This is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP) establishing a professional services contract for design and construction administration services at Mike Roess Gold Head Branch State Park. The consulting firm CPH, Inc., represented by Kayla Sheffield, P.E., is assigned to perform the work under FDEP Contract CN210, Task Assignment TA51. The project manager for FDEP is Ralph Perkins, and the overall project involves the replacement of the Turkey Oak Bathhouse building and associated site elements at the state park location in Florida.
The contract is structured as a fixed-price engagement with a total task amount of $122,388.70 to be paid upon execution and completion by March 3, 2025. CPH will deliver ten sequential tasks including conceptual design with two architectural options, 60% and 100% design documents across architectural, mechanical, electrical, and structural disciplines, topographic and civil site surveys, permitting coordination with Clay County and the St. Johns River Water Management District, geotechnical engineering services, asbestos and lead evaluation, and construction administration services including pre-construction meetings, RFI reviews, site observations during construction, and substantial completion verification. Deliverables consist of PDF documents containing design plans, specifications, opinions of probable cost, survey data, and construction administration field reports. The project schedule extends across multiple phases with individual task durations ranging from 21 to 120 calendar days, commencing upon execution of the task assignment.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT NOTIFICATION FORM
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description of Task:
Project Manager:
Schedule Start Date: Fixed Price Cost:
Completion Date: Cost Reimbursement not to exceed:
Total Task Amount:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 digit FLAIR Code: Total:
CN210 TA51 FDEP 61498C
Mike Roess Gold Head Branch State Park Replace Bathhouse
CPH, Inc.
Kayla Sheffield, P.E. 904-705-3125 ksheffield@cphcorp.com
Ralph Perkins 850-245-2460 ralph.perkins@floridadep.gov
Design, permitting, and construction administration for a replacement of the Turkey Oak Bathhouse building and site elements, per the attached proposal dated March 12, 2024.
Richard Rene Marcil, III
Upon execution $ 122,388.70 March 3, 2025 $ 0.00
$ 122,388.70
Tamika Bass
Richard Rene Marcil, III
Ralph Perkins
Kayla Sheffield, P.E.
Bryan Bradner
61498C 37502000032 080039/23 423001 U3200 131500 QK $ 122,388.70