CN-370000-HW682-DC25ACO1.pdf

PDF 1021 KB Posted

Attached to
Master Agreement FL|HW682|8fccc28dda898687f0dd3c309f3a996b
Contract number
HW682
Issued by
Florida

About this file

This document is a Task Assignment (TA) Change Order issued by the State of Florida Department of Environmental Protection (FDEP) to Environmental Consulting and Technology, Inc. (ECT) for environmental assessment services at Custom Care Cleaners in Gainesville, Alachua County, Florida. The change order, designated as TACO 1 to Task Assignment DC025A under Contract HW682, was executed on March 6, 2025, and is signed by Teresa Booeshaghi, Secretary or Designee for FDEP, and Mark A. Culbreth, Contract Manager for ECT. The project manager for FDEP is Karlee Fowler.

The change order reconciles a cost reduction of $932.16 caused by a decrease in travel hours required for Subtask 2 activities, reducing the total task assignment value from $146,592.36 to $145,660.20 with 274 total labor hours. The scope encompasses seven subtasks: project management and site assessment report preparation; hazardous substance and utility clearance; soil sampling with direct push technology and groundwater sampling including lithologic boring, soil samples, and groundwater samples; well installation and groundwater sampling; multi-increment gas sampling; professional land survey; and site assessment report preparation. Deliverables are due between January 31, 2025, and December 5, 2025, with invoice payments triggered upon FDEP approval of each deliverable. The task assignment completion date is extended from November 21, 2025, to March 6, 2026, representing an additional 105 days.

View the file

Other files

File Type Posted
CN-370000-GC914-T9CO2 (1).pdf PDF
CN-370000-HW682-DC001B.pdf PDF
CN-370000-HW682-DC001F.pdf PDF
CN-370000-HW682-DC002A.pdf PDF
CN-370000-HW682-DC005A.pdf PDF
CN-370000-HW682-DC005B.pdf PDF
CN-370000-HW682-DC007B.pdf PDF
CN-370000-HW682-DC008B.pdf PDF
CN-370000-HW682-DC008D.pdf PDF
CN-370000-HW682-DC010A.pdf PDF
CN-370000-HW682-DC013A.pdf PDF
CN-370000-HW682-DC014B.pdf PDF
CN-370000-HW682-DC015B.pdf PDF
CN-370000-HW682-DC016C.pdf PDF
CN-370000-HW682-DC019A.pdf PDF
CN-370000-HW682-DC01FCO1.pdf PDF
CN-370000-HW682-DC024A.pdf PDF
CN-370000-HW682-DC025A.pdf PDF
CN-370000-HW682-DC026A.pdf PDF
CN-370000-HW682-DC028A.pdf PDF
CN-370000-HW682-DC029A.pdf PDF
CN-370000-HW682-DC02ACO1.pdf PDF
CN-370000-HW682-DC04BCO7.pdf PDF
CN-370000-HW682-DC07BCO1.pdf PDF
CN-370000-HW682-DC07CC01.pdf PDF
CN-370000-HW682-DC08BCO2.pdf PDF
CN-370000-HW682-DC08CCO1.pdf PDF
CN-370000-HW682-DC09ACO1.pdf PDF
CN-370000-HW682-DC09ACO5.pdf PDF
CN-370000-HW682-DC09ACO6.pdf PDF
CN-370000-HW682-DC10BCO3.pdf PDF
CN-370000-HW682-DC11AC13.pdf PDF
CN-370000-HW682-DC11ACO1.pdf PDF
CN-370000-HW682-DC11ACO3.pdf PDF
CN-370000-HW682-DC13BCO3.pdf PDF
CN-370000-HW682-DC13BCO4.pdf PDF
CN-370000-HW682-DC14BCO1.pdf PDF
CN-370000-HW682-DC14BCO2.pdf PDF
CN-370000-HW682-DC16ACO1.pdf PDF
CN-370000-HW682-DC16ACO3.pdf PDF
CN-370000-HW682-DC18BCO1.pdf PDF
CN-370000-HW682-DC21ACO3.pdf PDF
CN-370000-HW682-DC21BCO2.pdf PDF
CN-370000-HW682-FIL5.pdf PDF
CN-370000-HW682-HW002A.pdf PDF
CN-370000-HW682-HW009B.pdf PDF
CN-370000-HW682-HW014A.pdf PDF
CN-370000-GC914-T9CO2.pdf PDF
CN-370000-GC914.pdf PDF
CN-370000-HW682-DC001A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

DC025A 1 HW682

This change order reconciles a cost decrease caused by a decrease in hours needed to travel to the site for Subtask 2 activities.

