CN-370000-HW681-DC012C.pdf
PDF 4 MB Posted
- Contract number
- HW681
- Issued by
- Florida
About this file
This document is a Task Assignment (TA) issued under Contract Number HW681 between the State of Florida Department of Environmental Protection (FDEP) and CDM Smith Inc., a contractor providing environmental consulting services. The task assignment is designated DC012C and covers groundwater monitoring work at the Carriage Trade Dry Cleaners facility located at 38225 12th Avenue, Zephyrhills, Pasco County, Florida (ERIC_5232). The FDEP project manager is Kyle McMurray, and the contractor's project manager is Shayne Wood of CDM Smith Inc.
The scope of work includes quarterly groundwater sampling from monitoring wells MW07D and MW13D, with field work scheduled for August 2023, November 2023, February 2024, and May 2024. Deliverables for each quarter consist of field notes, field forms, and laboratory chains of custody. An annual groundwater monitoring report summarizing all monitoring work, field and laboratory data, investigation-derived waste (IDW) management, conclusions, and recommendations is due July 15, 2024. The total task assignment value is $14,319.17, with invoice amounts distributed as follows: Quarter 1 ($2,311.41), Quarter 2 ($2,211.41), Quarter 3 ($2,211.41), Quarter 4 ($2,348.91), and Annual Report plus Project Management ($5,236.03). The contract includes a fixed unit rate payment structure with completion by August 30, 2024. Laboratory analysis will be performed using EPA Method 8260C for volatile organic compounds, and investigation-derived waste disposal services were procured from Erwin Remediation at $125.00 per drum based on a competitive bidding process.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW681
DC012C Completion August 30, 2024
CDM Smith Inc. will conduct Quarterly Groundwater Monitoring in accordance with the June 29th, 2023 Scope of Work and Cost Proposal.
Kyle McMurray 850-245-8973 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
CDM Smith Inc.
CDM Smith Inc.
Shayne Wood 904-527-6703
ERIC_5232
38225 12th Avenue Zephyrhills, Pasco County, Florida
Carriage Trade Dry Cleaners
✔ $ 14,319.17
$ 14,319.17
Scope of Work
Shayne Wood
Vice President
6/20/2023
Shayne Wood Digitally signed by Shayne Wood DN: C=US, E=woodsh@cdmsmith.com, CN=Shayne Wood Date: 2023.06.30 10:41:57-04'00'
Kelly Crain
Kelly Crain Digitally signed by Kelly Crain Date: 2023.06.29 19:51:34 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 2: Quarterly Groundwater Sampling – Quarter 1 Field notes, Field Forms, Laboratory COCs 09/15/2023
Subtask 3: Quarterly Groundwater Sampling – Quarter 2 Field notes, Field Forms, Laboratory COCs 12/15/2023
Subtask 4: Quarterly Groundwater Sampling – Quarter 3 Field notes, Field Forms, Laboratory COCs 03/15/2024
Subtask 5: Quarterly Groundwater Sampling – Quarter 4 Field notes, Field Forms, Laboratory COCs 06/15/2024
Subtask 6: Annual Groundwater Monitoring Report Groundwater Monitoring Report including tabulated data, conclusions, and recommendations.
07/15/2024
Subtask 2: Quarterly Groundwater Sampling – Quarter 1 $ 2,311.41
Subtask 3: Quarterly Groundwater Sampling – Quarter 2 $ 2,211.41
Subtask 4: Quarterly Groundwater Sampling – Quarter 3 $ 2,211.41
Subtask 5: Quarterly Groundwater Sampling – Quarter 4 $ 2,348.91
Subtask 1 and 6: Annual Groundwater Monitoring Report + Project Management $ 5,236.03
$ 14,319.17
HW681
DC012C
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
TO: HW681 Contract File
FROM: Kyle McMurray, Contract Manager
DATE: June 29th, 2023
SUBJECT: Negotiation Summary
Task Assignment DC012C Carriage Trade Dry Cleaners
ERIC_5232
Quarterly GWM
CDM Smith Inc. (CDM) will conduct Quarterly Groundwater Monitoring. Specific subtasks are detailed below:
Subtask 1: Project Management Project Management is calculated at 13% of the direct labor.
