This document package contains Task Assignment Change Orders (TACO) between the State of Florida Department of Environmental Protection (FDEP) and Environmental Consulting and Technology, Inc. (ECT) under Contract HW682. The contract pertains to environmental remediation and monitoring services at the Koretizing Cleaners I site in Jacksonville, Duval County, Florida, identified by project number ERIC_4545. The change orders amend the original task assignment DC020A and document modifications to project scope, cost, and timeline.

The services include three primary subtasks: Project Management (Subtask 1), a Numerical Aquifer Monitoring (NAM) Report involving groundwater sampling and analysis (Subtask 2), and Injection/Disposal Well (IDW) manifest preparation and hazardous waste transportation and disposal coordination (Subtask 3). TACO #1, effective June 13, 2024, extended the completion date from June 14, 2024 to October 25, 2024 with no cost change, maintaining the task value at $7,009.98. TACO #2, effective October 23, 2024, increased the total task value from $7,009.98 to $9,572.81, representing an increase of $2,562.83 to cover additional groundwater sampling labor, analytical costs, equipment, and waste disposal services. The completion date was further extended to January 31, 2025, for a total of 98 additional days. Invoice payments are due upon FDEP approval of deliverables, with amounts of $8,279.14 for the NAM Report and $1,293.67 for IDW Manifest and Project Management combined, totaling $9,572.81.

View the file

Other files

File Type Posted
CN-370000-GC914-T9CO2 (1).pdf PDF
CN-370000-HW682-DC001B.pdf PDF
CN-370000-HW682-DC001F.pdf PDF
CN-370000-HW682-DC002A.pdf PDF
CN-370000-HW682-DC005A.pdf PDF
CN-370000-HW682-DC005B.pdf PDF
CN-370000-HW682-DC007B.pdf PDF
CN-370000-HW682-DC008B.pdf PDF
CN-370000-HW682-DC008D.pdf PDF
CN-370000-HW682-DC010A.pdf PDF
CN-370000-HW682-DC013A.pdf PDF
CN-370000-HW682-DC014B.pdf PDF
CN-370000-HW682-DC015B.pdf PDF
CN-370000-HW682-DC016C.pdf PDF
CN-370000-HW682-DC019A.pdf PDF
CN-370000-HW682-DC01FCO1.pdf PDF
CN-370000-HW682-DC024A.pdf PDF
CN-370000-HW682-DC025A.pdf PDF
CN-370000-HW682-DC026A.pdf PDF
CN-370000-HW682-DC028A.pdf PDF
CN-370000-HW682-DC029A.pdf PDF
CN-370000-HW682-DC02ACO1.pdf PDF
CN-370000-HW682-DC04BCO7.pdf PDF
CN-370000-HW682-DC07BCO1.pdf PDF
CN-370000-HW682-DC07CC01.pdf PDF
CN-370000-HW682-DC08BCO2.pdf PDF
CN-370000-HW682-DC08CCO1.pdf PDF
CN-370000-HW682-DC09ACO1.pdf PDF
CN-370000-HW682-DC09ACO5.pdf PDF
CN-370000-HW682-DC09ACO6.pdf PDF
CN-370000-HW682-DC10BCO3.pdf PDF
CN-370000-HW682-DC11AC13.pdf PDF
CN-370000-HW682-DC11ACO1.pdf PDF
CN-370000-HW682-DC11ACO3.pdf PDF
CN-370000-HW682-DC13BCO3.pdf PDF
CN-370000-HW682-DC13BCO4.pdf PDF
CN-370000-HW682-DC14BCO1.pdf PDF
CN-370000-HW682-DC14BCO2.pdf PDF
CN-370000-HW682-DC16ACO1.pdf PDF
CN-370000-HW682-DC16ACO3.pdf PDF
CN-370000-HW682-DC18BCO1.pdf PDF
CN-370000-HW682-DC21ACO3.pdf PDF
CN-370000-HW682-DC21BCO2.pdf PDF
CN-370000-HW682-FIL5.pdf PDF
CN-370000-HW682-HW002A.pdf PDF
CN-370000-HW682-HW009B.pdf PDF
CN-370000-HW682-HW014A.pdf PDF
CN-370000-GC914-T9CO2.pdf PDF
CN-370000-GC914.pdf PDF
CN-370000-HW682-DC001A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

DC020A 2 HW682

Karlee Fowler 850-245-8944 Contractor Environmental Consulting and Technology, Inc. (ECT) Contractor

Contractor Mark A. Culbreth Contractor 813-289-9338

ERIC_4545

Koretizing Cleaners I

✔ $ 9,572.81 $ 7,009.98

$ 9,572.81 $ 7,009.98 Completion

✔ Completion 10/25/2024 01/31/2025 98

✔ 1 1 2

Environmental Consulting & Technology, Inc.

Contractor Mark A. Culbreth

Contract Manager

10/23/2024

Digitally signed by Mark Culbreth Date: 2024.10.23 13:57:46-04'00'Mark Culbreth

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2024.10.23 09:36:26 -04'00'

This change order reconciles a cost increase caused by WCD #1 and a time extension to allow for additional cost reconciliation, if needed.

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW682

DC020A

$ 9,572.81

Annual NAM Report (Subtask 2)

IDW Manifest; Project Management (Subtask 1 & 3)

Upon Submittal and FDEP approval of Annual NAM Report (Subtask 2)

Upon Submittal and FDEP approval of IDW Manifest; Project Management (Subtask 1 & 3)

08/30/2024

08/30/2024

$ 1,293.67

$ 8,279.14

FFLORIDAA DEPARTMENTT OF

EEnvironmentall Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ronn DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawnn Hamilton Secretary

To:

From:

Date:

HW68 Contract Negotiation File

County

ERIC_

Project Manager

Subject: Negotiation Summary

HW68

This Task Assignment

FDEP COST ESTIMATEContractor: Environmental Consulting & Technology, Inc.

Date: 10/22/2024

Task #: DC020A SubTask 1 Project Management

Site: Koretizing Cleaners I SubTask 2 NAM Report

Activity/Phase: NAM Report SubTask 3 IDW Manifest

Project Manager: Mark Culbreth SubTask 4

SubTask 5

Totals 1 2 3 Labor Rate Category

$82.52 Project Manager 2.9 2.9 $82.52 Senior Principal Scientist (MC) 2 2.0 0.0 $59.43 Senior Engineer / Scientist (GS) 14 11.5 2.0 $27.35 GIS Analyst / Graphics (JV) 4 4.0 0.0 $24.26 Technician (BC) 27 26.5 0.0 $33.36 Administrative (BJ) 4 4.0 0.0

Total Hours 53 2.9 48.0 2.0

Direct Labor $2,093.98 $240.90 $1,734.22 $118.86

Overhead 125.30% $2,623.76 $301.85 $2,172.98 $148.93 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 Fringe 47.40% $992.55 $114.19 $822.02 $56.34 Total Labor $5,710.29 $656.94 $4,729.22 $324.13

Travel Vehicle Rental $360.00 $360.00 $0.00 Per diem + Hotel $222.00 $222.00 $0.00 Total Travel $582.00 $582.00 $0.00

Subcontractor (Equipment Procurement) Subcontractor Subtotal $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Erwin Remediation $195.00 $0.00 $195.00 Subcontractor Subtotal $195.00 $0.00 $195.00 Handling Fee $19.50 $0.00 $19.50 Total Subcontractor Cost $214.50 $0.00 $214.50

Laboratory Analytical Costs $1,095.00 $1,095.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 Sample Shipping $104.00 $104.00 $0.00 Total Laboratory $1,199.00 $1,199.00 $0.00

Field Expenses Expendables $120.00 $120.00 $0.00 Shower Groundwater Sampling Kit $870.00 $870.00 $0.00 Metal Detector $80.00 $80.00 $0.00 DOT 55-Gallon Drum $200.00 $200.00 $0.00 Ice $26.00 $26.00 $0.00 Total Field Expenses $1,296.00 $1,296.00 $0.00

Subtotal $9,001.79 $656.94 $7,806.22 $538.63 Completion Fee $571.02 $65.69 $472.92 $32.41

Total Estimated Cost $9,572.81 $722.63 $8,279.14 $571.04

Cost from Prior CEF: $7,009.98 Manual Entry Cost from taco CEF; $2,562.83 Manual Entry

Cost (Prior + taco): $9,572.81 Auto-Calculated Rounding Error: $0.00 Auto-Calculated

Final Total Cost: $9,572.81 Auto-Calculated

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Koretizing Cleaners I SUBTASK 2: NAM Report

DATE: 10/22/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

M. Culbreth Sr. Principal Scientist Develop conclusions and recommendations to prepare final Annual NAM Report 2 Total Hours 2

G. Sattler Sr. Engineer Notify RPO of field activities 1.5 Prepare draft Annual NAM Report 10

Total Hours 11.5 J. Von Borstel GIS Analyst/Graphics Recreate figures 4

Total Hours 4 B. Carrick Technician Prep for field work and obtain IDW drum 1

Roundtrip mobilization from Orlando to Jacksonville for the annual groundwater event 5 Locate, open wells to collect DTW at 8 wells 1 Annual groundwater sampling at 8 wells 8 Containerizing purge water 0.5 Event 2 Prep for field work and obtain IDW drum 1 Event 2 Roundtrip mobilization from Gainesville to Lake City for the annual groundwater 2 Event 2 Open Wells, collect DTW at 7 wells, and calibrate equipment 1 Event 2 Annual groundwater sampling 7 wells 7

Total Hours 26.5 B. Jarvis Administrative Update tables and document production 4

Total Hours 4

TOTAL LABOR 48

VEHICLE TYPE RATE UNIT USEAGE

Truck B. Carrick $120.00 Day 3 $360.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

B. Carrick Per Diem $36.00 Day 2 $72.00 B. Carrick Hotel $150.00 Day 1 $150.00

TOTAL PER DIEM $222.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Shipping $52.00 2 $104.00 USEPA 8260 VOHs $73.00 15 $1,095.00

TOTAL LAB $1,199.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 3 $120.00 Shower Groundwater Sampling Kit $290.00 Day 3 $870.00 Metal Detector $40.00 Day 2 $80.00 DOT 55-Gallon Drum $100.00 Each 2 $200.00 Ice $6.50 Each 4 $26.00

TOTAL EQUIPMEN $1,296.00

FINAL --7/24/96

SUBTASK 3: IDW Manifest

DATE: 10/22/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Sr. Engineer IDW hazardous classification and schedule T&D accordingly 2 Total Hours 2

TOTAL LABOR 2

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediation IDW T&D $195.00 $195.00

TOTAL $195.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMEN $0.00

Task #: DC020A SubTask 1 Project Management

Site: Koretizing Cleaners I SubTask 2 NAM Report

Activity/Phase: NAM Report SubTask 3 IDW Manifest

Project Manager: Mark Culbreth SubTask 4

SubTask 5

Totals 1 2 3 Labor Rate Category

$82.52 Project Manager 1 0.6 $82.52 Senior Principal Scientist (MC) 0 0.0 0.0 $59.43 Senior Engineer / Scientist (GS) 2 0.5 1.0 $27.35 GIS Analyst / Graphics (JV) 0 0.0 0.0 $24.26 Technician (BC) 11 11.0 0.0 $33.36 Administrative (BJ) 1 1.0 0.0

Total Hours 14 0.6 12.5 1.0

Direct Labor $439.99 $50.62 $329.94 $59.43

Overhead 125.30% $551.31 $63.43 $413.41 $74.47 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 Fringe 47.40% $208.55 $23.99 $156.39 $28.17 Total Labor $1,199.85 $138.04 $899.74 $162.07

Travel Vehicle Rental $120.00 $120.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 Total Travel $120.00 $120.00 $0.00

Subcontractor (Equipment Procurement) Subcontractor Subtotal $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Erwin Remediation $70.00 $0.00 $70.00 Subcontractor Subtotal $70.00 $0.00 $70.00 Handling Fee $7.00 $0.00 $7.00 Total Subcontractor Cost $77.00 $0.00 $77.00

Laboratory Analytical Costs $511.00 $511.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 Sample Shipping $52.00 $52.00 $0.00 Total Laboratory $563.00 $563.00 $0.00

Field Expenses Expendables $40.00 $40.00 $0.00 Shower Groundwater Sampling Kit $290.00 $290.00 $0.00 Metal Detector $40.00 $40.00 $0.00 DOT 55-Gallon Drum $100.00 $100.00 $0.00 Ice $13.00 $13.00 $0.00 Total Field Expenses $483.00 $483.00 $0.00

Subtotal $2,442.85 $138.04 $2,065.74 $239.07 Completion Fee $119.98 $13.80 $89.97 $16.21

Total Estimated Cost $2,562.83 $151.84 $2,155.71 $255.28

SUBTASK 2: NAM Report

DATE: 10/22/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

M. Culbreth Sr. Principal Scientist Develop conclusions and recommendations to prepare final Annual NAM Report 0 Total Hours 0

G. Sattler Sr. Engineer Notify RPO of field activities 0.5 Prepare draft Annual NAM Report 0

Total Hours 0.5 J. Von Borstel GIS Analyst/Graphics Recreate figures 0

Total Hours 0 B. Carrick Technician Prep for field work and obtain IDW drum 0

Roundtrip mobilization from Orlando to Jacksonville for the annual groundwater event 0 Locate, open wells to collect DTW at 8 wells 0 Annual groundwater sampling at 8 wells 0 Containerizing purge water 0 Event 2 Prep for field work and obtain IDW drum 1 Event 2 Roundtrip mobilization from Gainesville to Lake City for the annual groundwater 2 Event 2 Open Wells, collect DTW at 7 wells, and calibrate equipment 1 Event 2 Annual groundwater sampling 7 wells 7

Total Hours 11 B. Jarvis Administrative Update tables and document production 1

Total Hours 1

TOTAL LABOR 12.5

VEHICLE TYPE RATE UNIT USEAGE

Truck B. Carrick $120.00 Day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

B. Carrick Per Diem $36.00 Day 0 $0.00 B. Carrick Hotel $150.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Shipping 52 1 $52.00 USEPA 8260 VOHs 73 7 $511.00

TOTAL LAB $563.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 1 $40.00 Shower Groundwater Sampling Kit $290.00 Day 1 $290.00 Metal Detector $40.00 Day 1 $40.00 DOT 55-Gallon Drum $100.00 Each 1 $100.00 Ice $6.50 Each 2 $13.00

TOTAL EQUIPMEN $483.00

FINAL --7/24/96

DATE: 10/22/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Sr. Engineer IDW hazardous classification and schedule T&D accordingly 1 Total Hours 1

TOTAL LABOR 1

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediation IDW T&D $70.00 $70.00

TOTAL $70.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Task #: DC020A SubTask 1 Project Management

Site: Koretizing Cleaners I SubTask 2 NAM Report

Activity/Phase: NAM Report SubTask 3 IDW Manifest

Project Manager: Mark Culbreth SubTask 4

SubTask 5

Totals 1 2 3 Labor Rate Category

$82.52 Project Manager 2 2.3 $82.52 Senior Principal Scientist (MC) 2 2.0 0.0 $59.43 Senior Engineer / Scientist (GS) 12 11.0 1.0 $27.35 GIS Analyst / Graphics (JV) 4 4.0 0.0 $24.26 Technician (BC) 16 15.5 0.0 $33.36 Administrative (BJ) 3 3.0 0.0

