Report 1175 PH B105 Heat PM 9-27-19.pdf

PDF 2 MB Posted

Attached to
Prospect Harbor Space Force Station (SFS) Base Operations Support (BOS)
Solicitation number
FA255024R0003
Issued by

About this file

This notice provides details for the Prospect Harbor Space Force Station Base Operations Support services procurement. The solicitation seeks base operations support services at the government-owned, contractor-operated Prospect Harbor Space Force Station in Maine. Services include physical security, civil engineering, communications systems administration, logistics management, and environmental and occupational health compliance. The 100% small business set-aside contract will have a one year base period and four one-year options. The solicitation is expected to be released in January 2024 via the Procurement Integrated Enterprise Environment module. Offerors must register in PIEE and the solicitation system in advance to submit proposals. The notice establishes an ombudsman for offeror concerns and reserves the right to cancel the solicitation if funds are unavailable.

View the file

Other files

File Type Posted
PHSFS_BOS_RFP_Questions_SET_5_20240301.pdf PDF
FA255024R0003_Amend_0002_240301.pdf PDF
FA255024R0003_SF1449_Amend_0002_240301.pdf PDF
Atch_5_FFP_NTE_Task_Pricing_Template_Amend_0002_240229.xlsx XLSX spreadsheet
PHSFS_BOS_RFP_Questions_SET_2_20240226.pdf PDF
PHSFS_BOS_RFP_Questions_SET 4_20240226.pdf PDF
PHSFS_BOS_RFP_Questions_SET 3_20240226.pdf PDF
20240221_PHSFS_BOS_RFP_Questions.pdf PDF
Atch_8_ITO_Amend_0001_20240221.pdf PDF
FA255024R0003_Amend_0001_20240221.pdf PDF
Atch_9_Evaluation_Amend_0001_20240207.pdf PDF
Atch_16_PPQ_20240104.docx DOCX document
PH B104 Heat PM 9-18.pdf PDF
Report 2305 PH B103 OVHD PM 6-14-22.pdf PDF
Report 1844 PH B101 FM200 Fire System PM 4-5-21.pdf PDF
PH-103-K-01 - 2021 Inspection.pdf PDF
Report 259 PH B103 BFP Annual PM 3-28-23.pdf PDF
Report 1847 PH B112 Fire Alarm PM 4-5-21.pdf PDF
Report 1456 PH B110 Fire Alarm PM 6-30-20.pdf PDF
Report 2324 PH B104 Annual Heating PM 9-15-21.pdf PDF
Report 1359 PH B101 HVAC Compressor Nr 2 PM 6-10-20.pdf PDF
Report 2443 PH B101 Annual Heating PM 9-29-22.pdf PDF
PH B101 Boiler PM 10-18.pdf PDF
Report 1855 PH B101 Condenser B HVAC PM 4-20-21.pdf PDF
Report 1845 PH B102 CO2Fire System PM 4-5-21.pdf PDF
Report 1356 PH B101 HVAC Air Handler Nr 2 PM 6-10-20.pdf PDF
Report 2174 PH B102 CO2Fire System Annual PM SC 3-9-22.pdf PDF
PH inside Generator SC 3-29-19.pdf PDF
Report 1828 PH B104 OVHD Nr 2 PM 5-24-2021.pdf PDF
PH B112 F7P9ZP-PH-BURNER 2-03-21.pdf PDF
Report 1831 PH B102 Outside Generator SC 5-25-2021.pdf PDF
Report 2252 PH B102 Roof Inspection 6-6-2022.pdf PDF
PH-110-K-02 - 2021 Inspection.pdf PDF
Report 645 PH B102 Outside Generator Annual PM 9-6-23.pdf PDF
Report 1680 PH B103 No heat ESC 12-12-20.pdf PDF
Report 1082 PH B102 inside Generator PM 8-22-18.pdf PDF
Report 1851 Anual Extinguisher PMs 4-5-21.pdf PDF
Report 2241 PH B102 Outside Generator PM 5-18-22.pdf PDF
PH B103 Replace Window Glass 20190820.pdf PDF
Report 402 PH B101 HVAC Nr 1 PM 9-17.pdf PDF
Report 2448 PH B104 Annual Heating PM 9-28-22.pdf PDF
Report 1296 PH B102 Inside Generator PM 2-20-20.pdf PDF
PH B110 Boiler Nr 1 PM 9-18.pdf PDF
Report 367 PH B112 FA Install.pdf PDF
Report 1357 PH B103 HVAC PM 6-10-20.pdf PDF
Report 2175 PH B103 Fire Alarm PM 3-9-22.pdf PDF
Report 2047 PH B101 HVAC Air Handler Side A 9-30-21.pdf PDF
Report 658 PH B104 OVHDR eplace Push Button 7-25-18.pdf PDF
Report 645 PH Outside Generator repair SC 6-20-18.pdf PDF
Report 1829 PH B105 OVHD PM 5-24-2021.pdf PDF
Show 40 more

Latest 50 of 292 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAINTENANCE&INSPECTIONREPORT �DA丁各: 9ム)〃9

(ONEFOREACHPIECEOFEQUIPMENT)

(ATTACHADDITiONAしSHE打SIFNECESSARY)

TYPEOFEQUiPMENT �MAKE �MODEし �TIMETOCOMPLETETASK

娩′手′孔子伽cp � �ノしんウシ幼場∫ �,_・・音彫

CONTRACTOR: Gatcomb Piumbing and Heating TECHNiCIAN’s NAME: Tim Gatcomb

LOCATION BUILDING NAMEOR NUMBER

Prospect Harbor, Maine

WORK DESCRIPTION AND PROBしEMS FOUND

0ノン月館/覚めた,ノん少の匹∽/ aノンノブカを「

MATERIAしS USED

iNSPECTION LIST A丁丁ACHED? NO IF NO, DATE ITWILL BE RECEIVED: ASAP

SAFETYREQUiREMENTS

X �HAVEBEENMET

HAVENOTBEENMET

HOUSEKEEPINGCOMPしETE

X �Y亡S

NO

CONTRACTORSIGNA丁URE �CCiSIGNATURE �SITEINSPECTORSIGNATURE

ア売捌き/ � �

EしiN# REPORT # dmccaslin Rectangle dmccaslin Typewritten Text x dmccaslin Typewritten Text #1175 dmccaslin Typewritten Text

C004AA

dmccaslin Typewritten Text N40085-17-D-7201

Ga髄場鵬b削り請b旺g &柵やating書nc・

P.0. B飲う妙豊的t M8c柾a§,軌E 04630

鵜06U§氏もI W柄ting, MきO4691

0銃ce之0了「2紗・Z O29

C訊 207.26雪"7828

J。咽e:幽 しoc鼠tion :

B。剛蘭五二之や」で∫軸。「 S。剛0:

BST. 1983

しi僻爪Sed M8§鳴r§

‡薯二一器箆二霊護あ TEST CONDuC丁ED:∴∴∴∴ Befo「e Test After Test

EFFIC丁ENCY

W宙ter Te鵬p

Do鵬轟c櫨ot W鵬「 By

Oil Tank

Boilel●piping臆臆臆 臆臆喜一臆

F競eI Pu爪p Nll鵬be 」 __

Puel F唖er Nm鵬bel・

A立置l繍Si乙e

E持ICほ討CY R雷POR丁

GENERAL DIRECT CONDITION RATING

R租tin容 �SRMNeeds �RatingDefinition

Gr箸 �Sustainmentconsistingof �Entirecompo-1ellt-SeCtio11OrCOmPOnel-t-SeCtionsamplefreeof

POSSiblepreventivemaiIltenanCe (whereapplicable). �Observab置eorknowndistress.

G「ee皿 �SllSta】nmentCOnSistingof POSSibleprevelltivemaintenance (Whereapplicable)andminor 「epairs(cor「ectivemaintenance) topossjblyfeworsome SubcompollentS. �Nocomponent-SeCtionorsampleserviceabilityワo「reliability"

‘’eduction.Some‘butnota】l,minor(non-Critical)subcomponentsmay Sufferfromslightdegradation哩fewmgivr(Critical)sしIbcomponents maysu節erfromsIightdegradatjon.

Green(一) S!lghtor11OSerViceab踊yorreliab硝tyreductionovera旧othe

COmPOnentSmaySし一群erfromminordegradationormorethanone m鋤OrCriticalsubcompol置el〕tma Sufferfrom`l“htd d.

Ambe「(十) �SustajnmentorrestoratiorltOany Ofthefo1lowing: Minorrepairstoseve「aI Subcomponents;Or Significantrepair,rehab岨atjon, OrrePlacementofoneormore Subcomp。nentS,butnotenoしIgh toellCOmPaSSthecompone置1ト Sectionasawhole;Or CIombinationsthereof � ・y SlgegraOatl○○l. Component-SeCtionorsamplese「viceabilityorre置iabilityisdegraded, butadequate.Averyfivmむvr(c∫itical)subcomponentsmaysu鮪er frommoderatedeteriorationwithperhapsafewminor(non-Criticai) Subcomponentssufferingfromseve「edeterjo「ation, A爪be「 Component-SeCtiono「sanpieserviceabiljtyo。.eliabilityisdefinitely impaired.Some’butnotanlgiv「ity,mgivr(c「itical)subcomponents maysu節irfrommoderatedeteriorationwithperhapsmanyminol・ (non-C「itical)subcomponentssuiferingfromseveredete「io.ation.

Ambe「(-) Rd十 Compolle一一トSeCtio-1O「SamPlehassignifroantserviceabi時or l.eliabiiityloss.Mostsubcomponentsmaysufferfrommoderate degl・adationgrafivmむvr(C「jtica‘)sl-bcompo11entSmaySuife「from SeVeredegradatjon.

e() �Su§tammentO「restorat10n l‘equiredconsistingofmgivr repair,「血abi耀誼oIl,Or 「ep重acementtothecomponent- Se轟ionasawh0le. �Slgnifroantserviceab冊yorreliab叫yredllCtio両1COmPOnent-SeCtjoll OrSamPle.Am軸orityofsubcomponentsareseverelydegradedand Othersmayhavevaryingdegreesofdegradation.

Red Severesel.Viceab航yorreliabi“ty「edし1Ctiontothecomponent-SeCtion O「SanPlesuchthatitjsbare!yabIetoperform.Mostsubcomponents areseve「eiydeg「aded.

Red(輸) Ove「allcomponent-SeCtiondegradationistotal‘Few言fany, SubcomponentssaIvageable.C`ompletelossofcomponent-SeCtionor SamPleserviceabilit y・

Attachment J-」 502000-08 Page l