FA255024R0003_Amend_0002_240301.pdf

PDF 666 KB Posted

Attached to
Prospect Harbor Space Force Station (SFS) Base Operations Support (BOS)
Solicitation number
FA255024R0003
Issued by

About this file

This document provides details on a forthcoming federal contract solicitation for base operations support services at Prospect Harbor Space Force Station in Maine. The solicitation is expected to be released in January 2024 for a non-personal services contract to manage, operate, maintain, and provide all logistical support and security services at the facility. The contractor will be responsible for staffing and managing the site's physical security functions and programs, as well as providing civil engineering, communications, logistics, environmental, and safety services. The procurement will be set aside for small businesses and utilize a tradeoff best value selection process. Offerors must register in the Procurement Integrated Enterprise Environment system, including the solicitation module, to submit proposals electronically. No funds have yet been obligated for this requirement.

View the file

Other files

File Type Posted
PHSFS_BOS_RFP_Questions_SET_5_20240301.pdf PDF
FA255024R0003_SF1449_Amend_0002_240301.pdf PDF
Atch_5_FFP_NTE_Task_Pricing_Template_Amend_0002_240229.xlsx XLSX spreadsheet
PHSFS_BOS_RFP_Questions_SET_2_20240226.pdf PDF
PHSFS_BOS_RFP_Questions_SET 4_20240226.pdf PDF
PHSFS_BOS_RFP_Questions_SET 3_20240226.pdf PDF
20240221_PHSFS_BOS_RFP_Questions.pdf PDF
Atch_8_ITO_Amend_0001_20240221.pdf PDF
FA255024R0003_Amend_0001_20240221.pdf PDF
Atch_9_Evaluation_Amend_0001_20240207.pdf PDF
Atch_16_PPQ_20240104.docx DOCX document
PH B104 Heat PM 9-18.pdf PDF
Report 2305 PH B103 OVHD PM 6-14-22.pdf PDF
Report 1844 PH B101 FM200 Fire System PM 4-5-21.pdf PDF
PH-103-K-01 - 2021 Inspection.pdf PDF
Report 259 PH B103 BFP Annual PM 3-28-23.pdf PDF
Report 1847 PH B112 Fire Alarm PM 4-5-21.pdf PDF
Report 1175 PH B105 Heat PM 9-27-19.pdf PDF
Report 1456 PH B110 Fire Alarm PM 6-30-20.pdf PDF
Report 2324 PH B104 Annual Heating PM 9-15-21.pdf PDF
Report 1359 PH B101 HVAC Compressor Nr 2 PM 6-10-20.pdf PDF
Report 2443 PH B101 Annual Heating PM 9-29-22.pdf PDF
PH B101 Boiler PM 10-18.pdf PDF
Report 1855 PH B101 Condenser B HVAC PM 4-20-21.pdf PDF
Report 1845 PH B102 CO2Fire System PM 4-5-21.pdf PDF
Report 1356 PH B101 HVAC Air Handler Nr 2 PM 6-10-20.pdf PDF
Report 2174 PH B102 CO2Fire System Annual PM SC 3-9-22.pdf PDF
PH inside Generator SC 3-29-19.pdf PDF
Report 1828 PH B104 OVHD Nr 2 PM 5-24-2021.pdf PDF
PH B112 F7P9ZP-PH-BURNER 2-03-21.pdf PDF
Report 1831 PH B102 Outside Generator SC 5-25-2021.pdf PDF
Report 2252 PH B102 Roof Inspection 6-6-2022.pdf PDF
PH-110-K-02 - 2021 Inspection.pdf PDF
Report 645 PH B102 Outside Generator Annual PM 9-6-23.pdf PDF
Report 1680 PH B103 No heat ESC 12-12-20.pdf PDF
Report 1082 PH B102 inside Generator PM 8-22-18.pdf PDF
Report 1851 Anual Extinguisher PMs 4-5-21.pdf PDF
Report 2241 PH B102 Outside Generator PM 5-18-22.pdf PDF
PH B103 Replace Window Glass 20190820.pdf PDF
Report 402 PH B101 HVAC Nr 1 PM 9-17.pdf PDF
Report 2448 PH B104 Annual Heating PM 9-28-22.pdf PDF
Report 1296 PH B102 Inside Generator PM 2-20-20.pdf PDF
PH B110 Boiler Nr 1 PM 9-18.pdf PDF
Report 367 PH B112 FA Install.pdf PDF
Report 1357 PH B103 HVAC PM 6-10-20.pdf PDF
Report 2175 PH B103 Fire Alarm PM 3-9-22.pdf PDF
Report 2047 PH B101 HVAC Air Handler Side A 9-30-21.pdf PDF
Report 658 PH B104 OVHDR eplace Push Button 7-25-18.pdf PDF
Report 645 PH Outside Generator repair SC 6-20-18.pdf PDF
Report 1829 PH B105 OVHD PM 5-24-2021.pdf PDF
Show 40 more

Latest 50 of 292 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Solicitation/Contract Form

The following changes have been made:

INFORMATION FROM TO

Response Due Time Zone Mountain Standard Time (UTC -7) Mountain Daylight Time (UTC -6) Response Due Date 01 Mar 2024 11 Mar 2024

Supplies or Services & Prices or Costs

The following CLIN(s) / SLIN(s) / ELIN(s) were modified:

Option Line Item 1001

INFORMATION FROM TO CHANGED

BY

Description

Station Management, FFP Non- Personal Services IAW Attachment 1, PWS Paragraph (s): 2, 2.12 and 2.14-2.33.

Station Management, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): Paragraph 2, General Contract Performance Requirements, except 2.13, Phase-In. This CLIN also includes PWS 4.10.22 Labor Disputes.

Option Line Item 1003

INFORMATION FROM TO CHANGED

BY

Description Contract Security Guards Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 3.

Contract Security Guards Services, FFP Non- Personal Services IAW Attachment 1, PWS Paragraph(s): 3, Security Functions.

Option Line Item 1004

INFORMATION FROM TO CHANGED

BY

Description

Contract Security Guards Services, Additional Support, FFP NTE Hourly Priced (Each hour price is for TWO Contract Security Guards for ONE hour of services) Non-Personal Services IAW Attachment 1, PWS Paragraph (s): 3.

