Report 2186 PH B112 BFP PM 3-9-22.pdf

PDF 379 KB Posted

Attached to
Prospect Harbor Space Force Station (SFS) Base Operations Support (BOS)
Solicitation number
FA255024R0003
Issued by

About this file

This notice provides information on an upcoming federal contract opportunity for base operations support services at Prospect Harbor Space Force Station in Maine. The Department of the Air Force will release a solicitation in January 2024 for management, operation, maintenance, logistical support, security, civil engineering, communications systems administration, logistics management, and environmental and bioenvironmental compliance services at the government-owned, contractor-operated facility. The requirement is set aside for small businesses and will utilize a best value source selection approach. Interested offerors must register in the Procurement Integrated Enterprise Environment and its Solicitation Module to access solicitation materials and submit proposals electronically. No funds are presently available and the notice does not constitute a commitment to award.

View the file

Other files

File Type Posted
Report 645 PH Outside Generator repair SC 6-20-18.pdf PDF
Report 1424 PH B103 OVHD PM 7-7-2020.pdf PDF
PH inside Generator SC 3-29-19.pdf PDF
Report 1428 PH B106 OVHD PM 7-7-2020.pdf PDF
Report 1725 PH Outside Generator Rad repair.pdf PDF
Report 1190 PH B102 outdoor Gen Fuel Gauge SC 10-24-19.pdf PDF
Report 656 PH B106 OVHD PM 7-10-18.pdf PDF
Report 588 PH B101 HVAC Cond Nr 1 PM 5-14-18.pdf PDF
Report 658 PH B104 OVHDR eplace Push Button 7-25-18.pdf PDF
PH Inside Gen day tank repair 10-11-18.pdf PDF
Report 2240 PH B102 Inside Generator PM 5-18-22.pdf PDF
Report 1297 PH B102 outside Generator PM 2-20-20.pdf PDF
Report 2111 PH B102 Inside Generator PM 11-23-21.pdf PDF
Report 1963 PH B102 Outside Generator PM 8-25-21.pdf PDF
Report 1832 PH B102 Roof Inspection 5-24-2021.pdf PDF
PH B102 Inside Gen PM 5-19-19.pdf PDF
Report 1660 PH B102 Inside Generator PM 11-18-20.pdf PDF
Report 1714 PH B102 Inside Generator PM 2-23-21.pdf PDF
Report 2252 PH B102 Roof Inspection 6-6-2022.pdf PDF
Report 2446 PH B103 Annual Heating PM 9-28-22.pdf PDF
Report 1615 PH B105 Furnace Heat PM 9-30-20.pdf PDF
Report 2461 PH B101 HVAC Air Handler Side A 9-28-22.pdf PDF
Report 457 PH B102 inside Generator PM 11-16-17.pdf PDF
Report 2202 PH B101 HVAC Condensor Side B 4-8-22.pdf PDF
PH B101 Fire Alrm PM 2-15-19.pdf PDF
Report 2047 PH B101 HVAC Air Handler Side A 9-30-21.pdf PDF
Report 2174 PH B102 CO2Fire System Annual PM SC 3-9-22.pdf PDF
Report 2179 PH B101 Fire Alarm PM 3-9-22.pdf PDF
PH B110 Boiler Nr 2PM9-18.pdf PDF
PH B110 Boiler Nr 1 PM 9-18.pdf PDF
Report 2177 PH B110 BFP PM 3-9-22.pdf PDF
Report 1994 PH B110 Annual Heating Nr 3 PM 9-30-21.pdf PDF
Report 1997 PH B101 Annual Heating PM 9-30-21.pdf PDF
Report 1635 PH 101 ESC Fire Surpression Trouble 11-10-20.pdf PDF
Report 1860 PH B101 Condenser B HVAC Repl Valves 5-27-21.pdf PDF
Report 1171 PH B101 HVAC Compressor 2 PM 10-1-19.pdf PDF
Report 1169 PH B101 HVAC Air Handler 2 PM 10-1-19.pdf PDF
Report 1658 PH 101 HVAC Replace Damper Motors 11-5-20.pdf PDF
Report 1681 PH B112 Boiler Leaking 12-12-20.pdf PDF
Report 1356 PH B101 HVAC Air Handler Nr 2 PM 6-10-20.pdf PDF
Report 1925 PH B101 Install HVAC Condenser 7-12-21.pdf PDF
Report 1846 PH B103 Fire Alarm PM 4-5-21.pdf PDF
PH B101 HVAC Air Handler Nr 1 PM 10-18.pdf PDF
Report 1843 PH B101 Fire Alarm PM 4-5-21.pdf PDF
Report 1849 PH B110 BFP PM 4-5-21.pdf PDF
Report 2127 PH B103EMG ESC no heat 12-27-2021.pdf PDF
Report 1893 PH Outside Generator Program Controller 6-16-21.pdf PDF
Report 1777 PH B101 FM200 Service call 4-5-21.pdf PDF
Report 1828 PH B104 OVHD Nr 2 PM 5-24-2021.pdf PDF
Report 1829 PH B105 OVHD PM 5-24-2021.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(ATTACH ADDITIONAL SHEETS IF NECESSARY)

YES NO

YES NO

YES NO

MATERIALS USED

MAINTENACE & INSPECTION REPORT

(ONE FOR EACH PIECE OF EQUIPMENT)

WILL MATERIALS NEED TO BE ORDERED? HOW LONG IS THE LEED TIME?

EXPLAIN BELOW

HAVE NOT BEEN MET

(BELOW) FOR ADMINISTRATION USE ONLY

DATE IT WILL BE RECEIVED :

PROPER PPE BEING WORN

YES

CONTRACTOR: TECHNICIANS NAME:

LOCATION WEATHERBUILDING NAME or #

CONTRACTOR/SIGNATURE CCI/ SIGNATURE SITE INSPECTOR/SIGNATURE

CONTRACT # ELIN # REPORT NO.

HAVE BEEN MET

DATE:

General Direct Condition Rating

TYPE OF EQUIPMENT MAKE MODEL

WORK DESCRIPTION & PROBLEMS FOUNDS

TIME TO COMPLETE TASK

IS INSPECTION CHECK LIST ATTACHED?

SAFETY REQUIREMENTS

WAS WORK COMPLETED?

IF NO EXPLAIN BELOW

General Direct Condition Rating Notes ( Explain Conditions found for the Rating given above)

N40085-17-D-7201

NO

HOUSE KEEPING COMPLETE

YES

NO

MAXIMO # Work Order #

Backflow Prevention Assembly

Test and Maintenance Report

Property Owner/Agent Prospect Harbor

Lighthouse Point Road

Prospect Harbor, ME

CCI Group, LLC

Property Access Derek McCaslin

(207)620-7172 x111

Owner/Agent Contact

March 09, 2022

526 Western Ave.

Augusta, ME 04430 Water Company

Boiler feedBldg #112 Date of InstallDevice Manufacturer Model Serial No.Size Type

Gauge Manufacturer Purchase DateModel Serial No.

LF009QTWatts 2659571/2"

New Install ?

Type

Location of Assembly Service Type-Class-Use

Next Date DueDate Calibrated

Meter/Acct #

Alarm Company Phone Reference Date/Time OnDate/Time Off

RPZ

CV Assembly

______psi ______psi

CHECK VALVE #1 CHECK VALVE #2

PRESSURE VACUUM

Leaked

R E

P A

IR

S

IN

IT

IA

L

T E

S T

F

IN

A L

T E

S T

Closed tight

Pressure drop across check valve

Closed tight

Leaked

Cleaned

Rubber Kit Disc

Opened at:

Did not open Did not open

Air inlet opened:

REPLACED

O-Ring Seat

Spring

Stem/Guide

Retainer

Locknuts

Other

Cleaned

Rubber Kit Disc

REPLACED

O-Ring Seat

Spring

Stem/Guide

Retainer

Locknuts

Other

Cleaned

Rubber Kit Disc

REPLACED

Diaphragm Seat

Spring Guide

O-Ring

Other

Cleaned

Air Inlet Disc

Inlet Spring

REPLACED

Diaphragm

CV Disc

Spring

Guide

Retainer

O-Ring

Other

Closed Tight Closed Tight

Opened at:

Satisfactory

Check held at:

OR OR OR

CV Assembly RV Assembly

Pressure drop across check valve

Pressure drop across check valve

Pressure drop across check valve

X X

LINE PRESSURE:CONTROL VALVE #2:RESULTS OF TEST: LeakedTight

DIFFERENTIAL PRESSURE

Leaked

FailPass

RELIEF VALVE BREAKER

_______psi

______psi ______psi ______psi

______psi ______psi

______psi

XX

8.3 1.7 2.6

I ACKNOWLEDGE THE CONTROL

VALVES HAVE BEEN LEFT IN THE

OPEN POSITION

Witness to Assembly Test (Print) Witness to Assembly Test Signature Date

APPROVALS

INITIAL

TEST

Certified Tester (Print) Certified Tester # Exp. DateCertified Tester Signature

Exp. DateCertified Tester #

FINAL

TEST

Barry Prescott #135

Barry Prescott #135

Date

DateCertified Tester (Print) Certified Tester Signature

I CERTIFY THAT THIS DATA IS ACCURATE AND RELECTS THE PROPER OPERATION AND MAINTENANCE OF THE ASSEMBLY

1990NEWWA 8/26/2024

8/26/20241990NEWWA

3/9/2022

3/9/2022

Print Date: 3/30/2022 Copyright 2002-2020 Life Safety Inspector, OnSite Software

Report of Inspection/Test

Prospect HarborProperty:

Owner: CCI Group, LLC 200000047508Inspection Ref:

Annual Backflow Prevention Assemblies

03/09/2022

Deficiency / Recommendations Summary

These items were deficient and do not meet the requirements of the applicable code at the time of the inspection. Items marked

Recommendation are not required by the applicable code but are opportunities to improve the Life Safety of the property.

Backflow RPZ Test Bldg #112 Bldg #112 Bldg #112 Watts LF009QT Valve RPZ (Reduced Pressure)265957 Bldg #112

Yes Device Pass ?

This device is leaking and scheduled to be replaced the week ending 4/9/21

Print Date: 3/30/2022 Copyright 2002-2020 Life Safety Inspector, OnSite Software

DATE: 3/9/2022
TYPE OF EQUIPMENTRow1: Backflow preventer
MAKERow1: Watts
MODELRow1: LF009QT
TIME TO COMPLETE TASKRow1: .5
CONTRACTOR: Dean & Allyn, Inc.
TECHNICIANS NAME: Barry Prescott
LOCATIONRow1: Prospect Harbor
BUILDING NAME or Row1: #112
WEATHERRow1: Cool/overcast
General Direct Condition RatingRow1: Green
General Direct Condition Rating Notes Explain Conditions found for the Rating given aboveRow1:
WILL MATERIALS NEED TO BE ORDERED HOW LONG IS THE LEED TIME EXPLAIN BELOW:
MATERIALS USEDRow1:
DATE IT WILL BE RECEIVED:
CCI SIGNATURERow1:
ELIN N4008517D7201: F002AQ
REPORT NON4008517D7201: 2186
REPORT NOWork Order:
MAXIMO Row1:
Work Order Row1:
REPORT NORow3:
Text1: Annual backflow preventer test
Text2:
Check Box3: Yes
Check Box4: Off
Check Box5: Yes
Check Box6: Yes
Check Box7: Yes
Check Box8: Off
Check Box9: Yes
Check Box10: Off
Check Box11: Yes
Check Box12: Off
Check Box13: Yes
Check Box14: Off

File details come from the government source that posted it. Updated .