CN-370000-CN225-T54CO1.pdf
PDF 300 KB Posted
- Contract number
- CN225
- Issued by
- Florida
About this file
This document is a Task Assignment Change Order Form from the Florida Department of Environmental Protection (FDEP), Division of Recreation and Parks, issued to DRMP, Inc. for professional services related to the Gilchrist Blue Springs State Park Project Phase 1 in Gilchrist County, Florida. The change order is executed under FDEP Contract Number CN225, Task Assignment Number 54, and represents Change Order Number 1 to the original task agreement. Key personnel include Benjamin Lennon, P.E., as the consultant representative from DRMP, Inc., and Ralph Perkins as the FDEP Contract Manager. The document is dated February 11, 2025, with all required signatures from FDEP budget, project management, and contract authority representatives, as well as the consultant.
The change order authorizes re-permitting services for the septic system at Gilchrist Blue Springs State Park Phase 1, as the original permit has expired. The scope of work consists of Subtask 1A: Department of Health Permitting, to be completed within eight weeks of start, involving DRMP and subconsultant Wastewater Technologies, Inc. permitting the wastewater disposal system through Gilchrist County Department of Health. The net increase in task amount for this change order is $3,133.80, bringing the total task amount with all change orders to $62,891.93. Costs are allocated as fixed fees only, with no reimbursable expenses. The task end date is April 29, 2025, with no change in execution timeline. Funding is drawn from FLAIR Code 61269C 37502000175 080039/21 675002 U3200 131500 XR in the amount of $3,133.80.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DDivisionn off Recreationn andd Parkss
Taskk Assignmentt Changee Orderr Form
FDEP Contract Number: Task Assignment Number:
Change Order Number: Project Number:
Consultant Name:
Consultant Representative:
Name:
Phone:
Email:
FDEP Contract Manager:
Name:
Phone:
Email:
Description of Change:
Change in Task Amount
Item Reimbursement Fixed Fee Total Original Task Amount Task Amount Including All Previous Change Orders Net Increase/Decrease in Task Amount for this Change Order Task amount with All Change Orders
DRP-085
Rev. 07/28/2022 1 of 2 t
FFLORIDAA DEPARTMENTT OF
ENVIRONMENTALL PROTECTIONN
CN225 54
1 61269C
DRMP, Inc.
Benjamin Lennon
(850) 562-9600
BLennon@drmp.com
Ralph Perkins
(850) 245-2460 ralph.perkins@floridadep.gov
Re-permitting for the septic system, as the original permit expired for the Gilchrist Blue Springs State Park Project Phase 1 (Designed under CN225 TA#20) as per proposal dated December 2 , 2024.
$ 0.00 $ 59,758.13
$ 0.00 $ 59,758.13
$ 0.00 $ 3,133.80
$ 0.00 $ 62,891.93
$ 59,758.13
$ 59,758.13
$ 3,133.80
$ 62,891.93
FFLORIDAA DEPARTMENTT OF Divisionn off Recreationn andd Parks ENVIRONMENTALL PROTECTIONN Task Assignment Change Order Form
Change in Task Time
Original Task Execution Date Original Task End Date Present Task End Date Net Change in Days New Task End Date
Funding Information
29 Digit FLAIR Code:
Project # Grant # Org Code Cat/Year Fund Module Object Code
EO Amount
Total
Approval Signatures
Budget Representative, FDEP
Project Manager, FDEP
Contract Manager, FDEP
Consultant
Contract Authority, FDEP
Signature
Signature
Signature
Signature
Signature
Date
Date
Date
Date
Date
DRP-085
Rev. 07/28/2022 2 of 2 d nta atu
04/29/2025
04/29/2025
04/29/2025 0.00
04/29/2025
61269C 37502000175 080039/21 675002 U3200 131500 XR $ 3,133.80
Tamika Bass
Uyles W. Keen Jr
Ralph Perkins
Benjamin Lennon, P.E.
Michael W. Foster Jr., P.E.
$ 3,133.80
Tamika Bass Digitally signed by Tamika Bass Date: 2025.02.11 11:26:37 -05'00'
Uyles W. Keen Jr Digitally signed by Uyles W. Keen Jr Date: 2025.02.11 11:43:43 -05'00'
Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2025.02.11 16:14:06 -05'00'
Benjamin Lennon Digitally signed by Benjamin Lennon DN: E=BLennon@drmp.com, CN=Benjamin Lennon, OU=Cary Users, OU=DRMP Active Users, DC=drmp1, DC=com Date: 2025.02.12 08:24:47-05'00'
Michael W.
Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2025.02.14 08:29:08 -05'00'
1625 Summit Lake Drive, Suite 200, Tallahassee, Florida 32317 Phone: 850.562.9600 | Fax: 850.575.5544
December 2, 2024 DRMP Proposal #: 14-0210.0MK
Uyles W. Keen Jr Construction Project Consultant II Bureau of Design and Construction Florida Department of Environmental Protection 200 Buckman Locks Rd, Palatka, FL 32177
Subject: FDEP Agreement #CN225 – Task Assignment #54 – Change Order #1 Gilchrist Blue Springs State Park Phase 1 Proposal for Professional Services
Dear Mr. Keen:
The project requires re-permitting for the septic system, as the original permit expired for the Gilchrist Blue Springs State Park Project Phase 1 (Designed under CN225 TA#20). For your review, DRMP, Inc., has provided a proposal summary and man-hour documentation for the services task identified below:
Please review the attached Proposal Summary and Deliverables.
Sincerely, _____________________________ 12/02/2024___ Benjamin Lennon, P.E. Date
Attachment(s): DRMP, Inc. Proposal
CC: file
P:\Projects14\14-0210.000_FDEP_Base_Project\00_Marketing\14-0210.0XX Gilchrist Phase 1 Plans Update
Gilchrist Blue Springs State Park Ph1 – Gilchrist County, Florida FDEP Agreement #CN225 – Task Assignment #54 CO #1
Proposal for Professional Services
Subtask 1a: Department of Health Permitting
Description: DRMP and subconsultant Wastewater Technologies, Inc. will permit the wastewater disposal system through the Gilchrist County Department of Health. This system includes the advanced treatment system, tanks, pumps, and drainfield.
Deliverable(s): The Permit will be delivered in hard copy or digital format consistent with the issuance policy of the regulatory agency.
Performance Measure: Deliverables shall be reviewed by the Department to confirm they are complete, accurate, and timely.
DRMP Project Manager $159.52 2.5 $398.80 WTI Principal/Professional Engineer $175.00 3 $525.00 WTI Engineer/Construction Inspector $125.00 8 $1,000.00 WTI CAD, Wastewater Systems As-builts $95.00 8 $760.00 WTI Administration/Clerical $45.00 10 $450.00
SUBTASK 1A TOTAL: $3,133.80
Subtask 1A: Deptartment of Health Permitting
Reimbursable
CO#1 Subtask 1A: Deptartment of Health Permitting $3,133.80 Subtask 2A: Bidding Subtask 2B: Shop Drawings and RFI’s
Subtask 2E: Final Site Visit
Subtask 1A: Deptartment of Health Permitting within 8 weeks of start
$6,492.57 $16,282.17
$5,762.32
Summary of Fees Subtask: Fixed Price Cost Subtask 1: Plans Update $12,103.77
Subtask 2C: Construction Phase Site Visit (50%, 75%) $10,801.40 Subtask 2D: Substantial Completion Site Visit & As-built Review $8,315.90 n/a
Subtask 2E: Final Site Visit n/a
Total Fixed Price Cost: $62,891.93 Total Reimbursable Cost: $0.00
GRAND TOTAL COST: $62,891.93
Subtask 2A: Bidding
Project Schedule Subtask: Duration
Subtask 2D: Substantial Completion Site Visit & As-built Review n/a
Subtask 1: Plans Update within 8 weeks of start
Subtask 2B: Shop Drawings and RFI’s n/a Subtask 2C: Construction Phase Site Visit (50%, 75%) n/a
Principal/Plumbing, Wastewater systems
P:\Projects14\14-0210.000_FDEP_Base_Project\00_Marketing\14-0210.0XX Gilchrist Phase 1 Plans Update
NOTE: Should work effort vary from proposed professional services / anticipated agency requirements, the Consultant shall submit an additional services proposal for the Department Project Manager’s consideration to modify the agreed upon task assignment (scope of services, schedule, and fees) accordingly.
File details come from the government source that posted it. Updated .