Unit of Issue: Hours Quantity: 200 Hours for each of Options 1-5.

100 Hours for Option to Extend Services.

Contract Security Guards Services, Additional Support, FFP NTE Hourly Priced (Each hour price is for TWO Contract Security Guards for ONE hour of services) Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 3, Security Functions.

Unit of Issue: Hours Quantity: 200 Hours for each of Options 1-5.

100 Hours for Option to Extend Services.

Option Line Item 1006

INFORMATION FROM TO CHANGED

BY

Description

Civil Engineering Management and Facility Operations Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.1.2- 4.1.5.2, 4.1.6.9-4.1.6.13, 4.2.2-4.2.2.4, 4.2.4, 4.2.8- 4.2.8.2, 4.2.11-4.2.11.4, 4.2.14.2-4.2.14.4, 4.2.15.3-

Civil Engineering Management and Facility Operations Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s):

PWS 4, Civil Engineering (CE) Maintenance, Repair, Minor Renovations and Environmental (Base Operations), AND 7.3.6 Water Main Flushing Plan. This CLIN EXCLUDES requirements under CLINs X008 CE Maintenance and Repair Services; X010 Custodial Services; X012 Groundskeeping Services; X014 Refuse and Recycling Collection and Disposal Services; X017 Environmental Quality; X019 Pollution Prevention; X021 Management of Invasive Species; X023 Cultural, Surveying Inventory, Historical services;

FA255024R00030002

4.2.15.4.3, 4.2.19-4.19.2, 4.3.1, 4.4, 4.5, 4.6.8.2, and 4.7-4.9.24.

X025 Natural Resources, Threatened and Endangered Species; and X027 (CE Major Repairs).

Option Line Item 1008

INFORMATION FROM TO CHANGED

BY

Description

Civil Engineering Maintenance and Repair Services, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5.

Non-Personal Services IAW Attachment 1, PWS Paragraph(s):

4.1.6-4.1.6.8, 4.2.1, 4.2.3.9, 4.2.5-4.2.5.4, 4.2.7, 4.2.9, 4.2.12- 4.2.14.1, 4.2.14.5-4.2.15.2.4, 4.2.16-4.2.17.2, and 4.2.18- 4.2.18.7.

Civil Engineering Maintenance and Repair Services, FFP NTE pricing IAW Attachment 1, PWS Paragraph(s): AS

INDICATED IN

ATTACHMENT 5 TO

CONTRACT FOR CLINS

X008.

Option Line Item 1010

INFORMATION FROM TO CHANGED

BY

Description Custodial Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.2.20.1-4.2.20.7.

Custodial Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.2.20.1-4.2.20.7, Facility Cleaning Services.

Option Line Item 1012

INFORMATION FROM TO CHANGED

BY

Description

Groundskeeping Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s):

4.2.17.3-4.2.17.7 and 4.2.21- 4.2.21.6.

Groundskeeping Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.2.17.3 Base Sweeper Operations, 4.2.17.6 Snow and Ice Control Operations, and

4.2.21 Grounds Maintenance through and including 4.2.21.6.

Option Line Item 1013

INFORMATION FROM TO CHANGED

BY

Description

Civil Engineering Groundskeeping Services Fac Ops Reimbursables, FFP NTE Reimbursables, IAW Attachment 1, PWS Paragraph 1.1.2.3.

(Government Determined Value for RFP and Award).E34

Civil Engineering Groundskeeping Services Fac Ops Reimbursables, FFP NTE Reimbursables, IAW Attachment 1, PWS Paragraph 1.1.2.3. (Government Determined Value for RFP and Award).

Option Line Item 1014

INFORMATION FROM TO CHANGED

BY

Description

Refuse and Recycling Collection and Disposal Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.2.6-4.2.6.5.

Refuse and Recycling Collection and Disposal Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.2.6-4.2.6.5, Refuse Collection and Recycle Services.

Option Line Item 1017

INFORMATION FROM TO CHANGED

BY

Description

Civil Engineering Environmental Quality (EQ) Services, FFP NTE pricing IAW Attachment 1 PWS at paragraph

1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5.

Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.6.3, 4.6.4, 4.6.5, 4.6.6.1, 4.6.6.2, 4.6.6.3, 4.6.6.4, 4.6.6.5, 4.6.6.6, and 4.6.6.7.

Civil Engineering Environmental Quality (EQ) Services, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5. Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.2.10 Storage Tank Tightness Testing, 4.6.3 Environmental Management System (EMS),

4.6.4 Installation Environmental Coordination, 4.6.5 Environmental Budgeting Requirements, 4.6.6 Environmental Compliance, and 4.6.6.1, 4.6.6.2 Air Quality, 4.6.6.3 Air Emissions, 4.6.6.4 Ozone Depleting Substances (ODS), 4.6.6.5 Hazardous Materials, 4.6.6.6 Hazardous Waste, 4.6.6.7 POLs and POL Storage Tanks, 4.6.6.8 Toxic Substances, including both 4.6.6.8.1 Lead-Based Paint (LBP) and 4.6.6.8.2 Polychlorinated Biphenyl's (PCB), and 4.6.6.8.3 Wastewater and Storm Water Programs.

Option Line Item 1019

INFORMATION FROM TO CHANGED

BY

Description

Civil Engineering Pollution Prevention (PP), FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5. Non- Personal Services IAW Attachment 1, PWS Paragraph(s): 4.6.8.

Civil Engineering Pollution Prevention (PP), FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5. Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.6.8, Pollution Prevention (P2), including both 4.6.8.1 and 4.6.8.2 Solid Wastes and Recycling.

Option Line Item 1021

INFORMATION FROM TO CHANGED

BY

Description

Civil Engineering Management of Invasive Species, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5.

Non-Personal Services IAW Attachment 1, PWS Paragraph (s): 4.2.11 and 4.6.7.3.

Civil Engineering Management of Invasive Species, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5.

Non-Personal Services IAW Attachment 1, PWS Paragraph(s):

4.6.7.3, Integrated Natural Resources Management Plan (INRMP), for the Integrated Pest Management Plan and the Invasive Plant Species Control Plan ONLY; and 4.2.11, Pest Management, for the Integrated Pest Management Plan and the Invasive Plant Species Control Plan ONLY.

Option Line Item 1023

INFORMATION FROM TO CHANGED

BY

Description

Civil Engineering Cultural, Surveying Inventory, Historical, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5. Non-Personal Services IAW Attachment 1, PWS Paragraph(s):

4.3.1, 4.6.7, 4.6.7.2, 4.6.7.1, and 4.6.7.2.

Civil Engineering Cultural, Surveying Inventory, Historical, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5. Non- Personal Services IAW Attachment 1, PWS Paragraph(s): 4.6.7, Environmental Conservation, including paragraphs 4.6.7.1 and 4.6.7.2.

Option Line Item 1025

INFORMATION FROM TO CHANGED

BY

Description

Civil Engineering Natural Resources, Threatened and Endangered Species, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5. Non-Personal Services IAW Attachment 1, PWS Paragraph(s):

4.6.6.9.

Civil Engineering Natural Resources, Threatened and Endangered Species, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5.

Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.6.6.9, Wetlands Permitting and 4.6.7.3 Integrated Natural Resources Management Plan

(INRMP).

Option Line Item 1028

INFORMATION FROM TO CHANGED

BY

Description Communications, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 5.

Communications, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 5, Communication Functions.

Option Line Item 1030

INFORMATION FROM TO CHANGED

BY

Description Logistics, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 6.

Logistics, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 6, Logistics Functions.

Option Line Item 1032

INFORMATION FROM TO CHANGED

BY

Description

Bioenvironmental Services, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5.

Non-Personal Services IAW Attachment 1, PWS Paragraph(s):

7.1-7.2.3.

Bioenvironmental Services, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5. Non- Personal Services IAW Attachment 1, PWS Paragraph(s):

7.2.3, Radon for Radon Testing, and 7.4, Urgent Water Sampling.

Option Line Item 1034

INFORMATION FROM TO CHANGED

BY

Description

Public/Occupational Health, FFP Non- Personal Services IAW Attachment 1, PWS Paragraph(s):

7.3-7.8.4.

Public/Occupational Health, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 7, Bioenvironmental Services, including 7.1 through 7.3.5, Consumer Confidence Reports (CCR), except for 7.2.3, Radon for Radon Testing. (PWS 7.3.6, Water Main Flushing Plan and PWS 7.4, Urgent Water Sampling, are not included and are under separate CLINs.)

Option Line Item 2001

INFORMATION FROM TO CHANGED

BY

Description

Station Management, FFP Non- Personal Services IAW Attachment 1, PWS Paragraph (s): 2, 2.12 and 2.14-2.33.

Station Management, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): Paragraph 2, General Contract Performance Requirements, except 2.13, Phase-In. This CLIN also includes PWS 4.10.22 Labor Disputes.

Option Line Item 2003

INFORMATION FROM TO CHANGED

BY

Description Contract Security Guards Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 3.

Contract Security Guards Services, FFP Non- Personal Services IAW Attachment 1, PWS Paragraph(s): 3, Security Functions.

Option Line Item 2004

INFORMATION FROM TO CHANGED

BY

Description

Contract Security Guards Services, Additional Support, FFP NTE Hourly Priced (Each hour price is for TWO Contract Security Guards for ONE hour of services) Non-Personal Services IAW Attachment 1, PWS Paragraph (s): 3.

Unit of Issue: Hours Quantity: 200 Hours for each of Options 1-5.

100 Hours for Option to Extend Services.

Contract Security Guards Services, Additional Support, FFP NTE Hourly Priced (Each hour price is for TWO Contract Security Guards for ONE hour of services) Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 3, Security Functions.

Unit of Issue: Hours Quantity: 200 Hours for each of Options 1-5.

100 Hours for Option to Extend Services.

Option Line Item 2006

INFORMATION FROM TO CHANGED

BY

Description

Civil Engineering Management and Facility Operations Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.1.2- 4.1.5.2, 4.1.6.9-4.1.6.13, 4.2.2-4.2.2.4, 4.2.4, 4.2.8- 4.2.8.2, 4.2.11-4.2.11.4, 4.2.14.2-4.2.14.4, 4.2.15.3- 4.2.15.4.3, 4.2.19-4.19.2, 4.3.1, 4.4, 4.5, 4.6.8.2, and 4.7-4.9.24.

Civil Engineering Management and Facility Operations Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s):

PWS 4, Civil Engineering (CE) Maintenance, Repair, Minor Renovations and Environmental (Base Operations), AND 7.3.6 Water Main Flushing Plan. This CLIN EXCLUDES requirements under CLINs X008 CE Maintenance and Repair Services; X010 Custodial Services; X012 Groundskeeping Services; X014 Refuse and Recycling Collection and Disposal Services; X017 Environmental Quality; X019 Pollution Prevention; X021 Management of Invasive Species; X023 Cultural, Surveying Inventory, Historical services;

X025 Natural Resources, Threatened and Endangered Species; and X027 (CE Major Repairs).

Option Line Item 2008

CHANGED

INFORMATION FROM TO BY

Civil Engineering Maintenance and Repair Services, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5.

Non-Personal Services IAW Attachment 1, PWS Paragraph(s):

4.1.6-4.1.6.8, 4.2.1, 4.2.3.9, 4.2.5-4.2.5.4, 4.2.7, 4.2.9, 4.2.12- 4.2.14.1, 4.2.14.5-4.2.15.2.4, 4.2.16-4.2.17.2, and 4.2.18- 4.2.18.7.

Civil Engineering Maintenance and Repair Services, FFP NTE pricing IAW Attachment 1, PWS Paragraph(s): AS

INDICATED IN

ATTACHMENT 5 TO

CONTRACT FOR CLINS

X008.

Option Line Item 2010

INFORMATION FROM TO CHANGED

BY

Description Custodial Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.2.20.1-4.2.20.7.

Custodial Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.2.20.1-4.2.20.7, Facility Cleaning Services.

Option Line Item 2012

INFORMATION FROM TO CHANGED

BY

Description

Groundskeeping Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s):

4.2.17.3-4.2.17.7 and 4.2.21- 4.2.21.6.

Groundskeeping Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.2.17.3 Base Sweeper Operations, 4.2.17.6 Snow and Ice Control Operations, and

4.2.21 Grounds Maintenance through and including 4.2.21.6.

Option Line Item 2013

INFORMATION FROM TO CHANGED

BY

Description

Civil Engineering Groundskeeping Services Fac Ops Reimbursables, FFP NTE Reimbursables, IAW Attachment 1, PWS Paragraph 1.1.2.3.

(Government Determined Value for RFP and Award).E34

Civil Engineering Groundskeeping Services Fac Ops Reimbursables, FFP NTE Reimbursables, IAW Attachment 1, PWS Paragraph 1.1.2.3. (Government Determined Value for RFP and Award).

Option Line Item 2014

INFORMATION FROM TO CHANGED

BY

Description

Refuse and Recycling Collection and Disposal Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.2.6-4.2.6.5.

Refuse and Recycling Collection and Disposal Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.2.6-4.2.6.5, Refuse Collection and Recycle Services.

Option Line Item 2017

INFORMATION FROM TO CHANGED

BY

Description

Civil Engineering Environmental Quality (EQ) Services, FFP NTE pricing IAW Attachment 1 PWS at paragraph

1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5.

Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.6.3, 4.6.4, 4.6.5, 4.6.6.1, 4.6.6.2, 4.6.6.3, 4.6.6.4, 4.6.6.5, 4.6.6.6, and 4.6.6.7.

Civil Engineering Environmental Quality (EQ) Services, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5. Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.2.10 Storage Tank Tightness Testing, 4.6.3 Environmental Management System (EMS),

4.6.4 Installation Environmental Coordination, 4.6.5 Environmental Budgeting Requirements, 4.6.6 Environmental Compliance, and 4.6.6.1, 4.6.6.2 Air Quality, 4.6.6.3 Air Emissions, 4.6.6.4 Ozone Depleting Substances (ODS), 4.6.6.5 Hazardous Materials, 4.6.6.6 Hazardous Waste, 4.6.6.7 POLs and POL Storage Tanks, 4.6.6.8 Toxic Substances, including both 4.6.6.8.1 Lead-Based Paint (LBP) and 4.6.6.8.2 Polychlorinated Biphenyl's (PCB), and 4.6.6.8.3 Wastewater and Storm Water Programs.

Option Line Item 2019

INFORMATION FROM TO CHANGED

BY

Civil Engineering Pollution Prevention (PP), FFP NTE pricing IAW

Civil Engineering Pollution Prevention (PP), FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2

Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5. Non- Personal Services IAW Attachment 1, PWS Paragraph(s): 4.6.8.

and specific task pricing applicable to this CLIN in Attachment 5. Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.6.8, Pollution Prevention (P2), including both 4.6.8.1 and 4.6.8.2 Solid Wastes and Recycling.

Option Line Item 2021

INFORMATION FROM TO CHANGED

BY

Description

Civil Engineering Management of Invasive Species, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5.

Non-Personal Services IAW Attachment 1, PWS Paragraph (s): 4.2.11 and 4.6.7.3.

Civil Engineering Management of Invasive Species, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5.

Non-Personal Services IAW Attachment 1, PWS Paragraph(s):

4.6.7.3, Integrated Natural Resources Management Plan (INRMP), for the Integrated Pest Management Plan and the Invasive Plant Species Control Plan ONLY; and 4.2.11, Pest Management, for the Integrated Pest Management Plan and the Invasive Plant Species Control Plan ONLY.

Option Line Item 2023

INFORMATION FROM TO CHANGED

BY

Description

Civil Engineering Cultural, Surveying Inventory, Historical, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5. Non-Personal Services IAW Attachment 1, PWS Paragraph(s):

4.3.1, 4.6.7, 4.6.7.2, 4.6.7.1, and 4.6.7.2.

Civil Engineering Cultural, Surveying Inventory, Historical, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5. Non- Personal Services IAW Attachment 1, PWS Paragraph(s): 4.6.7, Environmental Conservation, including paragraphs 4.6.7.1 and 4.6.7.2.

Option Line Item 2025

INFORMATION FROM TO CHANGED

BY

Description

Civil Engineering Natural Resources, Threatened and Endangered Species, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5. Non-Personal Services IAW Attachment 1, PWS Paragraph(s):

4.6.6.9.

Civil Engineering Natural Resources, Threatened and Endangered Species, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5.

Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.6.6.9, Wetlands Permitting and 4.6.7.3 Integrated Natural Resources Management Plan

(INRMP).

Option Line Item 2028

INFORMATION FROM TO CHANGED

BY

Description Communications, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 5.

Communications, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 5, Communication Functions.

Option Line Item 2030

INFORMATION FROM TO CHANGED

BY

Description Logistics, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 6.

Logistics, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 6, Logistics Functions.

Option Line Item 2032

INFORMATION FROM TO CHANGED

BY

Description

Bioenvironmental Services, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5.

Bioenvironmental Services, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5. Non-

Non-Personal Services IAW Attachment 1, PWS Paragraph(s):

7.1-7.2.3.

Personal Services IAW Attachment 1, PWS Paragraph(s):

7.2.3, Radon for Radon Testing, and 7.4, Urgent Water Sampling.

Option Line Item 2034

INFORMATION FROM TO CHANGED

BY

Description

Public/Occupational Health, FFP Non- Personal Services IAW Attachment 1, PWS Paragraph(s):

7.3-7.8.4.

Public/Occupational Health, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 7, Bioenvironmental Services, including 7.1 through 7.3.5, Consumer Confidence Reports (CCR), except for 7.2.3, Radon for Radon Testing. (PWS 7.3.6, Water Main Flushing Plan and PWS 7.4, Urgent Water Sampling, are not included and are under separate CLINs.)

Option Line Item 3001

INFORMATION FROM TO CHANGED

BY

Description

Station Management, FFP Non- Personal Services IAW Attachment 1, PWS Paragraph (s): 2, 2.12 and 2.14-2.33.

Station Management, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): Paragraph 2, General Contract Performance Requirements, except 2.13, Phase-In. This CLIN also includes PWS 4.10.22 Labor Disputes.

Option Line Item 3003

INFORMATION FROM TO CHANGED

BY

Description Contract Security Guards Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 3.

Contract Security Guards Services, FFP Non- Personal Services IAW Attachment 1, PWS Paragraph(s): 3, Security Functions.

Option Line Item 3004

INFORMATION FROM TO CHANGED

BY

Description

Contract Security Guards Services, Additional Support, FFP NTE Hourly Priced (Each hour price is for TWO Contract Security Guards for ONE hour of services) Non-Personal Services IAW Attachment 1, PWS Paragraph (s): 3.

Unit of Issue: Hours Quantity: 200 Hours for each of Options 1-5.

100 Hours for Option to Extend Services.

Contract Security Guards Services, Additional Support, FFP NTE Hourly Priced (Each hour price is for TWO Contract Security Guards for ONE hour of services) Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 3, Security Functions.

Unit of Issue: Hours Quantity: 200 Hours for each of Options 1-5.

100 Hours for Option to Extend Services.

Option Line Item 3006

INFORMATION FROM TO CHANGED

BY

Description

Civil Engineering Management and Facility Operations Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.1.2- 4.1.5.2, 4.1.6.9-4.1.6.13, 4.2.2-4.2.2.4, 4.2.4, 4.2.8- 4.2.8.2, 4.2.11-4.2.11.4, 4.2.14.2-4.2.14.4, 4.2.15.3- 4.2.15.4.3, 4.2.19-4.19.2, 4.3.1, 4.4, 4.5, 4.6.8.2, and 4.7-4.9.24.

Civil Engineering Management and Facility Operations Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s):

PWS 4, Civil Engineering (CE) Maintenance, Repair, Minor Renovations and Environmental (Base Operations), AND 7.3.6 Water Main Flushing Plan. This CLIN EXCLUDES requirements under CLINs X008 CE Maintenance and Repair Services; X010 Custodial Services; X012 Groundskeeping Services; X014 Refuse and Recycling Collection and Disposal Services; X017 Environmental Quality; X019 Pollution Prevention; X021 Management of Invasive Species; X023 Cultural, Surveying Inventory, Historical services;

X025 Natural Resources, Threatened and Endangered Species; and X027 (CE Major Repairs).

Option Line Item 3008

INFORMATION FROM TO CHANGED

BY

Civil Engineering Maintenance and Repair Services, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5.

Non-Personal Services IAW Attachment 1, PWS Paragraph(s):

Civil Engineering Maintenance and Repair Services, FFP NTE pricing IAW Attachment 1, PWS Paragraph(s): AS

Description 4.1.6-4.1.6.8, 4.2.1, 4.2.3.9, 4.2.5-4.2.5.4, 4.2.7, 4.2.9, 4.2.12- 4.2.14.1, 4.2.14.5-4.2.15.2.4, 4.2.16-4.2.17.2, and 4.2.18- 4.2.18.7.

INDICATED IN

ATTACHMENT 5 TO

CONTRACT FOR CLINS

X008.

Option Line Item 3010

INFORMATION FROM TO CHANGED

BY

Description Custodial Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.2.20.1-4.2.20.7.

Custodial Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.2.20.1-4.2.20.7, Facility Cleaning Services.

Option Line Item 3012

INFORMATION FROM TO CHANGED

BY

Description

Groundskeeping Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s):

4.2.17.3-4.2.17.7 and 4.2.21- 4.2.21.6.

Groundskeeping Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.2.17.3 Base Sweeper Operations, 4.2.17.6 Snow and Ice Control Operations, and

4.2.21 Grounds Maintenance through and including 4.2.21.6.

Option Line Item 3013

INFORMATION FROM TO CHANGED

BY

Description

Civil Engineering Groundskeeping Services Fac Ops Reimbursables, FFP NTE Reimbursables, IAW Attachment 1, PWS Paragraph 1.1.2.3.

(Government Determined Value for RFP and Award).E34

Civil Engineering Groundskeeping Services Fac Ops Reimbursables, FFP NTE Reimbursables, IAW Attachment 1, PWS Paragraph 1.1.2.3. (Government Determined Value for RFP and Award).

Option Line Item 3014

INFORMATION FROM TO CHANGED

BY

Description

Refuse and Recycling Collection and Disposal Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.2.6-4.2.6.5.

Refuse and Recycling Collection and Disposal Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.2.6-4.2.6.5, Refuse Collection and Recycle Services.

Option Line Item 3017

INFORMATION FROM TO CHANGED

BY

Description

Civil Engineering Environmental Quality (EQ) Services, FFP NTE pricing IAW Attachment 1 PWS at paragraph

1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5.

Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.6.3, 4.6.4, 4.6.5, 4.6.6.1, 4.6.6.2, 4.6.6.3, 4.6.6.4, 4.6.6.5, 4.6.6.6, and 4.6.6.7.

Civil Engineering Environmental Quality (EQ) Services, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5. Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.2.10 Storage Tank Tightness Testing, 4.6.3 Environmental Management System (EMS),

4.6.4 Installation Environmental Coordination, 4.6.5 Environmental Budgeting Requirements, 4.6.6 Environmental Compliance, and 4.6.6.1, 4.6.6.2 Air Quality, 4.6.6.3 Air Emissions, 4.6.6.4 Ozone Depleting Substances (ODS), 4.6.6.5 Hazardous Materials, 4.6.6.6 Hazardous Waste, 4.6.6.7 POLs and POL Storage Tanks, 4.6.6.8 Toxic Substances, including both 4.6.6.8.1 Lead-Based Paint (LBP) and 4.6.6.8.2 Polychlorinated Biphenyl's (PCB), and 4.6.6.8.3 Wastewater and Storm Water Programs.

Option Line Item 3019

INFORMATION FROM TO CHANGED

BY

Description

Civil Engineering Pollution Prevention (PP), FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5. Non- Personal Services IAW Attachment 1, PWS Paragraph(s): 4.6.8.

Civil Engineering Pollution Prevention (PP), FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5. Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.6.8, Pollution Prevention (P2), including both 4.6.8.1 and 4.6.8.2 Solid Wastes and Recycling.

Option Line Item 3021

BY

Description

Civil Engineering Management of Invasive Species, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5.

Non-Personal Services IAW Attachment 1, PWS Paragraph (s): 4.2.11 and 4.6.7.3.

Civil Engineering Management of Invasive Species, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5.

Non-Personal Services IAW Attachment 1, PWS Paragraph(s):

4.6.7.3, Integrated Natural Resources Management Plan (INRMP), for the Integrated Pest Management Plan and the Invasive Plant Species Control Plan ONLY; and 4.2.11, Pest Management, for the Integrated Pest Management Plan and the Invasive Plant Species Control Plan ONLY.

Option Line Item 3023

INFORMATION FROM TO CHANGED

BY

Description

Civil Engineering Cultural, Surveying Inventory, Historical, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5. Non-Personal Services IAW Attachment 1, PWS Paragraph(s):

4.3.1, 4.6.7, 4.6.7.2, 4.6.7.1, and 4.6.7.2.

Civil Engineering Cultural, Surveying Inventory, Historical, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5. Non- Personal Services IAW Attachment 1, PWS Paragraph(s): 4.6.7, Environmental Conservation, including paragraphs 4.6.7.1 and 4.6.7.2.

Option Line Item 3025

INFORMATION FROM TO CHANGED

BY

Description

Civil Engineering Natural Resources, Threatened and Endangered Species, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5. Non-Personal Services IAW Attachment 1, PWS Paragraph(s):

4.6.6.9.

Civil Engineering Natural Resources, Threatened and Endangered Species, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5.

Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.6.6.9, Wetlands Permitting and 4.6.7.3 Integrated Natural Resources Management Plan

(INRMP).

Option Line Item 3028

INFORMATION FROM TO CHANGED

BY

Description Communications, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 5.

Communications, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 5, Communication Functions.

Option Line Item 3030

INFORMATION FROM TO CHANGED

BY

Description Logistics, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 6.

Logistics, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 6, Logistics Functions.

Option Line Item 3032

INFORMATION FROM TO CHANGED

BY

Description

Bioenvironmental Services, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5.

Non-Personal Services IAW Attachment 1, PWS Paragraph(s):

7.1-7.2.3.

Bioenvironmental Services, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5. Non- Personal Services IAW Attachment 1, PWS Paragraph(s):

7.2.3, Radon for Radon Testing, and 7.4, Urgent Water Sampling.

Option Line Item 3034

CHANGED

INFORMATION FROM TO BY

Public/Occupational Health, FFP Non- Personal Services IAW Attachment 1, PWS Paragraph(s):

7.3-7.8.4.

Public/Occupational Health, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 7, Bioenvironmental Services, including 7.1 through 7.3.5, Consumer Confidence Reports (CCR), except for 7.2.3, Radon for Radon Testing. (PWS 7.3.6, Water Main Flushing Plan and PWS 7.4, Urgent Water Sampling, are not included and are under separate CLINs.)

Option Line Item 4001

INFORMATION FROM TO CHANGED

BY

Description

Station Management, FFP Non- Personal Services IAW Attachment 1, PWS Paragraph (s): 2, 2.12 and 2.14-2.33.

Station Management, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): Paragraph 2, General Contract Performance Requirements, except 2.13, Phase-In. This CLIN also includes PWS 4.10.22 Labor Disputes.

Option Line Item 4003

INFORMATION FROM TO CHANGED

BY

Description Contract Security Guards Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 3.

Contract Security Guards Services, FFP Non- Personal Services IAW Attachment 1, PWS Paragraph(s): 3, Security Functions.

Option Line Item 4004

INFORMATION FROM TO CHANGED

BY

Description

Contract Security Guards Services, Additional Support, FFP NTE Hourly Priced (Each hour price is for TWO Contract Security Guards for ONE hour of services) Non-Personal Services IAW Attachment 1, PWS Paragraph (s): 3.

Unit of Issue: Hours Quantity: 200 Hours for each of Options 1-5.

100 Hours for Option to Extend Services.

Contract Security Guards Services, Additional Support, FFP NTE Hourly Priced (Each hour price is for TWO Contract Security Guards for ONE hour of services) Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 3, Security Functions.

Unit of Issue: Hours Quantity: 200 Hours for each of Options 1-5.

100 Hours for Option to Extend Services.

Option Line Item 4006

INFORMATION FROM TO CHANGED

BY

Description

Civil Engineering Management and Facility Operations Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.1.2- 4.1.5.2, 4.1.6.9-4.1.6.13, 4.2.2-4.2.2.4, 4.2.4, 4.2.8- 4.2.8.2, 4.2.11-4.2.11.4, 4.2.14.2-4.2.14.4, 4.2.15.3- 4.2.15.4.3, 4.2.19-4.19.2, 4.3.1, 4.4, 4.5, 4.6.8.2, and 4.7-4.9.24.

Civil Engineering Management and Facility Operations Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s):

PWS 4, Civil Engineering (CE) Maintenance, Repair, Minor Renovations and Environmental (Base Operations), AND 7.3.6 Water Main Flushing Plan. This CLIN EXCLUDES requirements under CLINs X008 CE Maintenance and Repair Services; X010 Custodial Services; X012 Groundskeeping Services; X014 Refuse and Recycling Collection and Disposal Services; X017 Environmental Quality; X019 Pollution Prevention; X021 Management of Invasive Species; X023 Cultural, Surveying Inventory, Historical services;

X025 Natural Resources, Threatened and Endangered Species; and X027 (CE Major Repairs).

Option Line Item 4008

INFORMATION FROM TO CHANGED

BY

Description

Civil Engineering Maintenance and Repair Services, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5.

Non-Personal Services IAW Attachment 1, PWS Paragraph(s):

4.1.6-4.1.6.8, 4.2.1, 4.2.3.9, 4.2.5-4.2.5.4, 4.2.7, 4.2.9, 4.2.12- 4.2.14.1, 4.2.14.5-4.2.15.2.4, 4.2.16-4.2.17.2, and 4.2.18- 4.2.18.7.

Civil Engineering Maintenance and Repair Services, FFP NTE pricing IAW Attachment 1, PWS Paragraph(s): AS

INDICATED IN

ATTACHMENT 5 TO

CONTRACT FOR CLINS

X008.

Option Line Item 4010

BY

Description Custodial Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.2.20.1-4.2.20.7.

Custodial Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.2.20.1-4.2.20.7, Facility Cleaning Services.

Option Line Item 4012

INFORMATION FROM TO CHANGED

BY

Description

Groundskeeping Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s):

4.2.17.3-4.2.17.7 and 4.2.21- 4.2.21.6.

