Report 1173 PH B103 Heat PM 9-27-19.pdf

PDF 2 MB Posted

Attached to
Prospect Harbor Space Force Station (SFS) Base Operations Support (BOS)
Solicitation number
FA255024R0003
Issued by

About this file

This document contains a federal contract opportunity notice and related technical file. The notice is for base operations support services at Prospect Harbor Space Force Station in Maine. Key details include:

  • The solicitation is expected to be released in January 2024 for base operations and logistics services at a government-owned, contractor-operated facility. Services include physical security, civil engineering, communications systems administration, logistics management, and environmental compliance.

  • The procurement is a 100% small business set-aside and will use a tradeoff best value selection process. The government plans to release the solicitation through the Procurement Integrated Enterprise Environment module, requiring offerors to register and submit proposals through this system.

  • The technical file appears to contain inspection records and condition ratings for heating system components. It provides definitions for various condition ratings ranging from fully sustained to total degradation. No procurement-related information is included.

View the file

Other files

File Type Posted
PHSFS_BOS_RFP_Questions_SET_5_20240301.pdf PDF
FA255024R0003_Amend_0002_240301.pdf PDF
FA255024R0003_SF1449_Amend_0002_240301.pdf PDF
Atch_5_FFP_NTE_Task_Pricing_Template_Amend_0002_240229.xlsx XLSX spreadsheet
PHSFS_BOS_RFP_Questions_SET_2_20240226.pdf PDF
PHSFS_BOS_RFP_Questions_SET 4_20240226.pdf PDF
PHSFS_BOS_RFP_Questions_SET 3_20240226.pdf PDF
20240221_PHSFS_BOS_RFP_Questions.pdf PDF
Atch_8_ITO_Amend_0001_20240221.pdf PDF
FA255024R0003_Amend_0001_20240221.pdf PDF
Atch_9_Evaluation_Amend_0001_20240207.pdf PDF
Atch_16_PPQ_20240104.docx DOCX document
PH B104 Heat PM 9-18.pdf PDF
Report 2305 PH B103 OVHD PM 6-14-22.pdf PDF
Report 1844 PH B101 FM200 Fire System PM 4-5-21.pdf PDF
PH-103-K-01 - 2021 Inspection.pdf PDF
Report 259 PH B103 BFP Annual PM 3-28-23.pdf PDF
Report 1847 PH B112 Fire Alarm PM 4-5-21.pdf PDF
Report 1175 PH B105 Heat PM 9-27-19.pdf PDF
Report 1456 PH B110 Fire Alarm PM 6-30-20.pdf PDF
Report 2324 PH B104 Annual Heating PM 9-15-21.pdf PDF
Report 1359 PH B101 HVAC Compressor Nr 2 PM 6-10-20.pdf PDF
Report 2443 PH B101 Annual Heating PM 9-29-22.pdf PDF
PH B101 Boiler PM 10-18.pdf PDF
Report 1855 PH B101 Condenser B HVAC PM 4-20-21.pdf PDF
Report 1845 PH B102 CO2Fire System PM 4-5-21.pdf PDF
Report 1356 PH B101 HVAC Air Handler Nr 2 PM 6-10-20.pdf PDF
Report 2174 PH B102 CO2Fire System Annual PM SC 3-9-22.pdf PDF
PH inside Generator SC 3-29-19.pdf PDF
Report 1828 PH B104 OVHD Nr 2 PM 5-24-2021.pdf PDF
PH B112 F7P9ZP-PH-BURNER 2-03-21.pdf PDF
Report 1831 PH B102 Outside Generator SC 5-25-2021.pdf PDF
Report 2252 PH B102 Roof Inspection 6-6-2022.pdf PDF
PH-110-K-02 - 2021 Inspection.pdf PDF
Report 645 PH B102 Outside Generator Annual PM 9-6-23.pdf PDF
Report 1680 PH B103 No heat ESC 12-12-20.pdf PDF
Report 1082 PH B102 inside Generator PM 8-22-18.pdf PDF
Report 1851 Anual Extinguisher PMs 4-5-21.pdf PDF
Report 2241 PH B102 Outside Generator PM 5-18-22.pdf PDF
PH B103 Replace Window Glass 20190820.pdf PDF
Report 402 PH B101 HVAC Nr 1 PM 9-17.pdf PDF
Report 2448 PH B104 Annual Heating PM 9-28-22.pdf PDF
Report 1296 PH B102 Inside Generator PM 2-20-20.pdf PDF
PH B110 Boiler Nr 1 PM 9-18.pdf PDF
Report 367 PH B112 FA Install.pdf PDF
Report 1357 PH B103 HVAC PM 6-10-20.pdf PDF
Report 2175 PH B103 Fire Alarm PM 3-9-22.pdf PDF
Report 2047 PH B101 HVAC Air Handler Side A 9-30-21.pdf PDF
Report 658 PH B104 OVHDR eplace Push Button 7-25-18.pdf PDF
Report 645 PH Outside Generator repair SC 6-20-18.pdf PDF
Show 40 more

Latest 50 of 292 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TYPEOFEQUIPMENT �MAKE �MODとし �TIMETOCOMPしETETASK

蒐ブラ%を透見← �胴長ノ獲病 �′/(ぐんひ �一 /-

CO NTRACTOR: Gatcomb PIumbing and TECHNiCIAN's NAME:

LOCAT看ON �l BU’器MEORNUMB輔 l

」ノ巧打か盆ブ‾4玉名〆 /

CONTRACTORSIGNATURE �CCiSIGNATURE �SiTEINSPECTORSIGNATURE

EしIN ♯

dmccaslin Rectangle dmccaslin Typewritten Text x dmccaslin Typewritten Text #1173

6atcomb P山mbi噂& Heating lnc.

P.0. Bo米539 East Maohias, ME O4630

230eUS Rl, 1 W両種g, M己O4691

BST. 1983

-∴臆 -ヽ」 臆 臆∴一--臆臆〇一 一〇青・一一 ‾‾一書

しice∩sed M種s鳴「§

0飾ce 207-259・2029

‡磁Job封a-ne娩二二C二一掌疫立幼子 B抽定規B。剛。de-:左辺仁立冬“∴恥〇°e-・軸No:

言‡腔誓言霊宝宝器遠宏を Before Test After Test聖戦叢

Sm0ke

Gross Stack Temp

_土工_____」1_

一五箆」_ 」二進遼_

N。t Sta。k T。調。 俊一_____遡_---- ・・

B「eech Dl・紙

Ov針矩e Dra允

EFFICてらNCY

W額tcr T崩請p _

Do調e§七ic櫨ot W軸e「 By

Oil T弧k __加古_雄.. ______. _..__

Boile丁piping「臆∴ =臆_ _

Fuel Pu調p Nしmb針_____

Fu合l Filくer N皿lbel・

Air Fり針Si乙e

良師ICほNCY膝POR丁

A〃 GENERALDIRECTCONDIT10NRATINGGUIDAN第タイ場完.#L,

′ `プ

Ra備n蜜 �SRMNeeds �RatingDe鯖nition

Green(十) �ustainmentcollSistingof �EntirecomponenトSectio11OrCOmPOnent-SeCtionsamplefreeof

POSSiblepreventivemai11tellanCe (Whereapplicable). �ObservableorknO¥Vndistress.

G富een �Sし1Stainmentconsistingof �Nocomponent-SeCtionorsamplese「viceabilityγorreliab吊ity“

POSSiblepreventivemai賞ltenanCe �reduction.Some.butnotall,minor(non-Critical)subcomponentsmay

(Whereapplicable)andminor �Su飾erfromslightdegradationQIfewmむor(critical)sし庇omponents repai「s(cor「ectivemaintenance) topossiblyfeworsome �maysu締計舟oms!ightdeg「adation.

Green(-) ��Slightor-1OSerViceabilityorl・eliab硝tyreductionoveralltothe

Subcomponents. �COmPOnentSmaySしIfferfromminordeg「adationormorethanOne malor(critical)subcompone1置tmaySu能rfromslightdegradation.

Ambe「(十) �Sustainmentorrestorationtoany �Component-SeCtiono「sampleserviceabilityorre]iabilityisdegraded, Ofthefo=owing: �butadequate.Averyfew,m勾Or(critical)subcomponel〕tSmaySuifer

Minorl‘ePairstoseveral �frommoderatedeterioratio11Withperhapsafewminol・(non-Critical)

Subcomponents;Or Significantrepair,「ehab岨atjon, �Subcomponentssu節eringfromseve「edeterioratjon.

Ambel・ ��Component-SeCtionorsamplesel・viceab冊yo廿eliabilityisdefinitely

OrrePlacementofoneormore �impaired.Some,butnotamajority,m勾Ol・(critical)subcomponents

Subcomponents,butnotenoしIgh �maysu節erfrommoderatedeteriorationwithperhapsmanymino一・ toencompassthe∞mPOnellt- Sectionasawhole;Or �(non-C「itical)subcomponentssu節ering舟omseveredeterio「ation.

Amber(-) ��Compone一一トSeCtiono「samplehassjgnifroantserviceabilityo「

C‘ombinationsthe「eof �reliabilityloss.Mostsubcomponentsmaysu熊汁frommoderate degl‘adationgrafewm年ior(C「jtical)subcomponentsmaysu鯖e∫舟om

SeVeredegradation.

Red(十) �Sustainmentorrestoration �Sign誼cantse「viceabilityorreliability「edllCtjolli-1COmPOnent-SeCtion requiredconsistingofn垂io「 �OrSamPle.Am砧orityofsubcomponents餌esevereiydegradedand repair,rchabilitation,Or replacementtothecomponent- �Othersmayhavevaryingdegreesofdegradation"

Red ��Severeserviceabilityor「eliability「ed`lCtiontothecomponent-SeCtion

SeCtionasawhoIe. �OrSamPlesuchthati自sbarelyab!etoperform.Mostsubcomponents aresevere!ydeg「aded.

Rcd(・) ��Overa=componerIt-SeCtiondegradationistotal.Few言fany, Subcomponentssalvageable.Completelossofcomponent-SeCtionor

SamPleserviceability.

Attachment J-J 502000-08 Page l

File details come from the government source that posted it. Updated .