CN-370000-HW681-DC011E.pdf

PDF 1 MB Posted

Attached to
Master Agreement FL|HW681|acc15804f9112ed94de3c1f0669600ae
Contract number
HW681
Issued by
Florida

About this file

Task Assignment DC011E Summary

This document is a Task Assignment (TA) under Contract HW681 between the State of Florida Department of Environmental Protection (FDEP) and CDM Smith Inc., dated January 27, 2026, with completion scheduled for October 30, 2026. The TA authorizes work at Peterson Cleaners, located at 840 North Broadway Avenue, Bartow, Polk County, Florida (ERIC_5380). The project involves decommissioning a Soil Vapor Extraction (SVE) system per the contractor's proposed revised scope of work and cost estimate, with Benjamin Aoki serving as the Department Project Manager and Kathy Leggoe as the Contractor's Project Manager.

The contract value for this TA is $21,935.64 on a fixed unit rate basis, comprising four subtasks: Subtask 1 ($1,137.46) covers project management calculated at 13 percent of direct labor; Subtask 2 ($4,901.73) covers granular activated carbon (GAC) management and power disconnect, with field notes and laboratory chain of custody due by May 29, 2026; Subtask 3 ($14,339.94) covers SVE system removal and site restoration performed by subcontractor RSI LLC at $9,750.00; and Subtask 4 ($1,556.51) covers the SVE system decommissioning report due by August 28, 2026. The project includes subcontractor quotes from RSI LLC ($9,750.00 for system removal), Erwin Remediation ($475.00 for IDW disposal), and laboratory costs ($481.00). The SVE system will be transferred to the Sun State Supply Site (ERIC_5490) for reuse, with the existing blower stored at the TOC Apollo Site (ERIC_4697) following decommissioning activities.

View the file

Other files

File Type Posted
CN-370000-HW681-DC001A.pdf PDF
CN-370000-HW681-DC001C.pdf PDF
CN-370000-HW681-DC001D.pdf PDF
CN-370000-HW681-DC002B.pdf PDF
CN-370000-HW681-DC003D.pdf PDF
CN-370000-HW681-DC003E.pdf PDF
CN-370000-HW681-DC007C.pdf PDF
CN-370000-HW681-DC008A.pdf PDF
CN-370000-HW681-DC008C.pdf PDF
CN-370000-HW681-DC008D.pdf PDF
CN-370000-HW681-DC009B.pdf PDF
CN-370000-HW681-DC009C.pdf PDF
CN-370000-HW681-DC009D.pdf PDF
CN-370000-HW681-DC010B.pdf PDF
CN-370000-HW681-DC014A.pdf PDF
CN-370000-HW681-DC014B.pdf PDF
CN-370000-HW681-DC015B.pdf PDF
CN-370000-HW681-DC016A.pdf PDF
CN-370000-HW681-DC016B.pdf PDF
CN-370000-HW681-DC017A.pdf PDF
CN-370000-HW681-DC017C.pdf PDF
CN-370000-HW681-DC017D.pdf PDF
CN-370000-HW681-DC018A.pdf PDF
CN-370000-HW681-DC018B.pdf PDF
CN-370000-HW681-DC01ACO1.pdf PDF
CN-370000-HW681-DC01ACO2.pdf PDF
CN-370000-HW681-DC01ACO3.pdf PDF
CN-370000-HW681-DC025B.pdf PDF
CN-370000-HW681-DC025C.pdf PDF
CN-370000-HW681-DC026B.pdf PDF
CN-370000-HW681-DC026C.pdf PDF
CN-370000-HW681-DC027A.pdf PDF
CN-370000-HW681-DC027C.pdf PDF
CN-370000-HW681-DC028A.pdf PDF
CN-370000-HW681-DC028B.pdf PDF
CN-370000-HW681-DC028C.pdf PDF
CN-370000-HW681-DC029D.pdf PDF
CN-370000-HW681-DC02CCO1.pdf PDF
CN-370000-HW681-DC02DCO3.pdf PDF
CN-370000-HW681-DC032A.pdf PDF
CN-370000-HW681-DC032B.pdf PDF
CN-370000-HW681-DC032C.pdf PDF
CN-370000-HW681-DC033A.pdf PDF
CN-370000-HW681-DC038A.pdf PDF
CN-370000-HW681-DC03BCO1.pdf PDF
CN-370000-HW681-DC03ECO2.pdf PDF
CN-370000-HW681-DC040B.pdf PDF
CN-370000-HW681-DC040C.pdf PDF
CN-370000-HW681-DC041A.pdf PDF
CN-370000-HW681-DC042A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW681

DC011E Completion October 30, 2026

This Task Assignment authorizes CDM Smith Inc. to decommission the SVE system at Peterson Cleaners per their proposed revised scope of work and cost estimate.

Benjamin Aoki 850-245-7527 Contractor CDM Smith Inc. Contractor

Contractor Kathy Leggoe Contractor 904-527-6727

ERIC_5380

840 North Broadway Avenue, Bartow, Polk County, Florida

Peterson Cleaners

Contractor Contractor

✔ $ 21,935.64

$ 21,935.64

Scope of Work

CDM Smith Inc.

Contractor Joshua Hirten

Contract Manager

Joshua Hirten Digitally signed by Joshua Hirten Date: 2026.01.27 08:31:47 -05'00'

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2026.01.26 16:41:26 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtask 2: GAC Management and Power Disconnect - Field notes and laboratory chain of custody 05/29/2026

Subtask 1, 3, & 4: SVE System Decommissioning and Reporting - Decommissioning Report; Project Management 08/28/2026

Subtask 2: FDEP receipt and review of the GAC Management and Power Disconnect Data Deliverable $ 4,901.73

Subtask 1, 3, & 4: FDEP receipt and review of the SVE System Decommissioning Report $ 17,033.91

$ 21,935.64

HW681

DC011E

FFLORIDAA DEPARTMENTT OF

EEnvironmentall Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ronn DeSantis Governor

Alexiss A.. Lambertt Secretary

Memorandum

TO:

FROM:

SUBJECT:

DATE:

FD

EP

C

OS

T

ES

TI

MA

TE

C on tra ct or

C

D M

S m ith In c.

D at e:

/1

3/

Ta sk

S ub Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

S ite

S ub Ta sk

G A

C M an ag em en t a nd

P ow er D is co nn ec t S ub Ta sk

A ct iv ity

/P ha se

S V

E S ys te m D ec om m is si o

S ub

Ta sk

S

V E

S ys te m

D ec om m is si on in g S ub Ta sk

P ro je ct

M an ag er

A nd re w G al vi n

Ta sk

S

V E

S ys te m

D ec om m is si on in g R ep or t S ub Ta sk

S ub

Ta sk

S ub Ta sk

TT

ot al s

La bo r R at e

C at eg or y $8

0.

P P ro je ct

M an ag er

4.

$0

.0

$9 0.

S en io r T ec hn ic al E xp er t

1.

2.

$8

0.

P ro je ct

T ec hn ic al L ea d

0.

$8

0.

P ro je ct

M an ag er

4.

1.

3.

$5

5.

P ro fe ss io na l I I

.0

.0 5.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

T ot al H ou rs

4.

.0

.0 8.

0.

0.

D ire ct L ab or

$3

,2

.0

$3

.1

$1 ,2

.2

$1

,1

.7

$5

.8

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

O ve rh ea d

5.

$4

,4

.6

$5

.9

$1 ,6

.3

$1

,5

.8

$7

.5

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

G en

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge

.7 0%

$1 ,2

.6

$1

.9

$4

.8

$4

.2

$1

.6

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al

L ab or

$8 ,9

.3

$1

,0

.0

$3 ,3

.3

$3

,1

.8

$1 ,4

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ra ve l

V eh ic le

$2

.0

$1

.0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ile ag e

C os ts $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

A ir Fa re $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l T ra ve l $2

.0

$1

.0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P et er so n C le an er s

(E R

C _5

0)

Pa ge

FD

EP

C

OS

T

ES

TI

MA

TE

C on tra ct or

C

D M

S m ith In c.

at e:

/1

3/

Ta sk

Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

S ite

S ub Ta sk

G A

C M an ag em en t a nd

P ow er D is co nn ec t S ub Ta sk

A ct iv ity

/P ha se

S V

E S ys te m D ec om m is si o

S ub

Ta sk

S

V E

S ys te m

D ec om m is si on in g S ub Ta sk

P ro je ct

M an ag er

A nd re w G al vi n

Ta sk

S

V E

S ys te m

D ec om m is si on in g R ep or t S ub Ta sk

S ub

Ta sk

S ub Ta sk

TT

ot al s

P et er so n C le an er s

(E R

C _5

0)

S ub co nt ra ct or (E qu ip m en t P ro cu re m en t)

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

S ub to ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

P ro cu re m en t F ee $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al

S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or (S er vi ce s

P ro cu re m en t) ril lin g

(C on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D ril lin g (N on -c on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ob ile L ab or at or y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ur ve yi ng

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$4

.0

$4

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

U til iti es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

R S

I L

LC

$9 ,7

.0

$0

.0

$9 ,7

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$1 0, 5.

$4

.0

$9

,7

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

H an dl in g

Fe e

$1 ,0

.5

$4

7.

$9

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al

S ub co nt ra ct or C os t

$1 1, 7.

$5

.5

$1

0, 5.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

La bo ra to ry

A na ly tic al

C os ts $3

.0

$3

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fa st T ur na ro un d C ha rg es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S am pl e S hi pp in g

$1

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

T ot al L ab or at or y $4

.0

$4

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fi el d

E xp en se s

P er so na l P ro te ct io n

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E xp en da bl es

$8 0.

$4

0.

$4 0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

D ril lin g re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

A na ly tic al re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t (

ID

W re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( O th er

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al

F ie ld E xp en se s

$8 0.

$4

0.

$4 0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub to ta l $2

1, 6.

$1 ,0

.0

$4

,5

.8

$1 4, 5.

$1

,4

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

C om pl et io n

Fe e

$8

.8

$1

.4

$3

.8

$3

.0

$1

.5

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

T ot al E st im at ed

C os t $2

1, 5.

$1 ,1

.4

$4

,9

.7

$1 4, 9.

$1

,5

.5

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pa ge

SITE : Peterson Cleaners (ERC_5380) SUBTASK 2: GAC Management and Power Disconnect

DATE: 10/13/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr. Technical Expert Technical Guidance Field Support 1

Project Manager Update HASP (1 hr) 1 Final Preparation of Data Deliverable (1 hr) Coordinate Site Access with Owner (1 hr) 2 Coordinate with Utility Service 1

Professional II Mobilization (2 hrs) Demobilization (2 hrs) 4 Field Preparation 1 Meet Utility Service Personnel Onsite for Power Disconnect 4 Sample drum 1 IDW Management 2 Prepare Sample Kit 1 Preparation of Data Deliverable 2

Total Hours:

Sr. Technical Expert 1

PM 4

Professional II 15

TOTAL LABOR 20

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 each 1 $120.00

TOTAL VEHICLE $120.00

SUBCONTRACTOR COSTS

NAME PURPOSE UNIT COST

Erwin Remediation IDW Removal (GAC) non-haz 1 $125.00 $125.00 Erwin Remediation IDW Waste Profile non-haz 1 $350.00 $350.00

TOTAL $475.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Small cooler $110.00 1 $110.00 Non-Aqueous TCLP VOCs $210.00 1 $210.00 Non-Aqueous TCLP Metals $135.00 1 $135.00 Ice $6.50 4 $26.00

TOTAL LAB $481.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 1 $40.00

TOTAL EQUIPMENT $40.00

SUBTASK 3: SVE System Decommissioning

DATE: 10/13/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr. Technical Expert Technical Guidance Field Support 2

Project Manager SVE System Decommissioning Documentation 1

Professional II Mobilization (2 hrs) Demobilization (2 hrs) 4 Field Preparation 1 SVE System Decommissioning Oversight 9 SVE System Decommissioning Documentation 2

Total Hours:

Sr. Technical Expert 2

PM 1

Professional II 16

TOTAL LABOR 19

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 Day 1 $120.00

TOTAL VEHICLE $120.00

SUBCONTRACTOR COSTS

NAME PURPOSE UNIT COST

RSI LLC SVE System Removal 1 $9,750.00 $9,750.00

TOTAL $9,750.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 per day 1 $40.00

TOTAL EQUIPMENT $40.00

SUBTASK 4: SVE System Decommissioning Report

DATE: 10/13/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Manager SVE System Decommissioning Report 3

Professional II SVE System Decommissioning Report 5

Total Hours:

PM 3

Professional II 5

TOTAL LABOR 8

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE UNIT COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

o o o o o o o o o o o

408 Ditmar Street Pensacola, FL 32503

To: Mr. Kyle Turner CDM Smith 4010 West Boy Scout Boulevard, Suite 450 Tampa, FL 33607

January 15, 2024

Re: Non-Hazardous Drum Disposal of PFOS/PFAS Impacted Materials

Mr. Turner:

The price for the transportation and disposal (T&D) of non-hazardous drums of soil, mud, and water located in the State of Florida is listed below:

Non-Hazardous PFAS/PFOS Impacted Material:

Description Rate Unit

Profile Fee (Charged once per site) $ 350.00 Per Site T&D - Non-Haz PFOS/PFAS Impacted Soil/ Mud/Water $ 195.00 Per Drum

Non-Hazardous Material not Impacted with PFAS/PFOS:

Description Rate Unit

T&D - Non-Haz (no PFOS/PFAS) Impacted Mud/Water $ 125.00 Per Drum T&D - Non-Haz (no PFOS/PFAS) Impacted Soil $ 110.00 Per Drum

Please ensure that all drum lids are properly secured and that drums are on a level surface like the surrounding area (i.e., not on a pallet, etc.). A single False Mobilization fee will apply if our driver is not able to locate a drum on site or if we are unable to access the property due to a locked gate, etc.

The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida Keys. Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.

This quote is valid for 90 days.

Respectfully, Robert Donado Erwin Remediation, Inc.

Email: Robert@ErwinRemediation.com Office: (850) 466-2358

Respectfully, Robert Donado

Turner, Kyle M.

From: Turner, Kyle M.

Sent: Tuesday, January 16, 2024 10:03 AM To: stephenharris2@enviroserve.com Subject: IDW Rates - FDEP - CDM Smith

Good morning Steve, I hope you are doing well. I remember working with you back when I was with HSW/Verdantas. I have since moved companies and am trying to get some new quotes for drum disposal. I was wondering if you could provide me with quotes/rates for transporta on and disposal of the following. This will be for our FDEP Drycleaning Sites.

IDW Drum – Soil IDW Drum – Soil – PFAS Impacted IDW Drum – Water IDW Drum – Water – PFAS Impacted

Please include any addi onal charges such are mileage, low volume, waste profiling etc….

Thank you, Kyle M. Turner, MS, GIT Geologist CDM Smith 4010 W Boy Scout Blvd, Suite 450, Tampa, FL 33607 O: 813.262.8851 M: 727.488.4471 cdmsmith.com

Turner, Kyle M.

From: Kevin Hamilton <khamilton@hepaco.com> Sent: Friday, January 19, 2024 11:04 AM To: Turner, Kyle M.; Matthew Merritt Subject: Re: IDW Rates - FDEP - CDM Smith

I have sent this to my waste support group. Someone should reach out shortly.

Kevin Hamilton Territory Account Manager

1830 Clarkson Street Jacksonville, Florida 32202 T (904) 706 3040 | M (904) 303 8696 E khamilton@hepaco.com | HEPACO.com

1-800-888-7689 24/7 EMERGENCY RESPONSE

From: Turner, Kyle M. <turnerkm@cdmsmith.com> Sent: Thursday, January 18, 2024 3:54 PM To: Kevin Hamilton <khamilton@hepaco.com> Cc: Leggoe, Kathy R. <leggoekr@cdmsmith.com> Subject: FW: IDW Rates - FDEP - CDM Smith

HEPACO Notice: This communication is from an [EXTERNAL] sender.

If this email looks suspicious, do NOT click or open any links or attachments in the email. To report a suspicious email, click on the Phish Alert Report icon located on the Outlook menu ribbon.

Kevin, Just wanted to make sure you saw this and see if you had any questions. Please provide your rates to us by COB Tuesday 1/23/24 or we will assume the bid is no response.

Thank you, Kyle M. Turner, MS, GIT Geologist CDM Smith 4010 W Boy Scout Blvd, Suite 450, Tampa, FL 33607 O: 813.262.8851

To help protect you r priv acy, Microsoft Office prevented automatic download of this picture from the Internet.

From: Turner, Kyle M.

Sent: Tuesday, January 16, 2024 10:15 AM To: khamilton@hepaco.com Subject: IDW Rates - FDEP - CDM Smith

Good morning Kevin, It’s a new year which means we must update our IDW transportation and disposal rates. I was wondering if you could provide me with quotes/rates for transportation and disposal for the following. This will be for our FDEP Drycleaning Sites.

IDW Drum – Soil IDW Drum – Soil – PFAS Impacted IDW Drum – Water IDW Drum – Water – PFAS Impacted

Please include any additional charges such are mileage, low volume, waste profiling etc….

Please let me know if you have any questions, and if not, please provide rates at your earliest convenience.

Thank you, Kyle M. Turner, MS, GIT Geologist CDM Smith 4010 W Boy Scout Blvd, Suite 450, Tampa, FL 33607 O: 813.262.8851

To help protect you r priv acy, Microsoft Office prevented automatic download of this picture from the Internet.

This e-mail and any attachments to it contain confidential and proprietary material of HEPACO, LLC, its affiliates or agents, and is solely for the use of the intended recipient. Any review, use, disclosure, distribution or copying of this transmittal is prohibited except by or on behalf of the intended recipient. If you have received this transmittal in error, please notify the sender and destroy this e-mail and any attachments and all copies, whether electronic or printed.

Please consider the environment before printing this email.

File details come from the government source that posted it. Updated .