CN-370000-HW681-DC025C.pdf
PDF 6 MB Posted
- Contract number
- HW681
- Issued by
- Florida
About this file
This is a Task Assignment (TA) under Contract Number HW681 between the State of Florida Department of Environmental Protection (FDEP) and CDM Smith Inc. (Contractor), authorizing long-term monitoring services at McMullen Dry Cleaners in Hillsborough County, Florida. The TA is identified as DC025C and was effective through June 13, 2025. Benjamin Aoki serves as the FDEP Project Manager, while Kathy Leggoe is the Contractor's Project Manager. The project involves environmental remediation and monitoring activities at the dry cleaning facility located at 7853 US Highway 301 South, Riverview, Florida.
The Task Assignment encompasses four primary subtasks with a total value of $22,249.40 and 117.0 labor hours. Subtask 1 involves project management calculated at 13% of direct labor costs. Subtask 2 covers annual groundwater sampling from monitoring wells MW-2 through MW-19, including field parameter data collection and laboratory analysis by EPA Method 8260 for volatile organic halocarboxyls. Subtask 3 requires preparation of an Annual Groundwater Monitoring Report due April 25, 2025, including figures, data tables, field notes, laboratory reports, and quality assurance documentation. Subtask 4 addresses PFAS-impacted IDW removal and waste profiling, with costs segregated separately as requested by FDEP. Groundwater sampling is scheduled for completion by March 25, 2025, with invoicing occurring upon deliverable approval. The contract utilizes a fixed unit rate pricing structure of $22,249.40, with no additional funding information specified.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Data Deliverable/Inv milestone
KL
4/25/2025 KL
File details come from the government source that posted it. Updated .