Task Assignment Summary
This is a Task Assignment (TA) document for contract HW684 between the State of Florida Department of Environmental Protection (FDEP) and GHD Services, Inc. The TA authorizes operations and maintenance (O&M) work at the Weavers Cleaners site located at 711 N Pine Hills Road in Orange County, Orlando, Florida. The task assignment is identified as DC028D with a completion date of April 30, 2027. The Department Project Manager is Mackenzie Childs (850-245-8929), and the Contractor's Project Manager is Brian Moore (813-971-3882). The underlying contract number is HW684, and the project is designated as ERIC_5008.
The scope of work encompasses twelve months of operations and maintenance activities from January 2026 through December 2026, including five subtasks: Project Management (13% of direct labor costs), O&M with semi-annual summary (January-June 2026), utilities for six months, O&M with annual Remedial Action Status Report (July-December 2026), and utilities for the second six-month period. The contract utilizes a combination of fixed unit rates ($35,208.01) and cost reimbursement ($11,400.00) for a total task value of $46,608.01. The cost estimate includes direct labor ($9,916.52), overhead (79%), general and administrative costs (36%), fringe benefits (37.1%), travel ($1,320.00), utility subcontractor costs ($11,880.00), laboratory analytical services ($4,440.50), and field expenses ($1,468.00). Invoice milestones are scheduled for August 7, 2026 ($12,770.17); September 25, 2026 ($5,940.00); February 11, 2027 ($21,957.84); and February 26, 2027 ($5,940.00), with FDEP review and approval required before payment authorization.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number) Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW684
DC028D Completion April 30, 2027
This Task Assignment authorizes GHD Services, Inc to conduct O&M at Weavers Cleaners.
Mackenzie Childs 850-245-8929 Contractor GHD Services, Inc. Contractor
Contractor Brian Moore Contractor 813-971-3882
ERIC_5008
711 N Pine Hills Rd, Orange County, Orlando, FL 32808
Weavers Cleaners
Contractor Contractor
✔ $ 35,208.01 ✔ $ 11,400.00
$ 46,608.01
Scope of Work
GHD Services, Inc.
Contractor
Brian Moore Digitally signed by Brian Moore Date: 2026.01.29 13:02:10 -05'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2026.01.28 16:25:42 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 2: O&M (Semi-Annual Summary) 08/07/2026
Subtask 3: Utilities 09/25/2026
Subtasks 1 & 4: O&M (RASR) + Project Management 02/11/2027
Subtask 5: Utilities 02/26/2027
Subtask 2: FDEP review and approval of Semi-Annual Summary $ 12,770.17
Subtask 3: FDEP review and approval of paid utilities $ 5,940.00
Subtasks 1 & 4: FDEP review and approval of RASR + Project Management $ 21,957.84
Subtask 5: FDEP review and approval of paid utilities $ 5,940.00
$ 46,608.01
HW684
DC028D
TO: HW684 Contract File
Mackenzie Childs, Project Manager
ERIC_
FROM:
DATE:
SUBJECT:
This Task Assignment authorizes GHD Services, Inc., hereby referred to as GHD, to , Florida (FL). Erwin Remediation (Erwin) was selected as the lowest responsive and responsible bidder. Specific subtasks are detailed below:
Subtask 1: Project Management Project Management is calculated at 13% of the direct labor.
Subtask 2:
FD
EP
C O
ST
E
ST
IM
A
TE
C on tra ct or
G H
D S er vi ce s
In c.
D at e:
1/
/2
Ta sk
D C
8E
S ub Ta sk
P ro je ct
M an ag em en t
S ub
Ta sk
S ite
W ea ve rs C le an er s
Ta sk
O
M m on th s
S ub
Ta sk
A ct iv ity
/P ha se
O
M
Ta sk
U til iti es m on th s S ub Ta sk
P ro je ct
M an ag er
B ria n
M oo re , P
E
Ta sk
S ub Ta sk
S ub
Ta sk
S ub Ta sk
TTo ta ls
La bo r
R at e C at eg or y
$5 3.
PP
ro je ct M an ag er
JM
.3
.3
$0
.0
P rin ci pa l E ng in ee r/S ci en tis t 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
Te ch ni ca l D ire ct or
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$6 0.
S r P ro fe ss io na l E ng in ee r
JH
4.
2.
0.
2.
0.
0.
0.
0.
0.
0.
$0 .0
S en io r P ro je ct
M an ag er
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$4 3.
P ro fe ss io na l E ng in ee r/S c E
S 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
P ro je ct
E ng in ee r/S ci en tis t C
H 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$5
3.
P ro je ct
M an ag er
/ E ng in ee
JM
.0
.5
0.
.5
0.
0.
0.
0.
0.
0.
$3 4.
S ta ff
E ng in ee r/S ci en tis t
JW
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$4 1.
D at a
A na ly st
JL
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$4
6.
Fi el d M an ag er O
T 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$2
9.
S en io r T ec hn ic ia n S
A
2.
.0
0.
.5
0.
0.
0.
0.
0.
0.
$3 4.
S en io r T ec hn ic ia n
W M
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$2 8.
S en io r T ec hn ic ia n
D H
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$2 4.
Ju ni or
T ec hn ic ia n
W O
.5
.0
0.
.5
0.
0.
0.
0.
0.
0.
$2
3.
Ju ni or T ec hn ic ia n
JB
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$2 3.
D ra fti ng T ec hn ic ia n K
J 7.
0.
0.
7.
0.
0.
0.
0.
0.
0.
$2
2.
Ad m in is tra tiv e As si st an t
JJ
.0
6.
0.
8.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
To ta l H ou rs
9.
.3
5.
0.
3.
0.
0.
0.
0.
0.
0.
D ire ct L ab or
$9
,9
.5
$1 ,1
.8
$3
,6
.2
$0 .0
$5
,1
.4
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
O ve rh ea d
.0 0%
$7 ,8
.0
$9
.2
$2
,8
.3
$0 .0
$4
,0
.4
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
G en
A dm in
.0
0% $3
,5
.9
$4
.7
$1 ,3
.0
$0
.0
$1 ,8
.2
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fr in ge
.1
0% $3
,6
.0
$4
.2
$1 ,3
.1
$0
.0
$1 ,9
.6
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l L ab or
$2
4, 9.
$2 ,8
.0
$9
,1
.7
$0 .0
$1
2, 8.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
RE
V:
9/
CE
F
GH
D
Pa ge
FD
EP
C O
ST
E
ST
IM
A
TE
C on tra ct or
G H
D S er vi ce s
In c.
D at e:
1/
/2
Ta sk
D C
8E
S ub
Ta sk
P ro je ct M an ag em en t S ub Ta sk
S ite
W ea ve rs C le an er s
S ub
Ta sk
O
M m on th s S ub Ta sk
A ct iv ity
/P ha se
O
M S ub Ta sk
U til iti es m on th s
S ub
Ta sk
P ro je ct
M an ag er
B ria n
M oo re , P
E S ub Ta sk
S ub
Ta sk
S ub
Ta sk
S ub Ta sk
T To ta ls
TTr av el
V eh ic le
$1 ,3
.0
$6
.0
$0
.0
$7
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ile ag e
C os ts $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
A ir Fa re $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M ea ls
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
H ot el $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l T ra ve l $$1
,3
.0
$6
.0
$0 .0
$7
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
(E qu ip m en t P ro cu re m en t)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P ro cu re m en t F ee
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l S ub co nt ra ct or C os t
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (S er vi ce s
P ro cu re m en
t) D ril lin g (C on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
D ril lin g
(N on
-c on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M ob ile
L ab or at or y
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ur ve yi ng $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
ID
W $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
U til iti es $1
1, 0.
$0 .0
$5
,7
.0
$0 .0
$5
,7
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
U til ity
L oc at io n $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $1
1, 0.
$0 .0
$5
,7
.0
$0 .0
$5
,7
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
H an dl in g
Fe e
$4
.0
$0 .0
$2
.0
$0
.0
$2
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l S ub co nt ra ct or
C os t $1
1, 0.
$0 .0
$5
,9
.0
$0 .0
$5
,9
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
La bo ra to ry
A na ly tic al C os ts
$3 ,2
.0
$1
,1
.0
$0 .0
$2
,1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fa st
T ur na ro un d
C ha rg es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S am pl e
S hi pp in g $1
,1
.5
$5
.0
$0 .0
$6
.5
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l L ab or at or y $4
,4
.5
$1 ,6
.0
$0
.0
$2 ,7
.5
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fi el d
E xp en se s P er so na l P ro te ct io n $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E xp en da bl es $4
.0
$2
.0
$0
.0
$2
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
D ril lin g re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
A na ly tic al re la te
d) $6
.0
$0
.0
$0 .0
$6
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t (
ID
W re la te
d) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( O th er
$3
.0
$1
.0
$0
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l F ie ld E xp en se s
$1 ,4
.0
$3
.0
$0
.0
$1 ,0
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub to ta l $4
4, 8.
$2 ,8
.0
$1
1, 0.
$5 ,9
.0
$1
7, 1.
$5 ,9
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
C om pl et io n
Fe e
$2 ,4
.9
$2
.6
$9
.4
$0
.0
$1 ,2
.8
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l E st im at ed C os t
$4 6, 8.
$3
,1
.6
$1 2, 0.
$5
,9
.0
$1 8, 4.
$5
,9
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
C os t f ro m P rio r C
E F:
M an ua l E nt ry
C os t f ro m D el ta
C E
F;
M an ua l E nt ry C os t (
P rio r + D el ta
$0
.0
A ut o- C al cu la te d R ou nd in g
E rr or
$4 6, 8.
A ut o-
C al cu la te d
Fi na l T ot al C os t:
$4 6, 8.
A ut o-
C al cu la te d
RE
V:
9/
CE
F
GH
D
Pa ge
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Weavers Cleaners SUBTASK 2: O&M 6 months
DATE: 1/16/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr Professional Engineer JH Conclusions/Recommendations for semi-annual summary 2 2.0
Project Manager JM Prepare field scope of work for monthly O&M (0.25 hr/month) 1.5 Project Manager JM Site Access for O&M 1 Project Manager JM Analyze monthly influent/effluent and field operational data to ensure design criteria are met (0.25 hrs/mo 1.5 Project Manager JM Present field O&M results in semi-annual summary 2 Project Manager JM Present influent/effluent groundwater in semi-annual summary 2 Project Manager JM Operations and Maintenance details/troubleshooting/run time in semi-annual summary 2 Project Manager JM Laboratory Data Validation 2 Project Manager JM Conclusions/Recommendations in semi-annual summary 1.5 Project Manager JM Prepare Monthly Sanitary Discharge Reports semi-annual (2 hours per report) 12
25.5
Senior Technician SA Mob/Demob (6 days) 24 Senior Technician SA Monthly O&M (6 months) 30
Junior Technician WO Mob/demob (2 days) 8 Junior Technician WO Clean Air Stripper (2 days) 10
Staff Assistants JJ Data Entry (12 samples for O&M) 3 Staff Assistants JJ Summary tables (O&M analytical data) 2 Staff Assistants JJ Document publishing/generate pdf 1
TOTAL LABOR 105.5
VEHICLE TYPE RATE UNIT USEAGE
Company Truck $120.00 day 1 $120.00 Company Truck $480.00 week 1 $480.00
TOTAL VEHICLE $600.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
EPA 8260 monthly inf/eff (12) $73.00 12 $876.00 EPA 8260 Annual groundwater montioring $73.00 0 $0.00 PP Metals Annual eff discharge $247.00 0 $0.00
Manganese Quarterly eff discharge $13.50 2 $27.00 Cyanide Annual eff discharge $40.00 0 $0.00
Total Phenols Annual eff discharge $35.00 0 $0.00 pH Quarterly eff discharge $10.00 1 $10.00
TDS Annual eff discharge $16.00 0 $0.00 TSS Quarterly eff discharge $16.00 2 $32.00
Total Phosphorus Quarterly eff discharge $27.00 2 $54.00 TKN Quarterly eff discharge $31.00 2 $62.00 BOD Quarterly eff discharge $29.00 2 $58.00 chloride Annual eff discharge $24.00 0 $0.00 Oil & Grease Annual eff discharge $53.00 0 $0.00 sample shipping (next day) large cooler $150.00 2 $300.00 sample shipping (two Day) small cooler $52.00 4 $208.00 ice $6.50 6 $39.00
TOTAL LAB $1,666.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 6 $240.00
Construction/O&M Supplies $75.00 day 2 $150.00
TOTAL EQUIPMENT $390.00
FINAL --7/24/96
SUBTASK 3: Utilities - 6 months
DATE: 1/16/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
TOTAL LABOR 0.0
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
OUC Electrical $350.00 month 6 $2,100.00 Handling Fee $20.00 month 6 $120.00
Orange County Sanitary Discharge $600.00 month 6 $3,600.00 Handling Fee $20.00 month 6 $120.00
TOTAL $5,940.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day $0.00
Construction/O&M Supplies $75.00 day $0.00
TOTAL EQUIPMENT $0.00
SUBTASK 4: O&M 6 months
DATE: 1/16/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr Professional Engineer JH Conclusions/Recommendations for RASR 2 2.0
Project Manager JM Prepare field scope of work for monthly O&M (0.25 hr/month) 1.5 Project Manager JM Prepare field scope for gw sampling 1 Project Manager JM Site Access for sampling and O&M 1 Project Manager JM Analyze monthly influent/effluent and field operational data to ensure design criteria are met (0.2 1.5 Project Manager JM Summarize field O&M results in RASR 2 Project Manager JM Summarize influent/effluent groundwater and vapor results in RASR 2 Project Manager JM Operations and Maintenance details/troubleshooting/run time in RASR 1.5 Project Manager JM Groundwater Sampling Methods and wells sampled in RASR 1 Project Manager JM Groundwater elevation summary (shallow/intermediate/deep) in RASR 2.5 Project Manager JM Groundwater field parameter summary and evaluation in RASR 1.5 Project Manager JM Groundwater analytical results summary (shallow-int, int-deep) in RASR 3 Project Manager JM Laboratory Data Validation 2.5 Project Manager JM Conclusions/Recommendations in RASR 1.5 Project Manager JM Prepare Monthly Sanitary Discharge Reports (2 hours per report) 12
34.5
Senior Technician SA Mob/Demob (7 days) 28 Senior Technician SA Monthly O&M (6 months) 30 Senior Technician SA Water levels (all wells) 3 Senior Technician SA Groundwater Sampling (5 wells) 7.5
68.5
Junior Technician WO Mob/demob (3 days) 12 Junior Technician WO Clean Air Stripper (2 visits) 10 Junior Technician WO Water levels (all wells) 3 Junior Technician WO Groundwater Sampling (5 wells) 7.5
32.5
Drafting Technician KJ Prepare GW Flow Figures (shallow, intermediate, and deep) 4.5 Drafting Technician KJ Prepare GW VOH Maps (shallow-int and int-deep) 3
7.5
Staff Assistants JJ Data Entry (12 samples for O&M, 10 monitor well samples) 3 Staff Assistants JJ Summary tables (O&M, elevation, gw parameters, analytical data) 3 Staff Assistants JJ Document publishing/generate pdf 2
TOTAL LABOR 153.0
VEHICLE TYPE RATE UNIT USEAGE
Company Truck $120.00 day 2 $240.00 Company Truck $480.00 week 1 $480.00
TOTAL VEHICLE $720.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
EPA 8260 monthly inf/eff (12) $73.00 12 $876.00 EPA 8260 Annual groundwater montioring $73.00 10 $730.00 PP Metals Annual eff discharge $247.00 1 $247.00
Manganese Quarterly eff discharge $13.50 2 $27.00 Cyanide Annual eff discharge $40.00 1 $40.00
Total Phenols Annual eff discharge $35.00 1 $35.00 pH Quarterly eff discharge $10.00 1 $10.00
TDS Annual eff discharge $16.00 1 $16.00 TSS Quarterly eff discharge $16.00 2 $32.00
Total Phosphorus Quarterly eff discharge $27.00 0 $0.00 TKN Quarterly eff discharge $31.00 0 $0.00 BOD Quarterly eff discharge $29.00 2 $58.00 chloride Annual eff discharge $24.00 1 $24.00 Oil & Grease Annual eff discharge $53.00 1 $53.00
Sulfate Annual eff discharge $21.00 1 $21.00 sample shipping (next day) large cooler $150.00 2 $300.00 sample shipping (two Day) small cooler $52.00 5 $260.00
Ice $6.50 7 $45.50
TOTAL LAB $2,774.50
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 6 $240.00
Groundwater Sampling Kit $290.00 Day 2 $580.00 HDPE Tubing $0.30 ft 260 $78.00 silicone tubing $3.00 ft 10 $30.00
Construction/O&M Supplies $75.00 day 2 $150.00
TOTAL EQUIPMENT $1,078.00
SUBTASK 5: Utilities - 6 months
DATE: 1/16/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
TOTAL LABOR 0.0
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
OUC Electrical $350.00 month 6 $2,100.00 Handling Fee $20.00 month 6 $120.00
Orange County Sanitary Discharge $600.00 month 6 $3,600.00 Handling Fee $20.00 month 6 $120.00
TOTAL $5,940.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day $0.00
Construction/O&M Supplies $75.00 day $0.00
TOTAL EQUIPMENT $0.00
COST PROPOSAL FOR TASK DC028D
<Weavers Cleaner, ERIC_5008>
< Operations & Maintenance (Twelve Months)> (January 2026 through December 2026)
1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >
A Remedial Action Plan (RAP) was submitted in December 2009 for the Weavers Cleaners facility that was approved by the Department. The current task assignment includes costs associated with twelve (12) months of O&M.
Task DC028E includes twelve additional months of Operations and Maintenance (O&M) from January 2026 through December 2026, for the existing groundwater recovery system. The SVE system is currently offline and restart has not been recommended. The task includes regular O&M visits and annual groundwater sampling. O&M will include monthly site visits, monthly influent and effluent water sampling, and annual groundwater sampling. During monthly O&M site visits, the remedial system operation will be verified and performance monitoring will be conducted. Performance monitoring will include determining and adjusting operating conditions to maximize mass recovery.
The previous Semi-Annual Summary Report was submitted in July 2025. To date, no technical comments have been provided by the Department. As such, continued O&M in accordance with GHD recommendations is proposed.
Subtask 1: Project Management Subtask 1 includes all tasks associated with management of the O&M, groundwater sampling, and reporting for twelve (12) months.
Subtask 2: O&M – 6 months with semi-annual summary
Subtask 2 includes O&M activities from January 2026 through June 2026. During subtask 2, monthly O&M site visits will be conducted. Monthly site visits will include flow balancing, influent and effluent groundwater sampling, and groundwater recovery optimization.
Quarterly air stripper cleaning will also be conducted. During quarterly site visits, discharge sampling will also be conducted. Discharge sampling is required by Orange County on a quarterly basis for various parameters as part of the discharge permit. Orange County also required monthly reporting of flow and any analytical data. Following the June 2026 site visit, a semi-annual summary report will be prepared and submitted to the Department with recommendations for additional remedial operations.
Sampling Summary Monthly – Influent and effluent for groundwater system (8260 – VOHs) IWW Discharge (per Permit)
Annual Various parameters per permit Quarterly Flow, pH, BOD, Manganese, TKN, Phosphorus, TSS, TTO
Monthly Flow
Subtask 3: Utilities (January 2026 through June 2026) Subtask 3 includes utility (electric, POTW) discharges for six months. Based on previous usage, monthly invoices are estimated at $350 (electric) and $600 (POTW discharge)
Subtask 4: O&M – 6 months with RASR
Subtask 4 includes O&M activities from July 2026 through December 2026. During subtask 4, monthly O&M site visits will be conducted. Monthly site visits will include flow balancing, influent and effluent groundwater sampling, and groundwater recovery optimization.
Quarterly air stripper cleaning will also be conducted. In late October 2025, annual groundwater sampling will be conducted. Groundwater samples will be collected from monitoring wells MW003, MW011, MW012, MW014, MW015, MW017, MW019, MW024, MW025, and OW011. Groundwater samples will be analyzed for the presence of volatile organic compounds. During quarterly site visits, discharge sampling will also be conducted.
Discharge sampling is required by Orange County on a quarterly basis for various parameters as part of the discharge permit. Orange County also required monthly reporting of flow and any analytical data. Following the December 2026 site visit, an annual Remedial Action Status Report (RASR) will be prepared and submitted to the Department with recommendations for additional remedial operations.
Sampling Summary Monthly – Influent and effluent for groundwater system (8260 – VOHs) Annual GW sampling – MW003, 11, 12, 14, 15, 17, 19, 24, 25, and OW011 (8260 – VOHs) IWW Discharge (per Permit)
Quarterly Flow, pH, BOD, Manganese, TKN, Phosphorus, TSS, TTO Monthly Flow
Subtask 5: Utilities (July 2026 through December 2026) Subtask 5 includes utility (electric, POTW) discharges for six months. Based on previous usage, monthly invoices are estimated at $350 (electric) and $600 (POTW discharge)
Deliverables:
Deliverable Deliverable Due Date
Completion of O&M (January 2026 to June 2026) and approval of Semi-Annual Summary Report 8/7/26
Paid Utility Invoices (January 2026 to June 2026) 9/25/26
Completion of O&M (July 2026 through December 2026) and approval of the Remedial Action Status Report 2/11/27
Paid Utility Invoices (July 2026 through December 2026) 2/26/27