Total Hours 39 2.3 35.5 1.0

Direct Labor $1,653.99 $190.28 $1,404.28 $59.43

Overhead 125.30% $2,072.45 $238.42 $1,759.56 $74.47 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 Fringe 47.40% $783.99 $90.19 $665.63 $28.17 Total Labor $4,510.43 $518.89 $3,829.47 $162.07

Travel Vehicle Rental $240.00 $240.00 $0.00 Per diem + Hotel $222.00 $222.00 $0.00 Total Travel $462.00 $462.00 $0.00

Subcontractor (Equipment Procurement) Subcontractor Subtotal $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Erwin Remediation $125.00 $0.00 $125.00 Subcontractor Subtotal $125.00 $0.00 $125.00 Handling Fee $12.50 $0.00 $12.50 Total Subcontractor Cost $137.50 $0.00 $137.50

Laboratory Analytical Costs $584.00 $584.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 Sample Shipping $52.00 $52.00 $0.00 Total Laboratory $636.00 $636.00 $0.00

Field Expenses Expendables $80.00 $80.00 $0.00 Shower Groundwater Sampling Kit $580.00 $580.00 $0.00 Metal Detector $40.00 $40.00 $0.00 DOT 55-Gallon Drum $100.00 $100.00 $0.00 Ice $13.00 $13.00 $0.00 Total Field Expenses $813.00 $813.00 $0.00

Subtotal $6,558.93 $518.89 $5,740.47 $299.57 Completion Fee $451.05 $51.89 $382.95 $16.21

Total Estimated Cost $7,009.98 $570.78 $6,123.42 $315.78

SUBTASK 2: NAM Report

DATE: 10/22/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

M. Culbreth Sr. Principal Scientist Develop conclusions and recommendations to prepare final Annual NAM Report 2 Total Hours 2

G. Sattler Sr. Engineer Notify RPO of field activities 1 Prepare draft Annual NAM Report 10

Total Hours 11 J. Von Borstel GIS Analyst/Graphics Recreate figures 4

Total Hours 4 B. Carrick Technician Prep for field work and obtain IDW drum 1

Roundtrip mobilization from Orlando to Jacksonville for the annual groundwater event 5 Locate, open wells to collect DTW at 8 wells 1 Annual groundwater sampling at 8 wells 8 Containerizing purge water 0.5

Total Hours 15.5 B. Jarvis Administrative Update tables and document production 3

Total Hours 3

TOTAL LABOR 35.5

VEHICLE TYPE RATE UNIT USEAGE

Truck B. Carrick $120.00 Day 2 $240.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

B. Carrick Per Diem $36.00 Day 2 $72.00 B. Carrick Hotel $150.00 Day 1 $150.00

TOTAL PER DIEM $222.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Shipping $52.00 1 $52.00 USEPA 8260 VOHs $73.00 8 $584.00

TOTAL LAB $636.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 2 $80.00 Shower Groundwater Sampling Kit $290.00 Day 2 $580.00 Metal Detector $40.00 Day 1 $40.00 DOT 55-Gallon Drum $100.00 Each 1 $100.00 Ice $6.50 Each 2 $13.00

TOTAL EQUIPMEN $813.00

DATE: 10/22/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Sr. Engineer IDW hazardous classification and schedule T&D accordingly 1 Total Hours 1

TOTAL LABOR 1

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediation IDW T&D $125.00 $125.00

TOTAL $125.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $0.00 Shower Groundwater Sampling Kit $0.00 Metal Detector $0.00 DOT 55-Gallon Drum $0.00 Ice $0.00

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

DC020A 1 HW682

Karlee Fowler 850-245-8944 Environmental Consulting and Technology, Inc. (ECT)

Mark A. Culbreth 813-289-9338

ERIC_4545

Koretizing Cleaners I

$ 7,009.98 $ 7,009.98

$ 7,009.98 $ 7,009.98

06/14/2024 10/25/2024 133

1 1 1

Environmental Consulting & Technology, Inc.

Mark A. Culbreth

Contract Manager

6/13/2024

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2024.06.13 08:47:30 -04'00'

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment