This document contains a federal contract opportunity notice and related file regarding base operations support services at Prospect Harbor Space Force Station in Maine. The notice seeks proposals for a competitively awarded small business set-aside contract to provide base operations support services on a government-owned, contractor-operated facility at Prospect Harbor Space Force Station, including physical security, civil engineering, communications systems operations and maintenance, logistics management, and environmental and safety compliance. Proposals are due in January 2024 for a period of performance beginning October 2024 when the installation is scheduled to transition from Navy to Space Force responsibility. The contractor will be responsible for operating the government-owned facility and providing all necessary labor, equipment, supplies and management to perform the required support services outlined in the performance work statement.
View the file
Other files
Show 40 more
Latest 50 of 292 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(ATTACH ADDITIONAL SHEETS IF NECESSARY)
YES NO
YES NO
YES NO
MATERIALS USED
MAINTENACE & INSPECTION REPORT
(ONE FOR EACH PIECE OF EQUIPMENT)
WILL MATERIALS NEED TO BE ORDERED? HOW LONG IS THE LEED TIME?
EXPLAIN BELOW
HAVE NOT BEEN MET
(BELOW) FOR ADMINISTRATION USE ONLY
DATE IT WILL BE RECEIVED :
PROPER PPE BEING WORN
YES
CONTRACTOR: TECHNICIANS NAME:
LOCATION WEATHERBUILDING NAME or #
CONTRACTOR/SIGNATURE CCI/ SIGNATURE SITE INSPECTOR/SIGNATURE
CONTRACT # ELIN # REPORT NO.
HAVE BEEN MET
DATE:
General Direct Condition Rating
TYPE OF EQUIPMENT MAKE MODEL
WORK DESCRIPTION & PROBLEMS FOUNDS
TIME TO COMPLETE TASK
IS INSPECTION CHECK LIST ATTACHED?
SAFETY REQUIREMENTS
WAS WORK COMPLETED?
IF NO EXPLAIN BELOW
General Direct Condition Rating Notes ( Explain Conditions found for the Rating given above)
N40085-17-D-7201
NO
HOUSE KEEPING COMPLETE
YES
NO
MAXIMO # Work Order #
4/5/2021
Fire alarm system Silent Knight SK5208 2 Dean & Allyn, Inc. Barry Prescott
Prospect harbor #112 Cool/drizzle Green +
Performed annual fire alarm test x
E002AM 1847
Barry Prescott #135
200000044216Inspection Ref:
Conducted by:
Report of Inspection/Test
Property Owner/Agent
526 Western Ave.
Augusta, ME 04430
CCI Group, LLCUS Navy - Prospect Harbor -
Bldg 112 (admin)
Light House Point Road
Prospect Harbor, ME
Annual Alarm
Derek McCaslin
(207)620-7172 x111 Print Date: 5/3/2021
April 5, 2021
Equipment Summary
Site
Description
Inspected Unable to
Inspect Serviced
Repaired Failed
%Qty%Qty%Qty%QtyQty
Alarm Alarm Panel 2
1 1 0 0100.0% 0.0% 0.0% 0 0.0%
Alarm Battery
Sealed Lead Acid 1 1 0 0100.0% 0.0% 0.0% 0 0.0%
Alarm Panel Information
Panel Manufacturer Model Serial No. Location
Silent Night 5208
Overcurrent Protect Type Overcurrent Size (Amps) Primary Supply Disconnect Location / Panel # / Breaker #
Battery Test
Location Type Manufacturer
Model
R e p la ce m e n t
D a te
Q u a n tit iy
C o n d iti o n
L e a ks o r
C o rr o si o n
C o n n e ct io n s
V o lta g e N o
L a d
M e a su re d
C a p a ci ty A
-H r
R a te d C a p a ci ty
A -H r O k?
V o lta g e W ith h a rg e r
V o lta g e N
L a d
M e a su re d a p a ci ty A
-H r Ok OkOk Ok 12v 17.2ah2 Sealed Lead Acid 19 13.18 1413.0
Device Summary
Device Qty Manufacturer Model Quantity
Failed
% of Total
Tested
Quantity
Tested
Initiating Devices
Heat Detector 5 ROR 5 0100%
Indicating Devices
Horn/Strobe 2 2 0100%
Initiating Devices
Pull Station 2 2 0100%
Smoke PE 6 6 0100%
System Function Summary & Test
Function Description Test Result
Alarm Functions
Alarm Bells/Horns/Strobes Evacuation Alarm functions including Bells/Horns/Strobes actuate properly Pass
Print Date: 5/3/2021 Copyright 2002-2018 Life Safety Inspector, OnSite Software
Report of Inspection/Test
US Navy - Prospect Harbor - Bldg 112 (admin)Property:
Owner: CCI Group, LLC 200000044216Inspection Ref:
Annual Alarm
April 5, 2021
System Function Summary & Test
Function Description Test Result
Alarm Panel Supervisory Functions
Panel AC Power Loss Loss of AC power to the alarm panel is detected by the alarm system. Pass
Panel Sec Power Loss Loss of Secondary power to the alarm panel is detected by the alarm system. Pass
Open Alarm Circuits Electrical opens in initiating and indicating circuits are detected. Pass
Short Alarm Circuits Electrical shorts in initiating and indicating circuits are detected. Pass
Ground Faults Detected Ground faults in alarm circuits are detected Pass
Panel Inspection (Alarm Panel 2)
Yes Panel and surrounding equipment, conduit and wiring well secured and in good condition
YesSystem was in operation upon arrival?
Yes Primary power supply operates properly under full load
YesAre all lamps and displays operating correctly?
Yes Have all fuses been checked for rating and supervision
YesTransient suppressors visually inspected?
Yes Are operating instructions posted or available at the panel?
YesAre drawings and wiring diagrams available at the panel?
Yes Are zones labeled and identified?
Inspector's Suggestions (Recommendations)
None In addition to the problems noted in this report the inspector suggests the following system changes/improvements, however, these suggestions are not the result of an engineering survey.