CN-370000-HW684-BIL2DCO2.pdf
PDF 2 MB Posted
- Contract number
- HW684
- Issued by
- Florida
About this file
This document package consists of a Task Assignment Change Order (TACO) Number 2 and supporting materials for Contract HW684 between the State of Florida Department of Environmental Protection (FDEP) and GHD Services, Inc. The contract pertains to environmental assessment activities at the Former Polk County Fertilizer site (Site ID: ERIC_13343). The TACO was executed on November 12, 2024, and amends the original Task Assignment BIL02D to settle a Work Change Directive (WCD) authorizing additional testing and to extend the project completion date.
The task assignment involves targeted brownfield site assessment activities including soil and groundwater assessment, site assessment reporting, and specialized SPLP (Synthetic Precipitation Leaching Procedure) testing. The amended total task value increased from $41,735.09 to $41,992.54, representing a net increase of $257.45. This increase resulted from a $4,020.00 cost addition for SPLP testing of 20 samples due to dieldrin leachability-based SCTL exceedances, offset by cost reductions in project management, soil assessment labor and equipment, totaling $3,762.55. The completion date was extended from November 15, 2024, to January 10, 2025 (56 additional days). Invoice payments are structured in three tranches: $27,238.73 for analytical data and field notes, $10,733.81 for project management and site assessment report addendum, and $4,020.00 for additional analytical work from supplemental fieldwork, totaling $41,992.54.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
BIL02D 2 HW684
This Task Assignment Change Order (TACO) settles the Work Change Directive for SPLP testing and extends the Task Assignment completion date, per the TACO request from GHD received on October 22, 2024..
Megan Johnson 850.245.8994 GHD Services, Inc.
Brian Moore 813.971.3882
ERIC_13343
Former Polk County Fertilizer
$ 41,992.54 $ 41,735.09
$ 41,992.54 $ 41,735.09
11/15/2024 01/10/2025 56
1 1 1
GHD Services, Inc.
Brian Moore, P.E.
Vice President
Brian Moore Digitally signed by Brian Moore Date: 2024.11.12 16:20:46 -05'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2024.11.12 13:51:18 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: GHD Services Inc. HW684 Contract File
FROM: Megan Johnson, Contract Manager
DATE: November 12, 2024
SUBJECT: Negotiation Summary – BIL22, Change Order #2 - TA BIL02D C2 Former Polk County Fertilizer - Site ID # ERIC_13343 Targeted Brownfield Site Assessment Activities
This Task Assignment Change Order (TACO) settles the WCD authorizing SPLP testing and extends the Task Assignment completion date. Specific changes are detailed below:
Subtask 1: Project Management The decrease in overall task hours produced a change associated with Project Management. This change resulted in a cost actual decrease of ($186.89).
Subtask 2: Soil Assessment There was a decrease in labor hours needed to perform this subtask, which also resulted in a decrease in vehicle usage. There was also a reduction in laboratory and equipment costs. This change resulted in a cost actual decrease of ($3,575.66).
Subtask 3: Site Assessment Report Addendum There are no changes in scope or cost associated with this Subtask.
Subtask 4: SPLP Sampling Due to dieldrin leachability-based SCTL exceedances, a Work Change Directive was authorized for SPLP testing of 20 samples. This change resulted in a cost actual increase of $4,020.00.
Summary The Department’s BIL Contract Manager and GHD’s Contract Manager have both agreed to the above changes. All changes noted above represent a total overall cost increase of $257.45, as shown in the Cost Actual LOE. The changes were noted in the TACO Request received from GHD on October 22, 2024. The final cost associated with this TA increased from $41,735.09 to $41,992.54. Documentation of the changes is included in the attached TACO Request, the Delta LOE spreadsheet and the Cost Actual LOE spreadsheet, and the TACO form for BIL02D C2, prepared by the Department.
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Former Polk County Fertilizer SUBTASK 2: Soil & Groundwater Assessment
DATE: 11/12/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager JM Contact Property Owner 4 Project Manager JM Field Work Preparation 4 Project Manager JM Evaluate Data and Determine need for additional SPLP analysis 6 Project Manager JM Data Summary 8
Sr Technician WM Mob/demob (7 days) 10 Sr Technician WM Locate/measure soil borings 4 Sr Technician WM Soil Borings (72 total - 1 hr per boring) 64
Sr Technician SA Mob/demob (7 days) 10 Sr Technician SA Locate/measure soil borings 4 Sr Technician SA Soil Borings (72 total - 1 hr per boring) 64
TOTAL LABOR 178
VEHICLE TYPE RATE UNIT USEAGE
WM Company Truck $480.00 week 1 $480.00 WM Company Truck $120.00 day 0 $0.00 SA Company Truck $480.00 week 1 $480.00 SA Company Truck $120.00 day 0 $0.00
TOTAL VEHICLE $960.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
OCPs Soil EPA 8081 $105.00 71 $7,455.00 PAHs Soil EPA 8270 SIM $110.00 18 $1,980.00 Nitrate SM4500 $23.00 0 $0.00 Sample Shipping - soil overnight - large cooler $150.00 5 $750.00 Ice $6.50 5 $32.50
TOTAL LAB $10,217.50
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 6 $240.00
Soil Assessment Kit $700.00 week 1 $700.00 Soil Assessment Kit $175.00 day 0 $0.00
GPS (Trimble) $700.00 week 1 $700.00 GPS (Trimble) $175.00 day 0 $0.00
TOTAL EQUIPMENT $1,640.00
FINAL --7/24/96
SUBTASK 3: Site Assessment Report Addendum
DATE: 11/12/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr. Professional Engineer JH Conclusion and Recommendations 4
Project Manager JM Background Summary for Pok Fertilizer (SARA) 6 Project Manager JM Soil Sampling Methods (SARA) 6 Project Manager JM Soil Sampling Results (SARA) 6 Project Manager JM Dieldrin Delineation 4 Project Manager JM PAH Delineation 4 Project Manager JM Groundwater Sampling Methods (SARA) 4 Project Manager JM Laboratory Data Validation (soil) 4 Project Manager JM Conclusions and Recommendations 4
Drafting Technician PM Soil Analytical Results Figures 6 Drafting Technician PM Groundwater Flow Figure 2 Drafting Technician PM Groundwater Analytical Results Figure 2
Administrative Assistant JJ Data Entry (49 borings and 8 wells) 6 Administrative Assistant JJ Summary Tables (soil, groundwater) 3 Administrative Assistant JJ Finalize SARA (pdf) 3
TOTAL LABOR 64
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
SUBTASK 4: WCD#1
DATE: 11/12/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
OCPs SPLP extraction $48.00 20 $960.00 OCPs - leachate EPA 8081 $105.00 20 $2,100.00
Rush Extraction $48.00 20 $960.00
TOTAL LAB $4,020.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
SUBTASK 2: Soil & Groundwater Assessment
DATE: 11/12/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager JM Contact Property Owner 0 Project Manager JM Field Work Preparation 0 Project Manager JM Evaluate Data and Determine need for additional SPLP analysis 0 Project Manager JM Data Summary 0
Sr Technician WM Mob/demob (7 days) -2 Sr Technician WM Locate/measure soil borings 0 Sr Technician WM Soil Borings (72 total - 1 hr per boring) -8
-10
Sr Technician SA Mob/demob (7 days) -2 Sr Technician SA Locate/measure soil borings 0 Sr Technician SA Soil Borings (72 total - 1 hr per boring) -8
-10
TOTAL LABOR -20
VEHICLE TYPE RATE UNIT USEAGE
WM Company Truck $480.00 week 0 $0.00 WM Company Truck $120.00 day -1 ($120.00) SA Company Truck $480.00 week 0 $0.00 SA Company Truck $120.00 day -1 ($120.00)
TOTAL VEHICLE ($240.00)
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
OCPs Soil EPA 8081 $105.00 0 $0.00 PAHs Soil EPA 8270 SIM $110.00 -2 ($220.00) Nitrate SM4500 $23.00 -56 ($1,288.00) Sample Shipping - soil overnight - large cooler $150.00 0 $0.00 Ice $6.50 0 $0.00
TOTAL LAB ($1,508.00)
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day -1 ($40.00)
Soil Assessment Kit $700.00 week 0 $0.00 Soil Assessment Kit $175.00 day -1 ($175.00)
GPS (Trimble) $700.00 week 0 $0.00 GPS (Trimble) $175.00 day -1 ($175.00)
TOTAL EQUIPMENT ($390.00)
SUBTASK 4: WCD#1
DATE: 11/12/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
OCPs SPLP extraction $48.00 20 $960.00 OCPs - leachate EPA 8081 $105.00 20 $2,100.00
Rush Extraction $48.00 20 $960.00
TOTAL LAB $4,020.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
SUBTASK 2: Soil & Groundwater Assessment
DATE: 11/12/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager JM Contact Property Owner 4 Project Manager JM Field Work Preparation 4 Project Manager JM Evaluate Data and Determine need for additional SPLP analysis 6 Project Manager JM Data Summary 8
Sr Technician WM Mob/demob (7 days) 12 Sr Technician WM Locate/measure soil borings 4 Sr Technician WM Soil Borings (72 total - 1 hr per boring) 72
Sr Technician SA Mob/demob (7 days) 12 Sr Technician SA Locate/measure soil borings 4 Sr Technician SA Soil Borings (72 total - 1 hr per boring) 72
TOTAL LABOR 198
VEHICLE TYPE RATE UNIT USEAGE
WM Company Truck $480.00 week 1 $480.00 WM Company Truck $120.00 day 1 $120.00 SA Company Truck $480.00 week 1 $480.00 SA Company Truck $120.00 day 1 $120.00
TOTAL VEHICLE $1,200.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
OCPs Soil EPA 8081 $105.00 71 $7,455.00 PAHs Soil EPA 8270 SIM $110.00 20 $2,200.00 Nitrate SM4500 $23.00 56 $1,288.00 Sample Shipping - soil overnight - large cooler $150.00 5 $750.00 Ice $6.50 5 $32.50
TOTAL LAB $11,725.50
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 7 $280.00
Soil Assessment Kit $700.00 week 1 $700.00 Soil Assessment Kit $175.00 day 1 $175.00
GPS (Trimble) $700.00 week 1 $700.00 GPS (Trimble) $175.00 day 1 $175.00
TOTAL EQUIPMENT $2,030.00
SUBTASK 3: Site Assessment Report Addendum
DATE: 11/12/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr. Professional Engineer JH Conclusion and Recommendations 4
Project Manager JM Background Summary for Pok Fertilizer (SARA) 6 Project Manager JM Soil Sampling Methods (SARA) 6 Project Manager JM Soil Sampling Results (SARA) 6 Project Manager JM Dieldrin Delineation 4 Project Manager JM PAH Delineation 4 Project Manager JM Groundwater Sampling Methods (SARA) 4 Project Manager JM Laboratory Data Validation (soil) 4 Project Manager JM Conclusions and Recommendations 4
Drafting Technician PM Soil Analytical Results Figures 6 Drafting Technician PM Groundwater Flow Figure 2 Drafting Technician PM Groundwater Analytical Results Figure 2
Administrative Assistant JJ Data Entry (49 borings and 8 wells) 6 Administrative Assistant JJ Summary Tables (soil, groundwater) 3 Administrative Assistant JJ Finalize SARA (pdf) 3
TOTAL LABOR 64
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Site Name: Site ID #:
Contract #: Contractor:
� Reason for Work Change Directive :
� Description of Work Change Directive :
� Attachments (if applicable, list documents supporting change):
� Costs (if negotiated unit costs, provide information below):
WCP WCD 07-2018
Authorized Contractor Signature:
Authorized FDEP Signature:
WORK CHANGE DIRECTIVE FORM
FDEP Supervisor Approval:
(if applicable)
Additional work is not authorized without prior FDEP approval as indicated by an approved Work Change Directive Form or Task Assignment Change Order Form. It is the Contractor's responsibility to ensure that additional costs associated with this WCD are resolved by a Task Assignment Change Order (TACO) prior to the completion date of the original Task Assignment or subsequent TACOs completed prior to the execution date of this WCD. Failure to do so will result in a loss of reimbursement for work associated with this WCD.
Task Assignment #: Work Change Directive #:
Maximum Estimated Increase in Task Amount:
Former Polk County Fertilizer ERIC_9970
HW684 GHD Services Inc.
BIL02D 1
dieldrin leachabilty-based SCTL exceedances
SPLP Testing
20 SPLP analysis ($45 extraction and $105 analysis of leachate) Rush extraction for 20 samples
$ 4,300.00
Brian Moore Digitally signed by Brian Moore Date: 2024.09.30 11:42:26 -04'00'
Megan R. Johnson Digitally signed by Megan R.
Johnson Date: 2024.09.30 11:59:22 -04'00'
Scott L Sweeney
Digitally signed by Scott L Sweeney Date: 2024.09.30 12:56:17 -04'00'
From: Brian Moore To: Johnson, Megan R Subject: RE: former Polk County Fertilizer Date: Tuesday, October 22, 2024 3:14:17 PM Attachments: image001.png image002.png image003.png image004.png image005.png TA_002D WCD#1.xlsx TA_002D final CO1.xlsx TA_002D Delta CO1.xlsx TA_002D.xlsx
EXTERNAL MESSAGE
This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.
Megan, A proposed change order is attached for consideration, which rectifies WCD#1 and adjust labor/expenses in subtask 2
Thank you
BRIAN MOORE PE
GHD
Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA
O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com
The Power of Commitment
Connect
Please consider our environment before printing this email
From: Johnson, Megan R <Megan.R.Johnson@FloridaDEP.gov> Sent: Monday, September 30, 2024 2:13 PM To: Brian Moore <Brian.Moore@ghd.com> Cc: Cross, Justin L. <Justin.L.Cross@FloridaDEP.gov>; Sweeney, Scott L <Scott.L.Sweeney@dep.state.fl.us> Subject: RE: former Polk County Fertilizer
Hi Brian, Attached is the DEP signed WCD#1 for the Polk County Fertilizer site. Let me know if you have any questions.
Thanks, Megan
From: Brian Moore <Brian.Moore@ghd.com> Sent: Monday, September 30, 2024 11:43 AM
To: Johnson, Megan R <Megan.R.Johnson@FloridaDEP.gov> Subject: RE: former Polk County Fertilizer
EXTERNAL MESSAGE
This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.
I revised WCD#1 to include both, thank you
BRIAN MOORE PE
GHD
Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA
O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com
The Power of Commitment
Connect
Please consider our environment before printing this email
From: Johnson, Megan R <Megan.R.Johnson@FloridaDEP.gov> Sent: Monday, September 30, 2024 11:33 AM To: Brian Moore <Brian.Moore@ghd.com> Subject: RE: former Polk County Fertilizer
Hi Brian, I received a WCD#1 on Saturday, this one is labeled as WCD#2. Are these two separate WCDs? Can we combine them into one, if so?
Thanks, Megan
From: Brian Moore <Brian.Moore@ghd.com> Sent: Monday, September 30, 2024 10:22 AM To: Johnson, Megan R <Megan.R.Johnson@FloridaDEP.gov> Subject: former Polk County Fertilizer
EXTERNAL MESSAGE
This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.
Megan, Please see attached proposed WCD for Polk County Fertilizer for some additional SPLP analysis for consideration.
Thank you
BRIAN MOORE PE
GHD
Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA
O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com
The Power of Commitment
Connect
Please consider our environment before printing this email
CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.
Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department�s Project Manager: Department�s Project Manager Phone:
Contractor Name: (Contractor ) ntractor�st �s Project Manager: ontractor�s t�s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
BIL02D 1 HW684
The Department approves this Task Assignment Change Order (TACO) for changes to the TA Completion date.
Allison Hankins 850 245 8990 Contractor GHD Services, Inc. Contractor
Contractor Brian Moore Contractor 813 971 3882
ERIC_13343
Former Polk County Fertilizer
$ 41,735.09 $ 41,735.09
$ 41,735.09 $ 41,735.09
Completion Completion 09/30/2024 11/15/2024 46
1 1 1
GHD Services, Inc.
Contractor
Brian Moore
Vice President
Brian Moore Digitally signed by Brian Moore Date: 2024.07.11 16:52:14 -04'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2024.07.10 14:15:17 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW684
BIL02D
$ 41,735.09
Soil Data and Field Notes
Site Assessment Report Addendum
DEP approval of Soil Data and Field Notes
DEP approval of Site Assessment Report Addendum
09/18/2024
10/17/2024
$ 10,920.70
$ 30,814.39
File details come from the government source that posted it. Updated .