This document contains a pre-solicitation notice and related service requirements for base operations support at Prospect Harbor Space Force Station in Maine. The Air Force plans to release a solicitation in January 2024 seeking a contractor to operate the government-owned facility on a 100% small business set-aside contract. Services will include physical security, civil engineering, communications systems administration, logistics management, and environmental and safety compliance. The requirement is for a non-personal services contract to manage, operate, maintain, and provide all support services described in the performance work statement. Questions may be directed to the points of contact listed by January 2024, and the Air Force intends to use the Procurement Integrated Enterprise Environment online portal for proposal submission.

View the file

Other files

File Type Posted
PHSFS_BOS_RFP_Questions_SET_5_20240301.pdf PDF
FA255024R0003_Amend_0002_240301.pdf PDF
FA255024R0003_SF1449_Amend_0002_240301.pdf PDF
Atch_5_FFP_NTE_Task_Pricing_Template_Amend_0002_240229.xlsx XLSX spreadsheet
PHSFS_BOS_RFP_Questions_SET_2_20240226.pdf PDF
PHSFS_BOS_RFP_Questions_SET 4_20240226.pdf PDF
PHSFS_BOS_RFP_Questions_SET 3_20240226.pdf PDF
20240221_PHSFS_BOS_RFP_Questions.pdf PDF
Atch_8_ITO_Amend_0001_20240221.pdf PDF
FA255024R0003_Amend_0001_20240221.pdf PDF
Atch_9_Evaluation_Amend_0001_20240207.pdf PDF
Atch_16_PPQ_20240104.docx DOCX document
PH B104 Heat PM 9-18.pdf PDF
Report 2305 PH B103 OVHD PM 6-14-22.pdf PDF
Report 1844 PH B101 FM200 Fire System PM 4-5-21.pdf PDF
PH-103-K-01 - 2021 Inspection.pdf PDF
Report 259 PH B103 BFP Annual PM 3-28-23.pdf PDF
Report 1847 PH B112 Fire Alarm PM 4-5-21.pdf PDF
Report 1175 PH B105 Heat PM 9-27-19.pdf PDF
Report 1456 PH B110 Fire Alarm PM 6-30-20.pdf PDF
Report 2324 PH B104 Annual Heating PM 9-15-21.pdf PDF
Report 1359 PH B101 HVAC Compressor Nr 2 PM 6-10-20.pdf PDF
Report 2443 PH B101 Annual Heating PM 9-29-22.pdf PDF
PH B101 Boiler PM 10-18.pdf PDF
Report 1855 PH B101 Condenser B HVAC PM 4-20-21.pdf PDF
Report 1845 PH B102 CO2Fire System PM 4-5-21.pdf PDF
Report 1356 PH B101 HVAC Air Handler Nr 2 PM 6-10-20.pdf PDF
Report 2174 PH B102 CO2Fire System Annual PM SC 3-9-22.pdf PDF
PH inside Generator SC 3-29-19.pdf PDF
Report 1828 PH B104 OVHD Nr 2 PM 5-24-2021.pdf PDF
PH B112 F7P9ZP-PH-BURNER 2-03-21.pdf PDF
Report 1831 PH B102 Outside Generator SC 5-25-2021.pdf PDF
Report 2252 PH B102 Roof Inspection 6-6-2022.pdf PDF
PH-110-K-02 - 2021 Inspection.pdf PDF
Report 645 PH B102 Outside Generator Annual PM 9-6-23.pdf PDF
Report 1680 PH B103 No heat ESC 12-12-20.pdf PDF
Report 1082 PH B102 inside Generator PM 8-22-18.pdf PDF
Report 1851 Anual Extinguisher PMs 4-5-21.pdf PDF
Report 2241 PH B102 Outside Generator PM 5-18-22.pdf PDF
PH B103 Replace Window Glass 20190820.pdf PDF
Report 402 PH B101 HVAC Nr 1 PM 9-17.pdf PDF
Report 2448 PH B104 Annual Heating PM 9-28-22.pdf PDF
Report 1296 PH B102 Inside Generator PM 2-20-20.pdf PDF
PH B110 Boiler Nr 1 PM 9-18.pdf PDF
Report 367 PH B112 FA Install.pdf PDF
Report 1357 PH B103 HVAC PM 6-10-20.pdf PDF
Report 2175 PH B103 Fire Alarm PM 3-9-22.pdf PDF
Report 2047 PH B101 HVAC Air Handler Side A 9-30-21.pdf PDF
Report 658 PH B104 OVHDR eplace Push Button 7-25-18.pdf PDF
Report 645 PH Outside Generator repair SC 6-20-18.pdf PDF
Show 40 more

Latest 50 of 292 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(ATTACH ADDITIONAL SHEETS IF NECESSARY)

YES NO

YES NO

YES NO

MATERIALS USED

MAINTENACE & INSPECTION REPORT

(ONE FOR EACH PIECE OF EQUIPMENT)

WILL MATERIALS NEED TO BE ORDERED? HOW LONG IS THE LEED TIME?

