CN-370000-HW681-DC040B.pdf
PDF 9 MB Posted
- Contract number
- HW681
- Issued by
- Florida
About this file
Contract Summary
This package of documents comprises a Task Assignment (TA) DC040B under Contract Number HW681 between the State of Florida Department of Environmental Protection (FDEP) and CDM Smith Inc. for environmental site assessment services at the Golden Touch Cleaners property located at 4034 Little Road, New Port Richie, Pasco County, Florida. The project site, identified as ERIC_5242, is currently occupied by Suncoast Liquor and encompasses 8.61 acres. The contract was executed on June 29, 2023, with authorization from Teresa Booeshaghi (FDEP Secretary or Designee) and Shayne Wood (CDM Smith Vice President).
The scope of work includes five subtasks: Project Management (13% of direct labor costs), Site Survey (utility location and boundary survey), Stage I Field Investigation (soil boring, sampling, and groundwater profiling), Stage II Field Investigation (permanent groundwater monitoring well installation), and Site Assessment Report preparation. The total fixed-price contract value is $135,902.56, with deliverables scheduled for completion by February 15, 2024. Cost breakdown by subtask is as follows: Site Preparation ($16,395.31), Stage I Field Investigation ($79,758.73), Stage II Field Investigation ($22,312.62), and Site Assessment Report plus Project Management ($17,435.90). Subcontractors selected on a lowest-cost basis include Environmental Drilling Services (EDS) for drilling ($22,485.00 total), Southeastern Surveying and Mapping for boundary and topographic surveys ($14,975.00), Site Lines LLC for utility location ($800.00), and Erwin Remediation for investigation-derived waste disposal ($1,875.00 for anticipated drums). Laboratory analytical services, equipment rental, and other direct costs are detailed in comprehensive cost estimates provided within the package.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW681
DC040B Completion February 15, 2024
CDM Smith Inc. will conduct Site Assessment in accordance with the June 14th, 2023 Scope of Work and Cost Proposal.
Kyle McMurray 850-245-8973 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
CDM Smith Inc.
CDM Smith Inc.
Shayne Wood 904-527-6703
ERIC_5242
4034 Little Road, New Port Richey, Pasco County
Golden Touch Cleaners Inc
✔ $ 135,902.56
$ 135,902.56
Scope of Work
Shayne Wood
Vice President
6/29/2023
Shayne Wood Digitally signed by Shayne Wood DN: C=US, E=woodsh@cdmsmith.com, CN=Shayne Wood Date: 2023.06.29 17:03:48-04'00'
Teresa Booeshaghi
Teresa Booeshaghi Digitally signed by Teresa Booeshaghi Date: 2023.06.29 10:42:38 -04'00'
6/29/2023
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 2 Site Preparation Underground Utility and Boundary Survey, Paid invoices for subcontractors
08/15/2023
Subtask 3 Stage I Field Investigation Laboratory analytical reports, field documentation, boring logs, data tables, paid invoices for subcontractors
09/29/2023
Subtask 4 Stage II Field Investigation Laboratory analytical reports, field documentation, boring logs, data tables, paid invoices for subcontractors
10/31/2023
Subtask 5 Site Assessment Report 01/15/2024
Subtask 2 Site Preparation $ 16,395.31
Subtask 3 Stage I Field Investigation $ 79,758.73
Subtask 4 Stage II Field Investigation $ 22,312.62
Subtask 1 and 5 Site Assessment Report + Project Management $ 17,435.90
$ 135,902.56
HW681
DC040B
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
TO: HW681 Contract File
FROM: Kyle McMurray, Contract Manager
DATE: June 26, 2023
SUBJECT: Negotiation Summary
Task Assignment DC040B Golden Touch Cleaners Inc
ERIC_5242
SAR
CDM Smith Inc. (CDM) will prepare a Site Assessment Report. Specific subtasks are detailed below:
Subtask 1: Project Management Project Management is calculated at 13% of the direct labor.
Subtask 2: Site Survey CDM Smith will subcontract a utility location services company to provide a complete survey of the utilities and provide oversight for the Utility Survey.
Subtask 3: Stage I Field Investigation:
A continuous lithologic boring will be cored using DPT to obtain detailed site-specific lithologic and stratigraphic information for the site. A detailed geologic log will be recorded, and the boring will be backfilled with grout using a tremie pipe. The Stage I Field Investigation will delineate the extent of volatile organic halocarbons (VOHs) exceeding the Soil Cleanup Target Levels (SCTLs). Split soil samples will be collected and will be held for Synthetic Precipitate Leaching Procedure (SPLP) testing for samples that are below the direct-contact SCTL and above the default leachability SCTL. Soil borings will be completed by CDM Smith at 17 locations.
Borings will be installed using hand augers and concrete coring will be completed at each of the ten locations. Soil samples will be collected for laboratory analyses at the following depths: 0 to
0.5 feet bls, 0.5 to two feet bls, and at 2-foot intervals. CDM Smith assumes up to 119 samples will be collected. One soil boring near the former drycleaning machine will be completed as a 1-inch diameter monitoring well. The well will be developed and sampled for VOC analyses by EPA Method 8260. 9 of the soil borings will be completed as vapor extraction wells (VEW) for Modified Active Gas Sampling (MAGS™) testing. MAGS testing will be performed for each VEW in general accordance with the Modified Active Gas Sampling Manual dated October 12, 2004. CDM Smith assumes that setup, testing, and breakdown for all tests will require one day. A total of 9 soil gas samples will be submitted to the laboratory for TO-15 analyses with standard reporting times.
vertical groundwater profiling will be conducted at 10 locations using a direct-push technology (DPT) drill rig equipped with a groundwater screen point sampling system. Groundwater samples will be collected. In addition, a continuous lithologic boring will be cored using DPT to obtain detailed site-specific lithologic and stratigraphic information for the site.
Investigation derived waste (IDW) disposal is anticipated and has been accounted for under this subtask. Erwin Remediation for IDW disposal was chosen on a lowest-cost basis. 2 IDW bids are included and the 3rd from EnviroServe was non-responsive.
Subtask 4: Stage II Field Investigation:
CDM Smith currently plans to install 6 additional permanent groundwater monitoring wells. Prior to well installation, continuous soil cores will be collected to the total depth. Using direct push, four shallow zone wells will be installed to a total depth of 22 feet bls. Sand pack will be installed to a depth of one foot above the screen, followed by a 1-foot-thick fine-grained sand seal, and the remainder of the borehole will be grouted. The wells will be purged and sampled for VOHs following installation and a full round of water levels will be collected to map the potentiometric surface.
Investigation derived waste (IDW) disposal is anticipated and has been accounted for under this subtask. Erwin Remediation for IDW disposal was chosen on a lowest-cost basis. 2 IDW bids are included and the 3rd from EnviroServe was non-responsive.
Subtask 5: Site Assessment Report:
CDM Smith will prepare a Site Assessment Report in general accordance with the requirements of FDEP Chapter 62-780, FAC. The report will summarize the history of the Site, physical and geologic conditions, all field work completed by CDM Smith, field and laboratory data, conclusions, and recommendations.
CDM and the FDEP confirmed on June 26th, 2023, that an Access Agreement with the current real property owner of the site has been executed.
The final cost total for Task Assignment DC040B is $135,902.56.
TABLE 1
FDEP COST ESTI MATE
Contractor: CDM Smith, Inc.
Date: 13-Jun-23
Task #: SubTask 1 Project Management SubTask 6
Site: Golden Touch Cleaners SubTask 2 Site Survey SubTask 7
Activity/Phase: Initial Site Assessment SubTask 3 Stage I Field Investigation SubTask 8
Project Manager: Kara Fincham SubTask 4 Stage II Field Investigation SubTask 9
SubTask 5 Site Assessment Report SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$63.58 Project Manager K.Fincham 27.4 27.4 $63.58 PTL/PM K. Fincham 11.0 0.0 5.0 2.0 4.0 0.0 0.0 0.0 0.0 0.0
$0.00 PTL/PM 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$43.05 Professional II K Turner 171.0 2.0 78.0 31.0 60.0 0.0 0.0 0.0 0.0 0.0 $28.17 Professional I J. LeBlanc 156.0 18.0 90.0 24.0 24.0 0.0 0.0 0.0 0.0 0.0
$69.24 PTL/PM D. Anderson 14.0 4.0 2.0 8.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Hours 379.40 27.40 20.00 177.00 59.0 96.0 0.0 0.0 0.0 0.0 0.0
Direct Labor $15,170.04 $1,745.23 $593.16 $6,488.06 $2,276.27 $4,067.32 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 135.00% $20,479.55 $2,356.06 $800.77 $8,758.88 $3,072.96 $5,490.88 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.70% $5,719.10 $657.95 $223.62 $2,446.00 $858.15 $1,533.38 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $41,368.69 $4,759.24 $1,617.55 $17,692.94 $6,207.38 $11,091.58 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF CDM Smith Page 1
TABLE 1
FDEP COST ESTI MATE
Contractor: CDM Smith, Inc.
Date: 13-Jun-23
Task #: SubTask 1 Project Management SubTask 6
Site: Golden Touch Cleaners SubTask 2 Site Survey SubTask 7
Activity/Phase: Initial Site Assessment SubTask 3 Stage I Field Investigation SubTask 8
Project Manager: Kara Fincham SubTask 4 Stage II Field Investigation SubTask 9
SubTask 5 Site Assessment Report SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $1,440.00 $240.00 $720.00 $480.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $1,440.00 $240.00 $720.00 $480.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $22,485.00 $0.00 $15,085.00 $7,400.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $14,975.00 $12,060.00 $0.00 $2,915.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 IDW - Erwin $1,250.00 $0.00 $0.00 $1,250.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Site Lines LLC $800.00 $800.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $39,510.00 $12,860.00 $15,085.00 $11,565.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $3,951.00 $1,286.00 $1,508.50 $1,156.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $43,461.00 $14,146.00 $16,593.50 $12,721.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $31,885.00 $0.00 $30,985.00 $900.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $4,770.00 $0.00 $4,770.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping+ice $2,445.00 $0.00 $2,282.00 $163.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $39,100.00 $0.00 $38,037.00 $1,063.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $560.00 $80.00 $320.00 $160.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Other $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $4,661.00 $0.00 $4,251.00 $410.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW drums) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $1,175.00 $150.00 $375.00 $650.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $6,396.00 $230.00 $4,946.00 $1,220.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $131,765.69 $4,759.24 $16,233.55 $77,989.44 $21,691.88 $11,091.58 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $4,136.87 $475.92 $161.76 $1,769.29 $620.74 $1,109.16 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $135,902.56 $5,235.16 $16,395.31 $79,758.73 $22,312.62 $12,200.74 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF CDM Smith Page 2
SITE : Golden Touch Cleaners ERIC_5242 SUBTASK: 2 Site Survey
DATE: 6/13/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Professional II K. Turner Prepare HASP 2
Professional I J. LeBlanc Utility Locate with 2 hr roundtrip mobilization 8
Survey Oversight with 2 hr roundtrip mobilization 10
Staff Hours K. Turner 2
J. LeBlanc 18
Total: 20
TOTAL LABOR 20
VEHICLE TYPE RATE UNIT USEAGE
Truck Utility Locate & Survey $120.00 days 2 $240.00
TOTAL VEHICLE $240.00
SUBCONTRACTOR COSTS
NAME PURPOSE RATE UNITS USEAGE Subtotal
Site Lines LLC Private Utility Locate $800 1 $800.00
Southeastern Surveying Boundary Survey $12,060 1 $12,060.00
TOTAL $12,860.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES
TOTAL LAB
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Site Reconnaissance Kit $150.00 day 1 $150.00
Expendables $40.00 day 2 $80.00
TOTAL EQUIPMENT $230.00
SUBTASK: 3 Stage I Field Investigation
DATE: 6/13/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
PTL/PM K. Fincham Prepare field scope of work 1
Determine Field Activities based on field data 4
PTL/PM D. Anderson Provide Technical Guidance for fieldwork 4
Professional II K. Turner Field Event Preparation 1
Arrange for site access with owner 2
Prepare Sample Kit request 1
Mobilization drilling 2 hr round trip (5 days) 10
7 soil borings (1 day) 10
Vapor Extraction Well Installation (5 VEWS) plus one interior MW (2 day) 20
10 Vertical profiles (2 days) 20
Mobilization MAGS Testing 2 hr round trip (1 day) 4
MAGs Testing (10 days) 10
Professional I J. LeBlanc Mobilization drilling 2 hr round trip (5 days) 10
7 soil borings (1 day) 10
Vapor Extraction Well Installation (5 VEWS) plus one interior MW (2 day) 20
10 Vertical profiles (2 days) 20
Mobilization MAGS Testing 2 hr round trip (2 days) 4
MAGs Testing (2 days) 20
IDW Management 6
Staff Hours D. Anderson 4.0
K. Turner 78.0
90.0
5.0
J. LeBlanc
K. Fincham Total: 177.0
TOTAL LABOR 177
VEHICLE TYPE PURPOSE RATE UNIT USEAGE
Truck drilling $480.00 week 1 $480.00
Truck MAGS testing $120.00 day 2 $240.00
TOTAL VEHICLE $720.00
SUBCONTRACTOR COSTS
NAME PURPOSE RATE UNITS USEAGE Subtotal
EDS Ph I drilling $15,085 lump sum 1 $15,085.00
TOTAL $15,085.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES
Soil 8260B DTW ~5-7' bls, 17 soil samples at each SB $150.00 119 $17,850.00
1 week turnaround 20% $3,570.00
SPLP Extraction - 1312 $55.00 24 $1,320.00
SPLP Aqueous - 8260B $150.00 24 $3,600.00
Sample Shipping $150.00 9 $1,350.00
Ice $6.50 18 $117.00
Groundwater 8260B $150 40 $6,000.00
1 week turnaround 20% $1,200.00
Soil Gas TO-15 $200.00 9 $1,800.00
Soil TCLP VOCs (IDW) $210.00 1 $210.00
Water VOCs (IDW) $205.00 1 $205.00
Sample Shipping $150.00 5 $750.00
Ice $6.50 10 $65.00
TOTAL LAB $38,037.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Encore Sampler $16.00 Each 119 $1,904.00
Expendables $40.00 Days 8 $320.00
Total Survey Station $50.00 Days 1 $50.00
Soil Sampling Kit (through concrete) $235.00 Days 2 $470.00
Shallow Groundwater Sampling/Soil Vapor Screening Kit $290.00 Days 2 $580.00
Monitoring Well Installation Kit $325.00 Days 1 $325.00
Mags Investigation Kit $500.00 Days 2 $1,000.00
Summa Canister $33.00 each 9 $297.00
TOTAL EQUIPMENT $4,946.00
SUBTASK: 4 Stage II Field Investigation
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
PTL/PM K. Fincham Determine Field activities based on field data 2
PTL/PM D. Anderson Provide Technical Guidance for fieldwork 2
Professional II K. Turner Field Event Preparation 1
Prepare Sample Kit 1
Prepare Field forms/labels 1
Mobilization 2 hr round trip (2 days) 4
Install 4 Monitoring Wells (2 days) 20
Prepration/finalization of document deliverable 4
Professional I J. LeBlanc Survey oversight/IDW Management 10
Mobilization 2 hr round trip (1 day) 2
Sample 5 Monitoring Wells 8.0
Preparation ofo Document Deliverable 4
Staff Hours D. Anderson 2
K. Turner 31
J. LeBlanc
K. Fincham
Total: 59
TOTAL LABOR 59
VEHICLE TYPE RATE UNIT USEAGE
Truck $120.00 day 4 $480.00
TOTAL VEHICLE $480.00
SUBCONTRACTOR COSTS
NAME PURPOSE Unit COST
EDS Drilling, See Attachment A 1 $7,400.00 $7,400.00
Southeastern Survey Survey, see Attachment A 1 $2,915.00 $2,915.00
Erwin Remediation IDW Disposal, see Attachment A 10 $125.00 $1,250.00
TOTAL $11,565.00
6/13/2023
LABORATORY COSTS
PARAMETER RATE # SAMPLES
Groundwater 8260B (5 wells) $150.00 6 $900.00
Sample Shipping $150.00 1 $150.00
Ice $6.50 2 $13.00
TOTAL LAB $1,063.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Days 4 $160.00
Shallow Groundwater Sampling Kit $290.00 Days 1 $290.00
Monitoring Well Installation Kit $325.00 Days 2 $650.00
Tubing/HDPE $0.40 per foot 300 $120.00
TOTAL EQUIPMENT $1,220.00
SUBTASK: 4 Site Assessment Report
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
PTL/PM K. Fincham SAR Preparation of conclusions and recommendations 4
PTL/PM D. Anderson SAR Technical Evaluation/PG seal 8
Professional II K. Turner SAR Preparation - body of document 60
Professional I J. LeBlanc Assist in SAR Preparation - text, data tables, figures, etc 24
Staff Hours D. Anderson 8
K. Turner 60
J. LeBlanc
K. Fincham
Total: 96
TOTAL LABOR 96
6/13/2023
4651 Salisbury Road, Suite 420
Jacksonville, Florida 32256 tel: 904.731.7109
June 14, 2023
Mr. Kyle McMurray Florida Department of Environmental Protection Hazardous Waste Cleanup Section 2600 North Blair Stone Road, MS 4520 Tallahassee, Florida 32399-2400
Subject: Golden Touch Site Assessment Proposal 4034 Little Road New Port Richey, Pasco County, Florida
ERIC_5242
Dear Mr. McMurray:
CDM Smith Inc. (CDM Smith) is pleased to respond to the Florida Department of Environmental Protection (FDEP) Task Assignment Request to provide site assessment services for the Golden Touch Cleaners Site Assessment Work Plan site under Contract Number HW681. The scope of work, and project schedule are described below, and the cost estimate is also attached.
Site Assessment Scope of Work CDM Smith understands that FDEP would like to complete the initial site assessment within approximately eight months, leaving four months as a contingency to complete the site assessment within one year. The subtasks are described below.
Subtask 1 – Project Management Project management activities performed under this task generally consist of administrative functions required to maintain the project schedule, adhere to budget, and deliver the quality of the work products defined by CDM Smith's quality standards. We will prepare and submit invoices upon approval of each deliverable or milestone completion.
Project Kickoff and Progress Meetings CDM Smith expects to have a kickoff meeting or telephone conference with the FDEP to review the status of the project and address FDEP comments regarding the Task Assignment. CDM Smith will prepare meeting agendas and notes as part of this task.
Project Quality Technical Review CDM Smith's Quality Management System guidelines will be followed. Internal quality reviews will be conducted on plans and on investigation findings and reports.
Project Status Reports CDM Smith's Project Manager will prepare and submit monthly status reports to accompany each invoice throughout the duration of this project. The Project Manager will also discuss the status of the project with the FDEP on a bi-weekly basis until the project is complete.
Subtask 2 – Site Survey Underground Utility and Boundary Survey The work plan identified only a portion of the underground utilities. CDM Smith will subcontract a utility location services company to provide a complete survey of the utilities and provide oversight for the Utility Survey.
In addition, CDM Smith will subcontract a surveying company to conduct a complete boundary survey and will provide oversight prior to the beginning of fieldwork.
Deliverable: Surveys, paid invoices to surveyors
Subtask 3 – Stage I Field Investigation Initially, a continuous lithologic boring will be cored using DPT to obtain detailed site-specific lithologic and stratigraphic information for the site at a location immediately north of the facility.
The target boring depth will be 50 feet below land surface (bls), refusal, or the top of the SAS limestone. A detailed geologic log will be recorded, and the boring will be backfilled with grout using a tremie pipe.
The Stage I Field Investigation will delineate the extent of volatile organic compounds (VOCs) exceeding the Soil Cleanup Target Levels (SCTLs). Split soil samples will be collected and will be held for Synthetic Precipitate Leaching Procedure (SPLP) testing for samples that are below the direct-contact SCTL and above the default leachability SCTL.
Soil borings will be completed by CDM Smith at 17 locations. Borings will be installed using DPT and concrete coring will be completed at each of the 17 locations.
Soil samples will be collected for laboratory analyses at the following depths: 0 to 0.5 feet bls, 0.5 to two feet bls, and at 2-foot intervals thereafter to the water table (estimated at 7 feet bls). The soil samples will be submitted for laboratory analysis by United States Environmental Protection Agency (EPA) Method 8260 for VOCs. CDM Smith assumes up to 119 samples will be collected.
CDM Smith will collect duplicate samples at each interval to be analyzed by SPLP but will identify which samples to run for SPLP after the initial data is received from the laboratory. The cost for 20% of the soil samples were assumed to be run for SPLP in this proposal.
Nine of the soil borings will be completed as vapor extraction wells (VEWs) for Modified Active Gas Sampling (MAGS™) testing. The VEW well screens will be installed to a depth of one foot above the water table (estimated at 7 feet bls) and the top of the screen will terminate at a depth of approximately 1-foot bls. The total depth of the VEWs is expected to be 11-feet bls. The VEWs will be constructed using 10-feet of 2-inch diameter, 0.010-inch factory-slotted polyvinyl chloride (PVC) well screen, coupled with one foot of solid PVC riser. Each of the VEWs will be installed using a stainless steel hand auger. 20/30 graded silica sand will be placed from the bottom of the borehole to approximately 0.5 feet above the well screen, followed by 0.5 feet of neat cement grout. The VEWs will be completed within an 8-inch bolt-down flush-mount manhole.
MAGS testing will be performed for each VEW in general accordance with the Modified Active Gas Sampling Manual dated October 12, 2004, prepared by HSA Engineers & Scientists. More specifically:
To begin the MAGS testing, a step test will be performed at VEW001, where a vacuum of approximately 15 inches of water (“H2O) will be applied. Vacuum and flow rate readings will be recorded, along with vacuum readings at select monitor wells and designated vacuum monitoring points. Influent PID readings will also be recorded. The vacuum will be increased to approximately 30 “H2O, where additional data like that specified above will be recorded. The final step will be to increase the vacuum to approximately 45 “H2O, with the final set of data recorded. Actual vacuums applied during each step may vary based on site conditions. Each step is expected take 15 minutes, for a total of 45 minutes for the step test.
Using the optimum flow rate and vacuum determined from the step test, vapor samples will be collected at each VEW. The vapor samples will be collected using a 6-liter Summa canister. A purge time will be calculated based on the flow rate and estimated radius of influence, to ensure the collection of steady-state data. Vacuum and flow rate readings will be recorded, along with vacuum readings at select monitor wells and designated vacuum monitoring points, at 15-minute intervals for a total duration of one hour. Influent PID readings will also be recorded.
CDM Smith assumes that setup, testing, and breakdown for all tests will require one day. A total of nine soil gas samples will be submitted to the laboratory for TO-15 analyses with standard reporting times.
Following MAGS™ testing, vertical groundwater profiling will be conducted at ten locations using a direct-push technology (DPT) drill rig equipped with a groundwater screen point sampling system.
Groundwater samples will be collected using DPT screen points at the following depth intervals: six to ten feet bls, 16 to 20 feet bls, 26 to 30 feet bls, and 36 to 40 feet bls or to depth of refusal or limestone, whichever occurs first. The groundwater samples will be collected directly, and laboratory analyzed for VOCs by EPA Method 8260.
At the completion of field events, the utilities that were marked during mobilization and all boring locations will be surveyed. Investigation-derived waste (IDW) collected up to this point will be characterized and transported off-site for disposal. A total of five drums of nonhazardous IDW are anticipated at the completion of Stage I.
Deliverable: Laboratory analytical reports, field documentation, boring logs, data tables, paid invoices for subcontractors
Subtask 4 – Stage II Field Investigation The monitoring well locations will be finalized based on the Stage I results. CDM Smith currently plans to install six permanent groundwater monitoring wells. Prior to well installation, continuous soil cores will be collected to the total depth. Using direct push, five shallow zone wells will be installed to a total depth of 22 feet bls. Each shallow monitoring well will be constructed using 12-feet of 1-inch diameter solid PVC riser, coupled with ten feet of 0.010-inch prepacked well screen.
Using hollow stem augers, one intermediate zone monitoring well will be installed to a total depth of 38 feet bls. The intermediate monitoring well will be constructed using 33 feet of 2-inch diameter solid PVC riser, coupled with five feet of 0.010-inch factory-slotted PVC well screen. Sand pack will be installed to a depth of one foot above the screen, followed by a 1-foot-thick fine-grained sand seal, and the remainder of the borehole will be grouted. The wells will be developed following completion.
The wells will be purged and sampled for VOCs following installation and a full round of water levels will be collected to map the potentiometric surface. The monitoring wells will be surveyed at the completion of Subtask 4, and IDW will be characterized and transported off-site for disposal. A total of five drums of nonhazardous IDW are anticipated at the completion of Stage II.
Deliverable: Completed well logs, laboratory analytical reports, paid invoices
Subtask 5 – Site Assessment Report CDM Smith will prepare a Site Assessment Report in general accordance with the requirements of FDEP Chapter 62-780, FAC. The report will summarize the history of the Site, physical and geologic conditions, all field work completed by CDM Smith, field and laboratory data, conclusions, and recommendations. Additional elements of the report will include the following:
Figures depicting site conditions
Figures depicting soil and groundwater data and estimated extent of impact
Groundwater elevation contour map
Tables summarizing field and analytical data
Soil/lithological logs
Monitoring well completion reports
Groundwater sampling logs and field equipment calibration records
Laboratory analytical reports and chain of custody documentation
Waste disposal manifests and weigh tickets
Subcontractors Subcontracted services are required for drilling, surveying, utility location, and IDW disposal. The bidding, results, and subcontractor selections are described below, and Attachment A includes a summary of the subcontractor cost comparisons.
Drilling Request for Quotations (RFQs) were sent to three pre-qualified drilling companies for all drilling services. The lowest cost bid was from Groundwater Protection. The quotes are included in Attachment A.
Surveying Southeastern Surveying and Mapping is a primary subcontractor for HW681 and other bids were not solicited for this project. The quote is included in Attachment A.
Utility Location Bids were obtained from Blood Hound, GPRS Inc., and Site Lines LLC to complete the utility survey.
Site Lines LLC was the lowest bid. The quotes are included in Attachment A.
IDW Disposal Rates for IDW removal and disposal were previously requested for HW681 from Erwin Remediation, Hepaco, and Enviroserve (formerly Clark Environmental). Erwin Remediation was the lowest cost and has been selected as the IDW disposal subcontractor for this project as shown in Attachment A.
Assumptions This scope and schedule have been prepared predicated on unknown site conditions. The scope and schedule may change depending on surveys and the drilling conditions. Drillers and other subcontractors’ availability may be limited and impact the schedule. In addition, this scope does not consider any weather delays. CDM Smith will communicate with the FDEP in a timely manner if this occurs to prepare the necessary paperwork for change orders.
Schedule CDM Smith’s proposed project schedule is shown below, with targeted completion of the Site Assessment process within eight months. The final dates on the schedule depend on Notice to Proceed (NTP) and subcontractor availability. Once CDM Smith receives NTP, the subcontractor’s availability will be confirmed, and the schedule may be adjusted. The deliverables and due dates are summarized in Table 2 below.
Table 2: Deliverables Schedule
Subtask 2 Deliverable:
Due Date:
Site Preparation Underground Utility and Boundary Survey, Paid invoices for subcontractors August 15, 2023
Subtask 3 Deliverable:
Due Date:
Stage I Field Investigation Laboratory analytical reports, field documentation, boring logs, data tables, paid invoices for subcontractors September 29, 2023
Subtask 4 Deliverable:
Due Date:
Stage II Field Investigation Laboratory analytical reports, field documentation, boring logs, data tables, paid invoices for subcontractors October 31, 2023
Subtask 5 Deliverable:
Due Date:
Site Assessment Report Site Assessment Report January 15, 2024
We look forward to working on this important project. Feel free to contact me at 904-527-6716 or by email with any questions or comments.
Sincerely, Kara E. Fincham, PMP Shayne Wood, P.E., PMP, BCEE Senior Project Manager Vice President CDM Smith CDM Smith FinchamKE@cdmsmith.com WoodSH@CDMSmith.com cc: David Anderson, P.G., CDM Smith
Attachment A Subcontractor Quotes
Driller
Item Est. Qty. Units Rate Total Est. Qty. Units Rate Total Est. Qty. Units Rate Total
Utility Clearance-Obtain Sunshine 811 Dig Ticket, have utilities marked 1 lump sum Included Included 1 lump sum Included Included 1 lump sum $25.00 $25.00
Mobilization/Demobilization including crew HASP(1) and Water Mgt.
District Well Installation Permits
1 each $800.00 $800.00 1 lump sum $700.00 $800.00 1 lump sum $850.00 $850.00
Construct Temporary Decontamination Pad 1 lump sum Included Included 1 lump sum Included Included 1 lump sum $350.00 $350.00
DPT Drill Rig and Crew Daily Rate 5 per day $1,750.00 $8,750.00 5 per day $1,850.00 $9,250.00 5 per day $2,175.00 $10,875.00
DPT Crew Per Diem 4 night $300.00 $1,200.00 4 per day $250.00 $1,000.00 NA per day NA NA
Night Work Allowance/Surcharge 1 per night $300.00 $300.00 1 per night Included Included 1 per night $750.00 $750.00
Core drill for inside work 1 per day $250.00 $250.00 1 per day $250.00 $250.00 1 per day Included Included
Additional Equipment as Proposed by Subcontractor 1 each $450.00 $450.00 1 per day $500.00 $500.00 5 per day $75.00 $375.00
Materials for Soil Sampling (please list supplies) 1 lump sum Included 1 lump sum Included Included 1 lump sum $150.00 $150.00
Materials for Water Sampling (please list supplies) 40 each $10.00 $400.00 40 each $2.00 $80.00 1 lump sum $250.00 $250.00
Materials for Borehole Abandonment (grout & patch) 19 each $15.00 $285.00 4 per bag $20.00 $80.00 530 per linear foot $4.00 $2,120.00
VEW Installation: 2" diameter, 2.5 or 5 feet 0.01-Inch Slot Screen 45 foot $16.00 $720.00 45 per linear foot $35.00 $1,575.00 45 per linear foot $25.00 $1,125.00
Monitor Well Install via Hand Auger inside a building + materials: 1- Inch Sch. 40 PVC Well Installation & Materials, 6 or 8-inch O.D.
Borehole, Soil Sampling
10 per linear foot $4.00 $40.00 10 per linear foot $20.00 $200.00 10 per linear foot $25.00 $250.00
5 or 10 ft. pre-packed 0.01-Inch Slot Screens 1 each $95.00 $95.00 1 each Included Included 1 each Included Included 2' x 2' x 0.5' Well Pad/Donut Pad, Flush-Mounted Bolt-Down 8/5-Inch Manhole
10 each $150.00 $1,500.00 10 each $100.00 $1,000.00 10 each $125.00 $1,250.00
Decontamination between drilling locations and prior to demobilization 1 lump sum Included Included 1 lump sum Included Included 1 lump sum Included Included
Well Development, 3 well volumes or until volume used during drilling has been extracted via a submersible pump plus stabilization of field parameters
1 each $75.00 Included 1 per well Included Included 1 per well $175.00 $175.00
Investigation Derived Waste Mgt. - supply applicable DOT 55-gallon drums and handling/staging
5 each $65.00 $325.00 5 per drum $70.00 $350.00 5 per drum $70.00 $350.00
County Water Mgt. District Well Completion Reports 1 each Included Included 1 lump sum Included Included 1 lump sum $175.00 $175.00 All decon and drilling water be must PFAS certified free (only for sonic/remedial injections), provide cost.
1 each $300.00 $300.00 1 each Included Included 1 each $950.00 $950.00
Source of PFAS Free Water NA NA NA
Total Project duration 5 days 5 days 5 days
$15,415.00 $15,085.00 $20,020.00
Subcontractor Evaluation
Golden Touch Cleaners
Phase I Vertical Groundwater Profiling & Vapor Extraction Well Installation
GW Protection Environmental DrillingServices (EDS) Preferred Driling Solutions (PDS)
Total Total Total
Attachment C: Subcontractor Quotes Golden Touch Cleaners
New Port Richie, Pasco County, Florida
Driller
Item Est. Qty. Units Rate Total Est. Qty. Units Rate Total Est. Qty. Units Rate Total
Utility Clearance-Obtain Sunshine 811 Dig Ticket, have utilities marked 1 lump sum Included Included 1 lump sum Included Included 1 lump sum $25.00 $25.00
Mobilization/Demobilization including crew HASP(1) and Water Mgt.
District Well Installation Permits
1 each $800.00 $800.00 1 lump sum $800.00 $800.00 1 lump sum $850.00 $850.00
Construct Temporary Decontamination Pad 1 lump sum Included Included 1 lump sum Included Included 1 lump sum $350.00 $350.00
Drill Rig and Crew Daily Rate 1.5 lump sum $3,000.00 $3,000.00 2 per day $1,850.00 $3,700.00 2 per day $2,175.00 $4,350.00
DPT Crew Per Diem 1 night $300.00 $300.00 1 per day $250.00 $250.00 NA per day NA NA
Additional Equipment as Proposed by Subcontractor NA per day NA NA NA per day NA NA NA per day NA NA
1-Inch Sch. 40 PVC Well Installation & Materials, 5 or 10 ft. 0.01-Inch Slot Screens, 6 or 8-inch O.D. Borehole, Soil Sampling to depth
60 per linear foot $4.00 $240.00 NA NA NA NA NA NA NA NA
5 or 10 ft. pre-packed 0.01-Inch Slot Screens 4 each $170.00 $680.00 1 each Included Included 1 each Included Included
2-Inch Sch. 40 PVC Well Installation & Materials, 5 or 10 ft. 0.01-Inch Slot Screens, 6 or 8-inch O.D. Borehole, Soil Sampling to depth
33 per linear foot $14.00 $462.00 90 per linear foot $20.00 $1,800.00 90 per linear foot $25.00 $2,250.00
2' x 2' x 0.5' Well Pad, Flush-Mounted Bolt-Down 8-Inch Manhole 5 each $150.00 $750.00 5 Each $100.00 $500.00 5 Each $125.00 $625.00
Decontamination between drilling locations and prior to demobilization 2 per day Included Included 2 per day Included Included 2 per day $250.00 $500.00
Well Development, 3 well volumes or until volume used during drilling has been extracted via a submersible pump plus stabilization of field parameters
1 lump sum $275.00 $275.00 5 per well Included Included 5 per well $175.00 $875.00
Investigation Derived Waste Mgt. - supply applicable DOT 55-gallon drums and handling/staging
5 each $65.00 $325.00 5 per drum $70.00 $350.00 12 per drum $70.00 $840.00
County Water Mgt. District Well Completion Reports 1 lump sum Included Included 1 lump sum Included Included 1 pe well $175.00 $175.00
All decon and drilling water be must PFAS certified free, provide cost. 1 each $300.00 $300.00 1 each Included Included 1 each $500.00 $500.00
Total Project duration 1.5 days 2 days 2 days
Source of drilling/decon water office office office
$7,132.00 $7,400.00 $11,340.00
Driller
Phase I
Phase II
Total
Phase II Permanent Monitoring Well Installation
GW Protection Environmental Drilling Services (EDS) Preferred Driling Solutions (PDS)
Drilling Summary
GW Protection Environmental Drilling Services (EDS) Preferred Driling Solutions (PDS)
$15,415.00 $15,085.00 $20,020.00
$7,132.00 $7,400.00 $11,340.00
$22,547.00 $22,485.00 $31,360.00
Total Total Total
Attachment C: Subcontractor Quotes Golden Touch Cleaners
Utility Location
Company
Locate Utilities
Survey - Boundary, Site Features, Utilities, establish site elevation Survey Update - TOC and locations of installed wells and borings
Company
Item Est. Qty. Units Rate Total Est. Qty. Units Rate Total Est. Qty. Units Rate Total
Transport Cost - Truck Driver $69.60/hr, Truck $76.32/hr = $146.22 3 hours $146.22 $438.66
Fee - Energy, Security, Recovery Fee $15% of total 1 Fee $487.11 $487.11 Transport Cost < 100 mi. per drum Transport Cost 101-250 mi. per drum Transport Cost 250-400 mi. per drum
Liquid Disposal 5 Drums $125.00 $625.00 5 Drums $141.75 $708.75
Soil Disposal 10 Drums $125.00 $1,250.00 10 Drums $210.00 $2,100.00
$1,875.00 $0.00 $3,295.86
1 - Delivery destination 5371 Hartford St, Tampa, Florida: 41 miles
Blood Hound Site Lines LLC Geoview Inc
8 Hours $1,825.00 8 hours $800.00 8 hours $1,300.00
$1,300.00Total $1,825.00 Total $800.00 Total
Hepaco 1
Survey
Southeastern Surveying and Mapping
Lump Sum
Lump Sum $12,060.00
$2,915.00
Included Not Applicable
Total Total Total
Not Applicable
Included Not Applicable
Included No response - decline to bid
Included
Included
Total $14,975.00
Investigation-Derived Waste
Erwin Remediation EnviroServe
Attachment C: Subcontractor Quotes Golden Touch Cleaners
Item Description of Work Quantity Units Rate Extension
1.0 General Requirements
1.1 Utility Clearance-Obtain Sunshine 811 Dig Ticket, have utilities marked Lump Sum -$
1.2 Potable water - obtain permission/meter from local municipality, pay for water usage if a source is not available on-site Lump Sum -$
1.3 Mobilization/Demobilization including crew HASP(1) and Water Mgt.
District Well Installation Permits 1 Lump Sum 800.00$ 800.00$
1.4 Access improvements to drilling location(s) (if applicable) Lump Sum -$
1.5 Construct Temporary Decontamination Pad Lump Sum -$
1.6 DPT Drill Rig and Crew Daily Rate 5 Per Day 1,850.00$ 9,250.00$
1.6a DPT Crew Per Diem 4 Per Day 250.00$ 1,000.00$
1.7 Core drill for inside work 1 Per Day 250.00$ 250.00$
1.8 Additional Staff as Proposed by Subcontractor Per Day -$
1.9 Additional Equipment as Proposed by Subcontractor 1 Per Day 500.00$ 500.00$
2.0 Monitor or VEW Installation, Soil Sampling, Groundwater Sampling
2.1 Materials for Soil Sampling (please list supplies) provide unit -$
2.2 Materials for Water Sampling (please list supplies) 40 Each 2.00$ 80.00$
2.3 Materials for Borehole Abandonment (grout & patch) 4 Per Bag 20.00$ 80.00$
2.4 VEW Installation: 2" diameter, 2.5 or 5 feet 0.01-Inch Slot Screen 45 Per Linear Foot 35.00$ 1,575.00$
2.5 Monitor Well Install via Hand Auger inside a building + materials: 1- Inch Sch. 40 PVC Well Installation & Materials, 5 or 10 ft. pre-packed 0.01-Inch Slot Screens, 6 or 8-inch O.D. Borehole, Soil Sampling
10 Per Linear Foot 20.00$ 200.00$
2.6 2' x 2' x 0.5' Well Pad, Flush-Mounted Bolt-Down 8-Inch Manhole 10 Each 100.00$ 1,000.00$
2.7 2' x 2' x 0.5' Well Pad, Above-Ground Aluminum Riser, 4 Protective Safety Painted PVC Bollards
Each 600.00$ -$
2.8 Decontamination between drilling locations and prior to demobilization Per Day -$
2.9 Well Development, 3 well volumes or until volume used during drilling has been extracted via a submersible pump plus stabilization of field parameters
Per Well -$
2.10 Investigation Derived Waste Mgt. - supply applicable DOT 55-gallon drums and handling/staging
5 Per Drum 70.00$ 350.00$
2.11 Water Mgt. District Well Completion Reports Lump Sum -$
2.12 All decon and drilling water be must PFAS certified free, provide cost.
Each -$
2.12a Source of PFAS Free Water
3.0 Additional Items, as needed
please add as needed -$ -$
SUBTOTAL 15,085.00$
TOTAL 15,085.00$
5 Days
10 Hours
Days
Each
Notes:
1 - All drilling crew members shall meet the required OSHA training and medical monitoring requirements contained in 29 CFR 1910.120 and work shall be conducted under the Contractor's site-specific Health and Safety Plan.
Drill crew size/number of rigs & crews proposed/first available date to begin the work
Florida Licensed Monitoring Well Driller & Certification Number
0.9 0.9 0.8
Authorized Representative Name and Title Carl Leonhardt VP of Operations
Signature and Date
2.0
9521.0
Environmental Drilling Service, Inc.
Company Name
Interstate Workers' Compensation Experience Modification Rate (EMR)
Pollution Liability Insurance Limit per Occurrence
Site Name: Golden Touch Cleaners Site Address: 4034 Little Road, New Port Richie, Pasco County, Florida FDEP ERIC No. ERIC_5242
Total project duration Assumed work hours per day Assumed uninterrupted shift duration Assumed number of breaks
DRILLING CONTRACTOR BID SHEET
Drilling Method: Hollow Stem Auger, Sonic, Geoprobe® or Other:
Type and model of drill rig(s) Geoprobe 7822
Scope of Work: Hand clear all locations to 5 feet. Provide PFAS Free Water. Water levels estimated to be within this range: 5-7 ft bls -DPT install one (1) SB lithologic to 50 feet, collect continuous cores, plug and patch once complete.
-DPT install six (6) SBs to 10 ft (outside) and Hand Auger install eleven (11) SBs to 10 ft (inside), screen/sample collection to depth, plug and patch 8 locations (SBs not converted to VEWs).
-Convert nine (9) SBs to VEWs (2" diameter, 2.5 or 5 ft screen, estimate to 5 ft) complete with well pads/manholes.
-Hand Auger/Indoor dolly rig install one (1) monitor well inside the building to 10 feet, 1-Inch diameter Sch. 40 PVC Well Installation & Materials, 10 ft. 0.01-Inch Slot Screens prepacked with filter sand, complete with well pad/manhole.
-DPT install ten (10) Groundwater Monitoring Points (GMPs) to 40 ft, collect GW samples at 4 intervals, plug and patch once complete.
Drum all soil and development water.
BID SHEET
FDEP Waste Cleanup Project
1.0 General Requirements
1.1 Utility Clearance-Obtain Sunshine 811 Dig Ticket, have utilities marked Lump Sum -$
1.2 Potable water - obtain permission/meter from local municipality, pay for water usage if a source is not available on-site Lump Sum -$
1.3 Mobilization/Demobilization including crew HASP(1) and Water Mgt.
District Well Installation Permits 1 Lump Sum 800.00$ 800.00$
1.4 Access improvements to drilling location(s) (if applicable) Lump Sum -$
1.5 Construct Temporary Decontamination Pad Lump Sum -$
1.6 One Drill Rig and Crew Daily Rate 2 Per Day 1,850.00$ 3,700.00$
1.6a DPT Crew Per Diem 1 Per Day 250.00$ 250.00$
1.7 Additional Staff as Proposed by Subcontractor Per Day -$
1.8 Additional Equipment as Proposed by Subcontractor Per Day -$
2.0 Monitor Well Installation, Soil Sampling
2.1 2-Inch Sch. 40 PVC Well Installation & Materials, 5 or 10 ft. 0.01-Inch Slot Screens, 6 or 8-inch O.D. Borehole, Soil Sampling to depth
90 Per Linear Foot 20.00$ 1,800.00$
2.2 2' x 2' x 0.5' Well Pad, Flush-Mounted Bolt-Down 8-Inch Manhole 5 Each 100.00$ 500.00$
2.3 2' x 2' x 0.5' Well Pad, Above-Ground Aluminum Riser, 4 Protective Safety Painted PVC Bollards
Each -$
2.4 Decontamination between drilling locations and prior to demobilization Per Day -$
2.5 Well Development, 3 well volumes or until volume used during drilling has been extracted via a submersible pump plus stabilization of field parameters
Per Well -$
2.6 Investigation Derived Waste Mgt. - supply applicable DOT 55-gallon drums and handling/staging
5 Per Drum 70.00$ 350.00$
2.7 Water Mgt. District Well Completion Reports Lump Sum -$
2.8 All decon and drilling water be must PFAS certified free, provide cost.
Each -$
2.8a Source of PFAS Free Water
3.0 Additional Items, as needed
please add as needed -$ -$
SUBTOTAL 7,400.00$
TOTAL 7,400.00$
2 Days
10 Hours
Days
Each
Signature and Date
Notes:
1 - All drilling crew members shall meet the required OSHA training and medical monitoring requirements contained in 29 CFR 1910.120 and work shall be conducted under the Contractor's site-specific Health and Safety Plan.
Type and model of drill rig(s)
2020 0.9
Authorized Representative Name and Title Carl Leonhardt Vice President of Operations
2021 0.9 2022 0.8
Drilling Method: Hollow Stem Auger, Sonic, Geoprobe® or Other:
Company Name Environmental Drilling Service, Inc.
Geoprobe 7822
Drill crew size/number of rigs & crews proposed/first available date to begin the work 2.0
Florida Licensed Monitoring Well Driller & Certification Number 9521.0
Total project duration Assumed work hours per day Assumed uninterrupted shift duration Assumed number of breaks Pollution Liability Insurance Limit per Occurrence
Site Name: Golden Touch Cleaners Site Address: 4034 Little Road, New Port Richie, Pasco County, Florida FDEP ERIC No. ERIC_5242
DRILLING CONTRACTOR BID SHEET
Interstate Workers' Compensation Experience Modification Rate (EMR)
Scope of Work: Hand clear all locations to 5 feet. Provide PFAS Free Water. Water levels estimated to be within this range: 5-7 ft bls
- DPT Rig: Install four (4) monitor wells via DPT to 15 feet, 1-Inch diameter Sch. 40 PVC Well Installation & Materials, 10 ft. 0.01-Inch Slot Screens, Soil Sampling to depth.
- DPT Rig with Hollow Stem Auger capablity: Install one (1) monitor wells to 30 feet, 2-Inch diameter Sch. 40 PVC Well Installation & Materials, 5 ft. 0.01-Inch Slot Screens, Soil Sampling to depth.
- Complete all wells in 2x2 concrete pad with 8-inch diameter manholes and develop.
- Drum all soil and development water.
BID SHEET
FDEP Waste Cleanup Project
1.1 Utility Clearance-Obtain Sunshine 811 Dig Ticket, have utilities marked 1 Lump Sum 25.00$ 25.00$
1.2 Potable water - obtain permission/meter from local municipality, pay for water usage if a source is not available on-site 0 Lump Sum -$ -$
1.3 Mobilization/Demobilization including crew HASP(1) and Water Mgt.
District Well Installation Permits 1 Lump Sum 850.00$ 850.00$
1.4 Access improvements to drilling location(s) (if applicable) 0 Lump Sum -$ -$
1.5 Construct Temporary Decontamination Pad 1 Lump Sum 350.00$ 350.00$
1.6 DPT Drill Rig and Crew Daily Rate 5 Per Day 2,175.00$ 10,875.00$
1.6a DPT Crew Per Diem 0 Per Day 450.00$ -$
1.7 Core drill for inside work 0 Per Day 100.00$ -$
1.8 Additional Staff as Proposed by Subcontractor Per Day -$
1.9 Additional Equipment as Proposed by Subcontractor - Steam Cleaner 5 Per Day 75.00$ 375.00$
2.1 Materials for Soil Sampling (liners, patch) 1 Lump Sum 150.00$ 150.00$
2.2 Materials for Water Sampling (disp points, tubing, patch) 1 Lump Sum 250.00$ 250.00$
2.3 Materials for Borehole Abandonment (grout & patch) 530 Per Linear Foot 4.00$ 2,120.00$
2.4 VEW Installation: 2" diameter, 2.5 or 5 feet 0.01-Inch Slot Screen 45 Per Linear Foot 25.00$ 1,125.00$
2.5 Monitor Well Install via Hand Auger inside a building + materials: 1- Inch Sch. 40 PVC Well Installation & Materials, 5 or 10 ft. pre-packed 0.01-Inch Slot Screens, 6 or 8-inch O.D. Borehole, Soil Sampling
10 Per Linear Foot 25.00$ 250.00$
2.6 2' x 2' x 0.5' Well Pad, Flush-Mounted Bolt-Down 8-Inch Manhole 10 Each 125.00$ 1,250.00$
2.7 2' x 2' x 0.5' Well Pad, Above-Ground Aluminum Riser, 4 Protective Safety Painted PVC Bollards Each 200.00$ -$
2.8 Decontamination between drilling locations and prior to
demobilization Per Day -$ -$
2.9 Well Development, 3 well volumes or until volume used during drilling has been extracted via a submersible pump plus stabilization of field parameters
1 Per Well 175.00$ 175.00$
2.10 Investigation Derived Waste Mgt. - supply applicable DOT 55-gallon drums and handling/staging 5 Per Drum 70.00$ 350.00$
2.11 Water Mgt. District Well Permits and Completion Reports 1 Lump Sum 175.00$ 175.00$
2.12 All decon and drilling water be must PFAS certified free, provide cost.
1 Lump Sum 950.00$ 950.00$
2.12a Source of PFAS Free Water
Nightwork Surcharge 1 Per Day 750.00$ 750.00$
SUBTOTAL 20,020.00$
TOTAL #REF!
5 Days 10 Hours
Days Each
Site Name: Golden Touch Cleaners Site Address: 4034 Little Road, New Port Richey, Pasco County, Florida FDEP ERIC No. ERIC_5242
Total project duration Assumed work hours per day
DRILLING CONTRACTOR BID SHEET
Drilling Method: Hollow Stem Auger, Sonic,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .