This document provides information regarding a forthcoming solicitation for base operations support services at Prospect Harbor Space Force Station in Maine. The solicitation is expected to be released in January 2024 for a non-personal services contract to manage, operate, maintain, and provide all logistical support and security services at the facility. The contractor will be responsible for staffing and managing the site's physical security functions and programs, as well as providing civil engineering, communications, logistics, environmental, and occupational health services. This will be a 100% small business set-aside procurement conducted as a best value tradeoff selection using PIEE's solicitation module, which requires offerors to register in both PIEE and the module in order to submit proposals. The document outlines registration details and timelines for both systems.

View the file

Other files

File Type Posted
PHSFS_BOS_RFP_Questions_SET_5_20240301.pdf PDF
FA255024R0003_Amend_0002_240301.pdf PDF
FA255024R0003_SF1449_Amend_0002_240301.pdf PDF
Atch_5_FFP_NTE_Task_Pricing_Template_Amend_0002_240229.xlsx XLSX spreadsheet
PHSFS_BOS_RFP_Questions_SET 4_20240226.pdf PDF
PHSFS_BOS_RFP_Questions_SET 3_20240226.pdf PDF
20240221_PHSFS_BOS_RFP_Questions.pdf PDF
Atch_8_ITO_Amend_0001_20240221.pdf PDF
FA255024R0003_Amend_0001_20240221.pdf PDF
Atch_9_Evaluation_Amend_0001_20240207.pdf PDF
Atch_16_PPQ_20240104.docx DOCX document
PH B104 Heat PM 9-18.pdf PDF
Report 2305 PH B103 OVHD PM 6-14-22.pdf PDF
Report 1844 PH B101 FM200 Fire System PM 4-5-21.pdf PDF
PH-103-K-01 - 2021 Inspection.pdf PDF
Report 259 PH B103 BFP Annual PM 3-28-23.pdf PDF
Report 1847 PH B112 Fire Alarm PM 4-5-21.pdf PDF
Report 1175 PH B105 Heat PM 9-27-19.pdf PDF
Report 1456 PH B110 Fire Alarm PM 6-30-20.pdf PDF
Report 2324 PH B104 Annual Heating PM 9-15-21.pdf PDF
Report 1359 PH B101 HVAC Compressor Nr 2 PM 6-10-20.pdf PDF
Report 2443 PH B101 Annual Heating PM 9-29-22.pdf PDF
PH B101 Boiler PM 10-18.pdf PDF
Report 1855 PH B101 Condenser B HVAC PM 4-20-21.pdf PDF
Report 1845 PH B102 CO2Fire System PM 4-5-21.pdf PDF
Report 1356 PH B101 HVAC Air Handler Nr 2 PM 6-10-20.pdf PDF
Report 2174 PH B102 CO2Fire System Annual PM SC 3-9-22.pdf PDF
PH inside Generator SC 3-29-19.pdf PDF
Report 1828 PH B104 OVHD Nr 2 PM 5-24-2021.pdf PDF
PH B112 F7P9ZP-PH-BURNER 2-03-21.pdf PDF
Report 1831 PH B102 Outside Generator SC 5-25-2021.pdf PDF
Report 2252 PH B102 Roof Inspection 6-6-2022.pdf PDF
PH-110-K-02 - 2021 Inspection.pdf PDF
Report 645 PH B102 Outside Generator Annual PM 9-6-23.pdf PDF
Report 1680 PH B103 No heat ESC 12-12-20.pdf PDF
Report 1082 PH B102 inside Generator PM 8-22-18.pdf PDF
Report 1851 Anual Extinguisher PMs 4-5-21.pdf PDF
Report 2241 PH B102 Outside Generator PM 5-18-22.pdf PDF
PH B103 Replace Window Glass 20190820.pdf PDF
Report 402 PH B101 HVAC Nr 1 PM 9-17.pdf PDF
Report 2448 PH B104 Annual Heating PM 9-28-22.pdf PDF
Report 1296 PH B102 Inside Generator PM 2-20-20.pdf PDF
PH B110 Boiler Nr 1 PM 9-18.pdf PDF
Report 367 PH B112 FA Install.pdf PDF
Report 1357 PH B103 HVAC PM 6-10-20.pdf PDF
Report 2175 PH B103 Fire Alarm PM 3-9-22.pdf PDF
Report 2047 PH B101 HVAC Air Handler Side A 9-30-21.pdf PDF
Report 658 PH B104 OVHDR eplace Push Button 7-25-18.pdf PDF
Report 645 PH Outside Generator repair SC 6-20-18.pdf PDF
Report 1829 PH B105 OVHD PM 5-24-2021.pdf PDF
Show 40 more

Latest 50 of 292 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Set 2 - Page 1

FA255024R0003, Prospect Harbor SFS BOS Acquisition 26 Feb 2024

Question Set 2

Files associated with the responses in this file:

1. Emergency and Hazardous Chemical Inventory

2. Navy Radon Report

3. PH Air Summary (with 50 CONS additions)

4. Prospect Harbor Air License

5. NSA Prospect Harbor HWMP

1. Consent Letter. Ref: Attachment 15.

Subcontractors and teaming partners must complete Attachment 15, the consent letter to release past performance information to the prime contractor. Our subcontractor is the prime contractor of their past performance projects. Must our subcontractor still complete Attachment 15 if they are the prime?

Response: The question "Must our subcontractor still complete Attachment 15 if they are the prime?" is considered to mean your firm is the prime and your subcontractor is a subcontractor to your firm. This means your subcontractor is not the prime offeror for the FA255024R0003 requirement, for which your firm would submit a proposal, since your firm is the prime.

Therefore, the answer is Yes, Attachment 15 is required.

2. Contract Relevancy Ratings. Ref: Attachment 9, Evaluation page 8 of 16: Table B4.6.2.1.1. (Question submitted separately)

B4.6.2.1 states "In evaluating Past Performance Relevancy, the Government shall consider the following ratings for Contract Management, Contract Security Guard Services, and Civil Engineering Services:"

B4.6.2.1.1, Contract Management Relevancy Ratings, has Table B4.6.2.1.1, Contract Relevancy Ratings. For the rating "Very Relevant," the description in the table is "Past performance effort was for a requirement of similar magnitude which included at least four functional areas and management of at least one of those functional areas was accomplished through a subcontractor."

Question: The Offerors will include past performance projects for contract security guard and civil engineering services, but not contract management. Can the Government remove this relevancy criterion as it does not apply to the two types of services (security and civil) we include for project experience?

Response: No change; Contract Management Relevancy Ratings are part of the Government's acquisition strategy for assessing Relevancy under the Past Performance Factor.

Set 2 - Page 2

3. Dual Armed Contract Security Guard Services. Ref: Atch_9_Evaluation_Amend_

0001_20240207; PWS 3.2.24.10.1.

B3.5.1 requires "Two years dual armed Contract Security Guard services" as a Minimum Experience Threshold. PWS Section 3.2.24.10.1 requires that “CSG personnel on duty shall be dual armed, with one rifle and one pistol.” For the purposes of meeting the Minimum Experience Threshold, does "dual armed" mean that security personnel must carry both weapons at once, or just that they are required to use both types of weapon in the course of their duties (though not necessarily at the same time)?

Response: RFP Attachment 9 has, at B3.5.1, "Two years dual armed Contract Security Guard services," which means being armed with both pistol and rifle when performing Contract Security Guard services.

4. Two Years Civil Engineering Services. Ref: Atch_9_Evaluation_Amend_0001_ 20240207.

B3.5.2 requires "Two years Civil Engineering services" as a Minimum Experience Threshold.

Does only one civil engineering past performance project need to show two years of experience to meet the threshold or do all submitted projects need to meet the threshold?

Response: RFP Attachment 9 has, at B3.5, Minimum Experience Threshold, "contract experience of the offeror and any applicable subcontractors submitted in its Past Performance Volume, must meet a minimum of: ...B3.5.2 Two years Civil Engineering services."

The requirement can be met by a single contract past performance reference, if it includes two years Civil Engineering services."

5. Environmental Management System (EMS) Ref: Attachment 1 PWS, Section 4.6.3

Is there an existing Navy EMS plan which can be provided?

Response: Prospect Harbor is not required to have an EMS under NAVFAC, so no EMS plan exists.

Can you provide more specific information as to what is required to complete this scope item.

Response: The EMS program is developed as a tracking tool for all applicable environmental programs at the site. It is a top cover/roll up of the programs that identifies environmental aspects/impacts.

6. Potable Water System. Ref: Attachment 1 PWS, Section 4.2.14.1.

Request additional information as to what the current potable water system consists of and what maintenance is required to maintain the system.

Set 2 - Page 3

Response: There are two water wells in use on site, each serving several nearby buildings.

Pressure tanks are used to maintain potable water system pressure. Chlorine is added to the water to keep water in the distribution system free of contamination. Potable water is tested periodically to ensure it is acceptable for use. Maintenance includes keeping the chlorine system supplied and operational, keeping the pressure tanks operational, and any maintenance to the distribution lines and facilities using the potable water system. Potable water will be within the required levels as identified by local governing standards.

7. Environmental Management. Ref: Attachment 1 PWS, Section 4.6.

What CLIN does this scope of work item fall under?

Response: For the PWS paragraphs under PWS 4.6, Environmental Management, if not listed in the solicitation (SF1449, Supplies or Services & Prices or Costs) for CLINs X017, X019, X021, X023, and X025, then CLINs X006, Civil Engineering Management and Facility Operations Services.

8. Environmental Compliance. Ref. Attachment 1 PWS, 4.6.6.

Please provide a list of existing "pollution generating activities"

Response: Information is contained in the PH Air Summary file provided with this response.

9. Environmental Compliance. Ref. Attachment 1 PWS, 4.6.6.

The PWS states "The contractor shall provide disposal management of all hazardous, universal, and special/state regulated wastes generated on PHSFS."

Please provide a list of wastes to be managed as part of this task.

Response: 10 SOPS Det Alfa generates very limited hazardous waste such as florescent bulbs, expired grease, and batteries. An Emergency and Hazardous Chemical Inventory is provided in a separate file.

Typical wastes generated on a 180 day cycle:

HAZARDOUS WASTE – Aerosol cans, weapons cleaning waste.

UNIVERSAL WASTE – Fluorescent lamps, rechargeable batteries.

In addition, is the Transport and Disposal of these wastes included in this contract? If so, what CLIN does it fall under?

Response: Transport and Disposal of these wastes are included in this contract; CLINs X006, Civil Engineering Management and Facility Operations Services.

Set 2 - Page 4

10. Air Quality. Ref. Attachment 1 PWS, 4.6.6.2.

The PWS states "the contractor shall develop, manage, and implement the PHSFS Air Quality, Ozone Depleting Substances (ODSs), and Radon Management plans and programs."

Please provide more specific information as to what is required to complete this scope item.

Response: Radon monitoring results are included in a file provided (note that the file includes radon monitoring for other locations, in addition to NSAPH). ODS are in the PH Air Summary file provided. The contractor's plan would need to address the requirements at PWS 4.6.6.2; however, as noted in the two referenced files, radon and ODS are not significant issues at NSA PH.

Please provide the previous PHSFS Air Quality, Ozone Depleting Substances (ODSs), and Radon Management plans and/or example plan that is of the sufficient scope and detail expected by USAF.

Response: The Radon Management Plan is still in draft form. However, radon monitoring results are included in a file provided (the file includes radon monitoring for other locations, in addition to NSAPH). ODS are in the PH Air Summary file provided.

11. Air Emissions. Ref. Attachment 1 PWS, 4.6.6.3.

Please provide current air emissions inventory and the current air permits for the facility

Response: The PH Air Summary file is provided, and also the license for NSA Prospect Harbor.

12. Ozone Depleting Substances (ODSs). Ref. Attachment 1 PWS, 4.6.6.4.

Please provide list of ODSs used at PHSFS.

Response: R-22 and R-410A are listed in the provided PH Air Summary file.

13. Hazardous Waste. Ref: Attachment 1 PWS, 4.6.6.6.

Please provide list of hazardous wastes to be generated as part of the contract including waste material, quantity and frequency.

Response: 10 SOPS generates very limited hazardous waste such as florescent bulbs, batteries ,and expired grease. The amount and periodicity is random, on an as-needed basis.

Typical wastes generated on a 180 day cycle:

HAZARDOUS WASTE – Aerosol cans, weapons cleaning waste.

UNIVERSAL WASTE – Fluorescent lamps, rechargeable batteries.

Set 2 - Page 5

Also please confirm if hazardous waste transport and disposal is included in this contract. If so, please provide the waste types and quantities to be disposed.

Response: The contractor will be responsible for hazardous waste transport and disposal.

Typical wastes generated on a 180 day cycle:

HAZARDOUS WASTE – Aerosol cans, weapons cleaning waste.

Set 2 - Page 6

14. CLINs and PWS. Ref: Attachment 5 FFP NTE Services CLINs Task Pricing.

It is not clear what CLINS correspond to given sections in the PWS. Please add the PWS sections associated with each CLIN and Task Reference Number in the Pricing Table (Attach 5).

Response: The PWS paragraph(s) for the CLINs 1008, 2008, 3008, 4008, 5008, and 6008 are shown below for the specific tasks listed in the Task Description.

Also, the PWS paragraph(s) for the CLINs 1032, 2032, 3032, 4032, 5032, and 6032 are shown below for the specific tasks listed in the Task Description.

For the CLINs X017, X019, X021, X023, and X025, the PWS paragraph(s) for the CLINs is already shown in the solicitation (SF1449, Supplies or Services & Prices or Costs.)

Civil Engineering Maintenance and Repair Services, FFP NTE

Option 1 Option 2 Option 3 Option 4 Option 5

Option to Extend

Services

Section for

CLIN:

Section for

CLIN:

Section for

CLIN:

Section for

CLIN:

Section for

CLIN:

Section for

CLIN:

1008 2008 3008 4008 5008 6008 Civil Engineering Maintenance and Repair Services, FFP NTE

Task Reference Number

Task Reference Number

Task Reference Number

Task Reference Number

Task Reference Number

Task Reference Number Task Description

PWS Para for Tasks Identified in Task Description

PLUMBING

A01 B01 C01 D01 E01 F01 Plumbing, Routine Repairs 4.2.14.1 Potable Water System

A02 B02 C02 D02 E02 F02 Plumbing, Preventative Maintenance - General 4.2.14.1 Potable Water System

A03 B03 C03 D03 E03 F03 Plumbing, Preventative Maintenance - Backflow 4.2.14.1.2 Backflow Prevention

A04 B04 C04 D04 E04 F04 Plumbing, Emergency Repairs 4.2.14.1 Potable Water System

Set 2 - Page 7

Option to Extend

Services

Section for

CLIN:

Section for

CLIN:

Section for

CLIN:

Section for

CLIN:

Section for

CLIN:

Section for

CLIN:

1008 2008 3008 4008 5008 6008 Civil Engineering Maintenance and Repair Services, FFP NTE

Task Reference Number

Task Reference Number

Task Reference Number

Task Reference Number

Task Reference Number

Task Reference Number Task Description

PWS Para for Tasks Identified in Task Description

ELECTRICAL

A05 B05 C05 D05 E05 F05 Routine Repairs

4.2.12 Electrical Services for

other than generators and generator equipment; 4.2.12.1, and 4.2.12.4.

A06 B06 C06 D06 E06 F06 Preventative Maintenance

4.2.12 Electrical Services for

other than generators and generator equipment; 4.2.12.1, and 4.2.12.4.

A07 B07 C07 D07 E07 F07 Emergency Repairs

4.2.12 Electrical Services for

other than generators and generator equipment; 4.2.12.1, and 4.2.12.4.

ELECTRICAL - POWER PRODUCTION

A08 B08 C08 D08 E08 F08 Electrical Power Production, Routine Repairs

4.2.12 Electrical Services for

generators and generator equipment; 4.2.12.1 and 4.2.12.2.

A09 B09 C09 D09 E09 F09 Electrical Power Production, Preventative Maintenance

4.2.12 Electrical Services for

generators and generator equipment; 4.2.12.1 and 4.2.12.2.

Set 2 - Page 8

Option to Extend

Services

Section for

CLIN:

Section for

CLIN:

Section for

CLIN:

Section for

CLIN:

Section for

CLIN:

Section for

CLIN:

1008 2008 3008 4008 5008 6008 Civil Engineering Maintenance and Repair Services, FFP NTE

Task Reference Number

Task Reference Number

Task Reference Number

Task Reference Number

Task Reference Number

Task Reference Number Task Description

PWS Para for Tasks Identified in Task Description

A10 B10 C10 D10 E10 F10 Electrical Power Production, Emergency Repairs

4.2.12 Electrical Services for

generators and generator equipment; 4.2.12.1 and 4.2.12.2.

HEATING, VENTILATION AND AIR CONDITIONING

SYSTEMS (HVAC)

A11 B11 C11 D11 E11 F11 HVAC Routine Repairs

4.2.5 Heating, Ventilation, Air

Conditioning, and Refrigeration;

4.2.5.1, and 4.2.5.2

A12 B12 C12 D12 E12 F12 HVAC Preventative Maintenance

4.2.5 Heating, Ventilation, Air

Conditioning, and Refrigeration;

4.2.5.1, and 4.2.5.2

A13 B13 C13 D13 E13 F13 HVAC Emergency Repairs

4.2.5 Heating, Ventilation, Air

Conditioning, and Refrigeration;

4.2.5.1, and 4.2.5.2

FUEL SYSTEMS

A14 B14 C14 D14 E14 F14 Fuel Systems, Routine Repairs

4.2.14.3 Petroleum, Oil, and

Lubricant (POL) Systems

A15 B15 C15 D15 E15 F15 Fuel Systems, Preventative Maintenance

4.2.14.3 Petroleum, Oil, and

Lubricant (POL) Systems

A16 B16 C16 D16 E16 F16 Fuel Systems, Emergency Repairs

4.2.14.3 Petroleum, Oil, and

Lubricant (POL) Systems

Set 2 - Page 9

Option to Extend

Services

Section for

CLIN:

Section for

CLIN:

Section for

CLIN:

Section for

CLIN:

Section for

CLIN:

Section for

CLIN:

1008 2008 3008 4008 5008 6008 Civil Engineering Maintenance and Repair Services, FFP NTE

Task Reference Number

Task Reference Number

Task Reference Number

Task Reference Number

Task Reference Number

Task Reference Number Task Description

PWS Para for Tasks Identified in Task Description

LOCKSMITH

A17 B17 C17 D17 E17 F17 Locksmith Services, Routine Repairs 4.2.19.1 Locksmith

A18 B18 C18 D18 E18 F18 Locksmith Services, Preventative Maintenance 4.2.19.1 Locksmith

A19 B19 C19 D19 E19 F19 Locksmith Services, Emergency Repairs 4.2.19.1 Locksmith

STRUCTURES (Roof, Welding, Signs)

A20 B20 C20 D20 E20 F20 Structures, Roof, Welding, Signs, Routine Repairs

4.2.18 Structures; 4.2.18.2 Roof

Systems; 4.2.18.5 Welding;

4.2.18.6 Base Signage.

A21 B21 C21 D21 E21 F21 Structures, Roof, Welding, Signs, Preventative Maintenance

4.2.18 Structures; 4.2.18.2 Roof

Systems; 4.2.18.5 Welding;

4.2.18.6 Base Signage.

A22 B22 C22 D22 E22 F22 Structures, Roof, Welding, Signs, Emergency Repairs

4.2.18 Structures; 4.2.18.2 Roof

Systems; 4.2.18.5 Welding;

4.2.18.6 Base Signage.

PEST MANAGEMENT

A23 B23 C23 D23 E23 F23 Pest Management, Scheduled Preventative Maintenance

4.2.11.1 (Wild animal control services); 4.2.11.2 (Insect control services)

A24 B24 C24 D24 E24 F24 Pest Management, Unscheduled Responses

4.2.11.1 (Wild animal control services); 4.2.11.2 (Insect control services)

Set 2 - Page 10

Option to Extend

Services

Section for

CLIN:

Section for

CLIN:

Section for

CLIN:

Section for

CLIN:

Section for

CLIN:

Section for

CLIN:

1008 2008 3008 4008 5008 6008 Civil Engineering Maintenance and Repair Services, FFP NTE

Task Reference Number

Task Reference Number

Task Reference Number

Task Reference Number

Task Reference Number

Task Reference Number Task Description

PWS Para for Tasks Identified in Task Description

A25 B25 C25 D25 E25 F25 Pest Management, Emergency Responses

4.2.11.1 (Wild animal control services); 4.2.11.2 (Insect control services)

PROTECTIVE COATINGS (Painting)

A26 B26 C26 D26 E26 F26 Protective Coatings, Preventative Maintenance 4.2.7 Protective Coating Services

A27 B27 C27 D27 E27 F27 Protective Coatings, Emergency Repairs 4.2.7 Protective Coating Services

READINESS AND EMERGENCY MANAGEMENT

A28 B28 C28 D28 E28 F28 Internal Planning and Policy Documents

4.7.1 Internal Planning and

Policy Documents

A29 B29 C29 D29 E29 F29 Installation Emergency Management (EM) Program

4.7.3 Installation Emergency

Management (EM) Program

A30 B30 C30 D30 E30 F30 Respond to Contingencies and Disasters

4.7.4 Respond to Contingencies

and Disasters

A31 B31 C31 D31 E31 F31 Logistics and Equipment Management

4.7.5 Emergency Management

Logistics and Equipment Management

Set 2 - Page 11

Bioenvironmental Services, FFP NTE

Option to Extend

Services

Section for

CLIN:

Section for

CLIN:

Section for

CLIN:

Section for

CLIN:

Section for

CLIN:

Section for

CLIN:

1032 2032 3032 4032 5032 6032 Bioenvironmental Services, FFP NTE

Task Reference Number

Task Reference Number

Task Reference Number

Task Reference Number

Task Reference Number

Task Reference Number Task Description

PWS Para for Tasks Identified in Task Description

A37 B37 C37 D37 E37 F37 Environmental Compliance - Radon Testing 7.2.3 Radon (Radon Testing)

A38 B38 C38 D38 E38 F38 Environmental Compliance - Potable Water Programs 7.4 Urgent Water Sampling

Set 2 - Page 12

15. Hazardous Waste. Ref: Attachment 1 PWS, 4.6.6.6

The PWS states "The contractor shall develop, implement, and maintain a Hazardous and Universal Waste Program."

Please provide more specific information as to what is required to complete this scope item including what is to be required for the Hazardous Waste Management Plan (HWMP) and Waste Analysis Plan (WAP).

Response: PWS paragraph 4.6.6.6, Hazardous Waste, has the specific information for this requirement.

PWS Ref: 4.6.6.6 Hazardous Waste. All references to hazardous waste include RCRA hazardous waste, universal waste, used oil, and other industrial wastes processed through the hazardous waste program. The contractor shall develop, implement, and maintain a Hazardous and Universal Waste Program. As part of this program management, annually submit a Hazardous Waste Management Plan (HWMP) (CDRL A024). All plans shall be updated, reviewed, and approved annually by organizations using hazardous materials. The contractor shall include a Waste Analysis Plan (WAP) to identify, sample, and analyze waste streams from new and on-going processes (CDRL A025). The contractor shall determine proper classification of hazardous waste based upon analysis, generator knowledge, and MSDSs to ensure proper storage, transportation, and disposal. The contractor shall ensure that the installation’s hazardous waste generators properly accumulate and manage the waste streams they generate. The contractor shall perform and document inspections of hazardous waste accumulation points at least quarterly and infrequent generator locations at least semi-annually.

The contractor shall ensure site managers accomplish corrective actions and maintain follow-up documentation. The contractor shall coordinate transportation from waste generating areas to the consolidation site, accept, consolidate, and process wastes, store for no more than the maximum days allowed, and arrange for transportation and disposal of hazardous wastes. The contractor shall maintain, review, and track disposal manifests, Land Disposal Restriction Certifications, Certificates of Destruction, and other shipment documents. The contractor shall ensure receipt of returned signed manifest within 45-calendar days of shipment date or prepare an exception report and forward it to Maine Department of Public Health and Environment through the CE FAS.

Please provide the previous PHSFS HWMP and WAP and/or example plans that are of the sufficient scope and detail expected by USAF.

Response: The current NSA Prospect Harbor HWMP is provided in a file.

16. Hazardous Waste. Ref: Attachment 1 PWS, 4.6.6.6.

The PWS states "The contractor shall determine proper classification of hazardous waste based upon analysis, generator knowledge, and MSDSs to ensure proper storage, transportation, and disposal."

What analysis should be assumed to be required as part of this task?

Response: Lab analysis to determine the product/hazmat; this would assist in identifying the

Set 2 - Page 13 disposal process.

17. Hazardous Materials. Ref: Attachment 1 PWS, 4.6.6.5.

PWS states "The contractor shall develop, implement, and manage an effective and proactive hazardous material management (HAZMAT) program."

Please provide more specific information as to what is required to complete this scope item including number of MSDS to be managed as well as reviewed per year.

Response: Contractor will have a HAZMAT tracking program and the number of MSDSs depends on the number of HAZMAT products they maintain. Note: 10 SOPS Det Alfa states that it manages its own SDS program.

Please provide the previous PHSFS Hazardous Materials Emergency Response Plan and/or example plans that are of the sufficient scope and detail expected by USAF.

Response: A current NSA Prospect Harbor Hazardous Materials Emergency Response Plan does not exist. The current NSA Prospect Harbor HWMP is provided in a file; see Chapter 10.

18. POLs and POL Storage Tanks. Ref: Attachment 1 PWS, 4.6.6.7.

Please provide listing of current storage tanks at the facility as well as the current database of tank information.

Response: Information already provided to potential offerors includes all of the storage tank inspection reports (two years of reports for the diesel, heating oil and kerosene tank inspections) and the following:

15. Are there any fuel tank storages (50/100/500 gallons) associated with the contract?

If so, please provide the quantity/size/type or style and how often are they refueled.

Response:

Three Each: 500 gallon outside tanks (one each outside Buildings 101, 104/105, and 112). For building heating.

Three Each: 275 gallon inside tanks (one inside Building 103, and two inside Building 110). For building heating.

One Each: 2,000 gallon outside Diesel tank (by Building 102; supplies inside generator).

One Each: 546 gallon outside Diesel tank (by Building 102; supplies outside generator).

One Each: 50 gallon inside Diesel day tank (inside Building 102; for generator).

Refueling of tanks: For building heating, depends on the weather conditions over the course of the heating season. For backup generators, depends on the frequency and duration of utility electrical outages. From information provided by station personnel, Set 2 - Page 14 utility electrical outages are fairly frequent due to regional storm damage to utility pole electrical distribution systems across the heavily forested state; underground electrical distribution is apparently problematic in some or all of Maine due to generally thin soil layers underlain by granitic bedrock.

19. POLs and POL Storage Tanks. Ref: Attachment 1 PWS, 4.6.6.7.

Please provide copy of the Storage Tank Compliance Action Plan.

Response: NAVFAC has advised that no current Storage Tank Compliance Action Plan for NSA Prospect Harbor Plan exists.

20. Toxic Substances. Ref: Attachment 1 PWS, 4.6.6.8.

Please provide a copy of the Toxic Substance Compliance Action Plan.

Response: NAVFAC has advised that no current NSA Prospect Harbor Toxic Substance Compliance Action Plan exists.

21. Lead-Based Paint (LBP). Attachment 1 PWS, 4.6.6.8.1.

Please provide a copy of the LBP Management Plan.

Response: NAVFAC has advised that no current NSA Prospect Harbor LBP Management Plan exists. Note: PWS 4.6.6.8.1 includes "There is no known LBP on PHSFS at this time."

22. Wastewater and Storm Water Programs. Ref: Attachment 1 PWS, 4.6.6.8.3.

Please provide more specific information as to what is required to complete this scope item including permits to maintain, fees, testing requirements and scope of discharge monitoring.

Response: NAVFAC has advised that no current NSA Prospect Harbor wastewater or storm water program, or permit, exists.

23. Proposal Due Date.

In order to give offerors enough time to review RFI [questions submitted by potential offerors] responses and make necessary changes to their submissions, please extend the submission deadline to two weeks after the government answers all RFIs.

Response: Amendment 0002 will revise the proposal due date to Mon, 11 Mar 2024.

File details come from the government source that posted it. Updated .