Task Assignment Notification and Professional Services Proposal
This document is a Task Assignment Notification Form and accompanying professional services proposal for the Florida Department of Environmental Protection (FDEP), specifically for Task Assignment No. 27 under FDEP Contract No. CN225. The engagement is between FDEP and DRMP, Inc., a consulting firm with offices across Florida and the Southeast. The project location is Gilchrist Blue Springs State Park in Gilchrist County, Florida, with C Hewitt designated as the Project Manager for FDEP and Bryant King, P.E. as the Consultant Representative. The document was executed on May 5-7, 2021, with a project completion date of June 30, 2022.
The scope of services encompasses comprehensive design and permitting for the Gilchrist Blue Springs State Park shoreline stabilization and restoration project, including eight subtasks: topographic survey, geotechnical investigation, asbestos/lead paint/pre-demolition survey, 30% design, 60% design, 90% design, 100% design, and regulatory permitting. Regulatory permitting includes site inspection and environmental summary, Suwannee River Water Management District Environmental Resource Permit (ERP), federal wetland permitting, and Gilchrist County courtesy review. The contract specifies a fixed price cost of $86,142.90 and cost reimbursement not to exceed $5,000.00 for permit fees, totaling $91,142.90. The project schedule spans approximately 32 weeks from start date, with deliverables including construction documents, environmental assessments, and permit applications in PDF and digital formats. Construction administration services are excluded from this task assignment but are referenced as potential future work.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT NOTIFICATION FORM
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description of Task:
Project Manager:
Schedule Start Date: Fixed Price Cost:
Completion Date: Cost Reimbursement not to exceed:
Total Task Amount:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 digit FLAIR Code: Total:
CN225 27 FDEP 61322C
Gilchrist Blue Springs State Park Shoreline Stabilization
DRMP, Inc.
Bryant King, P.E. 850-692-5653 bking@drmp.com
Alyssa Skehan 850-245-2781 alyssa.skehan@FloridaDEP.gov
Consultant to provide topographic survey, geotech report, asbestos/lead paint survey, design, and permitting for the shoreline stabilization project at Gilchrist Blue Springs State Park. See attached proposal dated April 12, 2021.
C Hewitt or successor
Upon execution $ 86,142.90 6/30/2022 $ 5,000.00
$ 91,142.90
Greg Turral Gregory Turral Digitally signed by Gregory Turral Date: 2021.05.05 14:11:13 -04'00'
C Hewitt C Hewitt Digitally signed by C Hewitt Date: 2021.05.05 14:16:21 -04'00'
Alyssa Skehan Alyssa Skehan Digitally signed by Alyssa Skehan Date: 2021.05.05 17:00:22 -04'00'
Bryant King, P.E. Bryant A King
2021.05.06 10:29:47-04'00'
Bryan J. Bradner Bryan Bradner Digitally signed by Bryan Bradner Date: 2021.05.07 12:55:40 -04'00'
61322C 37502000175 080039/20 408001 U3200 131500 PF $ 91,142.90
$ 91,142.90
1625 Summit Lake Drive, Suite 200, Tallahassee, Florida 32317 Phone: 850.562.9600 | Fax: 850.575.5544
DRMP, INC.
PRINCIPALS
Lawrence L. Smith, Jr.
Donaldson K. Barton, Jr.
Glenn J. Lusink
Jon S. Meadows Mark D. Prochak Mark E. Puckett
OFFICES
Atlanta, Georgia
Boca Raton, Florida Charlotte, North Carolina
Chipley, Florida Fort Myers, Florida Gainesville, Florida
Jacksonville, Florida Lakeland, Florida
Melbourne, Florida Orlando, Florida
Panama City, Florida Pensacola, Florida
Raleigh, North Carolina Tallahassee, Florida
Tampa, Florida
1.833.811.3767 www.DRMP.com
April 12, 2021 DRMP Proposal #: 14-0210.M27
C. Hewitt Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard 260K, MS 520
Subject: FDEP Agreement #CN225 – Task Assignment #27
Gilchrist Blue Springs State Park Restoration Proposal for Professional Services
Dear Mr. Hewitt:
Our understanding of the project is for the design and permitting of the restoration of the spring head area, new water access area, and new paddlelaunch along the spring run. For your review, DRMP, Inc., has provided a proposal summary and man-hour documentation for the services task identified below:
Please review the attached Proposal Summary and Deliverables.
Sincerely, _____________________________ 4-12-2021___ Bryant King, P.E. Date Vice President
Attachment(s): DRMP, Inc. Proposal
CC: Benjamin Lennon P.E.
Mr. C. Hewitt
M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.027_TA27_Gilchrist_Blue_Springs_Restoration_(Pending- Execution)\2021_03.xx_ORIG\Proposal\__03.04.21-Submittal\DRMP_14-0210.M27_CN225_TA27_Proposal_04.12.2021.docx
Gilchrist Blue Springs State Park Restoration – Gilchrist County, Florida FDEP Agreement #CN225 – Task Assignment #27
Proposal for Professional Services
Background and Purpose The purpose of this project is to provide professional engineering and environmental services needed to design the following elements at Gilchrist Blue Springs State Park in Gilchrist County, Florida:
Restoration of the springhead to a more natural state, including removal of the bulkhead.
New water access to the springhead for swimmers.
ADA access from concessions/parking lot down to spring Fencing and signage plan to protect restored areas Shoreline will be buoyed off for restoration Demolition of existing pavilions Paddlecraft launch located further down the spring run. Launch area will require a low boardwalk and should provide space for docking.
Design a stable loop/turn-around area for paddlecraft drop-off. Design will address erosion/sediment issue.
Naked springs area: project is limited to reforestation/planting plan.
DHR clearance/approval is not part of this project and is being done by others
Subtask 1: Topographic Survey
Description: The Consultant shall provide a topographic survey in order to facilitate engineering the project site:
I. Property: A portion of Gilchrist Blue Springs, High Springs, FL Gilchrist County, FL
II. Services Provided: Topographic Survey of the above described property, as depicted in Figure (attached). The Topographic Survey provided will be prepared in accordance with the standards of practice set forth by Florida Administrative Code Section 5J-17.050, Section 472.027 of Florida Statutes (includes all above ground improvements exterior of any buildings). This survey information will be tied to the NAD83 horizontal datum and NAVD88 Vertical Datum Using GPS techniques. Spot elevations will be on a 50’ grid.
Contours will be drawn to 1’ intervals. Trees larger than 6” DBH will also be located. No underground utilities will be located except for tie in to existing septic. Any Storm or Sanitary Structures clearly visible at the time of the survey will also be located and measured.
Deliverable: The Consultant shall provide one (1) Topographic Survey (.pdf and dwg format) to the Department Project Manager.
Performance Measures: Deliverables shall be reviewed by the Department to confirm they are complete, accurate, and timely.
Schedule: The Consultant shall complete the Survey on the subject property within 4 weeks after the start of the project.
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost DRMP Project Manager $159.52 8 $1,276.16 JBPG Principal Surveyor $103.97 8 $831.76 JBPG CAD Technician $61.37 16 $981.92 JBPG 2 -Person Field Crew $105.17 55 $5,784.35
$8,874.19
Subtask 1: Topographic Survey
SUBTASK 1 TOTAL:
M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.027_TA27_Gilchrist_Blue_Springs_Restoration_(Pending- Execution)\2021_03.xx_ORIG\Proposal\__03.04.21-Submittal\DRMP_14-0210.M27_CN225_TA27_Proposal_04.12.2021.docx
Subtask 2: Geotechnical Investigation Description: The Consultant shall perform geotechnical engineering services through their subconsultant NOVA engineering. The proposed scope of services shall include the following components:
FIELD – Mobilize to site to perform the following:
- (5) auger borings to 15’ below grade or 4’ below the groundwater table with
Dynamic Cone Penetrometer (DCP) testing in the upper 10 feet (on 2-foot centers) or to the groundwater table along the new boardwalk and paddle launch alignments.
- (5) auger borings to 15’ below grade or 4’ below the groundwater table with Dynamic Cone Penetrometer (DCP) testing in the upper 10 feet (on 2-foot centers) or to the groundwater table within the slope restoration zone.
- (3) field percolation tests within the slope restoration zone, to be performed at variable depths depending on the soil profile and groundwater conditions encountered in the auger borings detailed above.
LABORATORY – budget includes (10) wash #200 sieve tests and (10) water content tests.
REPORT – will include site preparation recommendations and foundation recommendations as applicable for the paddle launch and boardwalk structures and slope restoration zone, as well as the field percolation test results.
Deliverable: The Consultant shall provide one digitally signed and sealed geotechnical report in .pdf format to the Department Project Manager.
Performance Measures: Deliverables shall be reviewed by the Department to confirm they are complete, accurate, and timely.
Schedule: The Consultant shall complete the services under Subtask 2 within 6 weeks of the start of the project.
Subtask 3: ACM, LBP and Pre-Demolition Survey Description: The Consultant shall perform hazardous material survey services through their subconsultant NOVA engineering for the four (4) pavilions to be demolished and the retaining wall at the springhead; all structures on the slope to the spring are to be demolished. The proposed scope of services shall include the following components:
FIELD - NOVA will conduct National Emissions Standards for Hazardous Air Pollutants (NESHAPs) pre-demolition survey on the requested buildings. The sampling strategy will be based on the Asbestos Hazard Emergency Response Act (AHERA) sampling method.
Sampling will be conducted by a Florida Certified Asbestos Inspector. Samples will be sent to our contracted National Voluntary Laboratory Accreditation Program (NVLAP) accredited laboratory. A minimum of three (3) samples are required per suspect asbestos containing material. Sampling will be destructive and will be performed on materials that will be
M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.027_TA27_Gilchrist_Blue_Springs_Restoration_(Pending- Execution)\2021_03.xx_ORIG\Proposal\__03.04.21-Submittal\DRMP_14-0210.M27_CN225_TA27_Proposal_04.12.2021.docx disturbed or demolished per the Client. The scope does not include repairs to damaged building components.
NOVA will complete a lead-based paint (LBP) survey of the buildings located at the property noted above. Testing will be performed in accordance with methodology detailed in the 1995 Housing and Urban Development (HUD) Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing, Chapter 7, Lead-Based Paint Inspection, as amended in October of 1997.
Testing will be performed using an X-Ray Fluorescence (XRF) meter by individuals certified in its use by the manufacturer. Testing will be directed by individuals certified by the State of Florida and the Environmental Protection Agency (EPA) in Lead-Based Paint Inspection.
Real time field sheets will be prepared and submitted as an attachment to our final report.
REPORT – The report will be a summary of our findings and will include lab results to identify and confirm the presence of Asbestos Containing Materials, Lead Based Paint, and Mercury Switches, or lack thereof, at the subject buildings. An electronic version of the report will be delivered to the Client. Hardcopies of the report can be provided to the Client upon request
Deliverable: The Consultant shall provide one summary report report in .pdf format to the Department Project Manager.
Performance Measures: Deliverables shall be reviewed by the Department to confirm they are complete, accurate, and timely.
Schedule: The Consultant shall complete the services under Subtask 3 within 6 weeks of the start of the project.
Subtask 4: 30% Design Description: Upon completion of the topographic survey the Consultant shall prepare and deliver a 30% design submittal. The Design Team will provide the priority phasing requirements to include the necessary documents for permitting and construction for this project. Our services will include preliminary Layout, Grading, and Details to best describe the proposed work for permitting and construction. The submittal shall include the following components:
The proposed scope of services shall include the following components:
Cover Sheet Existing Conditions Sheet Demolition Plan Site Plan Grading and Drainage Plan Details
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
DRMP Project Manager $159.52 2 $319.04 NOVA Staff Engineer $78.03 14 $1,092.42 NOVA Principal Engineer $274.55 5 $1,372.75
NOVA $58.00 2 $116.00
$2,900.21
Subtask 3: ACM, LBP and Pre-Demolition Survey
SUBTASK 3 TOTAL:
M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.027_TA27_Gilchrist_Blue_Springs_Restoration_(Pending- Execution)\2021_03.xx_ORIG\Proposal\__03.04.21-Submittal\DRMP_14-0210.M27_CN225_TA27_Proposal_04.12.2021.docx
Deliverable: • At a minimum, the deliverables shall include the following:
Electronic copies of the 30% Construction Document drawings in PDF file format. The documents shall be formatted for reproduction on 22x34 paper or half size at 11x17 paper.
Electronic copies of the 30% estimate of probable construction cost in PDF file format. The documents shall be formatted for reproduction on 8-1/2”x11” paper.
Electronic copies of all additional materials required to convey the 30% design intent.
Schedule: The Consultant shall complete the services under Subtask 4 within 8 weeks of the Start Date.
Subtask 5: 60% Design Description: Upon completion of the review of the 30% plans, the Consultant shall prepare and deliver a 60% design submittal. The 60% level should accurately convey all elements of the site plan elements of the project. The Design Team will provide the priority phasing requirements to include the necessary documents for permitting and construction for this project. Our services will include Demolition Plan, Site Plans, Grading and Drainage, Sections and Details to best describe the proposed work for permitting and construction. The submittal shall include the following components:
Deliverable: • At a minimum, the deliverables shall include the following:
Electronic copies of the 60% Construction Document drawings in PDF file format. The documents shall be formatted for reproduction on 22x34 paper or half size at 11x17 paper.
Electronic copies of the 60% estimate of probable construction cost in PDF file format. The
Electronic copies of all additional materials required to convey the 60% design intent.
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
DRMP Project Manager $159.52 4 $638.08 DRMP Senior Project Engineer PE $141.12 4 $564.48 DRMP Project Engineer PE $110.01 18 $1,980.18 DRMP Staff Engineer EI $81.79 20 $1,635.80 DRMP CADD Designer $105.23 16 $1,683.68 FELS Principal Environment Consultant $109.54 5 $547.70 FELS Senior Environmental Tech $53.86 6 $323.16 FELS Staff/Project Assistant $77.92 6 $467.52 KeverMcKee Project Manager $155.76 4 $623.04 KeverMcKee Senior Project Engineer $155.76 8 $1,246.08 KeverMcKee Staff Engineer $72.10 8 $576.80 KeverMcKee CAD Technician $40.50 8 $324.00 KeverMcKee Clerical $32.39 1 $32.39
$10,642.91
Subtask 4: 30% Design
SUBTASK 4 TOTAL:
M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.027_TA27_Gilchrist_Blue_Springs_Restoration_(Pending- Execution)\2021_03.xx_ORIG\Proposal\__03.04.21-Submittal\DRMP_14-0210.M27_CN225_TA27_Proposal_04.12.2021.docx
Schedule: The Consultant shall complete the services under Subtask 5 within 6 weeks of the submission of 30% design deliverables (based on 2-week client review).
Subtask 6: 90% Design Description: Based on the FDEP review of Subtask 5 (60% Design) deliverables, the Consultant shall perform final engineering analysis and prepare detailed construction drawings and technical specifications.
The 90% Design will include planting plans for the spring restoration area and Naked Spring area: FELSI will assist DRMP with formation of a suitable planting plan for the project in association with the spring restoration. This assistance will include selection or review of plants, review of the grading and stabilization plans for the spring banks, and review of the planting plan for other areas including areas designed for erosion control and areas planted to discourage pedestrian traffic.
For areas that are primarily natural, such as Naked Spring, that will need some supplemental planting only or restoration of the forest, FELSI will prepare a planting plan suitable for the situation. The planting plan will include native species suggestions, density, and plants sizes and quantities. The needs and size of the restoration area will be assessed during completion of Task 4.
Deliverable: • At a minimum, the deliverables shall include the following:
Electronic copies of the 90% Construction Document drawings in PDF file format. The documents shall be formatted for reproduction on 24x36 paper or half size at 12x18 paper.
Electronic copies of the 90% estimate of probable construction cost in PDF file format. The
Electronic copies of all additional materials required to convey the 90% design intent.
Schedule: The Consultant shall complete the services under Subtask 6 within 6 weeks of the submission of 60% design deliverables (based on 2-week client review).
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
DRMP Project Manager $159.52 6.5 $1,036.88 DRMP Senior Project Engineer PE $141.12 14 $1,975.68 DRMP Project Engineer PE $110.01 25 $2,750.25 DRMP Staff Engineer EI $81.79 30 $2,453.70 DRMP CADD Designer $105.23 24 $2,525.52 FELS Principal Environment Consultant $109.54 19 $2,081.26 FELS Senior Environmental Tech $53.86 30 $1,615.80
$14,439.09
Subtask 5: 60% Design
SUBTASK 5 TOTAL:
M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.027_TA27_Gilchrist_Blue_Springs_Restoration_(Pending- Execution)\2021_03.xx_ORIG\Proposal\__03.04.21-Submittal\DRMP_14-0210.M27_CN225_TA27_Proposal_04.12.2021.docx
Subtask 7: 100% Design Description: Based on the FDEP review of Subtask 6 (90% Design) deliverables, the Consultant shall perform final engineering analysis and prepare detailed construction drawings and technical specifications.
Deliverable: The Consultant shall deliver digitally signed and sealed 100% design plans and technical specifications to the Department Project Manager. The deliverable shall include digital PDFs of the construction drawings, technical specifications, Engineer’s Estimate of Quantities, opinion of probable construction costs, and Autocad (.dwg) file of the plans.
Schedule: The Consultant shall complete the services under Subtask 7 within 6 weeks of the submission of 90% design deliverables (based on 2-week client review).
DRMP Project Manager $159.52 11.5 $1,834.48 DRMP Senior Project Engineer PE $141.12 10 $1,411.20 DRMP Project Engineer PE $110.01 20 $2,200.20 DRMP Staff Engineer EI $81.79 32 $2,617.28 DRMP CADD Designer $105.23 28 $2,946.44 FELS Principal Environment Consultant $109.54 12 $1,314.48 FELS Senior Environmental Tech $53.86 20 $1,077.20 FELS Staff/Project Assistant $77.92 16 $1,246.72 KeverMcKee Project Manager $155.76 3 $467.28 KeverMcKee Senior Project Engineer $155.76 12 $1,869.12 KeverMcKee Staff Engineer $72.10 12 $865.20 KeverMcKee CAD Technician $40.50 30 $1,215.00
$19,064.60SUBTASK 6 TOTAL:
Subtask 6: 90% Design
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
DRMP Project Manager $159.52 2 $319.04 DRMP Senior Project Engineer PE $141.12 4 $564.48 DRMP Project Engineer PE $110.01 8 $880.08 DRMP Staff Engineer EI $81.79 12 $981.48 DRMP CADD Designer $105.23 11 $1,157.53 KeverMcKee Project Manager $155.76 2 $311.52 KeverMcKee Senior Project Engineer $155.76 2.5 $389.40 KeverMcKee CAD Technician $40.50 6 $243.00 KeverMcKee Clerical $32.39 2 $64.78
$4,911.31
Subtask 7: 100% Design
SUBTASK 7 TOTAL:
M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.027_TA27_Gilchrist_Blue_Springs_Restoration_(Pending- Execution)\2021_03.xx_ORIG\Proposal\__03.04.21-Submittal\DRMP_14-0210.M27_CN225_TA27_Proposal_04.12.2021.docx
Subtask 8: Regulatory Permitting
Subtask 8A: Site Inspection and Environmental Summary
Description: The Consultant, through subconsultant Florida Environmental & Land Services Inc., shall perform a site inspection and prepare an environmental summary. FELSI will delineate the wetlands on the property based upon State and Federal guidelines. The wetland line will be marked using numbered flagging tape marked with Wetland Delineation. Wetland points or locations will be collected concurrent with the fieldwork using GPS. A map of the wetland and digital GPS points will be provided. A field assessment of conditions within the restoration areas will be conducted, as well as observations concerning use needs and current access. The Gilchrist Blue Springs area is assumed to be approximately 5-6 acres and the Naked Springs area is also assumed to be approximately 5-6 acres. This, task will also include taking in-water measurements, submerged aquatic vegetation surveys and making assessments regarding paddle boat launch areas and opportunities for new boardwalks and ADA accesses.
Deliverable: The Consultant shall deliver the Environmental Summary document in .pdf format to the Department Project Manager.
Schedule: The Environmental Summary will be submitted within 4 weeks of the start of the project.
Subtask 8B: Suwannee River Water Management District (ERP)
Description: The Consultant and subconsultant Florida Environmental & Land Services Inc. will obtain an Environmental Resource Permit (ERP). We anticipate that this project will require stormwater treatment based on the project area or as a result of modification of previous permitted activities on the site.
The Consultant will prepare the application form and will respond to requests for additional information. The project may also require stormwater permitting from the state. FELSI will prepare the ERP permit sections relating to wetland impacts and state lands use (Sections A, C, D and F). The completion of the stormwater portion (Section E) is not included but can be added to the rest of the application package for submittal.
UMAM evaluation sheets will be prepared and a mitigation plan is included if required. The cost for requesting a Cultural Resource Evaluation letter from the Division of Historical Resources (DHR) is included. It is not anticipated that a submerged lands lease will be needed for the projects, therefore, the preparation of a lease is excluded from this proposal. Should a lease be required, an amended task can be added. The application fee will be $420 per application. It is anticipated that one combined application can be submitted for all the proposed projects.
Deliverable: The Permit will be delivered in hard copy or digital format consistent with the issuance policy of the regulatory agency.
Schedule: The permits will be delivered within 12 weeks of Subtask 5, 60% Design Documents.
Subtask 8C: Federal Wetland Permitting Description: The Consultant and subconsultant Florida Environmental & Land Services Inc. will obtain a Federal Wetland Permit for the spring restoration, boardwalks and the paddle craft launch. FELSI will prepare the application for the federal permit and continue with the processing effort. UMAM evaluation sheets will be prepared and a mitigation plan is included if required.
M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.027_TA27_Gilchrist_Blue_Springs_Restoration_(Pending- Execution)\2021_03.xx_ORIG\Proposal\__03.04.21-Submittal\DRMP_14-0210.M27_CN225_TA27_Proposal_04.12.2021.docx
Deliverable: The Permit will be delivered in hard copy or digital format consistent with the issuance policy of the regulatory agency.
Schedule: The permits will be delivered within 12 weeks of Subtask 5, 60% Design Documents.
Subtask 8D: Gilchrist County Review Description: The Consultant will submit plans to Gilchrist County for a courtesy review. Based on the review of County code, a Site Plan review is not anticipated. If any additional permitting is required as a result of the courtesy review, a separate task will be required.
Deliverable: Correspondence with Gilchrist County in digital format (either email or .pdf) for the courtesy review of the plans.
Schedule: The permits will be delivered within 20 weeks of Subtask 5, 60% Design Documents.
M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.027_TA27_Gilchrist_Blue_Springs_Restoration_(Pending- Execution)\2021_03.xx_ORIG\Proposal\__03.04.21-Submittal\DRMP_14-0210.M27_CN225_TA27_Proposal_04.12.2021.docx
Subtask 9: Construction Administration Services (Not in this Task Assignment)
Subtask 9A: Bidding Support Description: The Consultant shall answer bid questions provided by the Department and issue any Addenda needed for issuance. The Consultant or respective Subconsultants shall not answer any bid questions directly from Contractors, subcontractors or vendors and will direct all questions to the Purchasing Agent at the Department.
DRMP Project Manager $159.52 3.5 $558.32 FELS Principal Environment Consultant $109.54 20 $2,190.80 FELS Senior Environmental Tech $53.86 12.5 $673.25 FELS Staff/Project Assistant $77.92 12 $935.04
$4,357.41
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
DRMP Project Manager $159.52 2 $319.04 DRMP Project Engineer PE $110.01 6 $660.06 DRMP Staff Engineer EI $81.79 8 $654.32 DRMP CADD Designer $105.23 12 $1,262.76 FELS Principal Environment Consultant $109.54 20 $2,190.80 FELS Senior Environmental Tech $53.86 18 $969.48 FELS Staff/Project Assistant $77.92 16 $1,246.72
$7,303.18
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
DRMP Project Manager $159.52 4 $638.08 DRMP Project Engineer PE $110.01 2 $220.02 DRMP Staff Engineer EI $81.79 16 $1,308.64 DRMP CADD Designer $105.23 8 $841.84 FELS Principal Environment Consultant $109.54 17 $1,862.18 FELS Senior Environmental Tech $53.86 20 $1,077.20 FELS Staff/Project Assistant $77.92 12 $935.04
$6,883.00
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
DRMP Project Manager $159.52 1 $159.52 DRMP Project Engineer PE $110.01 2 $220.02
$379.54 Subtask Subtotal: $18,923.13
Firm Name Expense Type Unit Price Quantity Total NTE Cost DRMP Permit Fee(s) - Not to Exceed $5,000.00 NTE $5,000.00
$5,000.00 $23,923.13
8D TOTAL:
Subtask 8E: Permit Fees
REIMBURSABLE EXPENSE SUBTOTAL:
SUBTASK 8 Grand Total:
Subtask 8A: Site Inspection & Environmental Summary
8A TOTAL:
Subtask 8B: ERP Permitting
8B TOTAL:
Subtask 8C: Federal Wetland Permitting
8C TOTAL:
Subtask 8: Regulatory Permitting
Subtask 8D: Gilchrist County Review
M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.027_TA27_Gilchrist_Blue_Springs_Restoration_(Pending- Execution)\2021_03.xx_ORIG\Proposal\__03.04.21-Submittal\DRMP_14-0210.M27_CN225_TA27_Proposal_04.12.2021.docx
Subtask 9B: Shop Drawings and RFI’s Description: The Consultant shall review shop drawings pertaining to Site/Civil work and verify their accuracy with the plans and documents. The Consultant shall respond to the contractor with red line mark ups if the shop drawings are not in accordance with the plans. Markups may be approved as noted or require resubmittal. All shop drawings shall be returned to the Department for concurrence. The Consultant shall respond to contractor related questions and requests for information pertaining to Site/Civil work and verify their accuracy with the plans and documents. The Consultant shall respond to the contractor requests for information (RFI) in writing and provide this to BDC for concurrence.
Subtask 9C: Construction Phase Site Visits Description: The Consultant shall make a site visit at the 50% and 75% phase of construction or as requested by the FDEP project manager to observe as an experienced and qualified design professional the progress and quality of the executed work and to determine in general if the work is proceeding in accordance with the contract documents and permit conditions for the site work.
Subtask 9D: Substantial Completion Site Visit and As-built Review Description: The Consultant will review contractor provided as-built construction survey completed by a registered surveyor and mapper in the State of Florida, for conformance to the permitted construction plans. This survey must be signed and sealed by a State of Florida Professional Surveyor and Mapper. As-Built plans shall be submitted prior to the Substantial completion site review. The Consultant shall attend the inspection for substantial completion when requested by the contractor and prepare a punch list of those items not completed and that do not meet the intent of the plans and technical specifications or need minor adjustment. The Consultant shall sign the DEP certification of substantial completion for setting forth the date of substantial completion for this project.
Subtask 9E: Additional Site Visit
Description: The Consultant shall attend the inspection as needed when requested in writing by the DEP project manager to observe as an experienced and qualified design professional the progress and quality of the executed work and to determine in general if the work is proceeding in accordance with the contract documents and permit conditions for the site work.
Deliverable(s) & Schedule: (These are payment triggers – what items will consultant provide to FDEP, including format, size, number, minimum content, due date, etc.)
Subtask 9A: Bidding - Documentation of any responses to RFI’s (.pdf format).
Subtask 9B: Shop Drawings and RFI’s – Copies of Stamped Shop Drawings and Documentation of any RFI’s (.pdf format). Reviews and Responses will be returned within 7 days of receipt.
Subtask 9C: Construction Site Visit – Observation Report of the Site Visit (.pdf format). Report will be submitted within 7 days of the site visit.
Subtask 9D: Substantial Completion Site Visit – Written Summary of the As-built Review, Meeting and Certification and punch list (.pdf format). Report will be submitted within 7 days of the site visit and receipt of as-builts.
Subtask 9E: Additional Site Visit – Observation Report of the Site Visit (.pdf format). Report will be submitted within 7 days of the site visit.
Performance Measure: Deliverables shall be reviewed by the Department to confirm they are complete, accurate, and timely.
M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.027_TA27_Gilchrist_Blue_Springs_Restoration_(Pending- Execution)\2021_03.xx_ORIG\Proposal\__03.04.21-Submittal\DRMP_14-0210.M27_CN225_TA27_Proposal_04.12.2021.docx
DRMP Project Manager $159.52 2 $319.04 DRMP Project Engineer PE $110.01 2.5 $275.03 KeverMcKee Senior Project Engineer $155.76 2.5 $389.40 KeverMcKee CAD Technician $40.50 3.5 $141.75
SUBTASK 9A TOTAL: $1,125.22
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
DRMP Project Manager $159.52 4 $638.08 DRMP Sr Project Engineer PE $141.12 0.5 $70.56 DRMP Project Engineer PE $110.01 4 $440.04 DRMP Staff Engineer EI $81.79 3 $245.37 DRMP Secretary $47.83 1 $47.83 KeverMcKee Senior Project Engineer $155.76 7 $1,090.32 KeverMcKee Staff Engineer $72.10 1 $72.10 KeverMcKee Clerical $32.39 2 $64.78
SUBTASK 9B TOTAL: $2,669.08
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
DRMP Project Manager $159.52 2 $319.04 DRMP Project Engineer PE $110.01 14 $1,540.14 KeverMcKee Senior Project Engineer $155.76 2 $311.52 KeverMcKee Staff Engineer $72.10 13 $937.30 KeverMcKee Clerical $32.39 2 $64.78
SUBTASK 9C TOTAL: $3,172.78
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
DRMP Project Manager $159.52 6 $957.12 DRMP Staff Engineer EI $81.79 2 $163.58 Kever McKee Project Manager $155.76 5.5 $856.68 Kever McKee Clerical $32.39 1 $32.39
SUBTASK 9D TOTAL: $2,009.77
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
DRMP Project Manager $159.52 6 $957.12 DRMP Staff Engineer EI $81.79 1 $81.79
SUBTASK 9E TOTAL: $1,038.91
$10,015.76SUBTASK 10 GRAND TOTAL (Not in this Task Assignment):
Subtask 9: Construction Administration Services (Not in this Task Assignment) Subtask 9A - Bidding
Subtask 9B: Shop Drawings and RFI’s
Subtask 9C: Construction Phase Site Visit (50%, 75%)
Subtask 9D: Substantial Completion Site Visit & As-built Review
Subtask 9E: Additional Site Visit
M:\Profit-Center-Marketing\Tally\Proposals\Proposals 21\FDEP\14-0210.0MK_CN225_CSA_2015\14-0210.027_TA27_Gilchrist_Blue_Springs_Restoration_(Pending- Execution)\2021_03.xx_ORIG\Proposal\__03.04.21-Submittal\DRMP_14-0210.M27_CN225_TA27_Proposal_04.12.2021.docx
NOTE: Should work effort vary from proposed professional services / anticipated agency requirements, the Consultant shall submit an additional services proposal for the Department Project Manager’s consideration to modify the agreed upon task assignment (scope of services, schedule, and fees) accordingly.
Reimbursable
Subtask 2: Geotechnical Engineering $6,387.46
Subtask 5: 60% Design $14,439.09
$5,000.00
Total Fixed Price Cost: $86,142.90 Total Reimbursable Cost: $5,000.00
GRAND TOTAL COST: $91,142.90
Subtask 8: Regulatory Permitting
Summary of Fees Subtask: Fixed Price Cost Subtask 1: Topographic Survey $8,874.19
Subtask 3: ACM, LBP and Pre-Demolition Survey $2,900.21 Subtask 4: 30% Design $10,642.91
Subtask 6: 90% Design $19,064.60 Subtask 7: 100% Design $4,911.31
Task Assignment) N/A $18,923.13
All Subtasks with Predecessors Include 2 Week Review Period from Client Built in to Duration Total Estimated time = 32 weeks
Project Schedule Subtask: Duration Subtask 1: Topographic Survey 3 weeks from start
6 weeks from Subtask 6 20 weeks from Subtask 5
NA
Subtask 7: 100% Design Subtask 8: Regulatory Permitting Subtask 10: Construction Administration Services (Not in this Task Assignment)
Subtask 6: 90% Design 6 weeks from Subtask 5
Subtask 2: Geotechnical Engineering 6 weeks from Start Subtask 3: ACM, LBP and Pre-Demolition Survey 6 weeks from Start Subtask 4: 30% Design 8 weeks from Start Subtask 5: 60% Design 6 weeks from Subtask 4 pa dd le la un ch re m ov e pi cn ic s he lte rs re m ov e bu lk he ad sl op e re st or at io n