Task Assignment Summary
This is a Task Assignment (TA) document issued under Contract Number HW682 between the State of Florida Department of Environmental Protection (Department) and Environmental Consulting and Technology, Inc. (ECT), a private environmental consulting firm. The Department's Project Manager is Kelly Crain, and the Contractor's Project Manager is Mark A. Culbreth. The task assignment pertains to supplemental assessment activities and an interim source removal plan for the Bolton Plaza site located at 661 Blanding Boulevard, Orange Park, Clay County, Florida (Project Number ERIC_4269), with a completion date of June 23, 2023.
ECT will conduct supplemental soil assessment activities and prepare an Interim Source Removal Plan (ISRP) in accordance with the scope of work and cost proposal submitted on February 22, 2023. The work consists of three subtasks: Project Management ($907.05), Supplemental Soil Assessment including collection of 33 soil samples from 11 boring locations at three intervals with laboratory analysis ($12,185.39 due upon FDEP approval of draft figures and tables by April 19, 2023), and preparation of the ISRP ($3,091.32 due upon FDEP approval by May 12, 2023). The total Task Assignment value is $16,183.76 on a fixed unit rate basis. The contractor may invoice according to the attached schedule contingent upon deliverable approval by the Department.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW682
DC011A Completion June 23, 2023
ECT will conduct supplemental assessment activities and prepare an interim source removal plan for the Bolton Plaza site located in Orange Park, Florida. All work will be conducted in accordance with the scope of work and cost proposal submitted on February 22, 2023.
Kelly Crain 850-245-8953 Contractor Environmental Consulting and Technology, Inc. (ECT) Contractor
Contractor Mark A. Culbreth Contractor 813-289-9338
ERIC_4269
661 Blanding Blvd, Orange Park, Clay County
Bolton Plaza
Contractor Contractor
✔ $ 16,183.76
$ 16,183.76
Select One
Environmental Consulting and Technology, Inc. (ECT Contractor Mark A. Culbreth
Contract Manager Digitally signed by Mark Culbreth DN: CN=Mark Culbreth, E=mculbreth@ectinc.com Reason: I am approving this document Location: your signing location here Date: 2023.02.23 14:26:01-05'00' Foxit PhantomPDF Version: 10.1.6
Mark Culbreth
Kelly Crain
Kelly Crain Digitally signed by Kelly Crain Date: 2023.02.23 14:19:43 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Draft Figures and Tables (Subtask 2) 04/19/2023
ISRP and Project Management (Subtask 3 and 1) 05/12/2023
FDEP Approval of Draft Figures and Tables (Subtask 2) $ 12,185.39
FDEP Approval of ISRP and Project Management (Subtask 3 and 1) $ 3,998.37
$ 16,183.76
HW682
DC011A
FFLORIDAA DEPARTMENTT OF
EEnvironmentall Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ronn DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawnn Hamilton Secretary
Memorandum
TO: HW682 Contract File Bolton Plaza
ERIC_4269
FROM: Kelly Crain, Project Manager SUBJECT: Negotiation Summary Task Assignment DC-011A DATE: February 23, 2023
This Task Assignment authorizes ECT to conduct supplemental soil assessment activities and prepare an ISRP in accordance with the Scope of Work dated February 22, 2023. ECT will collect soil samples from 11 locations at three intervals (total of 33 samples). The resulting data will be used to both complete site assessment and design an excavation as part of the ISRP.
ECT will ensure that the Department has a current site access agreement in place prior to initiating field activities.
After revisions to the scope of work, the final costs associated with this Task Assignment are $16,183.76. ECT may invoice according to the attached schedule.
FDEP COST ESTIMATEContractor: Environmental Consulting & Technology, Inc.
Date: 14-Feb-23
Task #: SubTask 1 Project Management
Site: Bolton Plaza SubTask 2 Supplemental Soil Assessment
Activity/Phase: SubTask 3 Interim Source Removal Plan
Project Manager: Mark Culbreth SubTask 4
SubTask 5
TTotals 1 2 3 4 Labor Rate Category
$80.12 PProject Manager 4 3.8 $80.12 Senior Principal Scientist (MC) 4 0.0 4.0 0 $37.13 Staff Engineer / Scientist (LL) 25 9.0 16.0 0 $26.54 GIS Analyst / Graphics (JV) 6 4.0 2.0 0 $22.44 Technician (BC) 18 17.5 0.0 0 $22.44 Technician (DF) 15 15.0 0.0 0 $31.45 Administrative (BJ) 6 4.0 2.0 0
Total Hours 77 3.8 49.50 24 0
Direct Labor $2,628.35 $302.38 $1,295.43 $1,030.54 $0.00
Overhead 125.30% $3,293.32 $378.88 $1,623.17 $1,291.27 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 47.40% $1,245.84 $143.33 $614.03 $488.48 $0.00 Total Labor $7,167.51 $824.59 $3,532.63 $2,810.29 $0.00
Travel Vehicle Rental $480.00 $480.00 $0.00 $0.00 Per diem + Hotel $429.00 $429.00 $0.00 $0.00 Total Travel $909.00 $909.00 $0.00 $0.00
Subcontractor (Equipment Procurement) Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
IDW $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $6,864.00 $6,864.00 $0.00 $0.00 Sample Shipping $70.00 $70.00 $0.00 $0.00 Total Laboratory $6,934.00 $6,934.00 $0.00 $0.00
Field Expenses Expendables $40.00 $40.00 $0.00 $0.00 Soil Sampling Through Concrete Kit $235.00 $235.00 $0.00 $0.00 Ice $6.50 $6.50 $0.00 $0.00 Trimble $175.00 $175.00 $0.00 $0.00 Total Field Expenses $456.50 $456.50 $0.00 $0.00
Subtotal $15,467.01 $824.59 $11,832.13 $2,810.29 $0.00 Completion Fee $716.75 $82.46 $353.26 $281.03 $0.00
Total Estimated Cost $16,183.76 $907.05 $12,185.39 $3,091.32 $0.00
Source Removal Plan
REV: 08/22 PRAC ECT Page 1
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Bolton Plaza SUBTASK 2 (Supplemental Soil Assessment)
DATE: 2/14/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Technician BC Prep for field work 1 Technician BC Mobilize to site 2.5 Technician BC Collect 33 soil samples from 11 borings 9 Technician BC Restore asphalt at 11 boring locations 2 Technician BC Demobilize and arrange sample delivery 3
Total 17.5
Technician DF Prep for field work 1
Technician DF Mobilize to site 1.5
Technician DF Collect 33 soil samples from 11 borings 9
Technician DF Restore asphalt at 11 boring locations 2
Technician DF Demobilize 1.5
Total 15
Staff Engineer LL 2
Staff Engineer LL 2
Staff Engineer LL 1
Administrative LL
Prepare HASP
Verification of property ownership, notify RPO of field activities
Prepare field activities plan
Prepare draft figures illustrating the proposed extent of source removal 4
Total 17
GIS Analyst JV Recreate figures 4
Total 4
Administrative BJ Recreate tables 4
Total 4
TOTAL LABOR 49.5
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck BC $120.00 day 2 $240.00 Rental Truck DF $120.00 day 2 $240.00
TOTAL VEHICLE $480.00
PER DIEM STAFF RATE UNIT USEAGE
Per Diem BC $36.00 day 2 $72.00 Hotel BC $135.00 day 1 $135.00
Per Diem DF $36.00 day 2 $72.00
Hotel DF $150.00 day 1 $150.00
TOTAL PER DIEM $429.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIITS
0 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC UNITS
USEPA Method 5035 Prep - Soil $7.00 33 $231.00 USEPA Method 8260 for VOHs - Soil $73.00 33 $2,409.00 USEPA Method 1312 SPLP Bottle Extraction - Soil $55.00 33 $1,815.00 USEPA Method 8260 for VOHs - Leachate $73.00 33 $2,409.00 Shipping Samples $70.00 1 $70.00
TOTAL LAB $6,934.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 1 $40.00 Soil Sampling Through Concrete $235.00 day 1 $235.00 Ice $6.50 each 1 $6.50 Trimble $175.00 day 1 $175.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$456.50TOTAL EQUIPMENT
FINAL --7/24/96
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Bolton Plaza SUBTASK:3 (Interim Source Removal Plan)
DATE: 2/14/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
GIS Analyst JV Finalize figures 2 Administrative BJ Finalize tables and report production 2 Staff Engineer LL QA/QC check of soil lab data and prepare draft source removal plan 16
Sr. Principal Scientist MC Develop conclusions and recommendations and prepare final source removal plan 4
TOTAL LABOR 24
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck $120.00 day $0.00 Rental Car $80.00 day $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel $36.00 day $0.00 Per Diem $135.00 day $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE UNIT COST UNITS
0 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC Units
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00TOTAL EQUIPMENT
FINAL --7/24/96
2/ /2023 ECT No. P23RA-9999
Ms. Kelly Crain Florida Department of Environmental Protection 2600 Blair Stone Road Tallahassee, Florida 32399-2400
Re: Proposal for Supplemental Assessment and Interim Source Removal Plan Bolton Plaza 661 Blanding Boulevard Orange Park, Florida
ERIC_4269
Contract No. HW682
Dear Ms. Crain:
Environmental Consulting & Technology, Inc. (ECT) has prepared this scope of work to conduct a supplemental soil assessment to refine the extent of impacted soils that need to be excavated and to prepare an Interim Source Removal Plan for the Bolton Plaza in Orange Park, Florida (Site). The 2020 Site Assessment conducted by Earth Systems included collection of soil samples which identified soils that could potentially generate leachate containing tetrachloroethene at a concentration greater than its groundwater cleanup target level (GCTL). Following conversations with the Florida Department of Environmental Protection (FDEP), it was determined that the horizontal extent of impacted soils should be delineated and excavated to the depth of the water table prior to the next natural attenuation monitoring (NAM) event.
Based on the soil analytical data provided in the November 11, 2021, Site Assessment Report for the Site, soils which may generate leachate containing volatile organic halogens (VOHs) at concentrations greater than their GCTLs are limited to soil borings SB-3, SB-5, SB-12, and SB-13. The lateral extent of impacted soils has not been fully assessed at the following depths of 0.5 feet below land surface (bls), 1 foot bls, and 3 feet bls. The proposed scope of work consists of the collection and analysis of soil samples at these depths to assess the lateral extent of impacted soils and to develop an Interim Source Removal Plan to be implemented at the site.
SubTask 1 Project Management
Mark Culbreth is the project manager; his hours are directly computed on the Cost Estimate Worksheet.
SubTask 2 Scope of Work
Because this site is new, to ECT, we are requesting time to prepare a Health and Safety Plan for this site. Future monitoring activities will rely on this Health and Safety Plan so it is anticipated that this plan will need to be prepared only once. Because this site is new to ECT, we are requesting additional time to generate base maps and other related figures as well as to recreate tables.
ECT proposes to collect additional soil samples for analyses to assess the lateral extent of impacted soils at depths of 0.5 feet bls, 1, and 3 feet bls. Soil samples will be collected from borings SB-6 through SB-9, SB-11, and SB-14 through SB-19. No samples are to be collected at borings SB-1, SB-2, SB-4, or SB-10. A total of 33 soil samples will be collected. Attachment B illustrates the soil boring locations.
All soil samples will be analyzed for VOHs using U.S. Environmental Protection Agency (EPA) Method 8260. A portion of each sample will be held for analysis in the event soil samples contain VOHs at concentrations greater than their default groundwater leachability-based soil cleanup target levels (SCTLs). Those samples that contain one or more of the VOHs at concentrations greater than their leachability-based SCTL will be subjected to the synthetic precipitation leaching procedure (SPLP) using USEPA Method 1312 and the leachate analyzed for VOHs using EPA Method 8260. Pursuant to FDEP guidance, equipment blanks will not be collected. Upon receipt of the laboratory report, ECT will evaluate the data and notify the FDEP which soil samples, if any, contained VOHs at concentrations exceeding their SCTLs and require further analysis.
Following collection of samples, the remaining soil will be placed back in their respective boreholes. If required, paver sand will be used to fill the borehole to grade. Asphalt will be restored at each borehole using an asphalt patch material.
Following receipt of the analytical data, ECT will prepare draft figures showing the extent of the soil impacts and proposed limits of the source removal and will submit these to the FDEP. ECT proposes to discuss these results with the FDEP to obtain concurrence that the extent of VOHs has been adequately assessed and that the FDEP agrees with the proposed extent of the source removal.
The scope of work is detailed in the attached Level of Effort Worksheet. A summary of SubTask 2 activities is included in Table 1. Note that two technicians will be performing the field activities.
Table 1. SubTask 2 Activities Summary Employee/Resource Activity Time 2 x Technicians Prepare for field work 2 hours 2 x Technicians Mobilize to site 4 hours 2 x Technicians Collect 33 soil samples from 11 borings 18 hours 2 x Technicians Restore asphalt at 11 boring locations 4 hours 2 x Technicians Demobilize and arrange sample delivery 4.5 hours Staff Engineer Prepare HASP 2 hours Staff Engineer Verification of property ownership, notify RPO of field activities 2 hours
Staff Engineer Prepare field activities plan and discuss the plan with the technician
1 hours
Staff Engineer Prepare draft figures of the proposed extent of source removal and discuss with FDEP.
4 hours
GIS Analyst Recreate figures. 4 hours Administrative Recreate tables. 4 hours
SubTask 3 Scope of Work
Following concurrence with the FDEP that the extent of VOHs in soils has been adequately assessed and FDEP agrees with the proposed extent of the source removal, ECT will prepare an Interim Source Removal Plan which will include historical soil data as well as soil data collected as part of Subtask 2 summarized in tables and on figures, along with attachments including field notes, soil boring logs, photographs, and any other pertinent documentation. The plan will provide details for the source removal. The scope of work is detailed in the attached Level of Effort worksheet and Table 2 provides a summary of the SubTask 3 activities.
Table 2. SubTask 3 Activities Summary Employee/Resource Activity Time GIS Analyst Finalize figures. 2 hours Administrative Finalize tables and report production. 2 hours
Staff Engineer QA/QC check of laboratory data and prepare of draft Interim Source Removal Plan
16 hours
Sr. Principal Scientist Develop conclusions and recommendations and prepare final Interim Source Removal Plan
4 hours
Deliverables
A summary of cost and deliverable due dates for each SubTask is provided at Table 3.
Table 3. Deliverable Schedule and Cost Subtask Deliverable Deliverable Date Invoice Amount
1. Project Management - Billed at project conclusion $907.05
2. Supplemental Soil Assessment
Draft figures and tables April 19, 2023 $12,185.39
3. Interim Source Removal Plan
Interim Source Removal Plan
May 12, 2023 $3,091.32
Total $16,183.76
Please let us know if you have any questions regarding this proposal.
Sincerely, ENVIRONMENTAL CONSULTING & TECHNOLOGY, INC.
Leif E. Layton, Ph.D. Mark A. Culbreth, P.G.
Staff Engineer Principal Scientist