CN-370000-HW681-DC022C.pdf

PDF 811 KB Posted

Attached to
Master Agreement FL|HW681|acc15804f9112ed94de3c1f0669600ae
Contract number
HW681
Issued by
Florida

About this file

This is a Task Assignment (TA) document under Contract Number HW681 between the State of Florida Department of Environmental Protection (FDEP) and CDM Smith Inc. The task assignment was executed on December 9, 2024, with an effective completion date of April 10, 2026. The work is for the Mango Cleaners site located at 11744 Highway 574, Seffner, Hillsborough County, Florida (Project Number ERIC_4715). Benjamin Aoki serves as the FDEP Project Manager, while Kyle Turner represents CDM Smith as the contractor's project manager.

The scope of work encompasses Operation and Maintenance (O&M) and Groundwater Monitoring services for a soil vapor extraction (SVE) system, with eleven subtasks covering the period from December 2024 through November 2025. Subtask 1 includes project management at 13% of direct labor; Subtask 2 covers annual groundwater monitoring at five wells; Subtasks 3-6 address quarterly SVE system O&M and optimization with monthly site visits; Subtasks 7-10 provide utilities for the SVE system at $700 per month; and Subtask 11 includes a rebound evaluation. The total Task Assignment value is $64,824.57, comprised of $56,424.57 in fixed unit rate labor charges and $8,400.00 in cost reimbursement for utilities. The contract is structured on a fixed unit rate basis with 291 total labor hours estimated. Deliverables include field notes, laboratory reports, semiannual and annual Remedial Action Status Reports, and technical memoranda, with staggered due dates extending through February 2026. IDW disposal services are subcontracted to Erwin Remediation as the lowest cost provider.

View the file

Other files

File Type Posted
CN-370000-HW681-DC001A.pdf PDF
CN-370000-HW681-DC001C.pdf PDF
CN-370000-HW681-DC001D.pdf PDF
CN-370000-HW681-DC002B.pdf PDF
CN-370000-HW681-DC003D.pdf PDF
CN-370000-HW681-DC003E.pdf PDF
CN-370000-HW681-DC007C.pdf PDF
CN-370000-HW681-DC008A.pdf PDF
CN-370000-HW681-DC008C.pdf PDF
CN-370000-HW681-DC008D.pdf PDF
CN-370000-HW681-DC009B.pdf PDF
CN-370000-HW681-DC009C.pdf PDF
CN-370000-HW681-DC009D.pdf PDF
CN-370000-HW681-DC010B.pdf PDF
CN-370000-HW681-DC011E.pdf PDF
CN-370000-HW681-DC014A.pdf PDF
CN-370000-HW681-DC014B.pdf PDF
CN-370000-HW681-DC015B.pdf PDF
CN-370000-HW681-DC016A.pdf PDF
CN-370000-HW681-DC016B.pdf PDF
CN-370000-HW681-DC017A.pdf PDF
CN-370000-HW681-DC017C.pdf PDF
CN-370000-HW681-DC017D.pdf PDF
CN-370000-HW681-DC018A.pdf PDF
CN-370000-HW681-DC018B.pdf PDF
CN-370000-HW681-DC01ACO1.pdf PDF
CN-370000-HW681-DC01ACO2.pdf PDF
CN-370000-HW681-DC01ACO3.pdf PDF
CN-370000-HW681-DC025B.pdf PDF
CN-370000-HW681-DC025C.pdf PDF
CN-370000-HW681-DC026B.pdf PDF
CN-370000-HW681-DC026C.pdf PDF
CN-370000-HW681-DC027A.pdf PDF
CN-370000-HW681-DC027C.pdf PDF
CN-370000-HW681-DC028A.pdf PDF
CN-370000-HW681-DC028B.pdf PDF
CN-370000-HW681-DC028C.pdf PDF
CN-370000-HW681-DC029D.pdf PDF
CN-370000-HW681-DC02CCO1.pdf PDF
CN-370000-HW681-DC02DCO3.pdf PDF
CN-370000-HW681-DC032A.pdf PDF
CN-370000-HW681-DC032B.pdf PDF
CN-370000-HW681-DC032C.pdf PDF
CN-370000-HW681-DC033A.pdf PDF
CN-370000-HW681-DC038A.pdf PDF
CN-370000-HW681-DC03BCO1.pdf PDF
CN-370000-HW681-DC03ECO2.pdf PDF
CN-370000-HW681-DC040B.pdf PDF
CN-370000-HW681-DC040C.pdf PDF
CN-370000-HW681-DC041A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW681

DC022C Completion April 10, 2026

This Task Assignment authorizes CDM Smith Inc. to conduct Operation and Maintenance (O&M) and Groundwater Monitoring at Mango Cleaners per their proposed scope of work submitted on 21NOV2024.

Benjamin Aoki 850-245-7527 Contractor CDM Smith Inc. Contractor

Contractor Kyle Turner Contractor 813-262-8851

ERIC_4715

11744 Highway 574, Seffner, Hillsborough County, FL

Mango Cleaners

Contractor Contractor

✔ $ 56,424.57

$ 8,400.00

$ 64,824.57

Scope of Work

CDM Smith Inc.

Contractor Leslie Samel

Vice President

Leslie Samel Digitally signed by Leslie Samel Date: 2024.12.09 14:04:49 -05'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2024.12.09 08:42:58 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number: HW681 Task Assignment #: DC022C

Deliverables:

Deliverable Deliverable Due Date Subtask 2: Groundwater Monitoring - Field Notes, Laboratory Report, Updated Tables 02/28/25

Subtask 3 & 4: SVE System O&M and Optimization - Quarters 14 & 15 (DEC24-MAY25) - Semiannual Remedial Action Status Report, including GWM

07/13/25

Subtask 1, 5, & 6: SVE System O&M and Optimization - Quarters 16 & 17 (JUN25-NOV25) - Annual Remedial Action Status Report;

Project Management

02/06/26

Subtask 7: Utilities - Qtr 14 - Paid Utility Invoices 05/16/25

Subtask 8: Utilities - Qtr 15 - Paid Utility Invoices 07/25/25

Subtask 9: Utilities - Qtr 16 - Paid Utility Invoices 11/14/25

Subtask 10: Utilities - Qtr 17 - Paid Utility Invoices 02/13/25

Subtask 11: Rebound Evaluation - Technical Mem including field documentation, laboratory report, updated tables, and conclusions 02/28/25

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced Subtask 2: Groundwater Monitoring - Field Notes, Laboratory Report, Updated Tables $4,901.81

Subtask 3 & 4: SVE System O&M and Optimization - Quarters 14 & 15 (DEC24-MAY25) - Semiannual Remedial Action Status Report, including GWM

$20,329.85

Subtask 1, 5, & 6: SVE System O&M and Optimization - Quarters 16 & 17 (JUN25-NOV25) - Annual Remedial Action Status Report;

Project Management

$26,652.42

Subtask 7: Utilities - Qtr 14 - Paid Utility Invoices $2,160.00

Subtask 8: Utilities - Qtr 15 - Paid Utility Invoices $2,160.00

Subtask 9: Utilities - Qtr 16 - Paid Utility Invoices $2,160.00

Subtask 10: Utilities - Qtr 17 - Paid Utility Invoices $2,160.00

Subtask 11: Rebound Evaluation - Technical Mem including field documentation, laboratory report, updated tables, and conclusions $4,300.49

TOTAL COST $64,824.57

BWC TAFORM 01_18

JAN25-JUNE25 - KT

JULY25-DEC25 - KT

08/15/25 - KT

03/15/25 - KT

03/06/26 - KT

06/20/25 - KT

08/22/25 - KT

12/19/25 - KT

03/13/26 - KT

03/15/25 - KT

JAN25-JUNE25 - KT

JULY25-DEC25 - KT

RRonn DeSantiss Governor

JJeanette Nuñez Lt. Governor

Shawnn Hamiltonn Secretary

TO:

FROM:

DATE:

SUBJECT:

FLORIDAA DEPARTMENTT OFF

Environmentall Protectionn

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

FD

EP

C O

ST

E

ST

IM

A

TE

C on tra ct or

C D

M S m ith

, I nc

D at e:

/1

4/

Ta sk

S ub Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

S

V E

S ys te m

O

M a nd O pt im iz at io n

S ub

Ta sk

S ite

M an go

C le an er s E

R

IC

_4

S ub Ta sk

A nn ua l G ro un dw at er M on ito rin g

S ub

Ta sk

U til iti es

Q tr

S ub Ta sk

A ct iv ity

/P ha se

O

M

Ta sk

S

V E

S ys te m

O

M a nd O pt im iz at io n

S ub

Ta sk

U til iti es

Q tr

S ub Ta sk

P ro je ct

M an ag er

S te ve n C ob er t

Ta sk

S

V E

S ys te m

O

M a nd O pt im iz at io n

S ub

Ta sk

U til iti es

Q tr

S ub Ta sk

S ub

Ta sk

S

V E

S ys te m

O

M a nd O pt im iz at io n

S ub

Ta sk

U til iti es

Q tr

S ub

Ta sk

TTo ta ls

La bo r R at e

C at eg or y $7

6.

PP

ro je ct

M an ag

.4

.4 $1

.9

Se ni or

O ffi ce r

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$8 6.

Se ni or

T ec hn ic al E xp er t 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$7

6.

Pr oj ec t T ec hn ic al

L ea de r

.0

4.

5.

5.

5.

5.

0.

0.

0.

0.

2.

$7 6.

Pr oj ec t M an ag

.0 0.

1.

4.

1.

4.

0.

0.

0.

0.

1.

$7

1.

Se ni or P ro fe ss io na l

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$5 2.

Pr of es sio na l I I

5.

9.

.0

.0

.0

.0 0.

0.

0.

0.

6.

$3

4.

Pr of es sio na l I

.0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

$5 4.

Se ni or

T ec hn ic ia n

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$3 0.

St af f T ec hn ic ia n

5.

0.

.0

.0

.0

.0

0.

0.

0.

0.

9.

$4 2.

Pr oj ec t A dm in ist ra tio n 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4

2.

Se ni or S up po rt Se rv ic es 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

To ta l H ou rs

.0

.0

.0

.0

.0 0.

0.

0.

0.

.0

D ire ct L ab or

$1

4, 5.

$1 ,6

.1

$1

,2

.0

$1 ,7

.7

$3

,3

.8

$1 ,7

.7

$3

,5

.2

$0 .0

$0

.0

$0 .0

$0

.0

$8

.9

O ve rh ea d

5.

$1

9, 4.

$2 ,2

.7

$1

,6

.6

$2 ,3

.3

$4

,5

.3

$2 ,3

.3

$4

,8

.3

$0 .0

$0

.0

$0 .0

$0

.0

$1 ,1

.5

G en

A dm in 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge

.7 0%

$5 ,3

.8

$6

.6

$4

.8

$6

.4

$1

,2

.5

$6

.4

$1 ,3

.8

$0

.0

$0 .0

$0

.0

$0 .0

$3

.8

To ta l L ab or

$3

8, 1.

$4 ,4

.5

$3

,3

.5

$4 ,8

.5

$9

,1

.7

$4 ,8

.5

$9

,7

.5

$0 .0

$0

.0

$0 .0

$0

.0

$2 ,2

.3

RE

V:

2/

CE

F

CD

M Sm it h

Pa ge

FD

EP

C O

ST

E

ST

IM

A

TE

C on tra ct or

C D

M S m ith

, I nc at e:

/1

4/

Ta sk

Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

S

V E

S ys te m

O

M a nd O pt im iz at io n

S ub

Ta sk

S ite

M an go

C le an er s E

R

IC

_4

S ub Ta sk

A nn ua l G ro un dw at er M on ito rin g

S ub

Ta sk

U til iti es

Q tr

S ub Ta sk

A ct iv ity

/P ha se

O

M

Ta sk

S

V E

S ys te m

O

M a nd O pt im iz at io n

S ub

Ta sk

U til iti es

Q tr

S ub Ta sk

P ro je ct

M an ag er

S te ve n C ob t

Ta sk

S

V E

S ys te m

O

M a nd O pt im iz at io n

S ub

Ta sk

U til iti es

Q tr

S ub Ta sk

S ub

Ta sk

S

V E

S ys te m

O

M a nd O pt im iz at io n

S ub

Ta sk

U til iti es

Q tr

S ub

Ta sk

TTo ta ls

Tr av el V eh ic le R en ta l $1

,5

.0

$1

.0

$3

.0

$3

.0

$3

.0

$3

.0

$0 .0

$0

.0

$0 .0

$0

.0

$1

.0

M ile ag e

C os ts $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

A ir

Fa re

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

P er d ie m

H ot el

$1 ,1

.0

$0

.0

$0 .0

$5

.0

$0

.0

$5

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l T ra ve l $2

,6

.0

$1

.0

$3

.0

$9

.0

$3

.0

$9

.0

$0 .0

$0

.0

$0 .0

$0

.0

$1

.0

S ub co nt ra ct or (E qu ip m en t P ro cu re m en t)

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

S ub to ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P ro cu re m en t F ee

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or (S er vi ce s

P ro cu re m en t) ril lin g

(C on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

D ril lin g

(N on

-c on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ob ile L ab or at or y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ur ve yi ng $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$1

.0

$0 .0

$0

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

U til iti es $8

,4

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$2

,1

.0

$2 ,1

.0

$2

,1

.0

$2 ,1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$8 ,5

.0

$0

.0

$0 .0

$1

.0

$0

.0

$0 .0

$2

,1

.0

$2 ,1

.0

$2

,1

.0

$2 ,1

.0

$0

.0

H an dl in g Fe e $2

.5

$0

.0

$0 .0

$1

2.

$0 .0

$0

.0

$6 0.

$6

0.

$6 0.

$6

0.

$0 .0

To ta l S ub co nt ra ct or

C os t $8

,7

.5

$0 .0

$0

.0

$1

.5

$0 .0

$0

.0

$2 ,1

.0

$2

,1

.0

$2 ,1

.0

$2

,1

.0

$0 .0

La bo ra to ry

A na ly tic al

C os ts $1

,7

.0

$3

.0

$2

.0

$2

.0

$2

.0

$8

.0

$0 .0

$0

.0

$0 .0

$0

.0

$8

.0

Fa st

T ur na ro un d

C ha rg es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S am pl e S hi pp in g

$9

.0

$1

.0

$1

.0

$1

.0

$1

.0

$4

.0

$0 .0

$0

.0

$0 .0

$0

.0

$4

.0

To ta l L ab or at or y

$2 ,6

.0

$5

.0

$3

.0

$3

.0

$3

.0

$1

,2

.0

$0 .0

$0

.0

$0 .0

$0

.0

$1 ,2

.0

Fi el d

E xp en se s

P so na l P ro te ct io n

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E xp en da bl es $5

.0

$4

0.

$1

.0

$1

.0

$1

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$4 0.

E qu ip m en t ( D ril lin g re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

A na ly tic al re la te

d) $4

.0

$4

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

ID

W re la te d)

$1

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( O th er

$5

,2

.0

$0 .0

$1

,3

.0

$1 ,3

.0

$1

,3

.0

$1 ,3

.0

$0

.0

$0 .0

$0

.0

$0 .0

$4

.0

To ta l F ie ld

E xp en se s $6

,2

.0

$5

.0

$1 ,4

.0

$1

,4

.0

$1 ,4

.0

$1

,4

.0

$0 .0

$0

.0

$0 .0

$0

.0

$4

.0

S ub to ta l $5

6, 7.

$4 ,4

.5

$4

,5

.5

$6 ,9

.5

$1

1, 8.

$6 ,9

.5

$1

3, 4.

$2 ,1

.0

$2

,1

.0

$2 ,1

.0

$2

,1

.0

$4 ,0

.3

C om pl et io n Fe e $3

,6

.0

$4

.3

$3

.2

$4

.2

$9

.7

$4

.2

$9

.1

$0 .0

$0

.0

$0 .0

$0

.0

$2

.1

To ta l E st im at ed C os t

$6 4, 4.

$4

,8

.9

$4 ,9

.8

$7

,4

.8

$1 2, 8.

$7

,4

.8

$1 4, 1.

$2

,1

.0

$2 ,1

.0

$2

,1

.0

$2 ,1

.0

$4

,3

.4

RE

V:

2/

CE

F

CD

M Sm it h

Pa ge

SITE :

SUBTASK: 2 Annual Groundwater Monitoring

DATE: 11/14/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Technical Leader Technical Evaluation of Data/trend analysis 4

Professional II Sample Kit Coordination 1

Site Access with Site Owner 1

IDW Management 1

Data Package for Annual Sampling 6

Professional I Travel (1 Trip) 2

Annual Groundwater Sampling - 5 wells 8

Field Preparation 1

Updated Data Tables for Annual Sampling 2

Total Hours:

PTL 4

Professional II 9

Professional I 13

TOTAL LABOR 26

VEHICLE TYPE RATE UNIT USEAGE

Truck $120 each 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE UNIT COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOH 8021/8260 $73.00 5 $365.00

Shipping (Large Cooler) $150.00 1 $150.00

Ice $6.50 2 $13.00

TOTAL LAB $528.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Deep Groundwater Sampling Kit $415.00 Day 1 $415.00

Expendables $40.00 Day 1 $40.00

Drums $100.00 Each 1 $100.00

TOTAL EQUIPMENT $555.00

Mango Cleaners ERIC_4715

SUBTASK: 3 SVE System O&M and Optimization

DATE: 11/14/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Technical Leader System Optimization 3

Engineering Evaluation 2

Project Manager Quarterly O&M Documentation Technical Review 1

Staff Technician Travel to/from Site (3 Trips) 6

O&M Site Visit (3 Months) 18

Professional II Updated Data Tables / Review and Interpretation 4

Quarterly O&M Documentation Package 6

Sample Kit Coordination 1

Total Hours:

PTL 5

PM 1

Staff Technician 24

Professional II 11

TOTAL LABOR 41

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 day 3 $360.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00

$0.00

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE Unit COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TO-15 $200.00 1 $200.00

Small Cooler $110.00 1 $110.00

TOTAL LAB $310.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction/O&M/Pilot kit $360.00 day 3 $1,080.00

Construction/O&M Supplies $75.00 day 3 $225.00

Expendables $40.00 day 3 $120.00

TOTAL EQUIPMEN $1,425.00

nical Leader System Optimization / Operations Review 3

Author Engineering Section of Semiannual RASR 2 ger Semiannual RASR / GWMR Technical Review 4

II Semiannual RASR preparation (including GWM) 32

Figures for Semiannual RASR 4

Sample Kit Coordination (Soil Vapor Sample) 1 ian Travel to/from Site (3 Trips) 6

O&M Site Visit (3 Months) 18

II 37

ian 24

TOTAL LABOR 70

TYPE RATE UNIT USEAGE

Truck $120.00 day 3 $360.00

TOTAL VEHICLE $360.00

M STAFF RATE UNIT USEAGE

Staff Technician $150.00 Hotel 3 $450.00

Staff Technician $36.00 Per Diem 3 $108.00

TOTAL PER DIEM $558.00

TRACTOR COSTS

E PURPOSE Unit COST diation IDW Removal (Water) 1 $125.00 $125.00 IDW from ST 2 Sampling

TOTAL $125.00

ORY COSTS

TER RATE # SAMPLES #QAQC

$200.00 1 $200.00

$110.00 1 $110.00

TOTAL LAB $310.00

NT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction/O&M/Pilot kit $360.00 day 3 $1,080.00

Construction/O&M Supplies $75.00 day 3 $225.00

Expendables $40.00 day 3 $120.00

SUBTASK: 5 SVE System O&M and Optimization

DATE: 11/14/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Technical Leader System Optimization 3

Engineering Evaluation 2

Project Manager Quarterly O&M Documentation Technical Review 1

Staff Technician Travel to/from Site (3 Trips) 6

O&M Site Visit (3 Months) 18

Professional II Updated Data Tables / Review and Interpretation 4

Quarterly O&M Documentation Package 6

Sample Kit Coordination 1

Total Hours:

PTL 5

PM 1

Professional II 11

Staff Technician 24

TOTAL LABOR 41

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 day 3 $360.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE Unit COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TO-15 $200.00 1 $200.00

Small Cooler $110.00 1 $110.00

TOTAL LAB $310.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction/O&M/Pilot Kit $360.00 Day 3 $1,080.00

Construction/O&M Supplies $75.00 Day 3 $225.00

Expendables $40.00 Day 3 $120.00

SUBTASK: 6 SVE System O&M and Optimization

DATE: 11/14/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Technical Leader System Optimization / Operations Review 3

Author Engineering Section of Annual RASR 2

Project Manager Annual RASR Technical Review 4

Staff Technician Travel to/from Site (3 Trips) 6

O&M Site Visit (3 Months) 18

Professional II Annual RASR preparation 36

Figures for Annual RASR 4

Sample Kit Coordination (Soil Vapor Sample) 1

Total Hours:

PTL 5

PM 4

Staff Technician 24

Professional II 41

TOTAL LABOR 74

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 day 3 $360.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

Staff Technician $150.00 Hotel 3 $450.00 Staff Technician $36.00 Per Diem 3 $108.00

TOTAL PER DIEM $558.00

SUBCONTRACTOR COSTS

NAME PURPOSE Unit COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TO-15 $200.00 4 $800.00

Small Cooler $110.00 4 $440.00

TOTAL LAB $1,240.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction/O&M/Pilot kit $360.00 day 3 $1,080.00

Construction/O&M Supplies $75.00 day 3 $225.00

Expendables $40.00 day 3 $120.00

TOTAL $0.00

SES ITEM RATE COSTING UNIT USEAGE TOTALS

4 Utilities Utility Charges (Electric) $700.00 Month 3 $2,100.00 dling Fee Utility Handling Fee $20.00 Month 3 $60.00

TOTAL EQUIPMEN $2,160.00

SUBTASK: 8 Utilities - Qtr 15

DATE: 11/14/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

FIELD EXPENSES ITEM RATE COSTING UNIT USEAGE TOTALS

O&M Quarter 15 Utilities Utility Charges (Electric) $700.00 month 3 $2,100.00

Quarter 15 Handling Fee Utility Handling Fee $20.00 Month 3 $60.00

SUBTASK: 9 Utilities - Qtr 16

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

FIELD EXPENSES ITEM RATE COSTING UNIT USEAGE TOTALS

O&M Quarter 16 Utilities Utility Charges (Electric) $700.00 month 3 $2,100.00

Quarter 16 Handling Fee Utility Handling Fee $20.00 Month 3 $60.00

SUBTASK: 10 Utilities - Qtr 17

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

FIELD EXPENSES ITEM RATE COSTING UNIT USEAGE TOTALS

O&M Quarter 17 Utilities Utility Charges (Electric) $700.00 month 3 $2,100.00

Quarter 17 Handling Fee Utility Handling Fee $20.00 Month 3 $60.00

Updated Data Tables 2

Rebound Evaluation Technical Memo 3

Sample Kit Coordination (Soil Vapor Samples) 1

Travel to/from Site (1 Trip) 2

O&M Site Visit (Rebound Evaluation) (1 Month) 7

TYPE RATE UNIT USEAGE

Truck $120.00 Day 1 $120.00

TOTAL VEHICLE $120.00

STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

COSTS

PURPOSE COST

TOTAL $0.00

TS

R RATE # SAMPLES #QAQC

$200.00 4 $800.00 Post shutdown samp $110.00 4 $440.00

TOTAL LAB $1,240.00

ITEM RATE COSTING UNIT USEAGE TOTALS

Construction/O&M/Pilot Kit $360.00 Day 1 $360.00

Construction/O&M Supplies $75.00 Day 1 $75.00

Expendables $40.00 Day 1 $40.00

TOTAL EQUIPMEN $475.00

4651 Salisbury Rd., Suite 420, Jacksonville, FL 32256 | tel: 904-731-7109

November 21, 2024

Mr. Benjamin Aoki Environmental Specialist II Florida Department of Environmental Protection Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400

Subject: Operation and Maintenance and Groundwater Monitoring Proposal Mango Cleaners 11744 Highway 574, Seffner, Hillsborough County, FL

ERIC_4715

Dear Mr. Aoki:

CDM Smith Inc. (CDM Smith) is pleased to respond to the Florida Department of Environmental Protection (FDEP) Task Assignment Request to provide Operation and Maintenance (O&M) and groundwater monitoring services for the Mango Cleaners site under Contract Number HW681. Our project understanding, scope of work, and project schedule are described below, while the cost estimate is also attached.

Project Understanding The former dry-cleaning facility is currently vacant and is in a small strip mall. A revised Interim Source Removal Plan (ISRP) for the site was submitted in April 2020 and a Remedial Action Startup Report was submitted in May 2022. The required O&M activities for this task assignment were taken from the 2020 ISRP and the schedule is based on work completed during remedial action startup.

O&M services are required for a soil vapor extraction (SVE) system that consists of three vapor extraction (VE) wells, SVE blower, air injection blower, moisture separator, and a granulated activated carbon (GAC) vapor treatment drum. Two additional MAGS™ wells are also connected to the system that have been used for both VE and air injection. All VE wells are in indoor locations. SVE operations began on October 20, 2021.

SVE system influent air samples are sampled on a quarterly basis and submitted for laboratory analysis by United States Environmental Protection Agency (EPA) Method TO-15 for volatile organic halocarbons.

Air samples are collected from the three operating SVE wells (VE001, VE002, and VE003) on an annual basis and submitted for laboratory analysis by EPA Method TO-15. Operation and Maintenance (O&M) site visits are completed monthly, and O&M reports are submitted quarterly.

Groundwater monitoring is being completed annually at five monitoring wells for volatile organic halocarbons (VOHs). Semiannual and Annual Remedial Action Status Reports (RASR) are submitted. The annual sampling event would be performed in January 2025.

Mr. Benjamin Aoki

Scope of Work This cost proposal covers SVE system O&M and groundwater monitoring for one year, beginning in December 2024 and ending in November 2025.

Subtask 1 – Project Management Project management activities performed under this task consist of administrative functions required to maintain the project schedule, adhere to budget, and deliver the quality of the work products defined by CDM Smith's quality standards. We will prepare and submit invoices upon approval of each deliverable or milestone completion.

Project Kickoff and Progress Meetings CDM Smith expects to have a kickoff meeting or telephone conference with the FDEP to review the status of the project and address FDEP comments regarding the Task Assignment. CDM Smith will prepare meeting agendas and notes as part of this task.

Project Quality Technical Review CDM Smith’s Quality Management System guidelines will be followed. Internal quality reviews will be conducted on plans and on investigation findings and reports.

Project Status Reports CDM Smith’s Project Manager will prepare and submit monthly status reports to accompany each invoice throughout the duration of this project. The Project Manager will also discuss the status of the project with the FDEP on a bi-weekly basis until the project is complete.

Subtask 2 – Groundwater Monitoring The groundwater monitoring requirements for the site were identified in the 2020 ISRP. CDM Smith will complete the groundwater sampling event in January 2025. The required laboratory analyses and the wells included in the monitoring program are listed in the attached Table 1.

CDM Smith will collect water levels from all site monitoring wells during the sampling event. Purging and sampling will be in accordance with FDEP’s Standard Operating Procedures for Groundwater Sampling, FS 2200, and will be collected using low-flow techniques with a peristaltic pump and dedicated polyethylene tubing. A YSI-556 multi-parameter probe and a turbidimeter will be used to collect water quality indicator parameters including dissolved oxygen, pH, conductivity, oxidation reduction potential, temperature, turbidity. The instrumentation will be properly calibrated and recorded. All purge water will be contained in a drum for characterization and disposal as nonhazardous investigation-derived waste (IDW). CDM Smith assumes that one IDW drum will require disposal under Subtask 4.

Deliverables: Laboratory Reports, field notes, and updated tables for the groundwater sampling event.

Subtasks 3, 4, 5 and 6 – Quarterly SVE System Operation and Maintenance O&M Site visits will be completed monthly, and the following work will be completed during each visit.

System operation and alarm status and blower run time.

Moisture separator liquid volume.

System vacuums and velocity/flow rate at blower, before / after GAC (if applicable), and after moisture separator.

Blower oil changes (when applicable) based on manufacture recommendations.

SVE well vacuum/pressure and flow rate.

Total organic vapors measured with a photoionization detector from operating SVE wells, system influent, and system effluent.

Water levels from monitoring wells MW-1, MW-2, MW-3, MW-4, MW-5, MW-6, DW-1 and DW- 2.

Adjust vacuums and injection pressures on the SVE wells to optimize the SVE system performance.

The information will be consistently recorded in the field on pre-prepared forms.

SVE system influent samples will be collected quarterly for laboratory analysis by Method TO-15. The required laboratory analyses and the SVE included in the monitoring program are listed in the attached Table 1.

Following the completion of Subtasks 3 and 4 O&M activities, CDM Smith will prepare a Semiannual RASR and an Annual RASR will be prepared following the completion of Subtask 5 and 6 activities. The reports will summarize the history of the Site, all fieldwork completed by CDM Smith, field and laboratory data, conclusions, and recommendations. Additional elements of the reports will include the following:

Figures depicting site conditions.

Figures depicting groundwater data and estimated extent of impact.

Groundwater elevation contour map.

Tables summarizing field and analytical data.

Groundwater sampling logs and field equipment calibration records.

Laboratory analytical reports and chain of custody documentation.

Waste disposal manifests and weigh tickets.

Deliverables: Semiannual and Annual Remedial Action Status Reports

Subtasks 7, 8, 9, and 10 – Utilities CDM Smith will provide utilities for the SVE system and assume $700 per month including administrative costs.

Deliverable: Utilities Handling Fee, receipt of 3 months of utility invoices for each Subtask (Cost Plus Fixed Fee)

Subtask 11 – Rebound Evaluation The Annual RASR under Task Assignment DC022B was submitted in August 2024 and is still awaiting FDEP technical approval. The Rebound Evaluation associated with the Annual RASR dated August 2024 will be conducted in this Task Assignment under Subtask 11.

At FDEP’s direction a modified Rebound Evaluation will be conducted in the first month of operation under this Task Assignment. The system has been off since the October 2024 O&M event; therefore, pre-shutdown samples will not be collected. CDM Smith will turn the system on, purge one pore volume of soil vapor, and then collect soil vapor samples from VE001, VE002, VE003 and system influent prior to shutting the system off until Rebound Evaluation results and a path forward can be discussed with the FDEP. CDM Smith will summarize the Rebound Evaluation and conclusions in a technical memo to FDEP.

Deliverable: Rebound Evaluation Technical Memo including field documentation, updated analytical tables, and conclusions.

Subcontractors Subcontracted services are required for IDW disposal. Rates for IDW removal and disposal were previously requested for HW681 from Erwin Remediation, Enviroserve (formerly Clark Environmental), and Hepaco. Erwin Remediation was the lowest cost and has been selected as the IDW disposal subcontractor for this project as shown in Attachment A

Assumptions CDM Smith will communicate with the FDEP in a timely manner if schedule delays are encountered and will prepare necessary paperwork for change orders.

Schedule Subtask 2: Groundwater Monitoring

Deliverable: Field notes, laboratory report, updated tables

Due Date: February 28, 2025

Subtasks 3 and 4: SVE System O&M and Optimization – Quarters 14 and 15 (December 2024 – May 2025)

Deliverable: Semiannual Remedial Action Status Report, including GWM

Due Date: July 18, 2025

Subtasks 5 and 6: SVE System O&M and Optimization – Quarters 16 and 17 (June 2025 – November 2025)

Deliverable: Annual Remedial Action Status Report

Due Date: February 6, 2026

Subtask 7: Utilities – Qtr 14

Deliverable: Paid Utility Invoices

Due Date: May 16, 2025

Subtask 8: Utilities – Qtr 15

Deliverable: Paid Utility Invoices

Due Date: July 25, 2025

Subtask 9: Utilities – Qtr 16

Deliverable: Paid Utility Invoices

Due Date: November 14, 2025

Subtask 10: Utilities – Qtr 17

Deliverable: Paid Utility Invoices

Due Date: February 13, 2025

Subtask 11: Rebound Evaluation

Deliverable: Technical Memo including field documentation, laboratory report, updated tables, and conclusions

Due Date: February 28, 2025

We look forward to working on this important project. Feel free to contact me at 407-660-6361 or by email with any questions or comments.

Sincerely, Joshua J. Hirten, P.G. Leslie S. Samel, P.E.

Program Manager Vice President CDM Smith CDM Smith HirtenJJ@CDMSmith.com SamelLS@CDMSmith.com

Table

Sample ID Monthly Quarterly Semiannual Annual SVE Influent V,F,P 4,V,F,P 4,V,F,P

VE-1 V,F,P V,F,P 4,V,F,P

VE-2 V,F,P V,F,P 4,V,F,P

VE-3 V,F,P V,F,P 4,V,F,P

M-2 V,P M-3 V,P M-4 V,P M-5 V,P M-6 V,P M-8 V,P

MW-1 L L

MW-2 L 1,L

MW-3 L 1,L

MW-4 L L

MW-5 L 1,L

MW-6 L 1,L

DW-1 L L

DW-2 L 1,L

1 = VOHs by Method 8260B 4 = VOHs by Method TO-15 V = Vacuum/Pressure F = Flow Rate

P = PID

L = Depth to Water

Table 1: Sampling Schedule Mango Cleaners

ERIC_4715

Seffner, Hillsborough County, Florida

Attachment A Subcontractor Quotes

In ve st ig at iv e De riv ed

W as te (I

DW

) M an ag em en t Jo b De ta ils

Pe r 5 5-ga llo n Dr um

Pe r E ve nt

He pa co

NA

NA

NA

NA

En vi ro

Se rv e

NA

NA

NA

NA

Er w in

R em ed ia tio n

$1

$1

In clu de d

In clu de d

$1

$1

ID

W

S ub co nt ra ct or E va lu at io n

CD

M S m ith

HW

/1

5/

No R es po ns e

No R es po ns e

Co m pa ny

Di sp os al

Tr an sp or ta tio n To ta l

Li qu id So il Fe e Li qu id

So il

File details come from the government source that posted it. Updated .