CN-370000-CN214-T49.pdf
PDF 2 MB Posted
- Contract number
- CN214
- Issued by
- Florida
About this file
This is a Task Assignment Notification Form from the Florida Department of Environmental Protection (FDEP) establishing a consulting contract for the Weeki Wachee State Park Theater Exit Seawall Improvements project. The contract is assigned to George and Associates, Consulting Engineers, Inc., with consultant representative Stacy Johnson and FDEP contract manager Ralph Perkins. The project is located at Weeki Wachee State Park in Hernando County, Florida, and is identified as FDEP Contract No. CN214, Task Assignment No. 49, Project No. 6AO03. The document was executed on November 2, 2023, with approval signatures from budget, project management, contract management, and contract authority representatives.
The contract establishes a fixed-price, comprehensive consulting services engagement valued at $90,471.24 with no cost reimbursement component. Services include seven subtasks: geotechnical analysis ($13,043.81), lead and asbestos testing ($2,541.75), environmental assessment ($5,921.22), structural on-site review and 60% plan set ($24,829.44), permitting coordination ($7,281.72), 90% construction documents ($27,693.58), and final 100% construction documents ($9,159.72). The scope encompasses geotechnical investigation, hazardous material surveys, environmental and wetland assessment, structural design review, and preparation of construction documents progressing from 60% to 90% to final 100% completion. Project completion is scheduled for November 2, 2025. Services are funded through the CSFRF grant program with FDEP project management, and payment is contingent upon approval of deliverables for each subtask by the Department.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT NOTIFICATION FORM
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description of Task:
Project Manager:
Schedule Start Date: Fixed Price Cost:
Completion Date: Cost Reimbursement not to exceed:
Total Task Amount:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 digit FLAIR Code: Total:
CN214 49 6AO03
Weeki Wachee Theater Exit Seawall
George and Associates
Stacy Johnson 850-521-0344 sjohnson@gaceng.net
Ralph Perkins 850-245-2460 ralph.perkins@floridadep.gov
Proposal for Weeki Wachee State Park – Seawall Improvements. Tasks include geotechnical analysis, lead and asbestos testing, environmental assessment, structural review and design, permitting and construction documents ... per the attached proposal dated 8.7.23
Garland Sandel
Execution Date $ 90,471.24 11/02/2025 $ 0.00
$ 90,471.24
Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2023.11.02 15:58:54 -04'00'
Garland Sandel Garland Sandel Digitally signed by Garland Sandel Date: 2023.11.03 07:48:13 -04'00'
Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2023.11.03 09:06:05 -04'00'
Stacy Johnson Stacy K Johnson Digitally signed by Stacy K Johnson Date: 2023.11.03 11:26:44 -04'00'
Michael W. Foster Jr., PE Michael W. Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2023.11.08 10:09:58 -05'00'
6A003 CSFRF 37504000281 085154/22 000286 U3200 131500 AD $ 90,471.24
$ 90,471.24
1967 COMMONWEALTH LANE, SUITE 200 - TALLAHASSEE, FLORIDA 32303
PHONE 850-521-0344 - FAX 850-521-0345
www.gaceng.net CIVIL ENGINEERING - LAND USE PLANNING - ENVIRONMENTAL - SYSTEMS PLANNING - TRANSPORTATION
August 7, 2023
Garland Sandel Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard, MS 520 Tallahassee, FL 32399
RE: CN214‐TA 49 : Weeki Wachee State Park Seawall
Garland, For your review, George & Associates, Consulting Engineers, Inc. has prepared a fee proposal summary and man‐hour documentation for the proposed Weeki Wachee State Park – Seawall
Improvements. Tasks include geotechnical analysis, lead and asbestos testing, environmental assessment, structural review and design, permitting and construction documents. The attached survey provided by Hyatt Survey Services, Inc. (dated 08/2022) will be utilized for understanding of site geometry and design of the seawall.
Please review the attached Proposal Summary and deliverables.
Sincerely, Stacy Johnson, P.E.
George & Associates, Consulting Engineers, Inc.