Karlee Fowler 850-245-8944 Contractor Environmental Consulting and Technology, Inc. (ECT) Contractor

Contractor Mark A. Culbreth Contractor 813-289-9338

ERIC_3980

Custom Care Cleaners

✔ $ 145,660.20 $ 146,592.36

$ 145,660.20 $ 146,592.36 Completion

Completion 11/21/2025 03/06/2026 105

✔ 1 1 1

Environmental Consulting & Technology, Inc.

Contractor Mark A. Culbreth

Contract Manager

3/6/2025

Digitally signed by Mark Culbreth Date: 2025.03.06 16:09:54-05'00'Mark Culbreth

Teresa Booeshaghi

Teresa Booeshaghi Digitally signed by Teresa Booeshaghi Date: 2025.03.06 08:44:11 -05'00'

3/6/2025

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW682

DC025A

$ 145,660.20

Email Deliverable for GPR & Field Notes (Subtask 2)

Email Deliverable for DPT, Soil Field Notes, & IDW Manifest (Subtask 3)

Email Deliverable for Well Install, Field Notes, Well Permits, and IDW Manifest (Subtask 4)

Email Deliverable for MAGS (Subtask 5)

PLS (Subtask 6)

Project Management, Site Assessment Report (Subtask 1 & 7)

FDEP Approval of Email Deliverable for GPR & Field Notes (Subtask 2)

FDEP Approval of Email Deliverable for Well Install, Field Notes, Well Permits, and IDW Manifest (Subtask 4)

FDEP Approval of Email Deliverable for MAGS (Subtask 5)

FDEP Approval of Project Management, Site Assessment Report (Subtask 1 & 7)

FDEP Approval of PLS (Subtask 6)

FDEP Approval of Email Deliverable for DPT, Soil Field Notes, & IDW Manifest (Subtask 3)

01/31/2025

05/16/2025

07/25/2025

10/03/2025

12/05/2025

10/03/2025

$ 51,369.64

$ 2,981.07

$ 67,193.54

$ 5,642.49

$ 5,208.18

$ 13,265.28

Printed on recycled paper.

FFLORIDAA DEPARTMENTT OF

EEnvironmentall Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ronn DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawnn Hamilton Secretary

From:

Date:

To: HW Contract Negotiation File

ERIC_

, Project Manager

Subject: Negotiation Summary

HW

This Task Assignment is $ with labor hours.

FD

EP

C O

ST

E

ST

IM

A

TE

C on tra ct or

E nv iro nm en ta l C on su lti ng

T ec hn ol og y, In c.

D at e:

2/

/2

Ta sk

S ub Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

P ro fe ss io na l L an d

S ur ve y

S ite

C us to m C ar e

C le an er s

Ta sk

H

A S

P

U til ity C le ar an ce

S ub

Ta sk

S

A R

P re pa ra tio n

A ct iv ity

/P ha se

In iti al S ite A ss es sm en t ( O rig in al

T A

C O

S ub

Ta sk

S oi l S am pl in g w ith

D P

T

G ro un dw at er

S am pl in g S ub Ta sk

P ro je ct

M an ag er

M ar k

C ul br et h

Ta sk

W el l I ns ta lla tio n

G ro un dw at er

S am pl in g S ub Ta sk

S ub

Ta sk

M

A G

S S ub Ta sk

T To ta ls

La bo r R at e

C at eg or y $8

4.

PP

ro je ct

M an ag

.7

.7 $8

4.

Se ni or P rin ci pa l S ci en tis t (

M C

7.

0.

2.

$5

4.

Se ni or E ng in ee r /

S ci en tis t ( R

P)

.0 0.

0.

0.

$5 5.

Se ni or

E ng in ee r / S ci en tis t (

D P)

4.

.0

.0

.0

$2 8.

G

IS

A na lys t / G ra ph ic s

(J V)

.0

0.

$2

4.

As so ci at e En gi ne er

Sc ie nt ist

(J P)

.0

.0

$2

3.

Te ch ni ci an (M

W

.0

$3 4.

Ad m in ist ra tiv e

(B J)

.0

To ta l H ou rs

3.

.7

.5

.5

.0

.0

D ire ct L ab or

$1

3, 1.

$1 ,5

.4

$6

.0

$3

,6

.0

$3 ,7

.2

$9

.2

$2

.4

$2

,8

.8

O ve rh ea d

5.

$1

7, 0.

$1 ,9

.4

$8

.8

$4

,6

.6

$4 ,6

.2

$1

,2

.2

$3

.3

$3 ,5

.5

G en

A dm in 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge

.4 0%

$6 ,4

.1

$7

.6

$3

.7

$1

,7

.0

$1 ,7

.2

$4

.1

$1

.7

$1

,3

.4

To ta l L

$3 7, 0.

$4

,3

.5

$1 ,7

.6

$1

0, 2.

$1 0, 7.

$2

,6

.6

$6

.5

$7 ,7

.7

Tr av el V eh ic le R en ta l $1

,6

.0

$1

.0

$4

.0

$7

.0

$2

.0

$1

.0

$0 .0

P er d ie m

H ot el

$2 ,2

.0

$0

.0

$7

.0

$1 ,0

.0

$4

.0

$0

.0

$0 .0

To ta l T ra ve l $3

,9

.0

$1

.0

$1 ,2

.0

$1

,7

.0

$6

.0

$1

.0

$0 .0

S ub co nt ra ct or

(E qu ip m en t P ro cu re m en t) co nt ra ct or

S ub to ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P ro cu re m en t F ee

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or (S er vi ce s

P ro cu re m ril lin g

(C on ve nt io na

l) $5

6, 6.

$0 .0

$1

7, 1.

$3 9, 5.

$0

.0

$0 .0

$0

.0

S ur ve yi ng $3

,9

.7

$0 .0

$0

.0

$0 .0

$0

.0

$3 ,9

.7

$0

.0

ID

W

$4 ,9

.0

$0

.0

$8

.0

$4 ,1

.0

$0

.0

$0 .0

$0

.0

G P

R $8

.0

$8

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$6 6, 7.

$8

.0

$1

7, 6.

$4 4, 0.

$0

.0

$3 ,9

.7

$0

.0

H an dl in g Fe e $6

,6

.7

$8 0.

$1

,7

.6

$4 ,4

.0

$0

.0

$3

.1

$0 .0

To ta l S ub co nt ra ct or

C os t $7

3, 2.

$8

.0

$1 9, 9.

$4

8, 0.

$0 .0

$4

,3

.9

$0 .0

La bo ra to ry

A na ly tic al

C os ts $2

1, 8.

$0 .0

$1

7, 6.

$2 ,7

.0

$1

,2

.0

$0 .0

$0

.0

S am pl e

S hi pp in g $8

.0

$0

.0

$3

.0

$3

.0

$1

.0

$0 .0

$0

.0

To ta l L ab or at or y

$2 1, 8.

$0

.0

$1 7, 6.

$3

,0

.0

$1 ,3

.0

$0

.0

$0 .0

Fi el d

E xp en se

E xp en da bl es

$5

.0

$4 0.

$2

.0

$2

.0

$4

0.

$4 0.

$0

.0

So il A ss es sm en t K it

$7

.0

$0 .0

$7

.0

$0

.0

$0 .0

$0

.0

$0 .0

M on ito rin g w el l I ns ta ll K it $1

,9

.0

$0 .0

$6

.0

$1

,3

.0

$0 .0

$0

.0

$0 .0

Sh al lo w G ro un dw at er S am pl in g

Ki t

$8

.0

$0 .0

$2

.0

$5

.0

$0

.0

$0 .0

$0

.0

Ic e

$9 1.

$0

.0

$6 5.

$2

6.

$0 .0

$0

.0

$0 .0

To ta l S ur ve y St at io n $1

.0

$0

.0

$5 0.

$5

0.

$0 .0

$0

.0

$0 .0

D ee p

G ro un dw at er

S am pl in g Ki t $4

.0

$0

.0

$0 .0

$4

.0

$0

.0

$0 .0

$0

.0

M

AG

S Ki t $5

.0

$0

.0

$0 .0

$0

.0

$5

.0

$0 .0

$0

.0

Ai r S am pl in g

C an ist er s $2

.0

$0

.0

$0 .0

$7

0.

$1

.0

$0 .0

$0

.0

To ta l F ie ld E xp en se s

$5 ,4

.0

$4

0.