Subtask 2, 3, 4, 5: Quarterly Groundwater Sampling Contractor will mobilize to the Site to collect groundwater samples from monitoring wells MW07D and MW13D on a quarterly basis, assuming the first quarter will be August 2023; second quarter will be November 2023, third quarter will be February 2024, and fourth quarter will be May 2024.
All monitoring wells will be sampled in accordance with FDEP SOPs. Field parameter data will be collected (dissolved oxygen, pH, conductivity, oxidation reduction potential, temperature, turbidity). Depth-to-groundwater measurements will be collected from all 13 monitoring wells.
Subtask 6: Annual Groundwater Monitoring Report Upon completion of groundwater sampling field work, Contractor will prepare an Annual Groundwater Monitoring Report. This report will summarize all monitoring work completed, field and laboratory data, investigation-derived waste (IDW) management, conclusions, and recommendations.
Erwin Remediation for IDW was chosen upon being the lowest responsive and responsible bidder. Only 2 IDW bids are included as the 3rd bidder EnviroServe was non-responsive.
CDM and the FDEP confirmed on June 29th, 2023, that an Access Agreement(s) with the current real property owner(s) of the site has been executed.
The final cost total for Task Assignment DC012C is $14,319.17.
FDEP COST ESTI MATEContractor: CDM Smith, Inc.
Date: 6/29/2023
Task #: SubTask 1 Project Management SubTask 6 Groundwater Monitoring Report
Site: Carriage Trade Dryclean SubTask 2 Groundwater Sampling - Q1 SubTask 7
Activity/Phase: 2022 Groundwater Monit SubTask 3 Groundwater Sampling - Q2 SubTask 8
Project Manager: Kara Fincham, PMP SubTask 4 Groundwater Sampling - Q3 SubTask 9
SubTask 5 Groundwater Sampling - Q4 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$60.10 Project Manager 7.1 7.1 $0.00 0.0 0 0 0 0 0 0 0 0 0 $0.00 0.0 0 0 0 0 0 0 0 0 0
$63.24 Project Technical Leader D. Anderson 2.0 0 0 0 0 2 0 0 0 0 $60.10 Project Manager K. Leggoe 6.0 1.0 1.0 1.0 1.0 2.0 0 0 0 0 $42.10 Professional II M. Blanton 56.0 9.0 9.0 9.0 9.0 20.0 0 0 0 0 $23.26 Professional I L. Weber 18.0 2.0 2.0 2.0 2.0 10.0 0 0 0 0
$0.00 Professional 1 0.0 0.0 0.0 0.0 0.0 0.0 0 0 0 0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0 0 0 0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0 0 0 0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0 0 0 0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0 0 0 0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0 0 0 0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0 0 0 0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0 0 0 0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0 0 0 0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0 0 0 0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0 0 0 0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0 0 0 0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0 0 0 0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0 0 0 0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0 0 0 0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0 0 0 0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0 0 0 0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0 0 0 0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0 0 0 0
Total Hours 89.1 7.1 12.0 12.0 12.0 12.0 34.0 0 0 0 0
Direct Labor $3,687.60 $424.24 $485.52 $485.52 $485.52 $485.52 $1,321.28 $0.00 $0.00 $0.00 $0.00
Overhead 135.00% $4,978.25 $572.72 $655.45 $655.45 $655.45 $655.45 $1,783.73 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.70% $1,390.22 $159.94 $183.04 $183.04 $183.04 $183.04 $498.12 $0.00 $0.00 $0.00 $0.00 Total Labor $10,056.07 $1,156.90 $1,324.01 $1,324.01 $1,324.01 $1,324.01 $3,603.13 $0.00 $0.00 $0.00 $0.00
REV: 02/03 Page 1
FDEP COST ESTI MATEContractor: CDM Smith, Inc.
Date: 6/29/2023
Task #: SubTask 1 Project Management SubTask 6 Groundwater Monitoring Report
Site: Carriage Trade Dryclean SubTask 2 Groundwater Sampling - Q1 SubTask 7
Activity/Phase: 2022 Groundwater Monit SubTask 3 Groundwater Sampling - Q2 SubTask 8
Project Manager: Kara Fincham, PMP SubTask 4 Groundwater Sampling - Q3 SubTask 9
SubTask 5 Groundwater Sampling - Q4 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $480.00 $120.00 $120.00 $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $480.00 $120.00 $120.00 $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $125.00 $0.00 $0.00 $0.00 $125.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $125.00 $0.00 $0.00 $0.00 $125.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $12.50 $0.00 $0.00 $0.00 $12.50 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $137.50 $0.00 $0.00 $0.00 $137.50 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs 6 samples 8260 $584.00 $146.00 $146.00 $146.00 $146.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $492.00 $123.00 $123.00 $123.00 $123.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,076.00 $269.00 $269.00 $269.00 $269.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $160.00 $40.00 $40.00 $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) Groundwater Sam $1,304.00 $326.00 $326.00 $326.00 $326.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,564.00 $466.00 $366.00 $366.00 $366.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $13,313.57 $1,156.90 $2,179.01 $2,079.01 $2,079.01 $2,216.51 $3,603.13 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,005.60 $115.69 $132.40 $132.40 $132.40 $132.40 $360.31 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $14,319.17 $1,272.59 $2,311.41 $2,211.41 $2,211.41 $2,348.91 $3,963.44 $0.00 $0.00 $0.00 $0.00
REV: 02/03 Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Carriage Trade Drycleaners SUBTASK: 2 - Groundwater Sampling
DATE: 6/29/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager K. Leggoe Interpretation of Lab Data Eval 1
Professional II M. Blanton Mobilization/Demobilization 1 Field Preparation 2 Arrange for Site Access with owner 1 Prepare Sample Kit 1 Sample Monitoring Wells 3 Deliverable Documentation Preparation 1
Professional I L. Weber Data Tabulation 2
Total Hours:
K. Leggoe 1 M. Blanton 9 L. Weber 2
TOTAL LABOR 12
VEHICLE TYPE RATE UNIT USEAGE
Truck $120.00 1 $120.00
TOTAL VEHICLE $120.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOC - EPA Method 8260 $73.00 2 0 $146.00 Cooler (0 to 25 lbs) - Shipping $110.00 1 $110.00 Ice $6.50 2 $13.00
TOTAL LAB $269.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Groundwater Sampling Kit $290.00 1 $290.00 Expendables $40.00 1 $40.00 HDPE Tubing $0.30 60 $18.00 Silicon Tubing (1/4") $3.00 6 $18.00 Drum $100.00 1 $100.00
TOTAL EQUIPMENT $466.00
FINAL --7/24/96
SUBTASK: 2 - Groundwater Sampling - Q2
DATE: 6/29/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager K. Leggoe Interpretation of Lab Data Eval 1
Professional II M. Blanton Mobilization/Demobilization 1 Field Preparation 2 Arrange for Site Access with owner 1 Prepare Sample Kit 1 Sample Monitoring Wells 3 Deliverable Documentation Preparation 1
Professional I L. Weber Data Tabulation 2
Total Hours:
K. Leggoe 1 M. Blanton 9 L. Weber 2
TOTAL LABOR 12
VEHICLE TYPE RATE UNIT USEAGE
Truck $120.00 1 $120.00
TOTAL VEHICLE $120.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOC - EPA Method 8260 $73.00 2 0 $146.00 Cooler (0 to 25 lbs) - Shipping $110.00 1 $110.00 Ice $6.50 2 $13.00
TOTAL LAB $269.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Groundwater Sampling Kit $290.00 1 $290.00 Expendables $40.00 1 $40.00 HDPE Tubing $0.30 60 $18.00 Silicon Tubing (1/4") $3.00 6 $18.00
TOTAL EQUIPMENT $366.00
SUBTASK: 2 - Groundwater Sampling - Q3
DATE: 6/29/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager K. Leggoe Interpretation of Lab Data Eval 1
Professional II M. Blanton Mobilization/Demobilization 1 Field Preparation 2 Arrange for Site Access with owner 1 Prepare Sample Kit 1 Sample Monitoring Wells 3 Deliverable Documentation Preparation 1
Professional I L. Weber Data Tabulation 2
Total Hours:
K. Leggoe 1 M. Blanton 9 L. Weber 2
TOTAL LABOR 12
VEHICLE TYPE RATE UNIT USEAGE
Truck $120.00 1 $120.00
TOTAL VEHICLE $120.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOC - EPA Method 8260 $73.00 2 0 $146.00 Cooler (0 to 25 lbs) - Shipping $110.00 1 $110.00 Ice $6.50 2 $13.00
TOTAL LAB $269.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Groundwater Sampling Kit $290.00 1 $290.00 Expendables $40.00 1 $40.00 HDPE Tubing $0.30 60 $18.00
SUBTASK: 2 - Groundwater Sampling - Q4
DATE: 6/29/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager K. Leggoe Interpretation of Lab Data Eval 1
Professional II M. Blanton Mobilization/Demobilization 1 Field Preparation 2 Arrange for Site Access with owner 1 Prepare Sample Kit 1 Sample Monitoring Wells 3 Deliverable Documentation Preparation 1
Professional I L. Weber Data Tabulation 2
Total Hours:
K. Leggoe 1 M. Blanton 9 L. Weber 2
TOTAL LABOR 12
VEHICLE TYPE RATE UNIT USEAGE
Truck $120.00 1 $120.00
TOTAL VEHICLE $120.00
SUBCONTRACTOR COSTS
NAME PURPOSE Unit COST Erwin Remediation IDW 1 $125.00 $125.00
TOTAL $125.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOC - EPA Method 8260 $73.00 2 0 $146.00 Cooler (0 to 25 lbs) - Shipping $110.00 1 $110.00 Ice $6.50 2 $13.00
TOTAL LAB $269.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Groundwater Sampling Kit $290.00 1 $290.00 Expendables $40.00 1 $40.00 HDPE Tubing $0.30 60 $18.00
LEVEL OF EFFORT/EXPENSE WORKSHEET
SUBTASK: 2 - Groundwater Monitoring Report
DATE: 2/9/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Technical Leader D. Anderson PG review/Seal 2 Project Manager K. Leggoe GWMR Conclusions/Recommendations 2 Profesisonal II M. Blanton Preparation of GWMR - body of report 20 Professional I L. Weber Preparation of GWMR Data Tables, Summaries, Figures 10
Total Hours:
D. Anderson 2 K. Leggoe 2 M. Blanton 20 L. Weber 10
TOTAL LABOR 34
FINAL --7/24/96
4651 Salisbury Road, Suite 420
Jacksonville, Florida 32256 tel: 904.527.6716
June 29, 2023
Mr. Kyle McMurray Florida Department of Environmental Protection Division of Waste Management 2600 North Blair Stone Road Tallahassee, Florida 32399
Subject: Task Assignment Request—Quarterly Groundwater Monitoring Carriage Trade Dry Cleaners 38225 12th Avenue Zephyrhills, Florida
ERIC_5232
Dear Mr. McMurray:
CDM Smith Inc. is pleased to submit this Task Assignment Request for Groundwater Monitoring of the Carriage Trade Dry Cleaners (the Site) located at 38225 12th Avenue, Zephyrhills, Pasco County, Florida, ERIC_5232. The scope of work, proposed deliverable, and deliverable schedule are summarized below and the cost estimate is also attached.
This Task Assignment, when executed, shall be incorporated in, and become part of Contract No.
HW681, between the Florida Department of Environmental Protection (FDEP), and CDM Smith, Inc. (Contractor), dated January 5, 2022, hereafter referred to as the Contract.
Scope of Work The proposed scope of work includes the following elements:
Subtask 1: Project Management Project management activities performed under this task consist of those generally administrative functions required to maintain the project on schedule, within budget, and that the quality of the work products defined within this scope is consistent with CDM Smith’s quality standards. We will prepare and submit invoices upon approval of each deliverable or milestone completion.
Project Kickoff and Progress Meetings Contractor expects to have a kickoff meeting or telephone conference with the FDEP to review the status of the project and address FDEP comments regarding the Task Assignment. CDM Smith will prepare meeting agendas and notes as part of this task.
ERIC_5232_Carriage Trade_GWMR Proposal 06_23
Project Resource Management Contractor will manage, allocate, and coordinate necessary resources for completion of tasks related to groundwater sampling.
Project Quality Technical Review Contractor’s Quality Management System guidelines will be followed. Internal quality reviews will be conducted on plans and on investigation findings and reports.
Project Status Reports Contractor’s Project Manager will prepare and submit monthly status reports to accompany each invoice throughout the duration of this project.
Subtask 2 through 5: Quarterly Groundwater Sampling Contractor will mobilize to the Site to collect groundwater samples from monitoring wells MW07D and MW13D on a quarterly basis, assuming the first quarter will be August 2023;
second quarter will be November 2023, third quarter will be February 2024, and fourth quarter will be May 2024.
All monitoring wells will be sampled in accordance with FDEP SOPs (FS 2200) for low-flow sampling using a peristaltic pump. A YSI-556 multi-parameter probe and a turbidimeter will be used to collect field data. Field parameter data will be collected (dissolved oxygen, pH, conductivity, oxidation reduction potential, temperature, turbidity) using properly calibrated probes, and recorded. Depth-to-groundwater measurements will be collected from all 13 monitoring wells at the Site prior to the collection of groundwater samples.
The groundwater samples will be collected in laboratory supplied containers, placed on ice, and delivered to a NELAP certified laboratory for analysis by United States Environmental Protection Agency (EPA) Method 8260C for volatile organic halocarbons (VOHs).
All purge water will be containerized and transferred to a Florida Department of Transportation-approved 55-gallon drum. One disposal event is planned for all purge water collected under this proposal. The disposal services will be provided by Erwin Environmental and one drum of nonhazardous water for both events is assumed.
Deliverables: Field notes, Laboratory COCs per quarter
Subtask 6: Annual Groundwater Monitoring Report Upon completion of groundwater sampling field work, Contractor will prepare an Annual Groundwater Monitoring Report. This report will summarize all monitoring work completed, field and laboratory data, investigation-derived waste (IDW) management, conclusions, and recommendations.
Deliverable: Groundwater Monitoring Report
ERIC_5232_Carriage Trade_GWMR Proposal 06_23
Schedule:
Contractor will schedule the field reconnaissance after the receipt of formal notice to proceed (NTP). The deliverables will be submitted as detailed below:
Subtask 2: Quarterly Groundwater Sampling – Quarter 1
Deliverable: Field notes, Field Forms, Laboratory COCs
Due Date: September 15, 2023
Subtask 3: Quarterly Groundwater Sampling – Quarter 2
Deliverable: Field notes, Field Forms, Laboratory COCs
Due Date: December 15, 2023
Subtask 4: Quarterly Groundwater Sampling – Quarter 3
Deliverable: Field notes, Field Forms, Laboratory COCs
Due Date: March 15, 2024
Subtask 5: Quarterly Groundwater Sampling – Quarter 4
Deliverable: Field notes, Field Forms, Laboratory COCs
Due Date: June 15, 2024
Subtask 6: Annual Groundwater Monitoring Report
Deliverable: Groundwater Monitoring Report including tabulated data, conclusions, and recommendations.
Due Date: July 15, 2024
CDM Smith appreciates this opportunity to work with FDEP on this contract. If you have any questions, please do not hesitate to contact us.
Sincerely, Approved By:
Kara Fincham, PMP Shayne Wood, P.E., BCEE Contract Manager Vice President CDM Smith Inc. CDM Smith Inc.
Investigative Derived Waste (IDW) Management Job Details - Per 55-gallon Drum
Per Event Hepaco $142 $210 $146.22 $50.00 $388.67 $467.15 EnviroServe $80 $80 $50.00 $50.00 $198.00 $198.00 Erwin Remediation $125 $125 Included Included $125 $125
IDW Subcontractor Evaluation CDM Smith - HW681
Tuesday, May 23, 2023
Company Disposal Transportation Total
Liquid Soil Fee Liquid Soil
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To: Ms. Kara Fincham CDM Smith 4651 Salisbury road, Suite 420 Jacksonville, FL 32256
May 22, 2023
Re: Non-Hazardous Drum Disposal
Ms. Fincham:
The price for the transportation and disposal (T&D) of 55-gallon drums of non-hazardous soil, mud, and water is listed below:
Impacted with Non-Hazardous Dry-Cleaning Solvents:
Description Rate Unit
T&D - Non-Haz Mud/Water $ 125.00 Per Drum
T&D - Non-Haz Soil $ 125.00 Per Drum
All drum lids should be properly secured, and drums should be placed on level ground (i.e., not on a pallet, etc.). A single False Mobilization fee will apply if our driver is not able to locate a drum on site or if we are unable to access the property due to a locked gate, etc.
The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida Keys.
Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.
Respectfully, Robert Donado Erwin Remediation, Inc.
Email: robert@erwinremediation.com
Leggoe, Kathy R.
From: Leggoe, Kathy R.
Sent: Wednesday, March 1, 2023 1:47 PM
To: Fincham, Kara E.
Subject: RE: FDEP IDW Rates for 2023
I was just looking through my contact list and Hepaco has been trying to get business over the last year and I used them for drums a couple times. Would you like me to try? They are in Tampa. I also updated Clark’s contact info to say
EnviroServe in the list of subs on teams.
From: Fincham, Kara E. <finchamke@cdmsmith.com>
Sent: Wednesday, March 1, 2023 1:45 PM
To: Leggoe, Kathy R. <leggoekr@cdmsmith.com>
Subject: FW: FDEP IDW Rates for 2023
#2. They never responded and therefore is non responsive.
If you know of someone else who will actually respond, that would be great.
From: Fincham, Kara E.
Sent: Thursday, January 5, 2023 7:23 AM
To: Steve E. Harris <sharris@clarkenvironmental.com>
Subject: FDEP IDW Rates for 2023
We are renewing the rates for IDW for 2023—I will need a general cost proposal for the pickup and disposal of all investigation derived waste associated with our FDEP projects for one year. The rates should include non-hazardous waste, liquid and solid, generally in 55-gallon drums. The majority of the IDW will most likely be contained in 55-gallon drums and consist of soil and groundwater from environmental site investigations, but we are going to start doing more PFAS work this year, so if there is a separate cost associated with PFAS IDW
(soil/Groundwater), please include it in your proposal.
The sites are located throughout the state, including Pensacola, Jacksonville, North Florida, South Florida, Tampa, and Orlando. The lowest bidder will win the work for the remainder of 2023.
If you are interested, please submit a proposal by Wednesday, January 11, 2023. If you are not interested in bidding, please reply back to let us know.
Thanks
Kara
Kara E. Fincham, PMP
Senior Project Manager
4651 Salisbury Road, Suite 420
Jacksonville, FL 32256
LEGGOEKR
Text Box Original Request, no response received. KF follow up call confirmed request received and was informed Clark was purchased by EnviroServe. Yes the email for Steve was still good and new email obtained.
LEGGOEKR
Highlight ent: Thursday, January 5, 2023 7:23 AM
LEGGOEKR
Highlight S
LEGGOEKR
Highlight To: Steve E. Harris <sharris@clarkenvironmental.com>
LEGGOEKR
Highlight Subject: FDEP IDW Rates for 2023
LEGGOEKR
Highlight I was just looking through my contact list and Hepaco has been trying to get business over the last year and I used them for drums a couple times. Would you like me to try? They are in Tampa. I also updated Clark’s contact info to say EnviroServe in the list of subs on teams.
LEGGOEKR
Highlight
LEGGOEKR
Highlight I was just looking through my contact list and Hepaco has been trying to get business over the last year and I used them for drums a couple times. Would you like me to try? They are in Tampa. I also updated Clark’s contact info to say EnviroServe in the list of subs on teams.
LEGGOEKR
Highlight I was just looking through my contact list and Hepaco has been trying to get business over the last year and I used them for drums a couple times. Would you like me to try? They are in Tampa. I also updated Clark’s contact info to say EnviroServe in the list of subs on teams.
Leggoe, Kathy R.
From: Leggoe, Kathy R.
Sent: Wednesday, March 1, 2023 4:07 PM
To: stephenharris@enviroserve.com
Subject: Drum Quote Request for CDM Smith
Greetings Steve, nice to be writing you from a new place of business. I have joined the CDM Smith team and working with the dry cleaning program. We are trying to get a current quote for 2023. Kara Fincham sent you the message below back in January. I thought I would try to send the same message to your new email. See below and respond with a quote if you would like us to use you.
We are renewing the rates for IDW for 2023—I will need a general cost proposal for the pickup and disposal of all investigation derived waste associated with our FDEP projects for one year. The rates should include non-hazardous waste, liquid and solid, generally in 55-gallon drums. The majority of the IDW will most likely be contained in 55-gallon drums and consist of soil and groundwater from environmental site investigations, but we are going to start doing more
PFAS work this year, so if there is a separate cost associated with PFAS IDW (soil/Groundwater), please include it in your proposal.
The sites are located throughout the state, including Pensacola, Jacksonville, North Florida, South Florida, Tampa, and
Orlando. The lowest bidder will win the work for the remainder of 2023.
If you are interested, please submit a proposal by Thursday, March 9, 2023.
If you are not interested in bidding, please reply to let us know.
Very Respectfully, Kathy R. Leggoe, PG, PMP
Geologist
Project Manager
CDM Smith
4651 Salisbury Road, Suite 420
Jacksonville, Florida 32256
(office) 904.527.6727, (cell) 904.651.0740 cdmsmith.com
LEGGOEKR
Text Box Second Request two months later, no response ever received.
LEGGOEKR
Highlight To: stephenharris@enviroserve.com Subject: Drum Quote Request for CDM Smith
LEGGOEKR
Highlight Sent: Wednesday, March 1, 2023 4:07 PM
03/02/2023
Kathy Leggoe
CDM Smith
PG, PMP, Geologist
4651 Salisbury Road
Jacksonville, FL, 32256 leggoekr@cdmsmith.com
904*651*0740
Subject: IDW Drums
Quote Number: QT-1093
Dear Kathy, Thank you for the opportunity to provide this proposal for the IDW drums located in the Florida Area.
HEPACO is a premier environmental contractor with coverage from 45 offices. We specialize in emergency response, industrial services, remediation, and waste services. HEPACO serves a multitude of customers including transportation companies, energy companies, environmental consultants, industrial facilities, terminals, environmental service companies, general contractors, property owners, and many other public and private-sector clients.
HEPACO, with its well-rounded and cross-trained staff, can effectively and efficiently complete this project and appreciates the opportunity. We stand firmly behind our work and always strive to deliver exceptional value and a high level of service at reasonable pricing.
Scope of Work
HEPACO will provide the following:
Pickup / Transportation and Disposal of Non-Hazardous IDW drums throughout the state of
Florida
Provide pricing per incident for disposal of Hazardous IDW Drums and PFAS waste.
Assumptions
HEPACO assumes the following:
Pricing for PFAS Drums and Hazardous IDW Drums will be priced according to location. PFAS drums can be transported to WM site in Alabama. Pricing is cost plus 30%.
All work will be completed in one mobilization unless otherwise noted
If groundwater is encountered, additional pricing for transportation, disposal, management, and/or containment will apply. This will be charged according to the HEPACO Time and Materials
Rate Sheet.
Prices do not include any required permitting unless otherwise noted
Prices do not include any surgical excavation around utilities, surface and/or subsurface structures
(it is assumed utilities are not present)
Client will provide any required sampling/analysis, technical reports, surveying, compaction testing and/or private utility locating services unless otherwise noted
All disposal prices are based on final profile approval and waste acceptance by the disposal facility
Client is responsible for any additional price associated with non-conforming waste as determined by the disposal facility
Field crew will be on-site working eight (8) hours per day M-F with no weekend or holiday work unless otherwise noted
Customer is responsible for disposal prices unless otherwise noted
Quantities are speculative. Except for minimums, all billing will be based on actual quantities.
Price
A pricing itemization is provided in Attachment A.
HEPACO Basic Conditions:
All projects require a two (2) week notice to proceed. HEPACO will make every effort possible to meet all our client’s requests; however, HEPACO cannot guarantee a project start date with less than two (2) weeks’ notice to proceed.
This proposal is contingent upon credit approval and valid for thirty days
For any additional work beyond the original scope of work, time and material rates will apply.
Except for minimums, billing will be based on actual quantities at unit prices (see Attachment A).
A four (4)-hour minimum will apply to all unit pricing quoted by the hour
Unit prices quoted by the day will be billed at the full day rate for any work on site. There will be no partial billing for partial workdays.
Unit prices quoted by the day apply up to eight hours per day. After eight hours per day, the day rate will be pro-rated for additional hours.
Unit prices are based on a non-union work force, no prevailing wages, no overtime work, and no performance bond.
Additional costs related to unexpected, concealed, or unknown conditions or any delays at the project site shall be incurred by customer.
HEPACO will not be held responsible if underground or above ground structures, cables, conduits, site features, property, materials, or equipment are destroyed, damaged, or rendered inoperable during the project.
Pricing includes HEPACO’s standard insurance coverage. Adding additional insured or increased coverages will be at additional pricing and will be quoted on a case-by-case basis.
Again, thank you for the opportunity and we look forward to completing this project.
Sincerely, Kevin Hamilton
Kevin Hamilton
HEPACO Territory Account Manager
Subject: IDW Drums
Quote Number: QT-1093
By signing below the customer acknowledges that they have received, reviewed, and agree to the HEPACO
Proposal
Owner or Owner Agent:
Signature:
Date of Acceptance:
Print Name
Owner or Owner Agent
ATTACHMENT A
PRICING ITEMIZATION TABLE
PRICING ITEMIZATION TABLE
PRICING SUMMARY TABLE
Item Type Total Price
MOBILIZATION
LABOR
MATERIALS
PPE
VEHICLES
BOATS
HEAVY EQUIPMENT
RECOVERY/TMT/STORAGE
MISC. EQUIPMENT
MONITORING/SAMPLING
LABORATORY/ANALYTICAL
COMMUNICATION
MISC.
SUBCONTRACTOR
DISPOSAL
DEMOBILIZATION
REPORT
FEES
Fee Calculated As Total Dollar Amount
Energy, Security and Recovery Fee Percentage of Total $82.15
Estimated Total Quote Price: $629.82
Item Name or Description Estimated Quantity Unit Price Units of Measure Total Line-Item Price
TRUCK DRIVER 1 $69.60 HOUR $69.60
FLATBED W/LIFT GATE 1 $76.32 HOUR $76.32
NON-HAZ SOLIDS DISPOSAL (PER
DRUM) 1 $210.00 DRUM $210.00
NON-HAZ LIQUIDS DISPOSAL (PER
DRUM) 1 $141.75 DRUM $141.75
LTL WASTE TRANSPORTATION PER
DRUM 1 $50.00 FEE $50.00
File details come from the government source that posted it. Updated .