Weeki Wachee State Park Seawall Improvements
CN214‐TAXX
Subtask 1a – Geotechnical Analysis Description: Environmental and Geotechnical Specialists, Inc. (EGS) will perform geotechnical design services. The geotechnical investigation will be for up to 100 linear foot of proposed seawall. Performance of the Geotechnical Scope of Services will include:
Mobilize on site Install 2 – 40’ deep SPT Borings on the landside of Proposed Seawall (80 ft total)
Perform 5 – 10’ deep Manual Penetrometer Probes along Proposed Seawall Face Particle Size Analysis every 5’ (16 tests) Plastic Limit and Liquid Limit every 20’ (4 tests) Organic Test every 20’ (4 tests) Prepare a Geotechnical Report, including:
o Subsurface Materials Encountered o Measured Groundwater and Estimated “Normal” Seasonal High
Groundwater o Geotechnical Design Parameters for the 100 linear foot of Proposed Seawall
Deliverables:
Geotechnical Report, signed and sealed, pdf
Performance Measures: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 1a – Geotechnical Analysis
Firm Name
Position Classification Hourly Rate
Hours Total Fixed Price Cost
EGS, Inc. Senior Engineer $194.76 2 $389.52
EGS, Inc. Geotechnical Engineer $115.50 8 $924.00
EGS, Inc. Engineering Intern $77.25 24 $1,854.00
EGS, Inc. Senior Engineering Technician $78.99 32 $2,527.68
EGS, Inc. Engineering Technician $32.49 8 $259.92
EGS, Inc. Drill Rig ‐ Track Mounted Mobilization $758.99 1 $758.99
EGS, Inc. SPT ‐ Track/ATV/Skid ‐ 0‐50 Ft $23.91 80 $1,912.80
EGS, Inc. Grout Boreholes ‐ Track/ATV/Skid ‐ 0‐50 Ft $9.12 80 $729.60
EGS, Inc. Extra SPT Samples ‐ Track/ATV/Skid ‐ 0‐50 Ft $47.82 16 $765.12
EGS, Inc. 4‐Inch Temporary Casing ‐ Track/ATV/Skid ‐ 0‐50 Ft $17.76 70 $1,243.20
EGS, Inc. Particle Size Analysis AASHTO T88 (No Hydrometer) $48.58 16 $777.28
EGS, Inc. Liquid Limit AASHTO T89 $75.90 4 $303.60
EGS, Inc. Plastic Limit & Plasticity Index AASHTO T90 $30.36 4 $121.44
EGS, Inc. Organic Content Ignition FM 1 T‐267 $39.47 4 $157.88
Robinson_MS Text Box
EGS, Inc. Corrosion Series FM 5‐550 through 5‐553 $159.39 2 $318.78
Fixed Price Total Cost: $13,043.81
Total for Subtask 1a: $13,043.81
Subtask 1b – Lead and Asbestos Testing Description: GLE Associates (GLE) will perform a survey for asbestos‐containing materials (ACM) that will generally consist of the following items:
Review of previous records, if available
Visual observations of friable and non‐friable suspect ACM
Physical assessments of suspect friable materials
Bulk sampling
Laboratory analysis
Recommendations and conclusions
All testing to comply with current National Emissions Standards for Hazardous Air Pollutants (NESHAP) and Occupational Safety & Health Administration (OSHA) regulations. Upon completion of the above‐referenced survey, GLE will develop recommendations and conclusions for dealing with any ACM determined to be present in the wall surveyed. Results will be presented in a report.
GLE will complete a lead‐containing paint survey to comply with 29 CFR Part 1926 “Lead Exposure in Construction; Interim Final Rule” for future demolition and/or renovation activities. The sampling protocol used in this survey is a modified version of the survey methodology established by HUD.
Sampling of the paint surfaces will be performed by collecting representative paint chips. All samples will be submitted to an accredited laboratory recognized under EPA’s National Lead Laboratory Accreditation Program (NLLAP). The samples will be analyzed by EPA Method SW 846 3050B/7000B.
Deliverable:
Asbestos & Lead‐Paint Survey Report, pdf
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 1b – Lead and Asbestos Testing
Firm Name Position Classification Hourly Rate
Hours Total Fixed Price Cost
GLE Certified Industrial Hygienist $192.45 3 $577.35
GLE
Senior Project Manager/Asbestos & Lead Consultant
$112.08 3 $336.24
GLE Project Manager/Asbestos & Lead Consultant $91.23 8 $729.84
GLE Asbestos/Lead Monitor $76.50 6 $459.00
GLE Administrative I $69.66 2 $139.32
GLE Laboratory Analysis/Sample (Cost per sample) $15.00 20 $300.00
Fixed Price Total Cost: $2,541.75
Total for Subtask 1b: $2,541.75
Subtask 1c – Environmental Assessment Description: Florida Environmental and Land Services, Inc. (FELSI) will conduct a site visit to perform an environmental survey including wetland delineation and submerged grass survey.
FELSI will delineate the wetlands within the project area based upon State and Federal guidelines. The wetland line will be flagged using numbered flagging tape marked with ‘Wetland Delineation’. Wetland points or locations will be collected concurrent with the fieldwork using GPS. A general and protected species survey will also be conducted in conjunction with the fieldwork and GPS used to locate any observed environmental features.
A submerged grasses and shoreline vegetation survey in the vicinity of the seawall will also be completed, as this will likely be required for permitting.
A narrative report will be prepared in a format acceptable for review by Hernando County and for use in federal or state environmental planning and permitting as needed. The report will include descriptions of wetlands, vegetative community types, protected species, survey methodology, and any significant natural features. An aerial map depicting the features will also be included in the report.
Deliverable:
Narrative environmental report, pdf
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 1c – Environmental Assessment
Firm Name Position Classification Hourly Rate
Hours Total Fixed Price Cost
FELSI, Inc. Principle Consultant $109.83 34 $3,734.22
FELSI, Inc. Senior Environmental Tech $54.00 24.5 $1,323.00
FELSI, Inc. Environmental Tech $42.00 2 $84.00
FELSI, Inc. Staff Assistant $60.00 13 $780.00
Fixed Price Total Cost: $5,921.22
Total for Subtask 1c: $5,921.22
Subtask 1d – Structural On‐Site Review and 60% Plan Set Description: George & Associates Consulting Engineers, Inc. (G&A) will perform an onsite review of existing seawall (approximately 135 linear foot). G&A will collect measurements and photographic data necessary for the repair and/or design of the existing and proposed seawall.
Data collection will also include a desktop review of available information related to the design and construction of the existing seawall, as well as the Geotechnical Report and Environmental Assessment from previous subtasks. BDC to provide G&A with any available documentation concerning the existing seawall in digital format.
Measurements and research documents will be used to create repair procedures and a preliminary (60%) plan set of the proposed improvements. G&A will prepare plans and details for construction of the proposed seawall, including an overall project limits map. A cost estimate based off of preliminary quantities, with unit prices, will be submitted as part of the plans package.
Deliverables:
Written summary of findings report, pdf
60% Construction Plans, pdf and AutoCAD
Preliminary Engineer’s Opinion of Probable Cost, pdf
Fixed Price Cost:
Subtask 1d – Structural On‐Site Review and 60% Plan Set
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
G&A Chief Engineer $203.43 8 $1,627.44
G&A Project Manager 1 $180.00 72 $12,960.00
G&A Engineer Intern 3 $114.00 45 $5,130.00
G&A Senior Engineer Technician $72.00 68 $4,896.00
G&A Project Coordinator $72.00 3 $216.00
Fixed Price Total Cost: $24,829.44
Total for Subtask 1d: $24,829.44
Subtask 2a – Permitting Coordination Description: G&A will coordinate with permitting agencies that could have jurisdiction over this project to confirm the level of permitting associated with the final conceptual / schematic plan. The following agencies may potentially have jurisdiction over the project:
DHR
SWFWMD
FDEP
Hernando County
G&A will contact these agencies to confirm if permitting will be needed, and the type of permit that will most likely be required. G&A will produce a permitting manual with documentation of coordination with the aforementioned agencies, and what level of permitting will be expected.
A compliance review consultation form will be submitted to DHR based on the final conceptual extents of the proposed work. Consultation with DHR will determine if archaeological survey or monitoring will be required during the design/permitting phase of the work.
FELSI will assist in permit applications with completion of sections related to wetlands, as well as one response to a Request for Additional Information from agency staff as pertains to tasks completed by FELSI, if needed.
Deliverables:
Permitting Manual, pdf
Performance Measures: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 2a – Permitting Coordination
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
G&A Chief Engineer $203.43 4 $813.72
G&A Project Manager 1 $180.00 22 $3,960.00
G&A Engineer Intern 3 $114.00 22 $2,508.00
Fixed Price Total Cost: $7,281.72
Total for Subtask 2a: $7,281.72
Subtask 2b – 90% Construction Documents Description: Upon receiving feedback from BDC on the 60% wall layout, and making the requested revisions, G&A will design and develop wall details for construction and prepare 90% construction plans that meet FDOT specifications for wall construction. A cost estimate based off the quantities in the construction documents, with unit prices, will be submitted as part of the plans package.
Kever McKee Engineering (KME) will provide an independent structural check and review of G&A’s structural calculations and plan details to include the following:
Evaluate the geotechnical report to determine the loading requirements.
Create design calculations for the structural wall system.
Review the design calculations provided by G&A.
Review the plans provided by G&A for constructability and compliance with the calculations.
Deliverables:
Response to 60% Plans comments from BDC, pdf
90% Construction Plans, pdf and AutoCAD
Engineer’s Opinion of Probable Cost, pdf
Fixed Price Cost:
Subtask 2b – 90% Construction Documents
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
G&A Chief Engineer $203.43 6 $1,220.58
G&A Project Manager 1 $180.00 58 $10,440.00
G&A Engineer Intern 3 $114.00 38 $4,332.00
G&A Senior Engineer Technician $72.00 41 $2,952.00
G&A Project Coordinator $72.00 2 $144.00
KME Principle Engineer $185.00 13 $2,405.00
KME Senior Engineer $150.00 18 $2,700.00
KME Graduate Engineer $125.00 28 $3,500.00
Fixed Price Total Cost: $27,693.58
Total for Subtask 2b: $27,693.58
Subtask 3 – Final (100%) Construction Documents Description: After BDC comments are received, G&A will update the 90% plans, and prepare final construction documents.
Deliverables:
Response to 90% Plans comments from BDC, pdf
100% Construction Plans, pdf and AutoCAD
100% Specifications, pdf
Final Engineer’s Opinion of Probable Cost, pdf
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 3 – Final (100%) Construction Documents
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
G&A Chief Engineer $203.43 4 $813.72
G&A Project Manager 1 $180.00 28 $5,040.00
G&A Engineer Intern 3 $114.00 17 $1,938.00
G&A Senior Engineer Technician $72.00 17 $1,224.00
G&A Project Coordinator $72.00 2 $144.00
Fixed Price Total Cost: $9,159.72
Total for Subtask 3: $9,159.72
Summary of Fees:
Subtask Subtask Fixed Price Cost
Subtask Reimbursable
Subtask 1a – Geotechnical Analysis $13,043.81 $0.00
Subtask 1b – Lead and Asbestos Testing $2,541.75 $0.00
Subtask 1c – Environmental Assessment $5,921.22 $0.00
Subtask 1d – Structural On‐Site Review & 60% Plans $24,829.44 $0.00
Subtask 2a – Permitting Coordination $7,281.72 $0.00
Subtask 2b – 90% Construction Documents $27,693.58 $0.00
Subtask 3 – Final (100%) Construction Documents $9,159.72 $0.00
Total Fixed Costs: $90,471.24
Total Reimbursable Cost $0.00
Overall Total Cost: $90,471.24
Project Schedule:
Activity Duration (calendar days)
Dates *
Subtask 1a – Geotechnical Analysis 60 Upon execution
Subtask 1b – Lead and Asbestos Testing 30 Upon execution
Subtask 1c – Environmental Assessment 30 Upon execution
Subtask 1d – Structural On‐Site Review & 60% Plans
Upon completion of Geotechnical
Analysis
Subtask 2a – Permitting Coordination 90 Upon execution
Subtask 2b – 90% Construction Documents
Upon receiving BDC feedback from
60% Plans
Subtask 3 – Final (100%) Construction Documents
Upon receiving BDC feedback from
90% Construction Documents
* ‐ Dates for starting subtasks may vary depending on receiving feedback and comments from
BDC
Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.
x x x x x x x x x x xx x x x x x x x x x x x x x x x x
SHED
DECK
FLOATING
DECK
METAL
RAMP
SHED
CONCRETE
RIPRAP
COVERED
PATIO
CONCRETE
CONCRETE
CONCRETE
DECK
SNACK SHACK
CONCRETE
AUDITORIUM
CONCRETE
BUILDING
OVERHANG
GRASS
PLANTER
HEDGE
H
ED
G E
NDF TRAV PT
FLO 0056
STAIRS
STAIRS
RIPRAP
GRASS
WEEKI WACHI SPRINGS
CP 1 (CONCRETE MONUMENT) 1521363.40 471881.00 17.08'
DESIGNATION NORTHING EASTING ELEVATION
Geographic Data SpecialistsLB No.: 7203 Hyatt Survey Services, Inc.
2012 Lena Road Bradenton, Florida 34211 Phone: (941) 748-4693
SECTION 02, TOWNSHIP 23 SOUTH, RANGE 17 EAST, HERNANDO COUNTY, FLORIDA
TOPOGRAPHIC SURVEY - WEEKI WACHI SPRINGS 1
SHEET
OF 1
SITE CONTROL
THIS SURVEY IS NOT VALID WITHOUT THE ORIGINAL SIGNATURE AND
RAISED SEAL OR DIGITAL SIGNATURE OF A FLORIDA LICENSED
SURVEYOR AND MAPPER.
RUSSELL P. HYATT, PSM
FLORIDA SURVEYORS REGISTRATION NO. 5303
1. THIS SURVEY IS REFERENCED TO A GRID PROJECTION OF THE FLORIDA STATE PLANE COORDINATE SYSTEM (NAD 83/11).
2. THIS IS NOT A BOUNDARY SURVEY.
3. THIS SURVEY IS SUBJECT TO PERTINENT EASEMENTS AND RESTRICTIONS OF RECORD, IF ANY.
4. THE FOLLOWING NGS VERTICAL CONTROL POINT WAS RECOVERED AND UTILIZED FOR THE ELEVATIONS SHOWN HEREIN:
"FL 0056" CONCRETE MONUMENT NAVD 1988 ELEVATION 17.08'.
SURVEYOR'S NOTES
CONTROL POINT
FIRE HYDRANT
WATER VALVE
SIGN
CATCH BASIN
LEGEND
NDF NAIL W/ DISC FOUND
GUY WIRE
PALM TREE
HEDGE
POST
WATER METER
LIGHT POLE
CP 2 (CONCRETE MONUMENT) 1521312.33 472119.37 11.84'
CP 3 (NAIL AND DISK FOUND) 1521380.77 471970.13 14.03'
HANDRAIL
4. THE APPROXIMATE WATER ELEVATION AT THE TIME OF SURVEY WAS 8.50' (NAVD 88)
5. THIS SURVEY DRAWING WAS PREPARED FOR THE EXCLUSIVE USE OF THE PARTY OR PARTIES CERTIFIED TO BELOW FOR THE EXPRESS PURPOSE STATED HEREON AND/OR CONTAINED IN THE CONTRACT BETWEEN HYATT SURVEY SERVICES, INC. AND THE CLIENT FOR THIS PROJECT. COPYING, DISTRIBUTING AND/OR USING THIS DRAWING, IN WHOLE OR IN PART FOR ANY PURPOSE OTHER THAN ORIGINALLY INTENDED WITHOUT WRITTEN CONSENT FROM HYATT SURVEY SERVICES, INC IS STRICTLY PROHIBITED AND RENDERS THE SURVEYOR'S CERTIFICATION, SIGNATURE AND SEAL NULL AND VOID. ANY QUESTIONS CONCERNING THE CONTENT OR PURPOSE OF
THIS DRAWING SHOULD BE DIRECTED TO HYATT SURVEY SERVICES, INC.
AutoCAD SHX Text
AutoCAD SHX Text
DWG # 22-2763
AutoCAD SHX Text
PROJECT # 22-2763
AutoCAD SHX Text
PROJECT MANAGER: SL
AutoCAD SHX Text
SURVEY DATE: 08/2022
AutoCAD SHX Text
SCALE: 1" = 10'
AutoCAD SHX Text
CHECKED BY: RPH
AutoCAD SHX Text
DRAWN BY: SL
AutoCAD SHX Text
AutoCAD SHX Text
| BLANK TA Form.pdf |
| CN214 TA49 Weeki Wachee -Seawall Improvements (Approved).pdf |