$1 ,9

.0

$2

,6

.0

$7

.0

$4 0.

$0

.0

S ub to ta l $1

,9

.1

$4

,3

.5

$2 ,8

.6

$5

0, 3.

$6 6, 2.

$5

,3

.6

$5 ,1

.4

$7

,7

.7

C om pl et io n

Fe e

$3 ,7

.0

$4

.1

$1

.4

$1

,0

.2

$1 ,0

.7

$2

.8

$6

7.

$7

.7

To ta l E st im at ed C os t

$1

,6

.2

$4 ,7

.7

$2

,9

.0

$5 1, 9.

$6

7, 3.

$5 ,6

.4

$5

,2

.1

$8 ,5

.5

Pa ge

SITE : Custom Care Cleaners SUBTASK 3: Soil Sampling with DPT & Groundwater Sampling

DATE: 2/11/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

M. Culbreth Senior Principal SPLP evaluation 1

Scientist Develop conceptual site model based on review of lithologic data and water levels 1.5 Total Hours 2.5

D Phillips Senior Scientist Round trip Mobilization from Orlando to the site in Gainesville 6 Soil Borings and DPT Sampling 50 DTW measurements & grab groundwater sampling at 5 wells 4 Characterization of waste to profile soil & water IDW drums for transportation and disposal 1 Work with Erwin Remediation to have IDW picked up, transported, and disposed of. 1

Total Hours 62 B. Jarvis Administrative Create tables and data entry 2

Total Hours 2

TOTAL LABOR 66.5

VEHICLE TYPE RATE UNIT USAGE

Rental Truck $480.00 week 1 $480.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USAGE

Hotel D Phillips $150.00 day 4 $600.00 Per Diem D Phillips $36.00 day 5 $180.00

TOTAL PER DIEM $780.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Groundwater Protection DPT Soil & Groundwater Sampling $17,011.00 1 $17,011.00 Erwin Remediation IDW T&D Soil $150.00 3 $450.00 Erwin Remediation IDW T&D Water $125.00 3 $375.00

TOTAL $17,836.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC UNITS

USEPA Method 8260 Full list Soil SBs $110.00 72 $7,920.00 SPLP Extractions $45.00 24 $1,080.00 USEPA Method 8260 for Full list Groundwater DPT $110.00 30 $3,300.00 USEPA Method 8260 Full list Grab samples from 5 MW $110.00 5 $550.00 USEPA Method 8260 for SPLP $110.00 24 $2,640.00 Encore Samplers $16.00 72 $1,152.00 IDW USEPA Method 8260 for Full list Soil $110.00 2 $220.00 IDW Encore Samplers $16.00 2 $32.00 IDW USEPA Method 6020 or 6010 for RCRA 4 Metals $56.00 2 $112.00 IDW USEPA Method 8260 for Full list Purge water $110.00 1 $110.00 Shipping Samples $70.00 5 $350.00

TOTAL LAB $17,466.00

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

Expendables $40.00 Day 5 $200.00 Soil Assessment Kit $700.00 Week 1 $700.00 Monitoring well Install Kit $325.00 Day 2 $650.00 Shallow Groundwater Sampling Kit $290.00 Day 1 $290.00 Ice $6.50 each 10 $65.00 Total Survey Station $50.00 day 1 $50.00

TOTAL EQUIPMENT $1,955.00

SUBTASK 4: Well Installation & Groundwater Sampling

DATE: 2/11/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D Phillips Senior Scientist Round trip Mobilization from Orlando to the site in Gainesville 6 Oversight of well installation 50

Characterization of waste to profile soil & water IDW drums for transportation and disposal 1 Work with Erwin Remediation to have IDW picked up, transported, and disposed of. 1

Total Hours 58 J. Penia 4

DTW measurement & Sampling Wells (9 shallow, 4 intermediate & 1 deep), containerize water 16 Total Hours 20

B. Jarvis Administrative Create tables and data entry 2

Total Hours 2

TOTAL LABOR 80

VEHICLE TYPE RATE UNIT USAGE

Rental Truck DP $480.00 week 1 $480.00 Rental Truck JP $120.00 day 2 $240.00

TOTAL VEHICLE $720.00

PER DIEM STAFF RATE UNIT USAGE

Hotel D Phillips $150.00 day 4 $600.00 Per Diem D Phillips $36.00 day 5 $180.00

Hotel J. Penia $150.00 day 1 $150.00 Per Diem J. Penia $36.00 day 2 $72.00

TOTAL PER DIEM $1,002.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNITS

Preferred Drilling Solutions Well install 1 $39,975.00 Erwin Remediation IDW T&D Soil $150.00 20 $3,000.00 Erwin Remediation IDW T&D Water $125.00 9 $1,125.00

TOTAL $44,100.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC Units IDW USEPA Method 8260 for Full list Soil $110.00 6 $660.00 IDW Encore Samplers $16.00 6 $96.00 IDW USEPA Method 6020 or 6010 for RCRA 4 Metals $56.00 6 $336.00 IDW USEPA Method 8260 for Full list Purge water $110.00 1 $110.00 USEPA Method 8260 Full list samples from MW's $110.00 14 $1,540.00 Shipping Samples $70.00 5 $350.00

TOTAL LAB $3,092.00

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

Expendables $40.00 Day 5 $200.00 Monitoring well Install Kit $1,300.00 Week 1 $1,300.00 Shallow Groundwater Sampling Kit $290.00 Day 2 $580.00 Ice $6.50 each 4 $26.00 Total Survey Station $50.00 day 1 $50.00 Deep Groundwater Sampling Kit $415.00 Day 1 $415.00 Generator $70.00 Day 1 $70.00

TOTAL EQUIPMENT $2,641.00

$39,975.00

Associate Scientist

Round trip Mobilization from Tampa to the site in Gainesville

SUBTASK 5: MAGS

DATE: 2/11/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

R. Powell Senior Engineer P.E. oversight of MGAS events (Provide SOW, guidance, and answer field question) 3 Check MAGS data. 3

Total Hours 6 J. Penia Round trip Mobilization from Tampa to the site in Gainesville 4

Perform MAGS Testing 8 Total Hours 12

M. Wiss Technician Round trip Mobilization from Jacksonville to the site in Ocala 4 Perform MAGS Testing 8

Total Hours 12 B. Jarvis Administrative Update tables 2

Total 2

TOTAL LABOR 32

VEHICLE TYPE RATE UNIT USAGE

Rental Truck J. Penia $120.00 day 2 $240.00 Rental Truck B. Carrick $120.00 day 2 $240.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USAGE

Hotel J. Penia $150.00 day 1 $150.00 Per Diem J. Penia $36.00 day 2 $72.00

Hotel M. Wiss $150.00 day 1 $150.00 Per Diem M. Wiss $36.00 day 2 $72.00

TOTAL PER DIEM $444.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC Units

USEPA Method TO-15 for VOHs $200.00 6 $1,200.00 Sampling Shipping Overnight $70.00 2 $140.00

TOTAL LAB $1,340.00

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

Expendables $40.00 Day 1 $40.00 MAGS Kit $500.00 Day 1 $500.00 Air Sampling Canisters $33.00 Day 6 $198.00

TOTAL EQUIPMENT $738.00

Associate Scientist

SUBTASK 6: Professional Land Survey

DATE: 2/11/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D. Phillips Senior Scientist Coordinate and schedule with Surveyor 1 Total Hours 1

J. Penia Technician Round trip Mobilize from Tampa to the site in Gainesville 4 PLS Oversight and aid in location of wells 4

Total Hours 8

TOTAL LABOR 9

VEHICLE TYPE RATE UNIT USAGE

Rental Truck J. Penia $120.00 day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Southeastern Professional Land Survey $3,911.75 1 $3,911.75

TOTAL $3,911.75

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

Expendables $40.00 Event 1 $40.00

TOTAL EQUIPMENT $40.00

SUBTASK 7: SAR Preparation

DATE: 2/11/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

M. Culbreth Senior Principal Develop conclusions, recommendations, and prepare final Assessment Report 4 Scientist

Total 4 R. Powell Senior Engineer Prepare the draft SAR MAGS section 6

Total 6 D. Phillips Senior Scientist Prepare draft SAR lithological section, create draft figures to be submitted for AutoCAD generatio 30

QA/QC of analytical data 2

J. Von Borstel GIS Analyst Revise and Update Figures 10 Total 10

B. Jarvis Administrative Update tables, Document Preparation & Publishing 4 Total 4

TOTAL LABOR 56

VEHICLE TYPE RATE UNIT USAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

TOTAL EQUIPMENT $0.00

C O

ST

E

ST

IM

A

TE

C on tra ct or

E nv iro nm en ta l C on su lti ng

T ec hn ol og y, 2/

/2

Ta sk

S ub

Ta sk

P ro je ct M an ag em en t S ub Ta sk

P ro fe ss io na l L an d S ur ve y

S ite

C us to m C ar e

C le an er s S ub Ta sk

H A

S P

U til ity

C le ar an ce S ub Ta sk

S A

R P re pa ra tio n

A ct iv ity

/P ha se

In iti al S ite A ss es sm en t (

TA

C O

D el ta

S ub Ta sk

S oi l S am pl in g w ith D

P T

G ro un dw at er S am pl in g

S ub

Ta sk

P ro je ct

M an ag er

M ar k

C ul br et h S ub Ta sk

W el l I ns ta lla tio n

G ro un dw at er S am pl in g

S ub

Ta sk

S ub

Ta sk

M

A G

S S ub Ta sk

T To ta ls

La bo r R at e

C at eg or y $8

4.

P P ro je ct

M an

-0

.4 -0

.4 $8

4.

Se ni or P rin ci pa l S ci en tis t (

M C

0.

0.

0.

$5

4.

Se ni or E ng in ee r /

S ci en tis t ( R

P) 0.

0.

0.

0.

$5 5.

Se ni or

E ng in ee r / S ci en tis t (

D P)

-5 .0

-5 .0

0.

0.

$2

8.

G

IS

A na lys t /

G ra ph ic s (J

V) 0.

0.

$2 4.

As so ci at e

En gi ne er

Sc ie nt ist (J

P) 0.

0.

$2 3.

Te ch ni ci an

(M W

0.

$3

4.

Ad m in ist ra tiv e (B

J) 0.

To ta l H ou rs

-5 .4

-0 .4

-5 .0

0.

0.

0.

D ire ct L

0.

.7 5)

5.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

O ve rh ea d

5.

9.

.7 9)

4.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

G en

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fr in ge

.4

0%

7.

.9 5)

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l L

7.

.4

9)

9.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Tr av el V eh ic le R en ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P er d ie m

H ot el $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l T ra ve l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

(E qu ip m en t P ro cu re m en t)

S ub co nt ra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

P ro cu re m en t F ee $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

(S er vi ce s P ro cu re m en t)

D ril lin g

(C on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ur ve yi ng $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

G

P R

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

S ub to ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

H an dl in g Fe e $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

La bo ra to ry

A na ly tic al C os ts

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S am pl e S hi pp in g

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or at or y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fi el d E xp en se s

E xp en da bl es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

So il A ss es sm en t K it $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M on ito rin g w el l I ns ta ll K it

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Sh al lo w G ro un dw at er S am pl in g

Ki t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Ic e $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ur ve y

St at io n

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D ee p

G ro un dw at er

S am pl in g Ki t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M

AG

S Ki t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Ai r S am pl in g

C an ist er s $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l F ie ld E xp en se s

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub to ta l

7.

.4 9)

9.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

C om pl et io n

Fe e

.7 4)

9.

.9 9)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l E st im at ed C os t

2.

7.

4.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pa

LEVEL OF EFFORT/EXPENSE WORKSHEET

SUBTASK 2: HASP & Utility Clearance

DATE: 2/11/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

M. Culbreth Senior Principal Review Health and Safety Plan 0 Scientist

Total Hours 0 D. Phillips Senior Scientist Prepare Health and Safety Plan 0

Verification of property ownership, notify RPO of field activities 0 Obtain off-site access - 1 property 0 Mobilizationfrom Gainesville to Orlando -2.5 Utility clearance -2.5

Total Hours -5

TOTAL LABOR -5

VEHICLE TYPE RATE UNIT USAGE

Rental Truck $120.00 day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNITS

Site Lines, LLC Private Utility Location $800.00 0 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

Expendables $40.00 Event 0 $0.00

TOTAL EQUIPMENT $0.00

FINAL --7/24/96

C O

ST

E

ST

IM

A

TE

C on tra ct or

E nv iro nm en ta l C on su lti ng

T ec hn ol og y, 8/

/2

Ta sk

Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

P ro fe ss io na l L an d

S ur ve y

S ite

C us to m C ar e

C le an

Ta sk

H

A S

P

U til ity C le ar an ce

S ub

Ta sk

S

A R

P re pa ra tio n

A ct iv ity

/P ha se

In iti al S ite A ss es sm en t ( O rig in al

S ub

Ta sk

S oi l S am pl in g w ith

D P

T

G ro un dw at er

S am pl in g S ub Ta sk

P ro je ct

M an ag er

M ar k

C ul br et h

Ta sk

W el l I ns ta lla tio n

G ro un dw at er

S am pl in g S ub Ta sk

S ub

Ta sk

M

A G

S S ub Ta sk

T To ta ls

La bo r R at e

C at eg or y $8

4.

PP

ro je ct

M an

.2

.2 $8

4.

Se ni or P rin ci pa l S ci en tis t (

M C

7.

0.

2.

$5

4.

Se ni or E ng in ee r /

S ci en tis t ( R

P)

.0 0.

0.

0.

$5 5.

Se ni or

E ng in ee r / S ci en tis t (

D P)

9.

.0

.0

.0

$2 8.

G

IS

A na lys t / G ra ph ic s

(J V)

.0

0.

$2

4.

As so ci at e En gi ne er

Sc ie nt ist

(J P)

.0

.0

$2

3.

Te ch ni ci an (M

W

.0

$3 4.

Ad m in ist ra tiv e

(B J)

.0

To ta l H ou rs

9.

.2

.5

.5

.0

.0

D ire ct L

$1

4, 2.

$1 ,6

.1

$9

.0

$3

,6

.0

$3 ,7

.2

$9

.2

$2

.4

$2

,8

.8

O ve rh ea d

5.

$1

7, 9.

$2 ,0

.2

$1

,1

.3

$4 ,6

.6

$4

,6

.2

$1 ,2

.2

$3

.3

$3

,5

.5

G en

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fr in ge

.4

0% $6

,6

.4

$7

.6

$4

.0

$1 ,7

.0

$1

,7

.2

$4

.1

$1

.7

$1 ,3

.4

To ta l L

$3

8, 8.

$4 ,3

.0

$2

,5

.5

$1 0, 2.

$1

0, 7.

$2 ,6

.6

$6

.5

$7

,7

.7

Tr av el V eh ic le R en ta l $1

,6

.0

$1

.0

$4

.0

$7

.0

$2

.0

$1

.0

$0 .0

P er d ie m

H ot el

$2 ,2

.0

$0

.0

$7

.0

$1 ,0

.0

$4

.0

$0

.0

$0 .0

To ta l T ra ve l $3

,9

.0

$1

.0

$1 ,2

.0

$1

,7

.0

$6

.0

$1

.0

$0 .0

S ub co nt ra ct or

(E qu ip m en t P ro cu re m co nt ra ct or

S ub to ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P ro cu re m en t F ee

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or (S er vi ce s

P ro cu re m ril lin g

(C on ve nt io na

l) $5

6, 6.

$0 .0

$1

7, 1.

$3 9, 5.

$0

.0

$0 .0

$0

.0

S ur ve yi ng $3

,9

.7

$0 .0

$0

.0

$0 .0

$0

.0

$3 ,9

.7

$0

.0

ID

W

$4 ,9

.0

$0

.0

$8

.0

$4 ,1

.0

$0

.0

$0 .0

$0

.0

G P

R $8

.0

$8

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$6 6, 7.

$8

.0

$1

7, 6.

$4 4, 0.

$0

.0

$3 ,9

.7

$0

.0

H an dl in g Fe e $6

,6

.7

$8 0.

$1

,7

.6

$4 ,4

.0

$0

.0

$3

.1

$0 .0

To ta l S ub co nt ra ct or

C os t $7

3, 2.

$8

.0

$1 9, 9.

$4

8, 0.

$0 .0

$4

,3

.9

$0 .0

La bo ra to ry

A na ly tic al

C os ts $2

1, 8.

$0 .0

$1

7, 6.

$2 ,7

.0

$1

,2

.0

$0 .0

$0

.0

S am pl e

S hi pp in g $8

.0

$0

.0

$3

.0

$3

.0

$1

.0

$0 .0

$0

.0

To ta l L ab or at or y

$2 1, 8.

$0

.0

$1 7, 6.

$3

,0

.0

$1 ,3

.0

$0

.0

$0 .0

Fi el d

E xp en se

E xp en da bl es

$5

.0

$4 0.

$2

.0

$2

.0

$4

0.

$4 0.

$0

.0

So il A ss es sm en t K it

$7

.0

$0 .0

$7

.0

$0

.0

$0 .0

$0

.0

$0 .0

M on ito rin g w el l I ns ta ll K it $1

,9

.0

$0 .0

$6

.0

$1

,3

.0

$0 .0

$0

.0

$0 .0

Sh al lo w G ro un dw at er S am pl in g

Ki t

$8

.0

$0 .0

$2

.0

$5

.0

$0

.0

$0 .0

$0

.0

Ic e

$9 1.

$0

.0

$6 5.

$2

6.

$0 .0

$0

.0

$0 .0

To ta l S ur ve y St at io n $1

.0

$0

.0

$5 0.

$5

0.

$0 .0

$0

.0

$0 .0

D ee p

G ro un dw at er

S am pl in g Ki t $4

.0

$0

.0

$0 .0

$4

.0

$0

.0

$0 .0

$0

.0

M

AG

S Ki t $5

.0

$0

.0

$0 .0

$0

.0

$5

.0

$0 .0

$0

.0

Ai r S am pl in g

C an ist er s $2

.0

$0

.0

$0 .0

$7

0.

$1

.0

$0 .0

$0

.0

To ta l F ie ld E xp en se s

$5 ,4

.0

$4

0.

$1 ,9

.0

$2

,6

.0

$7

.0

$4 0.

$0

.0

S ub to ta l $1

,7

.5

$4

,3

.0

$3 ,5

.5

$5

0, 3.

$6 6, 2.

$5

,3

.6

$5 ,1

.4

$7

,7

.7

C om pl et io n

Fe e

$3 ,8

.8

$4

.9

$2

.4

$1

,0

.2

$1 ,0

.7

$2

.8

$6

7.

$7

.7

To ta l E st im at ed C os t

$1

,5

.3

$4 ,8

.9

$3

,8

.9

$5 1, 9.

$6

7, 3.

$5 ,6

.4

$5

,2

.1

$8 ,5

.5

Pa

Fowler, Karlee

From: Daniel S. Phillips <dphillips@ectinc.com> Sent: Tuesday, February 11, 2025 6:19 PM To: Fowler, Karlee Cc: Mark Culbreth; Courtney Wranosky Subject: Custom Care Cleaners - HW682 DC025A - TACO 1 Submittal Attachments: HW682 DC025A Custom Care Cleaners LOECEF TACO1.pdf; HW682 DC025A Custom

Care Cleaners LOECEF_Original.xlsx; HW682 DC025A Custom Care Cleaners LOECEF TACO 1 Delta.xlsx; HW682 DC025A Custom Care Cleaners LOECEF Original + TACO 1.xlsx

Follow Up Flag: Follow up Flag Status: Flagged

EXTERNAL MESSAGE

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.

Karlee:

As promised, here is TACO1 to remove a few labor hours, since the Subtask 2 mobilization to both Custom Care Cleaners and Classic Cleaners of Ocala were conducted on the same day and the utility survey took less time as estimated.

I am providing a pdf with all three LOECEFs for the Original/TACO 1 Delta/Original + TACO 1.

I have provided the excel versions as well.

Let me know if you have any questions.

Daniel S. Phillips, P.G.

Senior Scientist III | Site Assessment and Remediation

Environmental Consulting & Technology, Inc.

3751 Maguire Blvd. | Suite 234 | Orlando, FL 32803 C: 407-509-7684 | O: 407.903.0005 | dphillips@ectinc.com

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW682

DC025A November 21, 2025

This Task Assignment authorizes ECT to to perform an initial soil and groundwater assessment at Custom Care Cleaners in accordance with the SAWP generated from

DC023A.

Karlee Fowler 850 245-8944 Environmental Consulting and Technology, Inc. (ECT)

Mark A. Culbreth 813-289-9338

ERIC_3980

3735 West University Avenue Gainesville, Alachua County, Florida

Custom Care Cleaners

$ 146,592.36

$ 146,592.36

Scope of Work

Environmental Consulting and Technology, Inc. (ECT

Mark A. Culbreth

Contract Manager

10/11/2024

Teresa Booeshaghi

Teresa Booeshaghi Digitally signed by Teresa Booeshaghi Date: 2024.10.10 16:53:43 -04'00'

10/10/2024

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Invoice Schedule:

TOTAL COST

File details come from the government source that posted it. Updated .