EXPLAIN BELOW

HAVE NOT BEEN MET

(BELOW) FOR ADMINISTRATION USE ONLY

DATE IT WILL BE RECEIVED :

PROPER PPE BEING WORN

YES

CONTRACTOR: TECHNICIANS NAME:

LOCATION WEATHERBUILDING NAME or #

CONTRACTOR/SIGNATURE CCI/ SIGNATURE SITE INSPECTOR/SIGNATURE

CONTRACT # ELIN # REPORT NO.

HAVE BEEN MET

DATE:

General Direct Condition Rating

TYPE OF EQUIPMENT MAKE MODEL

WORK DESCRIPTION & PROBLEMS FOUNDS

TIME TO COMPLETE TASK

IS INSPECTION CHECK LIST ATTACHED?

SAFETY REQUIREMENTS

WAS WORK COMPLETED?

IF NO EXPLAIN BELOW

General Direct Condition Rating Notes ( Explain Conditions found for the Rating given above)

N40085-17-D-7201

NO

HOUSE KEEPING COMPLETE

YES

NO

MAXIMO # Work Order #

Derek McCaslin

From: Barry Prescott <bprescott@deanandallyn.com> Sent: Monday, March 21, 2022 3:24 PM To: Derek McCaslin Subject: Prospect harbor bldg #102 fire alarm svc call

Categories: Red Category

Good afternoon , I was dispatched to prospect harbor for and intermittent fire alarm in building 102 on the CO2 release panel.

Upon arrival I was asked by Ernie why I had responded because the condition did not exist currently. Ernie also stated that he wished that he had been contacted directly before I responded because he could have relayed the information that the condition was not evident currently.

From all on site evidence the condition that has been occurring has been a trouble alarm which sounds a buzzer in the panel not a fire alarm which would sound horn strobes and release the CO2. There is frequently confusion as to which one indicates an emergency and which one indicates a condition that is not critical.

If the fire alarm control panel has a yellow indicator and is only beeping locally at the panel it is not a critical condition.

If the horn strobes are sounding and there is a red indicator in the fire alarm control panel that requires that the panel be reset to return to normal it is a critical condition.

I attempted to confirm where the intermittent problem is by checking terminal screws and jostling the multitude of conductors in the panel. I determined that the problem is a bad solder joint which connects the terminal strip to the motherboard which cannot be repaired. This panel is three decades old and should be replaced as has been recommended for the past several years.

There are approximately 30 pair of conductors in this panel that are marked with a numbering system however a wiring diagram for the system cannot be found. This will complicate the replacement of the fire alarm control panel considerably.

If you would like I can research to see which, if any, currently available fire alarm control panels are compatible with this Kidde CO2 system and provide a quote to replace it.

Thank you

Barry Prescott Special Hazard Manager Dean & Allyn Inc 207‐595‐2226

This email has been scanned for spam and viruses by Proofpoint Essentials. Click here to report this email as spam.

DATE: 3/21/2022
TYPE OF EQUIPMENTRow1: CO2 system release panel
MAKERow1: Firelite
MODELRow1: Sensiscan
TIME TO COMPLETE TASKRow1: 2
CONTRACTOR: Dean & Allyn, Inc.
TECHNICIANS NAME: Barry Prescott
LOCATIONRow1: Prospect Harbor
BUILDING NAME or Row1: #102
WEATHERRow1: Cool/overcast
General Direct Condition RatingRow1: Amber
General Direct Condition Rating Notes Explain Conditions found for the Rating given aboveRow1:
WILL MATERIALS NEED TO BE ORDERED HOW LONG IS THE LEED TIME EXPLAIN BELOW:
MATERIALS USEDRow1:
DATE IT WILL BE RECEIVED:
CCI SIGNATURERow1:
ELIN N4008517D7201: F002AB
REPORT NON4008517D7201: 2173
REPORT NOWork Order:
MAXIMO Row1:
Work Order Row1:
REPORT NORow3:
Text1: Service call to check an intermittent "alarm" on the bldg #102 CO2 release fire alarm panel. Found a bad solder connection between a terminal strip and the control board which indicates that the panel should be replaced as has been recommended for the last several years.
Text2:
Check Box3: Yes
Check Box4: Off
Check Box5: Off
Check Box6: Yes
Check Box7: Off
Check Box8: Yes
Check Box9: Yes
Check Box10: Off
Check Box11: Yes
Check Box12: Off
Check Box13: Yes
Check Box14: Off

File details come from the government source that posted it. Updated .