Groundskeeping Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.2.17.3 Base Sweeper Operations, 4.2.17.6 Snow and Ice Control Operations, and

4.2.21 Grounds Maintenance through and including 4.2.21.6.

Option Line Item 4013

INFORMATION FROM TO CHANGED

BY

Description

Civil Engineering Groundskeeping Services Fac Ops Reimbursables, FFP NTE Reimbursables, IAW Attachment 1, PWS Paragraph 1.1.2.3.

(Government Determined Value for RFP and Award).E34

Civil Engineering Groundskeeping Services Fac Ops Reimbursables, FFP NTE Reimbursables, IAW Attachment 1, PWS Paragraph 1.1.2.3. (Government Determined Value for RFP and Award).

Option Line Item 4014

INFORMATION FROM TO CHANGED

BY

Description

Refuse and Recycling Collection and Disposal Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.2.6-4.2.6.5.

Refuse and Recycling Collection and Disposal Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.2.6-4.2.6.5, Refuse Collection and Recycle Services.

Option Line Item 4017

INFORMATION FROM TO CHANGED

BY

Description

Civil Engineering Environmental Quality (EQ) Services, FFP NTE pricing IAW Attachment 1 PWS at paragraph

1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5.

Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.6.3, 4.6.4, 4.6.5, 4.6.6.1, 4.6.6.2, 4.6.6.3, 4.6.6.4, 4.6.6.5, 4.6.6.6, and 4.6.6.7.

Civil Engineering Environmental Quality (EQ) Services, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5. Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.2.10 Storage Tank Tightness Testing, 4.6.3 Environmental Management System (EMS),

4.6.4 Installation Environmental Coordination, 4.6.5 Environmental Budgeting Requirements, 4.6.6 Environmental Compliance, and 4.6.6.1, 4.6.6.2 Air Quality, 4.6.6.3 Air Emissions, 4.6.6.4 Ozone Depleting Substances (ODS), 4.6.6.5 Hazardous Materials, 4.6.6.6 Hazardous Waste, 4.6.6.7 POLs and POL Storage Tanks, 4.6.6.8 Toxic Substances, including both 4.6.6.8.1 Lead-Based Paint (LBP) and 4.6.6.8.2 Polychlorinated Biphenyl's (PCB), and 4.6.6.8.3 Wastewater and Storm Water Programs.

Option Line Item 4019

INFORMATION FROM TO CHANGED

BY

Description

Civil Engineering Pollution Prevention (PP), FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5. Non- Personal Services IAW Attachment 1, PWS Paragraph(s): 4.6.8.

Civil Engineering Pollution Prevention (PP), FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5. Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.6.8, Pollution Prevention (P2), including both 4.6.8.1 and 4.6.8.2 Solid Wastes and Recycling.

Option Line Item 4021

INFORMATION FROM TO CHANGED

BY

Civil Engineering Management of Invasive Species, FFP NTE

Civil Engineering Management of Invasive Species, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5.

Non-Personal Services IAW Attachment 1, PWS Paragraph (s): 4.2.11 and 4.6.7.3.

specific task pricing applicable to this CLIN in Attachment 5.

Non-Personal Services IAW Attachment 1, PWS Paragraph(s):

4.6.7.3, Integrated Natural Resources Management Plan (INRMP), for the Integrated Pest Management Plan and the Invasive Plant Species Control Plan ONLY; and 4.2.11, Pest Management, for the Integrated Pest Management Plan and the Invasive Plant Species Control Plan ONLY.

Option Line Item 4023

INFORMATION FROM TO CHANGED

BY

Description

Civil Engineering Cultural, Surveying Inventory, Historical, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5. Non-Personal Services IAW Attachment 1, PWS Paragraph(s):

4.3.1, 4.6.7, 4.6.7.2, 4.6.7.1, and 4.6.7.2.

Civil Engineering Cultural, Surveying Inventory, Historical, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5. Non- Personal Services IAW Attachment 1, PWS Paragraph(s): 4.6.7, Environmental Conservation, including paragraphs 4.6.7.1 and 4.6.7.2.

Option Line Item 4025

INFORMATION FROM TO CHANGED

BY

Description

Civil Engineering Natural Resources, Threatened and Endangered Species, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5. Non-Personal Services IAW Attachment 1, PWS Paragraph(s):

4.6.6.9.

Civil Engineering Natural Resources, Threatened and Endangered Species, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5.

Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.6.6.9, Wetlands Permitting and 4.6.7.3 Integrated Natural Resources Management Plan

(INRMP).

Option Line Item 4028

INFORMATION FROM TO CHANGED

BY

Description Communications, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 5.

Communications, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 5, Communication Functions.

Option Line Item 4030

INFORMATION FROM TO CHANGED

BY

Description Logistics, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 6.

Logistics, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 6, Logistics Functions.

Option Line Item 4032

INFORMATION FROM TO CHANGED

BY

Description

Bioenvironmental Services, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5.

Non-Personal Services IAW Attachment 1, PWS Paragraph(s):

7.1-7.2.3.

Bioenvironmental Services, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5. Non- Personal Services IAW Attachment 1, PWS Paragraph(s):

7.2.3, Radon for Radon Testing, and 7.4, Urgent Water Sampling.

Option Line Item 4034

INFORMATION FROM TO CHANGED

BY

Description

Public/Occupational Health, FFP Non- Personal Services IAW Attachment 1, PWS Paragraph(s):

7.3-7.8.4.

Public/Occupational Health, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 7, Bioenvironmental Services, including 7.1 through 7.3.5, Consumer Confidence Reports (CCR), except for 7.2.3, Radon for Radon Testing. (PWS 7.3.6, Water Main Flushing Plan and PWS 7.4, Urgent Water Sampling, are not included and are under separate CLINs.)

Option Line Item 5001

BY

Description

Station Management, FFP Non- Personal Services IAW Attachment 1, PWS Paragraph (s): 2, 2.12 and 2.14-2.33.

Station Management, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): Paragraph 2, General Contract Performance Requirements, except 2.13, Phase-In. This CLIN also includes PWS 4.10.22 Labor Disputes.

Option Line Item 5003

INFORMATION FROM TO CHANGED

BY

Description Contract Security Guards Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 3.

Contract Security Guards Services, FFP Non- Personal Services IAW Attachment 1, PWS Paragraph(s): 3, Security Functions.

Option Line Item 5004

INFORMATION FROM TO CHANGED

BY

Description

Contract Security Guards Services, Additional Support, FFP NTE Hourly Priced (Each hour price is for TWO Contract Security Guards for ONE hour of services) Non-Personal Services IAW Attachment 1, PWS Paragraph (s): 3.

Unit of Issue: Hours Quantity: 200 Hours for each of Options 1-5.

100 Hours for Option to Extend Services.

Contract Security Guards Services, Additional Support, FFP NTE Hourly Priced (Each hour price is for TWO Contract Security Guards for ONE hour of services) Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 3, Security Functions.

Unit of Issue: Hours Quantity: 200 Hours for each of Options 1-5.

100 Hours for Option to Extend Services.

Option Line Item 5006

INFORMATION FROM TO CHANGED

BY

Description

Civil Engineering Management and Facility Operations Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.1.2- 4.1.5.2, 4.1.6.9-4.1.6.13, 4.2.2-4.2.2.4, 4.2.4, 4.2.8- 4.2.8.2, 4.2.11-4.2.11.4, 4.2.14.2-4.2.14.4, 4.2.15.3- 4.2.15.4.3, 4.2.19-4.19.2, 4.3.1, 4.4, 4.5, 4.6.8.2, and 4.7-4.9.24.

Civil Engineering Management and Facility Operations Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s):

PWS 4, Civil Engineering (CE) Maintenance, Repair, Minor Renovations and Environmental (Base Operations), AND 7.3.6 Water Main Flushing Plan. This CLIN EXCLUDES requirements under CLINs X008 CE Maintenance and Repair Services; X010 Custodial Services; X012 Groundskeeping Services; X014 Refuse and Recycling Collection and Disposal Services; X017 Environmental Quality; X019 Pollution Prevention; X021 Management of Invasive Species; X023 Cultural, Surveying Inventory, Historical services;

X025 Natural Resources, Threatened and Endangered Species; and X027 (CE Major Repairs).

Option Line Item 5008

INFORMATION FROM TO CHANGED

BY

Description

Civil Engineering Maintenance and Repair Services, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5.

Non-Personal Services IAW Attachment 1, PWS Paragraph(s):

4.1.6-4.1.6.8, 4.2.1, 4.2.3.9, 4.2.5-4.2.5.4, 4.2.7, 4.2.9, 4.2.12- 4.2.14.1, 4.2.14.5-4.2.15.2.4, 4.2.16-4.2.17.2, and 4.2.18- 4.2.18.7.

Civil Engineering Maintenance and Repair Services, FFP NTE pricing IAW Attachment 1, PWS Paragraph(s): AS

INDICATED IN

ATTACHMENT 5 TO

CONTRACT FOR CLINS

X008.

Option Line Item 5010

INFORMATION FROM TO CHANGED

BY

Description Custodial Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.2.20.1-4.2.20.7.

Custodial Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.2.20.1-4.2.20.7, Facility Cleaning Services.

Option Line Item 5012

BY

Description

Groundskeeping Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s):

4.2.17.3-4.2.17.7 and 4.2.21- 4.2.21.6.

Groundskeeping Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.2.17.3 Base Sweeper Operations, 4.2.17.6 Snow and Ice Control Operations, and

4.2.21 Grounds Maintenance through and including 4.2.21.6.

Option Line Item 5013

INFORMATION FROM TO CHANGED

BY

Description

Civil Engineering Groundskeeping Services Fac Ops Reimbursables, FFP NTE Reimbursables, IAW Attachment 1, PWS Paragraph 1.1.2.3.

(Government Determined Value for RFP and Award).E34

Civil Engineering Groundskeeping Services Fac Ops Reimbursables, FFP NTE Reimbursables, IAW Attachment 1, PWS Paragraph 1.1.2.3. (Government Determined Value for RFP and Award).

Option Line Item 5014

INFORMATION FROM TO CHANGED

BY

Description

Refuse and Recycling Collection and Disposal Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.2.6-4.2.6.5.

Refuse and Recycling Collection and Disposal Services, FFP Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.2.6-4.2.6.5, Refuse Collection and Recycle Services.

Option Line Item 5017

INFORMATION FROM TO CHANGED

BY

Description

Civil Engineering Environmental Quality (EQ) Services, FFP NTE pricing IAW Attachment 1 PWS at paragraph

1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5.

Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.6.3, 4.6.4, 4.6.5, 4.6.6.1, 4.6.6.2, 4.6.6.3, 4.6.6.4, 4.6.6.5, 4.6.6.6, and 4.6.6.7.

Civil Engineering Environmental Quality (EQ) Services, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5. Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.2.10 Storage Tank Tightness Testing, 4.6.3 Environmental Management System (EMS),

4.6.4 Installation Environmental Coordination, 4.6.5 Environmental Budgeting Requirements, 4.6.6 Environmental Compliance, and 4.6.6.1, 4.6.6.2 Air Quality, 4.6.6.3 Air Emissions, 4.6.6.4 Ozone Depleting Substances (ODS), 4.6.6.5 Hazardous Materials, 4.6.6.6 Hazardous Waste, 4.6.6.7 POLs and POL Storage Tanks, 4.6.6.8 Toxic Substances, including both 4.6.6.8.1 Lead-Based Paint (LBP) and 4.6.6.8.2 Polychlorinated Biphenyl's (PCB), and 4.6.6.8.3 Wastewater and Storm Water Programs.

Option Line Item 5019

INFORMATION FROM TO CHANGED

BY

Description

Civil Engineering Pollution Prevention (PP), FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5. Non- Personal Services IAW Attachment 1, PWS Paragraph(s): 4.6.8.

Civil Engineering Pollution Prevention (PP), FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5. Non-Personal Services IAW Attachment 1, PWS Paragraph(s): 4.6.8, Pollution Prevention (P2), including both 4.6.8.1 and 4.6.8.2 Solid Wastes and Recycling.

Option Line Item 5021

INFORMATION FROM TO CHANGED

BY

Description

Civil Engineering Management of Invasive Species, FFP NTE pricing IAW Attachment 1 PWS at paragraph 1.1.2.2 and specific task pricing applicable to this CLIN in Attachment 5.

Non-Personal Services IAW Attachment 1, PWS…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .