CN-370000-CN214-T15CO1.pdf
PDF 276 KB Posted
- Contract number
- CN214
- Issued by
- Florida
About this file
This is a Task Assignment Change Order Form submitted by the Florida Department of Environmental Protection (FDEP) for Contract No. CN214, managed through the Bureau of Design and Construction. The change order involves George & Associates, Consulting Engineers, Inc. as the consulting firm, with Robert George serving as the consultant representative. The project concerns improvements at Paynes Prairie Preserve State Park, specifically the upgrade of the septic system at the Lake Wauberg Day Use Area.
The change order authorizes additional survey and engineering design services for septic system relocation, including subtasks 10 through 13. Subtask 10 involves a site visit with the Alach县Health Department and topographical survey with a fixed price cost of $2,601.90 and reimbursable cost of $144.18. Subtask 11 covers revised 90% design plans at a cost of $998.52. Subtask 12 addresses permitting for the revised design at $716.64. Subtask 13 includes revised 100% design plans at $434.76. The overall change order total is $4,896.00, with a combined fixed price cost of $4,751.82 and reimbursable cost of $144.18. Payment will be made upon approval of deliverables for each subtask. The project end date remains December 31, 2017, with no net change in timeline. The change order was approved by FDEP representatives on May 26, 2017.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .