About this file
This document is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection for a design and engineering services project at DeLeon Springs State Park. The contract, CN214, was assigned to George & Associates, Consulting Engineers, Inc., with Robert D. George as the consultant representative. The FDEP Contract Manager is Mae Roth, and the Project Manager is Philip Stone. The project is located at DeLeon Springs State Park in Florida and involves springs protection and ATU (Aerobic Treatment Unit) installation services.
The task assignment encompasses four subtasks: Subtask 1A and 1B (Preliminary work including topographical survey, utilities survey, electrical engineering, septic tank inspections, and permitting services); Subtask 2 (60% construction documents for proposed ATU systems); Subtask 3 (100% construction documents and specifications); and Subtask 4 (permitting services). The total contract value is $24,417.00, comprising a fixed price cost of $23,587.00 and reimbursable costs not to exceed $830.00. The project execution began upon execution of the task assignment with a completion date of December 30, 2016. Work is performed by multiple firms including A.D. Platt & Associates, Inc., Dixie Septic Tank, Inc., Pace Analytical, and NHWL Engineering, Inc., with labor costs ranging from $15.00 to $125.00 per hour depending on position classification and firm. The project is funded through Object Code 131500 under Fund 131001 and Project Number 61004C.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .