORK ITEMS Page 305

Item includes:

• Branch conduit and wiring from receptacle box to the cable tray or the nearest junction box.

• Class II support for receptacles mounting.

• For ordinary spaces: plastic plate, smooth, white or other colors as per request of the Contracting

Officer.

• For AHU spaces: heavy duty plastic box.

• For boiler room and exterior mounting: heavy duty plastic box, weather-proof type, with weather-proof while-in-use cover.

• All operations necessary for the workmanlike execution of the work.

Item No. quantity unit of measure sub-item a 27 Ea P17/11 type receptacle, 2x10/16A+T, 250V, Italian standard b 16 Ea P40 “Unel” type receptacle, 2x10/16A+T, 250V, European standard c 5 Ea WS composition: #1 P17/11 receptacle + #1 P40

“Unel” receptacle, mounted in a single box d 12 Ea P40 “Unel” type receptacle, 2x10/16A+T, 250V, European standard. Provided with 10 mA GFI (ground fault interrupter), if not provided at the start of the circuit (GFCI in the panelboard) e 2 Ea P40 “Unel” type receptacle, 2x10/16A+T, 250V, European standard. Weather-proof type, with weather-proof while-in-use cover.

f 4 Ea P40 “Unel” type receptacle, 2x10/16A+T, 250V, European standard. Provided with 10 mA GFI (ground fault interrupter), if not provided at the start of the circuit (GFCI in the panelboard). Weather-proof type, with weather-proof while-in-use cover.

13. Furnishing and installation of new power connection, recessed on walls except for those installed above the false ceiling, on the exterior of the building and inside the mechanical rooms, for which exposed type is requested. Power-connection is to be intended as power-supply line of appliances and equipment not fed or connected by a receptacle (for example: mechanical equipment).

Item includes:

• Branch conduit and wiring from the backbone in cable tray or in the nearest junction box.

• Cables type FG16OR16 if wired through metallic cable tray or conduit, type FS17 if wired through

PVC conduit.

• PVC and metallic conduit with a minimum O.D. 20 mm a 16 Ea “FC” Fancoil power-connection: 230V, 1PH+N+G, max

16 A supply line. Complete with a non-electrical maintenance disconnector, installed near the equipment.

b 1 Ea “EF” Exhaust fan power-connection: 230V, 1PH+N+G, max 16 A supply line.

c 1 Ea “OU” Air conditioning outside unit: 230V, 1Ph+N+G, max 16 A supply line. Complete with a non-electrical maintenance disconnector, installed near the equipment.

FINAL (100% design) SCHEDULE OF WORK ITEMS Page 306 d 1 Ea “IU” Air conditioning internal unit: 230V, 1Ph+N+G, max 16 A supply line. Complete with a non-electrical maintenance disconnector, installed near the equipment. Complete with FG16OR16 5G2.5 sq.mm supply and control cable from the outside unit.

e 15 Ea “T”, “TH” Recessed on wall box for accommodation of thermostat, connected by a PVC O.D. 20 mm conduit to the special system cable tray above the false ceiling. Thermostat and wiring included in the Mechanical section of this document.

f 1 Ea “AHU-SF” Air handling unit supply fan power connection: 400V, 3Ph+G, max 16 A supply line.

g 1 Ea “AHU-RF” Air handling unit return fan power connection: 400V, 3Ph+G, max 16 A supply line.

h 10 Ea “PUMP” Pump power connection: 400V, 3Ph+G, max 10 A supply line.

IVb – Lighting system

14. Furnishing and installation of new lighting system control devices and connection points. Installation is intended recessed on walls except on the exterior of the building and inside the mechanical rooms, for which exposed type is requested. In general:

- steel galvanized cable trays are used for backbone pathways above the false ceilings,

- rigid PVC conduits are used above the false ceiling and exposed in wall, if not subjected to damage,

- pliable corrugated PVC conduits are used recessed in walls, slab and ceiling,

- steel galvanized conduits are used on the exterior of the building and in the mechanical rooms.

Item includes:

• Branch conduit and wiring from lighting device box to the cable tray or the nearest junction box.

• Class II support for lighting control mounting.

• For ordinary spaces: plastic plate, smooth, white or other colors as per request of the Contracting

Officer.

• For mechanical spaces and on the exterior of the building: heavy duty plastic box.

a 8 Ea Toggle switch, 16 A, 250 V b 2 Ea Toggle switch, weather-proof (IP55), 16 A, 250 V c 3 Ea Push-button, 16 A, 250 V d 79 Ea Connection point (punto luce), composed by conduit and wiring necessary to feed a single lighting fixture. If not otherwise shown on project drawings, the item is composed by 2,4 m (8 ft) of rigid PVC conduit O.D. 20 mm and 2,4 m (8 ft) of 2x1.5+G conductors.

e 15 Ea Occupancy sensor, ON-OFF type

15. Furnishing and installation of new interior lighting fixture as shown on the project drawings. The complete features of each kind of fixtures are described in the ANNEX 1 to this document, that contains data sheets of each fixture. IMORTANT: data sheets shown specific products made by specific

FINAL (100% design) SCHEDULE OF WORK ITEMS Page 307 manufacturer to allows the contractor to identify the type of fixture, but it’s not a prescription. The Contractor shall have the faculty to select a different product having the equivalent features and performance, made by a different manufacturer.

Item includes:

• Branch conduit and wiring from the lighting connection point.

• For the fixture recessed on the false ceiling: seismic suspension.

• For recessed fixture having a dimension lower than the false ceiling module: cut of the false ceiling panel to fit the lighting fixture. Cut could have circular or rectangular shape, depending on the fixture type.

a 17 Ea A1 type lighting fixture, DALI driver b 17 Ea A2 type lighting fixture c 5 Ea B1 type lighting fixture d 13 Ea C1 type lighting fixture e 7 Ea C2 type lighting fixture f 2 Ea D1 type lighting fixture g 4 Ea F1 type lighting fixture

16. Furnishing and installation of new emergency lighting fixture as shown on the project drawings. The complete features of each kind of fixtures are described in the ANNEX 1 to this document, that contains data sheets of each fixture. IMORTANT: data sheets shown specific products made by specific manufacturer to allows the contractor to identify the type of fixture, but it’s not a prescription. The Contractor shall have the faculty to select a different product having the equivalent features and performance, made by a different manufacturer.

Item includes:

• Branch conduit and wiring from the lighting connection point.

• For the fixture recessed on the false ceiling: seismic suspension.

• For recessed fixture having a dimension lower than the false ceiling module: cut of the false ceiling panel to fit the lighting fixture. Cut could have circular or rectangular shape, depending on the fixture type.

a 7 Ea Emergency lighting fixture, LED, 250 lm output, minimum 90 minutes of autonomy, with self-diagnosis system. Wall mounted b 7 Ea Emergency lighting fixture, LED, 400 lm output, minimum 90 minutes of autonomy, with self-diagnosis system. Recessed on false ceiling.

c 3 Ea Emergency lighting fixture, weather-proof type IP65, LED, 600 lm output, minimum 90 minutes of autonomy, with self-diagnosis system. Wall mounted on the exterior of the building.

Asymmetrical optic.

d 4 Ea Emergency exit sign, minimum 90 minutes of autonomy, with self-diagnosis system. Visibility distance minimum 20 m.

e 1 Ea Timer for emergency light test, panelboard mounted, complete with 1x20A contactors installed on the emergency lighting circuits to allows test

FINAL (100% design) SCHEDULE OF WORK ITEMS Page 308 operation.

17. Furnishing and installation of DALI system. IMORTANT: data sheets shown specific products made by specific manufacturer to allows the contractor to identify the type of fixture, but it’s not a prescription.

The Contractor shall have the faculty to select a different product having the equivalent features and performance, made by a different manufacturer.

Item includes:

• Branch conduit and wiring from the backbone on the cable tray or from the nearest junction box.

• System engineering and programming, with assignment of addresses, development of the software based on the instruction included in the project drawings.

• Development of As Built drawings with the position of each addressed device (lighting fixture, switch, sensor, etc.).

a 2 Ea DALI mini input unit interface, suitable for inclusion into standard size back boxes together with a suitable mains-rated switch. Type Helvar mod. 444 or equivalent.

b 1 Ea DALI power supply unit, complete with supply line to the routers. Type Helvar mod. 402 or equivalent.

c 1 Ea DALI router. Type Helvar mod. 905 or equivalent.

d 6 Ea DALI multisensory with linked PIR, that contains a light sensor, a passive infrared (PIR) movement detector, an infrared receiver. False ceiling mounting. Type Helvar mod. 312 or equivalent.

e 220 m FG16OM16 2x1.5 sq.mm

IVc – Telecommunication and special system

18. Furnishing and installation of telecommunication system outlets as indicated on drawings.

Item includes:

• Development of As Built drawings with the position of each addressed outlet.

• Labelling of outlet to shown the address, with the reference to the telecom cabinet port.

a 8 Ea Double telecommunication outlet, cat. 6, UTP type b 2 Ea Double telecommunication outlet, cat. 6, UTP type, in an exposed wall mounted box, IP40.

19. Furnishing and installation of telecommunication system cables for the building #939, as indicated on drawings.

850 m Cat. 6 UTP cable

FINAL (100% design) SCHEDULE OF WORK ITEMS Page 309

20. Furnishing and installation of a Public Address system as described on the project drawings. The complete features of each kind of equipment are described in the ANNEX 1 to this document, that contains the referenced data sheets. IMORTANT: data sheets shown specific products made by specific manufacturer to allows the contractor to identify the type of device and equipment, but it’s not a prescription. The Contractor shall have the faculty to select a different product having the equivalent features and performance, made by a different manufacturer.

a 13 Ea Loudspeaker, recessed on false ceiling type, fitted for 100V sound system. Different power rating output selectable (1, 3 and 6 W). Frequency response of 100- 15,000 H. Sensitivity 93 dB @ 1 m. Maximum sound pressure level 101 dB (6W, 1m, 1 kHz). Flush mounting hole about 170 mm. ABS body and metallic grille, white colour.

b 230 m EVAC alarm cable, type FG4OHM1 100/100V (PH30) EN 50200. Purple jacket.

21. Furnishing and installation of a Door Entry (intercom) system as described on the project drawings.

a 1 Ea Interior door unit, wall mounted type, complete with #2 buttons, microphone, speaker, and accessories.

b 40 m Door Entry system cable as per instructions of the manufacturers.

IVd – Fire Alarm system

22. Furnishing and installation of fire alarm addressable detection, notification, monitoring and control devices, as indicated on drawings.

Item includes:

• Branch conduit and wiring from the backbone circuit.

• Mounting bases and boxes.

a 38 Ea Addressable photoelectric smoke detector, type Notifier mod. NFXI-OPT or equivalent.

b 6 Ea Addressable base with electronic sounder and isolator, fitted for combination with smoke detectors. Sound power up to 97 dB @ 1 m. Power supply from the loop.

Type Notifier BSO-PP-I02 or equivalent.

c 17 Ea Optical alarm repeater, type Notifier mod. INDICATOR

FINAL (100% design) SCHEDULE OF WORK ITEMS Page 310 or equivalent.

d 4 Ea Addressable manual call point, type Notifier mod.

M5A-RP02SG or equivalent.

e 1 Ea Duct station for addressable detectors, type Notifier mod. DNRE or equivalent.

f 7 Ea Addressable audible and visual notification device, type Notifier mod. WSS-PC-I02 or equivalent.

g 5 Ea Addressable visual notification device, type Notifier mod. WST-PC-I02 or equivalent.

h 5 Ea Addressable output module, type Notifier mod. M701 or equivalent.

i 3 Ea Addressable monitor module, type Notifier mod.

M710-CZR or equivalent.

j 5 Ea 50 kg door holder, type Notifier mod. 960120 or equivalent.

23. Furnishing and installation of cables and conduits for the fire alarm system.

a 240 m Rigid metallic conduit, O.D. 25 mm b 80 m Rigid metallic conduit, O.D. 32 mm c 3 m Rigid metallic conduit, O.D. 40 mm d 700 m Fire detection and alarm cable, type FG4OHM1

100/100V (PH30) UNI9795 IMQ

FINAL (100% design) SCHEDULE OF WORK ITEMS Page 311

PART B - REPAIR WORKS

PART I – DEMOLITIONS, REMOVALS AND EXCAVATIONS

Ia - Civil Demolitions

1. Demolition of existing asphalt pavers on roads and parking areas.

Item includes:

• Loading and transportation of resulting materials to authorized public dump area.

• The payment of dump fee;

Item n. quantity unit of measure sub-item

1,350.00 Sm

2. Demolition of existing reinforced concrete walkways.

• Loading and transportation of resulting materials to authorized public dump area.

115.00 Sm

3. Demolition of existing reinforced concrete slab, where canopy.

• Loading and transportation of resulting materials to authorized public dump area.

165.00 Sm

4. Demolition of existing wood canopy, including metal finishing.

• Scaffoldings, where needed;

• Loading and transportation of resulting materials to authorized public dump area.

1 Ls.

5. Remove the existing perimeter fence, including the.

FINAL (100% design) SCHEDULE OF WORK ITEMS Page 312

• Loading and transportation of resulting materials to authorized public dump area.

42.00 Sm

6. Remove the underground existing diesel oil empyt tank.

• Cleaning, drainage of the tank, removal of any material contained;

• Remediation of contaminated soil;

• Loading and transportation of resulting materials to authorized public dump area.

1.00 Ls.

Ib – Architectural Demolitions

1. Remove the existing toilet fixtures including all accessories and anchor brackets.

Item includes:

• Loading and transportation of resulting materials to authorized public dump area.

17.00 Ea.

2. Remove the existing interior walls finishing, including wood or ceramic tiles wall lining, plaster, baseboards.

Item includes:

• Loading and transportation of resulting materials to authorized public dump area.

a 106.03 Lm Removal of existing interior walls b 29.60 Sm Removal of existing tiles/plaster

3. Remove of suspended ceiling (60x60cm mineral fiber panel or gypsum board), including supporting metal structure.

FINAL (100% design) SCHEDULE OF WORK ITEMS Page 313

420.00 Sm

4. Remove the existing external doors and windows, including the sills, the frames, venetian blinds and curtains, all components and accessories.

Item includes:

• Patch-up of wall opening areas for new door and windows installation;

• Loading and transportation of resulting materials to authorized public dump area.

a 59.16 Sm Removal of existing external doors b 36.45 Lm Removal of existing sills

5. Remove the existing interior doors and windows, including the sills, the frames and all components and accessories.

Item includes:

• Patch-up of wall opening areas for new door and windows installation;

• Loading and transportation of resulting materials to authorized public dump area;

45.31 Sm

6. Remove the existing doors containing asbestos (ACM), including the sills the frames and all components and accessories.

Item includes:

• Drafting of a work plan for AAS;

• Patch-up of wall opening areas for new door installation;

• Loading and transportation of resulting materials to authorized public dump area;

• The payment of dump fee;

• All operations necessary for the workmanlike execution of the work and according to the provisions of the law.

7. Demolition of ceramic tile or vinyl, carpet, etc. flooring and related baseboard, including removal of the setting bed, 5 centimeters minimum thickness. Item includes:

FINAL (100% design) SCHEDULE OF WORK ITEMS Page 314 a 202.00 Sm Removal of concrete slab and tiles b 251.00 Sm Remove of concrete slab and pvc/moquette

8. Demolition of existing masonry partitions, as indicated on drawings, including any ceramic tile wall lining or plaster.

Item includes:

• Loading and transportation of resulting materials to authorized public dump area.

473.65 Sm

9. Demolition of existing masonry partitions (unreinforced external walls) as necessary for the new layout of renovated areas.

Item includes:

• scaffoldings;

• Loading and transportation of resulting materials to authorized public dump area;

17.75 Cm Dem. Existing masonry partitions

10. Demolition of existing bituminous membrane and insulation on the roof, including removal of the setting bed, downspout, metal gutters with brackets.

Item includes:

• Scaffoldings, where needed;

• Loading and transportation of resulting materials to authorized public dump area.

a 141.68 Lm removal of downspout and gutters b 591.50 Sm removal of membrane

Ic - Structural Demolitions

1. Partial or complete demolition of existing reinforced concrete walls, as indicated on structural drawings

FINAL (100% design) SCHEDULE OF WORK ITEMS Page 315 a 2.00 Cm Dem. Reinforced concrete wall b 6.19 Dem. Reinf. Concrete wall-breach

2. Demolition of existing reinforced concrete slab

• Loading and transportation of resulting materials to authorized public dump area.

485.00 Sm Dem. Reinforced concrete wall

Id - Mechanical Demolitions

1. Remove of existing of existing HVAC ductworks, fittings and equipment in the entire building as shown in the drawings, and all other system accessories and fittings and needed to achieve the scope of work.

Item includes:

• Electrical and mechanical disconnection of equipment;

• Control disconnection of equipment;

• Loading and transportation to authorized public dump area of all materials not to be reused, or to other area as directed by the Contracting Officer’s Technical Representative.

• Lifting means of any kind;

2. Remove existing HVAC pipeworks, fittings and equipment in the entire building as shown in the drawings, and all other system accessories and fittings and needed to achieve the scope of work.

Item includes:

• Electrical and mechanical disconnection of equipment;

• Control disconnection of equipment;

• Loading and transportation to authorized public dump area of all materials not to be reused, or to other area as directed by the Contracting Officer’s Technical Representative.

FINAL (100% design) SCHEDULE OF WORK ITEMS Page 316

3. Remove existing piping, boilers, chimney and pumbling system in the mechanical room, as shown in the drawings, and all other system accessories and fittings and needed to achieve the scope of work.

Item includes:

• Electrical and mechanical disconnection of equipment;

• Control disconnection of equipment;

• Loading and transportation to authorized public dump area of all materials not to be reused, or to other area as directed by the Contracting Officer’s Technical Representative.

4. Remove existing gas natural system from downstream main pipe (5 bar) to the building included pressure reducer cabinet until to boilers in the mechanical room. Excavation excluded. The main pipe (5 bar) will be remove until to meet the new installation (new position of cabinet gas pressure reducer).

It is included, and all other system accessories and fittings and needed to achieve the scope of work.

Item includes:

• Electrical and mechanical disconnection of equipment;

• Control disconnection of equipment;

• Loading and transportation to authorized public dump area of all materials not to be reused, or to other area as directed by the Contracting Officer’s Technical Representative.

5. Remove existing gas natural system from pressure reducer cabinet/ boiler room to the kitchen in the breaking room. The pipes and its accessories will be remove until to meet the new installation. It is included, and all other system accessories and fittings and needed to achieve the scope of work.

Item includes:

• Electrical and mechanical disconnection of equipment;

• Control disconnection of equipment;

• Loading and transportation to authorized public dump area of all materials not to be reused, or to other area as directed by the Contracting Officer’s Technical Representative.

6. Remove existing exhaust air system & extinguishing system of kitchen hood.

• Electrical and mechanical disconnection of equipment;

• Control disconnection of equipment;

FINAL (100% design) SCHEDULE OF WORK ITEMS Page 317

• Loading and transportation to authorized public dump area of all materials not to be reused, or to other area as directed by the Contracting Officer’s Technical Representative.

7. Remove existing plumbing system in toilets, laundry, boiler room, kitchen, and break area

• Electrical and mechanical disconnection of equipment;

• Control disconnection of equipment;

• Loading and transportation to authorized public dump area of all materials not to be reused, or to other area as directed by the Contracting Officer’s Technical Representative.

8. Removal and disposal of PACM

9. Removal and disposal of potentially carcinogenic insulating MMVF and MMMF

Ie - Electrical Demolitions

1. Removal of the electrical, telecommunication, fire alarm and special systems in the existing facility Item includes:

• Removal systems;

• Loading and transportation to authorized public dump area of all materials not to be reused, as directed by Contracting Officer’s Technical Representative. If request delivery the existing lighting fixtures to the maintenance shops;

• Searching of the existing underground line, opening and closing the handhole/manhole to remove the existing electrical line also if other circuit lines are present in the ductbank

FINAL (100% design) SCHEDULE OF WORK ITEMS Page 318 a 570 sq.m Removal of the existing panelboards, main distribution wireways and cables b 570 sq.m Removal of the existing lighting fixtures, included associated terminal conduits and cables c 570 sq.m Removal of the existing power system, included associated terminal conduits and cables d 570 sq.m Partially removal of the existing fire alarm system e 3 Ea Removal of the existing park lighting fixtures and associated poles and handholes

FINAL (100% design) SCHEDULE OF WORK ITEMS Page 319

PART II – ARCHITECTURAL, STRUCTURAL AND CIVIL WORK

IIa – Civil Work

1. Excavation and trenches excavation for the new parking area.

Item includes:

• Reuse of excavated soil;

• Supply and installation of sand layer;

• Transportation and disposal of exceeding excavated soil in authorized landfill a 200,00 Cm Excavations b 638,12 Cm Excavations (trench) c 161,00 Cm Excavations (inside building) d 379,66 Cm Transp. And disposal (auth. landfill) e 619,46 Cm reuse

2. Construction of new parking area and replace of new utilities tranches including n.1 road subgrade layer, n.1 road subgrade tout-venant layer, n.1 bituminous conglomerate connection layer thk 8cm, n.1 bituminous conglomerate road wear layer thk 3cm, including concrete curbs a 100.00 Cm tout venant b 633,60 Sm bituminous conglom. 8cm (base layer) c 633,60 Sm bituminous conglom. 8cm (conn.layer) d 633,60 Sm bituminous conglom. 3cm (wear layer) e 50,00 Cm road subgrade f 350,00 Lm concrete curb

3. Construction of reinforced concrete walkways with anti-slip finishing, thk 15cm minimum and restoration of existing walkways where indicated on civil drawings, including welded mesh.

a 521,60 Sm concrete walkways b 2.245,10 Kg welded mesh

4. In green area, spreading of vegetal soil (thk 15cm minimum) and grass seeding.

a 210,00 Cm spread og vegetable soil

FINAL (100% design) SCHEDULE OF WORK ITEMS Page 320 b 1.400,00 Sm grass seeding

5. Furnishing and installation of new screen mesh, color green, including removal of existing.

• Scaffoldings, where needed.

6. Construction of new storm drainage system to be connected to the main utility sewer network, including furnishing and installation of new storm water storages and draining modular systems, as indicated on civil drawings.

Item includes:

• Rain water grids, manholes, with covers, extensions, pipes (different diameters);

• Excavation;

• Reuse of excavated soil;

• Filter pack;

• Non-woven sheet;

• Marking tape;

• Supply and installation of sand layer;

a 1.00 Ls. storm water storage 10,80X3,20 mt b 1.00 Ls. storm water storage 8,40X3,20 mt

7. Furnishing and installation of vertical signs or removal and reinstall of existing, where indicated, on roads and parking areas.

Item includes:

1.00 Ea.

8. Furnishing and installation of horizontal road signs, where indicated, on roads and parking areas.

a 500,00 Ea. Horizontal road signs b 65,00 Ea. Painting of road symbols

FINAL (100% design) SCHEDULE OF WORK ITEMS Page 321

9. Construction of new sewer system to be connected to the main utility, as indicated on drawings.

• Manholes, with covers, extensions, pipes (different diameters);

• Excavations;

• Reuse of excavated soil;

a 9,00 Ea. new manhole for sewer line inspec.

b 9,00 Ea. new steel cover c 56,00 Lm pipes for sewage system Ø160 d 9,66 Cm sand

10. Construction of new water adduction system to be connected to the main utility, as indicated on drawings.

Item includes:

• Manholes, with covers, extensions, pipes (different diameters);

• Excavations;

• Reuse of excavated soil;

• Supply and installation of sand layer;

• Connection to the existing water supply system;

a 3,00 Ea. new manhole for water supply line 60x60x70cm b 3,00 Ea. new cast iron cover D400 c 3,00 Ea extension for manhole 60x60x60cm d 13,73 Cm sand e 19,00 Lm HDPE pipes for water supply system Ø90mm f 1 Ls. Connection to the existing water supply system

11. Construction of new electrical connection to the main utility, as indicated on drawings.

• Manholes, with covers, extensions, pipes (different diameters);

• Excavations;

• Reuse of excavated soil;

a 2,00 Ea. new manhole for electric line 80x80x80cm b 2,00 Ea. new cast iron cover D40080x80cm c 1,00 Ea. extension for manhole 80x80x40cm d 15,00 Ea. new manhole for electric line and grounding system

40x40x40cm e 15,00 Ea. new cast iron cover D400 40x40cm f 27,00 Ea. extension for manhole 40x40x40cm g 9,15 Cm sand

FINAL (100% design) SCHEDULE OF WORK ITEMS Page 322

12. Construction of new storm drainage line to the main utility, as indicated on drawings.

• Manholes, with covers, extensions, pipes (different diameters);

• Excavations;

• Reuse of excavated soil;

a 14,00 Ea. manhole for rainwater line 40x40x40 b 2,00 Ea. manhole for rainwater line 60x60x70 c 13,00 Ea. manh. for rainw. (grid) line 60x60x70 d 14,00 Ea. new steel cover for manh. 40x40 e 2,00 Ea. new steel cover 60x60 f 546,00 Kg new grid for n. 13 manhole g 62,70 Lm pipes for draining rainwater Ø160 h 154,40 Lm pipes for draining rainwater Ø200 i 22,00 Lm pipes for draining rainwater Ø250 l 17,00 Lm pipes for draining rainwater Ø400 m 33,46 Cm sand

13. Construction of new telecommunications lines to the main utility, as indicated on drawings.

• Manholes, with covers, extensions;

• Excavations;

• Reuse of excavated soil;

a 2.00 Ea. new manhole for telecomm. lines 120x120x120cm b 2.00 Ea. extension for manhole 120x120x30cm c 2.00 Ea new cast iron cover D400 for manhole 120x120cm d 1.00 Ea new manhole for telecomm. lines 60x60x70cm e 1,00 Ea new cast iron cover D400 for manhole 60x60 f 1,00 Ea extension for manhole 60x60x60cm g 1,00 Ea extension for manhole 60x60x20cm h 15,00 Cm sand

14. Furnishing and installation of new fence similar to the existing one. Including new automatic sliding gate in galvanized metal carpentry as indicated on architectural drawings.

Item includes:

• Electrical supply;

• Concrete foundations and concrete steel;

FINAL (100% design) SCHEDULE OF WORK ITEMS Page 323 a 15,00 Lm new fence b 800,00 Kg new sliding gate c 1,00 Ls. new automation for sliding door d 2,63 Cm concrete foundation e 210,40 Kg concrete steel for foundation

15. Furnishing and installation of anti-noise barrier in sound-absorbing metal panels for outdoor use, including new door for access with lock, as indicated on architectural drawings.

Item includes:

• Concrete foundations and concrete steel

• Supporting structure in galvanized metallic carpentry

• Anchor plates and accessories

• Sound-absorbing metal panels a 23,60 Sm new anti-noise barrier b 120,00 Kg new gate on anti-noise barrier

IIb - Architectural Work

1. Furnish and installation of half-brick blocks (drilling less than 45%) for seismic zones (th 26cm), including concrete mortar.

Item includes:

• Scaffoldings, where needed;

• Any architraves or lintel;

• Mortar joints;

• Anchoring to existing wall;

11,34 Cm

2. Construction of new basement on n.2 technical rooms and one for gas cabinet, thk 10cm, including:

concrete foundation and welded mesh, as indicated on architectural drawings.

a 81.72 Kg double welded mesh b 1.37 Cm foundation concrete

FINAL (100% design) SCHEDULE OF WORK ITEMS Page 324

3. Core drilling for MEP penetrations.

10.00 Ea.

4. Construction of new floor system, including: protective sheath on foundation and water proofing membrane, as indicated on architectural drawings.

a 144.00 Sm water proofing membrane b 120.00 Sm protective sheath

5. Construction of new interior layer of floor screed thk 6cm.

413.52 Sm

6. Furnishing and installation ceramic tile floor finish, type Casalgrande Padania or approved equal. Tiles shall be non-slip type, unpolished surfaces, size and color to be selected by the Contracting Officer’s Technical Representative from various factory samples provided by the Contractor. Joints shall be performed with compound as recommended by the manufacturer. After tile flooring has been completed the surface shall be cleaned. Ceramic tile baseboard size will be compatible with size module of floor tiles, base height shall be 10 cm. As indicated on architectural drawings.

Item includes:

• Furnishing and installation of concrete mortar setting bed for ceramic tile floor;

a 401.52 Sm antislip ceramic tiles 60x60cm b 12,00 Sm antislip ceramic tiles 20x20cm c 366,80 Lm ceramic baseboard

7. Furnishing and installation of new industrial quartz concrete floor for technical room, thickness 8cm, smoothed with the use of a mechanical sander (helicopter) and expansion joints, as indicated on architectural drawings.

FINAL (100% design) SCHEDULE OF WORK ITEMS Page 325

61.74 Sm

8. Furnishing and installation of new metal gutters thk 8/10 minimum, metal downspout thk 8/10 minimum and cast-iron downspout (from finish floor to 1,50 meter above.

Item includes:

• Scaffoldings, where needed;

a 30,21 Lm downspout b 8,00 Ea. cast iron downspout c 117,60 Lm gutters

9. Furnishing and installation of sanitary ventilation stack covers and of n.1 metal chimney on the roof.

• Scaffoldings.

a 10.00 Ea. sanitary ventilation b 1,50 Lm metal chimney

10. Furnishing and installation of safety line on roof, as indicated on drawings.

• Design and Calculations.

• Final Certification

1.0 Ls.

11. Construction of new gypsum board partitions or counterwall, with 50 or 75 x 0.6 mm thick galvanized steel frame, mullions placed at 600 mm on center and upper and floor guides. The partition, 125mm total thickness, consist of 2+2 gypsum board plies, each 12.5 mm thick, with in between 40 mm or 60 mm thick rock wool sound insulating layer. Moisture resistant gypsum board shall be used in the restroom as indicated on architectural drawings.

Item includes:

• Scaffoldings, where needed;

• Cuts;

• Joint finish with sealing material and special tapes;

• Leveling and cleaning, leaving all surfaces ready for painting;

• For counterwall fix gypsum board with glue and screw anchor;

FINAL (100% design) SCHEDULE OF WORK ITEMS Page 326 a 318,42 Sm gypsum board partition b 145,08 Sm gypsum board counter wall c 346,81 Sm plasterboard on perimetric wall

12. Construction of hollow brick walls, LecaBlocco types or similar, thk 12cm, with concrete mortar, as indicated on architectural drawings for fire resistant wall EI120.

Item includes:

• Scaffoldings, where needed;

• Any architraves or lintel;

• Mortar joints;

• Anchoring to existing wall;

145.08 Sm lightned cmu walls

13. Furnishing and installation polyurethane insulation wall panels, “Stiferite GTE” type, thk 2cm.

• Scaffoldings, where needed;

• High performance sealing tape for continuity of vapor barrier;

145.08 Sm poly. panels on walls “Stiferite GTE”

14. Furnishing and installation of wall lining with 20x20 cm ceramic tiles, type Casalgrande Padania or approved equal, using jolly tiles on corners. Height of wall finish shall be 220cm. Size, color and decoration selected by the Contracting Officer’s Technical Representative from various factory samples provided by the Contractor (size will be compatible with the size module of floor tiles) with pure cement grout joints, as indicated on architectural drawings.

Item includes:

• Scaffoldings, where needed;

• Furnishing and installation of concrete mortar setting bed for ceramic tile floor;

36.64 Sm

15. Furnishing and installation of 600x600 mm, 15-17 mm thick mineral fiber panel, fireproof Class 1, moisture-proof, suspended ceiling, complete with galvanized factory painted steel supporting frame, as indicated on architectural drawings.

Item includes:

FINAL (100% design) SCHEDULE OF WORK ITEMS Page 327 a 385,13 Sm suspended ceiling b 12,00 Sm suspended ceiling water repellent

16. Providing fire rated plastering on ceiling.

• Surface preparation.

470,00 Sm

17. Providing of three coats of plaster finish 1.5 cm minimum thickness to interior walls.

• Surface preparation;

• Leveling and cleaning, leaving all surfaces ready for painting;

• Scaffoldings;

158,56 Sm

18. Painting of interior wall surfaces with one coat of primer and two coats of latex paint. Color to be selected by the Contracting Officer’s Technical Representative in compliance with the Aviano Air Base Design Guide.

Item includes:

• Surface preparation.

• Leveling and cleaning, leaving all surfaces ready for painting;

1,005,87 Sm

19. Furnishing and installation of EIFS (Exterior Insulation Finish System), thk 12cm, as indicated on architectural drawings. Laying according to what is prescribed by the Cortexa manual. EPS panel technical features in according to Annex B – Room Ventilation and Heating and Cooling Load.

Item includes:

• Surface preparation.

• Scaffoldings, where needed.

• Fiberglass mesh 165 g/mq;

• Profile Tropfkantenprofil or similar corner guard with drip and mesh in place of overhanging portions (floors on open spaces, pilot floors) or in place of the upper windows;

FINAL (100% design) SCHEDULE OF WORK ITEMS Page 328

• Total reinforced shaving covering thermal insulation panels with adhesive mortar added with carbon fiber with a nominal thickness of 8mm

• Wallcovering formulated with a particular combination of pigments, mineral fillers and acryl-siloxane resins;

• All the equipment and accessories for correct installation;

504,78 Sm

20. Furnishing and installation of natural stone, “Pietra Piasentina” or “Pietra Serena” type, for exterior and interior door and window sills,and for stair steps, and external baseboard, bush-hammered or flamed finish.

Item includes:

• Surface preparation.

a 1,53 Sm interior sills b 5,68 Sm external sills c 12,57 Sm external windows sills d 68,59 Sm external baseboard

21. Furnishing and installation of new exterior aluminum windows, included thermal break aluminum frame, thermopan glass, complete with insect screens, venetian blind on interior side of the window.

Furnishing and installation of Venetian blind to all windows, fireproof material, Class 1. Furnishing and installation of roll up insect screen. All color selected by the Contracting Officer’s Technical Representative. Windows shall be complete with fixing hardware, sealing gaskets, accessories, as indicated on architectural drawings. All windows frame shall be fixed to masonry or concrete wall with Torx screws type. Technical features in according to Annex B – Room Ventilation and Heating and Cooling Load.

Item includes:

• Perimeter profile for support frame in PVC;

• Recessed magnetic contact for DDC system;

• Heavy duty type hinge;

a 30,11 Sm external windows 1,93x1,56 b 5,43 Sm external windows 0,87x1,56 c 1,03 Sm external windows 0,66*1,56 d 36,57 Sm roller blind e 36,57 Sm roll up insect screen f 93,68 Lm perimeter profile

FINAL (100% design) SCHEDULE OF WORK ITEMS Page 329

22. Furnishing and installation of new exterior aluminum doors, included thermal break aluminum frame, thermopan glass, complete with panic devices hardware, where needed, and hardware sets. Color selected by the Contracting Officer’s Technical Representative. Windows shall be complete with fixing hardware, sealing gaskets, accessories, as indicated on architectural drawings. All windows frame shall be fixed to masonry or concrete wall with Torx screws type. Technical features in according to Annex B

– Room Ventilation and Heating and Cooling Load.

Item includes:

• Perimeter profile for support frame in PVC;

• Recessed magnetic contact for DDC system;

• Heavy duty type hinge;

• Lockset type "best access systems f81” or approved equal and automatic door-closer;

• Panic exit device as indicated on architectural drawings;

a 8,48 Sm external doors 1,60x2,65 b 5,28 Sm external doors 1,20x2,20 c 2,75 Sm external doors 1,25*2,20 d 3,31 Sm external doors 1,25*2,65 e 3,96 Sm external doors 0,90x2,20 f 63,65 Lm perimeter profile g 2,00 Ea. panic exit device (one opening) h 3,00 Ea. panic exit device (two openings)

23. Furnishing and installation of new interior doors with aluminum frames, complete with hardware sets and window glass. Blind panel with a structure alveolar anti-mold, self-extinguishing with wooden support of a minimum thickness of 3 mm, covered on both sides in plastic laminate. Color to be selected by the Contracting Officer’s Technical Representative in compliance with the Aviano Air Base Design Guide. Overall thickness panel 35-40 mm. Aluminum frame profiles for thickness of the masonry up to 16 cm, inclusive casing, frame, supporting and closing hardware, gaskets, casings, strips, wall assemblies.

Item includes:

• Perimeter profile for support frame a 21,00 Sm Interior doors b 1,00 Ea Panic exit device

24. Furnishing and installation of EI 120 certified steel door, with two hot galvanized painted 2 mm sheets, 60 mm total thickness, with internal stiffening and mineral wool insulation. Hot galvanized 2.5 mm thick steel frame. Door shall be complete with fixing hardware, sealing gaskets, automatic door-closer, accessories, lockset type "best access systems f84” or approved equal, EI 120 certified.

Item includes:

• Perimeter profile for support frame

• Panic exit device as indicated on architectural drawings;

FINAL (100% design) SCHEDULE OF WORK ITEMS Page 330 a 1,00 Ea Internal fire-resistant door (1,00x2,10) b 1,00 Ea Internal fire-resistant door (1,60x2,10) c 1,00 Ea panic exit device (double door)

25. Furnishing and installation of new coconut fiber met.

• Perimeter profile for support frame, as needed.

26. Furnishing and installation of toilet accessories. Accessories shall be installed complete, with all required hardware and trim.

a 2.00 Ea. Toilet Paper Holder b 2.00 Ea. Liquid Soap Dispenser c 2.00 Ea. Paper Towel Dispenser d 2.00 Ea. 70x90cm Mirror (Stainless Steel Frame) e 2.00 Ea. robe hook – double f 4.00 Ea. safety handle

27. Construction of new sloped roof consist of reinforced sloped screed coverage thk 15cm medium with XPS panel, n.1 layer of bituminous vapor barrier, n.1 layer of polyurethane foam insulation thk 12cm, double walkable water-proofing bituminous membranes over layer “Derbigum Derbibrite NT” type, color white, as indicated on architectural drawings.

Item includes:

• Scaffoldings, where needed;

• Preparation of the surface;

• Coating of primer bituminous, overlaps, overlaps, material of consumption, cuts, waste, protections;

• Fixing of the insulating panels using polyurethane foam and mechanical anchors;

• Laying of XPS panels and sand and cement screed for the slope of the roof;

a 621.08 Sm vapor barrier b 621,08 Sm double walkable and polyur. foam ins

FINAL (100% design) SCHEDULE OF WORK ITEMS Page 331

28. Furnishing and installation of floor insulation in polyiso foam insulation, type “GTE 6cm thk:

485,00 Sm

29. Furnishing and installation vapor barrier on floor:

533,50 Sm

IIc - Structural Work

1. Construction of support layer for aerated floor slab modular system, as indicated on structural drawing and structural calculations.

48.30 Cm lean concrete

2. Construction of new reinforced concrete vertical columns, concrete walls and beams, including:

concrete steel and welded mesh, as indicated on structural drawing and structural calculations.

Item includes:

a 2,03 Cm beams and pillars concrete b 1,16 Cm elevations concrete c 877,75 Kg concrete steel

3. Construction of anchorage holes on structural concrete (holes of 12/20mm and plugging with epoxy mixture type “emaco s” series or equivalent.

255,00 Ea

4. Construction of new aerated floor system, including: modular Iglu with reinforced concrete slab, thk 20cm + 5cm, concrete steel and welded mesh, Radon Gas Mitigation System Pvc vent pipes along the perimeters into the masonry with external copper grating, as indicated on architectural and structural drawings:

FINAL (100% design) SCHEDULE OF WORK ITEMS Page 332 a 460,00 Sm Aerated floor slab modular system b 2159,38 kg Welded mesh for aerated floor slab modular system

FINAL (100% design) SCHEDULE OF WORK ITEMS Page 333

PART III – MECHANICAL WORKS

Unless otherwise indicated in the single items, all items listed below are intended to be furnished and installed, connected and completed with all the accessories necessary to furnish the equipment operating in a perfect manner.

It shall be the Contractor’s responsibility to perform installations and furnish materials that conform with Norms, Regulations and Italian Laws.

All materials shall bear the Italian Quality Mark.

All machines, equipment and electric and mechanical components shall conform to the 2006/42/CE of 17 may 2006, D.Lgs. 17/2010 dated 27 january 2010 with "CE" Mark. The civil works necessary to perform the following items are included as well as the scaffolding.

In the items are included also the pressure test (with the final report) for mechanical and plumbing system

IIIa – HVAC System

1. Furnishing and installation of air handling unit as specified on the drawing and in the specs. Included cabinet, air dampers, by pass air dampers, filters (G4+F9 on outside air and G4 for exhaust side), energy recovery wheel with inverter, plug fans (exhaust / supply) (included external inverters), coils (heating, cooling, post heating), base water trap, sound attenuator, duct flexible connection, hydronic connection, plumbing connection, anti-vibration support, seismic retain, accessories (syphon, joint, plastic tubes for DDC, plug pressure tap, etc.), DDC device installation and connection. Eurovent and Erp2018.

Technical data:

Supply air flow ~553 l/s Exhaust air flow ~345 l/s Electric power ~0.75 + 1.1kW (400/3/50) Item includes:

• Installation on the dedicated room;

• Hydronic valves, Y-filters, PICV valves, bypass, manometer, thermometer, pipe wells

• Every lifting system;

• Spare air filters to install after TAB test;

• Every type of accessory for a complete installation work:

Item n. Quantity unit of measure sub-item

2. Furnishing and installation of independent split system two-section, refrigerant R410A, operation cold / heat pump with condensation in air, consisting of an external condensing unit and an indoor unit (evaporator) complete with line refrigeration in pre-insulated copper pipe between the indoor unit and the unit external, control panel, charge with refrigerant gas R410A, support brackets, electrical connection, piping of condensation drainage, power line between indoor units and outdoor units, excluding the power line for powering the air conditioner and the magnetothermal protection switch.

Inverter type split system. Internal unit wall mounted.

Features of internal unit:

- capacity: 3.5kW (cooling)

- power absorbed in cooling 880W;

- 230V/1/50Hz;

FINAL (100% design) SCHEDULE OF WORK ITEMS Page 334

• - Installation on the dedicated room;

• - Every lifting system;

• - Scaffholder;

• - Connection with DDC system;

• - Support and anchors;

• - Pipings;

• - Every type of accessory for a complete installation work:

• - All operations necessary for the workmanlike execution of the work.

3. Supply and installation of rectangular or circular duct in sheet metal galvanized steel with "A" sealing class and characteristics dimensions complying with UNI 10381, part 1 and 2 standards, complete with reinforcement elements, internal staples, joints longitudinal, flange transversal joints, curves, tees, branches, section changes, simple and airfoil deflectors, brackets fixing, bolts, inspections in compliance with the UNI EN 12097 Standard and including equipment for work up to 5 m in height. Item includes:

• seismic joint;

• closing caps;

• formation and finishing of wall sleeves;

• connection with the existing duct on the building (outlets duct in the vault)

• supports, anchors seismic bracing ad its calculation;

• flexible duct;

• accessories.

• Dalt test.

• All operations necessary for the workmanlike execution of the work

2950 Kg

4. Supply and installation of a suitable glass wool mat for insulation coating of duct that convey hot or cold air, made of glass wool felt, treated with resins thermosets, coated on one side with kraft-aluminum paper glued screen, thermal conductivity of 0.040 W / mK per temperature of 40 ° C, complete with metal clamps for fixing to the canal. Measurement method according to the UNI standard 6665/88.

Including equipment for work up to 5 m in height. Insulation compliance to the note “Q” or “R” of CE regulation n.1272/2008 (CLP)

• All operations necessary for the workmanlike execution of the work

5 Sm

5. Supply and installation of pure aluminum sheet (99.5%), minimum thickness 0.8 mm, as a finish to the insulating coating for duct, including self-tapping screws, end caps, special pieces such as bends, tees, reductions terminals, bottoms, curves, tees, reductions, special pieces. For duct outside the building

FINAL (100% design) SCHEDULE OF WORK ITEMS Page 335

5 Sm

6. Supply and installation of antibacterial sound-absorbing flexible air ducts classified in fire-retardant class 0, with circular section in micro-perforated aluminum, shielded by a polyester sheet, insulated with a thickness of 25 mm of glass fiber and coated in aluminum, complete with taping, support supports. Including equipment for work up to 5 m in height a 10.0 Lm diameter 150mm b 80.0 Lm diameter 200mm

7. Supply and installation of square return grilles with G3 filter. Square mesh 13x13mm, with side / top fitting plenum. Perforated metal grid with hinged central core for access to the filter. Core with lateral guides to prevent the filter from falling out of the opening, complete with 6mm thick G3 filter, complete with filter holder frame, and dosing box / plenum for flexible connection, false ceiling mounting, aluminum painted in RAL 9010, dimensions 600x600. Every accessory included. Insulated plenum (class 1 fire reaction of fire). Included equipment for work up to 5 m in height

18 Ea

8. Supply and installation of square return grilles. Square mesh 13x13mm, with side / top fitting plenum.

Perforated metal grid with hinged central core for access to the filter. Complete with insulated plenum (class 1 fire reaction of fire) for flexible connection, false ceiling mounting, aluminum painted in RAL 9010, dimensions 600x600. Every accessory included. Included equipment for work up to 5 m in height

3 Ea

9. Supply and installation of adjustable air extraction valves in painted aluminum RAL 9010, formed by cap, cover, adjustable central disc and threaded rod. Complete with galvanized counter frame and fastening material. Including scaffolding, supports, every burden included. Diameter 200 mm.

2 Ea

FINAL (100% design) SCHEDULE OF WORK ITEMS Page 336

10. Supply and installation of a square airflow (4 way) ceiling diffuser. Flush mount false ceiling without damper. Complete with insulated plenum (class 1 of reaction to fire). Construction in RAL 9010 anodized aluminum. Including scaffolding, supports, every burden included. Dimension 370x370 mm.

45 Ea

11. Supply and installation of steel air volume damper galvanized type, complete with coupled shaped fins in contrast or parallel and controlled by levismes positioned on the side shutter. Complete with fixing screws. Including scaffolding, supports and every burden.

Item includes:

• connection to the duct, also using a short plenum duct, flanges and other special pieces;

• insulation;

• accessories

51 Ea within 10dmq

12. Supply and installation of fire dampers REI 120 for rectangular ducts, depth 300 mm, built entirely (tunnel and shovel) in calcium-silicate plates, with release device consisting of return spring and thermal fuse, motorized 230V, including fastenings. Including scaffolding, supports, every burden included.

Item includes:

• connection to the duct, also using a short plenum duct, flanges and other special pieces;

• insulation;

• accessories;

• limit switch sensor to signal the damper intervention

• damper motor and its connection to the DDC system and 230V line

3 Ea within 15 dmq

13. Supply and installation of regulating variable flow regulator box (VAV) equipped with Belimo LMV-D3 or equivalent approved regulator suitable for 0-2-10V control powered at 24V or similar. Minimum differential pressure 1Pa. Fitting with groove for the lip seal, suitable for circular air ducts according to DIN EN 1506 or DIN EN 13180 (the lip seal is fitted in the factory). Losses from the enclosure according to DIN EN 1751, class A. External sheet metal door galvanized steel, sound-absorbing coating. Complete with cylindrical silencer L = 500mm model TROX CS050 or similar approved with outer shell and aluminum interior. Factory calibrated. Field verification and calibration, mechanical and electrical connection and signal. Scaffolding and all charges included. Diameter 200mm. Including fastenings.

Supports and every burden.

FINAL (100% design) SCHEDULE OF WORK ITEMS Page 337

• connection to the duct, also using a short plenum duct, flanges and other special pieces;

• insulation;

• accessories;

• DDC and electrical connection

2 Ea VAV d200

14. Supply and installation of regulating flow rate module operates by means of a…