This document contains a pre-solicitation notice and related service requirements for base operations support at Prospect Harbor Space Force Station in Maine. The Air Force plans to release a solicitation in January 2024 seeking a contractor to operate the government-owned facility on a 100% small business set-aside contract. Services will include physical security, civil engineering, communications systems administration, logistics management, and environmental and safety compliance. The requirement is for a non-personal services contract to manage, operate, maintain, and provide all support services described in the performance work statement. Questions may be directed to the points of contact listed by January 2024, and the Air Force intends to use the Procurement Integrated Enterprise Environment online portal for proposal submission.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(ATTACH ADDITIONAL SHEETS IF NECESSARY)
YES NO
YES NO
YES NO
MATERIALS USED
MAINTENACE & INSPECTION REPORT
(ONE FOR EACH PIECE OF EQUIPMENT)
WILL MATERIALS NEED TO BE ORDERED? HOW LONG IS THE LEED TIME?
EXPLAIN BELOW
HAVE NOT BEEN MET
(BELOW) FOR ADMINISTRATION USE ONLY
DATE IT WILL BE RECEIVED :
PROPER PPE BEING WORN
YES
CONTRACTOR: TECHNICIANS NAME:
LOCATION WEATHERBUILDING NAME or #
CONTRACTOR/SIGNATURE CCI/ SIGNATURE SITE INSPECTOR/SIGNATURE
CONTRACT # ELIN # REPORT NO.
HAVE BEEN MET
DATE:
General Direct Condition Rating
TYPE OF EQUIPMENT MAKE MODEL
WORK DESCRIPTION & PROBLEMS FOUNDS
TIME TO COMPLETE TASK
IS INSPECTION CHECK LIST ATTACHED?
SAFETY REQUIREMENTS
WAS WORK COMPLETED?
IF NO EXPLAIN BELOW
General Direct Condition Rating Notes ( Explain Conditions found for the Rating given above)
N40085-17-D-7201
NO
HOUSE KEEPING COMPLETE
YES
NO
MAXIMO # Work Order #
Derek McCaslin
From: Barry Prescott <bprescott@deanandallyn.com> Sent: Monday, March 21, 2022 3:24 PM To: Derek McCaslin Subject: Prospect harbor bldg #102 fire alarm svc call
Categories: Red Category
Good afternoon , I was dispatched to prospect harbor for and intermittent fire alarm in building 102 on the CO2 release panel.
Upon arrival I was asked by Ernie why I had responded because the condition did not exist currently. Ernie also stated that he wished that he had been contacted directly before I responded because he could have relayed the information that the condition was not evident currently.
From all on site evidence the condition that has been occurring has been a trouble alarm which sounds a buzzer in the panel not a fire alarm which would sound horn strobes and release the CO2. There is frequently confusion as to which one indicates an emergency and which one indicates a condition that is not critical.
If the fire alarm control panel has a yellow indicator and is only beeping locally at the panel it is not a critical condition.
If the horn strobes are sounding and there is a red indicator in the fire alarm control panel that requires that the panel be reset to return to normal it is a critical condition.
I attempted to confirm where the intermittent problem is by checking terminal screws and jostling the multitude of conductors in the panel. I determined that the problem is a bad solder joint which connects the terminal strip to the motherboard which cannot be repaired. This panel is three decades old and should be replaced as has been recommended for the past several years.
There are approximately 30 pair of conductors in this panel that are marked with a numbering system however a wiring diagram for the system cannot be found. This will complicate the replacement of the fire alarm control panel considerably.
If you would like I can research to see which, if any, currently available fire alarm control panels are compatible with this Kidde CO2 system and provide a quote to replace it.
Thank you
Barry Prescott Special Hazard Manager Dean & Allyn Inc 207‐595‐2226
This email has been scanned for spam and viruses by Proofpoint Essentials. Click here to report this email as spam.
| DATE: 3/21/2022 |
| TYPE OF EQUIPMENTRow1: CO2 system release panel |
| MAKERow1: Firelite |
| MODELRow1: Sensiscan |
| TIME TO COMPLETE TASKRow1: 2 |
| CONTRACTOR: Dean & Allyn, Inc. |
| TECHNICIANS NAME: Barry Prescott |
| LOCATIONRow1: Prospect Harbor |
| BUILDING NAME or Row1: #102 |
| WEATHERRow1: Cool/overcast |
| General Direct Condition RatingRow1: Amber |
| General Direct Condition Rating Notes Explain Conditions found for the Rating given aboveRow1: |
| WILL MATERIALS NEED TO BE ORDERED HOW LONG IS THE LEED TIME EXPLAIN BELOW: |
| MATERIALS USEDRow1: |
| DATE IT WILL BE RECEIVED: |
| CCI SIGNATURERow1: |
| ELIN N4008517D7201: F002AB |
| REPORT NON4008517D7201: 2173 |
| REPORT NOWork Order: |
| MAXIMO Row1: |
| Work Order Row1: |
| REPORT NORow3: |
| Text1: Service call to check an intermittent "alarm" on the bldg #102 CO2 release fire alarm panel. Found a bad solder connection between a terminal strip and the control board which indicates that the panel should be replaced as has been recommended for the last several years. |
| Text2: |
| Check Box3: Yes |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Yes |
| Check Box7: Off |
| Check Box8: Yes |
| Check Box9: Yes |
| Check Box10: Off |
| Check Box11: Yes |
| Check Box12: Off |
| Check Box13: Yes |
| Check Box14: Off |