This document contains a backflow prevention assembly test report for a facility at Prospect Harbor Space Force Station and a related pre-solicitation notice for base operations support services at the station.

The test report details inspection and maintenance performed on backflow prevention assemblies at Building 110, including testing of a reduced pressure zone assembly. The notice indicates the Department of the Air Force will release a solicitation in January 2024 for base operations support services at Prospect Harbor Space Force Station as a 100% small business set-aside. Services will include facility operation and maintenance, physical security, civil engineering, communications systems administration, logistics, and environmental and safety compliance. The period of performance will begin upon award through September 2024, at which time the installation is planned to transition from Navy to Space Force responsibility. Offerors are advised to register for the Procurement Integrated Enterprise Environment to submit proposals electronically.

View the file

Other files

File Type Posted
PHSFS_BOS_RFP_Questions_SET_5_20240301.pdf PDF
FA255024R0003_Amend_0002_240301.pdf PDF
FA255024R0003_SF1449_Amend_0002_240301.pdf PDF
Atch_5_FFP_NTE_Task_Pricing_Template_Amend_0002_240229.xlsx XLSX spreadsheet
PHSFS_BOS_RFP_Questions_SET_2_20240226.pdf PDF
PHSFS_BOS_RFP_Questions_SET 4_20240226.pdf PDF
PHSFS_BOS_RFP_Questions_SET 3_20240226.pdf PDF
20240221_PHSFS_BOS_RFP_Questions.pdf PDF
Atch_8_ITO_Amend_0001_20240221.pdf PDF
FA255024R0003_Amend_0001_20240221.pdf PDF
Atch_9_Evaluation_Amend_0001_20240207.pdf PDF
Atch_16_PPQ_20240104.docx DOCX document
PH B104 Heat PM 9-18.pdf PDF
Report 2305 PH B103 OVHD PM 6-14-22.pdf PDF
Report 1844 PH B101 FM200 Fire System PM 4-5-21.pdf PDF
PH-103-K-01 - 2021 Inspection.pdf PDF
Report 259 PH B103 BFP Annual PM 3-28-23.pdf PDF
Report 1847 PH B112 Fire Alarm PM 4-5-21.pdf PDF
Report 1175 PH B105 Heat PM 9-27-19.pdf PDF
Report 1456 PH B110 Fire Alarm PM 6-30-20.pdf PDF
Report 2324 PH B104 Annual Heating PM 9-15-21.pdf PDF
Report 1359 PH B101 HVAC Compressor Nr 2 PM 6-10-20.pdf PDF
Report 2443 PH B101 Annual Heating PM 9-29-22.pdf PDF
PH B101 Boiler PM 10-18.pdf PDF
Report 1855 PH B101 Condenser B HVAC PM 4-20-21.pdf PDF
Report 1845 PH B102 CO2Fire System PM 4-5-21.pdf PDF
Report 1356 PH B101 HVAC Air Handler Nr 2 PM 6-10-20.pdf PDF
Report 2174 PH B102 CO2Fire System Annual PM SC 3-9-22.pdf PDF
PH inside Generator SC 3-29-19.pdf PDF
Report 1828 PH B104 OVHD Nr 2 PM 5-24-2021.pdf PDF
PH B112 F7P9ZP-PH-BURNER 2-03-21.pdf PDF
Report 1831 PH B102 Outside Generator SC 5-25-2021.pdf PDF
Report 2252 PH B102 Roof Inspection 6-6-2022.pdf PDF
PH-110-K-02 - 2021 Inspection.pdf PDF
Report 645 PH B102 Outside Generator Annual PM 9-6-23.pdf PDF
Report 1680 PH B103 No heat ESC 12-12-20.pdf PDF
Report 1082 PH B102 inside Generator PM 8-22-18.pdf PDF
Report 1851 Anual Extinguisher PMs 4-5-21.pdf PDF
Report 2241 PH B102 Outside Generator PM 5-18-22.pdf PDF
PH B103 Replace Window Glass 20190820.pdf PDF
Report 402 PH B101 HVAC Nr 1 PM 9-17.pdf PDF
Report 2448 PH B104 Annual Heating PM 9-28-22.pdf PDF
Report 1296 PH B102 Inside Generator PM 2-20-20.pdf PDF
PH B110 Boiler Nr 1 PM 9-18.pdf PDF
Report 367 PH B112 FA Install.pdf PDF
Report 1357 PH B103 HVAC PM 6-10-20.pdf PDF
Report 2175 PH B103 Fire Alarm PM 3-9-22.pdf PDF
Report 2047 PH B101 HVAC Air Handler Side A 9-30-21.pdf PDF
Report 658 PH B104 OVHDR eplace Push Button 7-25-18.pdf PDF
Report 645 PH Outside Generator repair SC 6-20-18.pdf PDF
Show 40 more

Latest 50 of 292 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1458D002AQ

x

Barry Prescott #135

200000030929Inspection Ref:

Conducted by:

Report of Inspection/Test

Property Owner/Agent

526 Western Ave.

Augusta, ME 04430

CCI Group, LLCUS Navy - Prospect Harbor -

Bldg 110

Light House Point Road

Prospect Harbor, ME

Annual Backflow Prevention Assemblies

Derek McCaslin

(207)620-7172 x111 Print Date: 7/31/2020

06/30/2020

Equipment Summary

Site

Description

Inspected Unable to

Inspect

Serviced

Repaired Failed

%Qty%Qty%Qty%QtyQty

Backflow Prevention Assemblies Valve

RPZ (Reduced Pressure) 1 1 0 0100.0% 0.0% 0.0% 0 0.0%

Print Date: 7/31/2020 Copyright 2002-2020 Life Safety Inspector, OnSite Software

Backflow Prevention Assembly

Test and Maintenance Report

Property Owner/Agent US Navy - Prospect Harbor - Bldg 110

Light House Point Road

Prospect Harbor, ME

CCI Group, LLC

Property Access Derek McCaslin

(207)620-7172 x111

Owner/Agent Contact

June 30, 2020

526 Western Ave.

Augusta, ME 04430 Water Company

Date of InstallDevice Manufacturer Model Serial No.Size Type

Gauge Manufacturer Purchase DateModel Serial No.

909M1Watts 4335451-1/4" New Install ?

Type

Location of Assembly Service Type-Class-Use

Next Date DueDate Calibrated

Meter/Acct #

Alarm Company Phone Reference Date/Time OnDate/Time Off

RPZ

CV Assembly

______psi ______psi

CHECK VALVE #1 CHECK VALVE #2

PRESSURE VACUUM

Leaked

R E

P A

IR

S

IN

IT

IA

L

T E

S T

F

IN

A L

T E

S T

Closed tight

Pressure drop across check valve

Closed tight

Leaked

Cleaned

Rubber Kit Disc

Opened at:

Did not open Did not open

Air inlet opened:

REPLACED

O-Ring Seat

Spring

Stem/Guide

Retainer

Locknuts

Other

Cleaned

Rubber Kit Disc

REPLACED

O-Ring Seat

Spring

Stem/Guide

Retainer

Locknuts

Other

Cleaned

Rubber Kit Disc

REPLACED

Diaphragm Seat

Spring Guide

O-Ring

Other

Cleaned

Air Inlet Disc

Inlet Spring

REPLACED

Diaphragm

CV Disc

Spring

Guide

Retainer

O-Ring

Other

Closed Tight Closed Tight

Opened at:

Satisfactory

Check held at:

OR OR OR

CV Assembly RV Assembly

Pressure drop across check valve

Pressure drop across check valve

Pressure drop across check valve

X X

LINE PRESSURE:CONTROL VALVE #2:RESULTS OF TEST: LeakedTight

DIFFERENTIAL PRESSURE

Leaked

FailPass

RELIEF VALVE BREAKER

_______psi

______psi ______psi ______psi

______psi ______psi

______psi

6.9 1.3 2.4

I ACKNOWLEDGE THE CONTROL

VALVES HAVE BEEN LEFT IN THE

OPEN POSITION

Witness to Assembly Test (Print) Witness to Assembly Test Signature Date

APPROVALS

INITIAL

TEST

Certified Tester (Print) Certified Tester # Exp. DateCertified Tester Signature

Exp. DateCertified Tester #

FINAL

TEST

Barry Prescott #135

Barry Prescott #135

Date

DateCertified Tester (Print) Certified Tester Signature

I CERTIFY THAT THIS DATA IS ACCURATE AND RELECTS THE PROPER OPERATION AND MAINTENANCE OF THE ASSEMBLY

1990NEWWA 6/30/2020

6/30/20201990NEWWA

Print Date: 7/31/2020 Copyright 2002-2020 Life Safety Inspector, OnSite Software