Report 259 PH B103 BFP Annual PM 3-28-23.pdf
PDF 110 KB Posted
- Solicitation number
- FA255024R0003
About this file
This document contains a pre-solicitation notice and related federal contract opportunity for base operations support services at Prospect Harbor Space Force Station in Maine. The Department of the Air Force Space Command is seeking proposals for a non-personal services contract to manage, operate, maintain, and provide all logistical support and security services at the facility. Services include staffing and managing physical security functions and programs, civil engineering services and maintenance, operation and systems administration of communications systems, logistics management, environmental services, and ensuring compliance with all safety and occupational health requirements. The solicitation is planned for release in January 2024 as a 100% small business set-aside and will utilize best value tradeoff source selection. The resulting contract will require the contractor to provide all labor, management, transportation, tools, equipment, materials, and supplies necessary to perform the requirements outlined in the Performance Work Statement.
View the file
Other files
Show 40 more
Latest 50 of 292 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(ATTACH ADDITIONAL SHEETS IF NECESSARY)
YES NO
YES NO
YES NO
MATERIALS USED
MAINTENACE & INSPECTION REPORT
(ONE FOR EACH PIECE OF EQUIPMENT)
WILL MATERIALS NEED TO BE ORDERED? HOW LONG IS THE LEED TIME?
EXPLAIN BELOW
HAVE NOT BEEN MET
(BELOW) FOR ADMINISTRATION USE ONLY
DATE IT WILL BE RECEIVED :
PROPER PPE BEING WORN
YES
CONTRACTOR: TECHNICIANS NAME:
LOCATION WEATHERBUILDING NAME or #
CONTRACTOR/SIGNATURE CCI/ SIGNATURE SITE INSPECTOR/SIGNATURE
CONTRACT # ELIN # REPORT NO.
HAVE BEEN MET
DATE:
General Direct Condition Rating
TYPE OF EQUIPMENT MAKE MODEL
WORK DESCRIPTION & PROBLEMS FOUNDS
TIME TO COMPLETE TASK
IS INSPECTION CHECK LIST ATTACHED?
SAFETY REQUIREMENTS
WAS WORK COMPLETED?
IF NO EXPLAIN BELOW
General Direct Condition Rating Notes ( Explain Conditions found for the Rating given above)
NO
HOUSE KEEPING COMPLETE
YES
NO
MAXIMO # Work Order #
| DATE: 3/28/2023 |
| TYPE OF EQUIPMENTRow1: Backflow preventer |
| MAKERow1: Watts |
| MODELRow1: 9D-M3 |
| TIME TO COMPLETE TASKRow1: .5 |
| CONTRACTOR: Dean & Allyn, Inc. |
| TECHNICIANS NAME: Barry Prescott |
| LOCATIONRow1: Prospect Harbor |
| BUILDING NAME or Row1: #103 |
| WEATHERRow1: Overcast/cool |
| General Direct Condition RatingRow1: Green |
| General Direct Condition Rating Notes Explain Conditions found for the Rating given aboveRow1: |
| WILL MATERIALS NEED TO BE ORDERED HOW LONG IS THE LEED TIME EXPLAIN BELOW: |
| MATERIALS USEDRow1: |
| DATE IT WILL BE RECEIVED: |
| CCI SIGNATURERow1: |
| ELIN N4008517D7201: A002AM |
| REPORT NON4008517D7201: 259 |
| REPORT NOWork Order: |
| MAXIMO Row1: |
| Work Order Row1: |
| REPORT NORow3: |
| Text1: Backflow preventer check. Found non-testable device installed. |
| Text2: |
| Check Box3: Yes |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Yes |
| Check Box9: Yes |
| Check Box10: Off |
| Check Box11: Yes |
| Check Box12: Off |
| Check Box13: Yes |
| Check Box14: Off |
| Contract #: N40085-22-D-0087 |