PHSFS_BOS_RFP_Questions_SET_5_20240301.pdf

PDF 100 KB Posted

Attached to
Prospect Harbor Space Force Station (SFS) Base Operations Support (BOS)
Solicitation number
FA255024R0003
Issued by

About this file

This document provides information regarding a forthcoming solicitation for base operations support services at Prospect Harbor Space Force Station in Maine. The solicitation is expected to be released in January 2024 and will seek a contractor to provide non-personal services such as facility management, operations and maintenance, security, logistics, and environmental compliance. The requirement is set aside for small businesses and will utilize a subjective best value source selection process. Offerors must register in the Procurement Integrated Enterprise Environment system, including the solicitation module, to receive solicitation materials and submit proposals electronically. The notice encourages any interested parties to direct initial questions to the contracting officer and identifies an ombudsman for any unresolved concerns. Funding is not yet in place so the solicitation remains subject to cancellation.

View the file

Other files

File Type Posted
FA255024R0003_Amend_0002_240301.pdf PDF
FA255024R0003_SF1449_Amend_0002_240301.pdf PDF
Atch_5_FFP_NTE_Task_Pricing_Template_Amend_0002_240229.xlsx XLSX spreadsheet
PHSFS_BOS_RFP_Questions_SET_2_20240226.pdf PDF
PHSFS_BOS_RFP_Questions_SET 4_20240226.pdf PDF
PHSFS_BOS_RFP_Questions_SET 3_20240226.pdf PDF
20240221_PHSFS_BOS_RFP_Questions.pdf PDF
Atch_8_ITO_Amend_0001_20240221.pdf PDF
FA255024R0003_Amend_0001_20240221.pdf PDF
Atch_9_Evaluation_Amend_0001_20240207.pdf PDF
Atch_16_PPQ_20240104.docx DOCX document
PH B104 Heat PM 9-18.pdf PDF
Report 2305 PH B103 OVHD PM 6-14-22.pdf PDF
Report 1844 PH B101 FM200 Fire System PM 4-5-21.pdf PDF
PH-103-K-01 - 2021 Inspection.pdf PDF
Report 259 PH B103 BFP Annual PM 3-28-23.pdf PDF
Report 1847 PH B112 Fire Alarm PM 4-5-21.pdf PDF
Report 1175 PH B105 Heat PM 9-27-19.pdf PDF
Report 1456 PH B110 Fire Alarm PM 6-30-20.pdf PDF
Report 2324 PH B104 Annual Heating PM 9-15-21.pdf PDF
Report 1359 PH B101 HVAC Compressor Nr 2 PM 6-10-20.pdf PDF
Report 2443 PH B101 Annual Heating PM 9-29-22.pdf PDF
PH B101 Boiler PM 10-18.pdf PDF
Report 1855 PH B101 Condenser B HVAC PM 4-20-21.pdf PDF
Report 1845 PH B102 CO2Fire System PM 4-5-21.pdf PDF
Report 1356 PH B101 HVAC Air Handler Nr 2 PM 6-10-20.pdf PDF
Report 2174 PH B102 CO2Fire System Annual PM SC 3-9-22.pdf PDF
PH inside Generator SC 3-29-19.pdf PDF
Report 1828 PH B104 OVHD Nr 2 PM 5-24-2021.pdf PDF
PH B112 F7P9ZP-PH-BURNER 2-03-21.pdf PDF
Report 1831 PH B102 Outside Generator SC 5-25-2021.pdf PDF
Report 2252 PH B102 Roof Inspection 6-6-2022.pdf PDF
PH-110-K-02 - 2021 Inspection.pdf PDF
Report 645 PH B102 Outside Generator Annual PM 9-6-23.pdf PDF
Report 1680 PH B103 No heat ESC 12-12-20.pdf PDF
Report 1082 PH B102 inside Generator PM 8-22-18.pdf PDF
Report 1851 Anual Extinguisher PMs 4-5-21.pdf PDF
Report 2241 PH B102 Outside Generator PM 5-18-22.pdf PDF
PH B103 Replace Window Glass 20190820.pdf PDF
Report 402 PH B101 HVAC Nr 1 PM 9-17.pdf PDF
Report 2448 PH B104 Annual Heating PM 9-28-22.pdf PDF
Report 1296 PH B102 Inside Generator PM 2-20-20.pdf PDF
PH B110 Boiler Nr 1 PM 9-18.pdf PDF
Report 367 PH B112 FA Install.pdf PDF
Report 1357 PH B103 HVAC PM 6-10-20.pdf PDF
Report 2175 PH B103 Fire Alarm PM 3-9-22.pdf PDF
Report 2047 PH B101 HVAC Air Handler Side A 9-30-21.pdf PDF
Report 658 PH B104 OVHDR eplace Push Button 7-25-18.pdf PDF
Report 645 PH Outside Generator repair SC 6-20-18.pdf PDF
Report 1829 PH B105 OVHD PM 5-24-2021.pdf PDF
Show 40 more

Latest 50 of 292 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Set 5 - Page 1

FA255024R0003, Prospect Harbor SFS BOS Acquisition 1 Mar 2024

Question Set 5

1. Physical Access Control System and/or Visitor Access (System). Ref: PWS 3.2.15 and 3.2.16.

PWS paragraphs Para 3.2.15 and 3.2.16 communicate that DBIDS will not be employed in support of the Physical Access Control System and/or Visitor Access. Further, a PACS system does not appear on the GFE inventory.

a. Will the government provide terminal access to the NCIC and DMDC databases and scanners/card readers (such as ePACS) that will enable vetting of visitors and real-time access validation?

Response: No access to such systems or databases will be provided by the Government.

b. If a system is not provided, which systems are compliant with the government’s current or intended branch-wide vetting systems IAW DAFI 31-115 DAFGM2023-1?

Response: NSA Prospect Harbor (future Prospect Harbor SFS) is a closed site and access will be granted by the Contracting Officer Representative (COR) approval using an Entry Authorization Letter (EAL).

2. Spill Prevention Control and Countermeasure Plan (SPCC) for Diesel, Heating Oil, and

The response to [Question Set 2] Question 18 presents the total quantity of petroleum stored onsite totaling over 4,000 gallons.

a. Is a Spill Prevention Control and Countermeasure Plan (SPCC) available for the Site and if so, please provide a copy.

Response: The Navy SPCC is provided in a separate file.

b. If not, is it required to be developed and implemented as part of the contract?

Response: The PWS does not specifically require a SPCC. However, the PWS does have the requirement that "[t]he contractor shall develop, implement, and manage an effective and proactive hazardous material management (HAZMAT) program" and "The contractor shall respond to spills when notified for the purpose of documenting environmental impacts." (Ref.

PWS paragraph 4.6.6.5, Hazardous Materials.)

Set 5 - Page 2

3. Contract Management Relevancy Ratings. Ref: Table B4.6.2.1.1 - Contract Management Relevancy Ratings.

With regard to the "Contract Management Relevancy Ratings" in this table, in order to score "Relevant" or "Very Relevant", the Past Performance (PP) reference needs to involve "...

management of at least one of those functional areas was accomplished through a subcontractor."

Please confirm that this requirement only applies to the Prime's PPs, and not to any subcontractors who are submitting PPs for this bid.

Response: Please see Attachment 9, at paragraph B4.6, Relevancy Assessment: "In determining Relevancy for individual contracts, consideration shall be given only to the effort, or portion of the effort, being proposed to be performed by the offeror." .

4. Training Manager and a Weapons Qualification Instructor. Ref. PWS, Appendix 5

PWS, Appendix 5 references a "Training Manager" and a "weapons qualification instructor." Are these to be considered full-time positions, or is it up to the Offeror to decide?

Response: It is up to the offeror to decide; the positions could be an additional duty.

5. CSG Equipment. Ref. PWS Appendix 3, Contractor Provided Equipment, Uniforms, Vehicles and Weapons and PWS Appendix , Contractor Provided Weapons and Ammunition.

Is all equipment required by PWS, Appendices 3 and 4 required to be provided in new condition?

Response: The equipment is not required to be new; however, all equipment listed in PWS Appendices 3 and 4 must be serviceable for the intended use of the equipment.

File details come from the government source that posted it. Updated .