Contract Summary
This is a Task Assignment Notification Form and associated proposal documentation from the Florida Department of Environmental Protection (FDEP), dated August 1, 2018, for the Wekiwa Springs State Park Park Entrance project (Project #61188C). The contract involves the FDEP's Bureau of Design and Construction (BDC) as the state agency and CPH, Inc., based in Panama City, Florida, as the consulting firm. The project manager is Theresa Carron with FDEP, and the consultant representative is Jason Toole, P.E., with CPH, Inc. This task assignment (TA23) transfers remaining subtasks 5 through 10 from an expired contract (CN210 TA07) to allow continuation of design and pre-construction services for the park entrance improvements.
The contract covers comprehensive pre-construction and design services for improving the entry road from Wekiwa Springs Road to the Ranger Station compound area. Deliverables include site evaluation and conceptual site plans, topographic survey, lead-based paint and asbestos investigations, gopher tortoise survey, and design documents at 30%, 60%, and final phases, along with signage design and permitting assistance. The total contract value is $56,153.60, consisting of a fixed price cost of $55,270.35 and cost reimbursement not to exceed $883.25. The work is scheduled to commence upon execution with a completion date of December 1, 2020. Payment is made upon FDEP approval of deliverables for each subtask. Funding is provided through FDEP Grant #37503006080 using Cat/Year 080039/19, Fund 675002, Module U3200, and Object Code 131500.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT NOTIFICATION FORM
Required Signatures: Adobe Signature
FDEP Contract No.: I Task Assignment No.: Owner's Name: I Project No.:
CN210 23 FDEP-BDC 61188C
Project Location: Project Name:
Wekiwa Springs State Park Park Entrance
Consultant Name:
CPH, Inc.
Consultant Representative: Phone: Email:
Jason Toole, P.E. 850-563-1490 X 4801 jtoole@cphcorp.com
FDEP Contract Manager: Phone: Email:
Jack Brady 850-245-2535 Jack.Brady@FloridaDEP.gov
Description of Task:
To transfer remaining subtasks 5 through IO from expired CN2 l OT A07 to allow work to proceed as described in the attached proposal dated August 1, 2018.
Project Manager: Theresa Carron
Start Date: I Upon execution Completion Date: I 12/1/20
Greg Turral
Budget Representative, FDEP
Theresa Carron
Project Manager, FDEP
Jack Brady
Contract Manager, FDEP
Jason Toole, P.E.
Consultant
Michael W. Foster Jr., P.E.
Contract Authority, FDEP
Pro_ject # Grant# Org Code
61188C 37503006080
29 db?it FLAIR Code:
Schedule
Fixed Price Cost: $55,270.35 Cost Reimbursement not to exceed: $ 883.25
Total Task Amount: $56,153.60 Approval Signatures:
Greg Ory Tu rra I Digitally signed by Gregory Turral Date: 2019.08.26 10:31:16 -04'00'
Signature
Theresa Carron Digitally signed by Theresa Carron Date: 2019.08.26 11 :07:35 -04'00'
Signature
J a Ck B rad Y Digitally signed by Jack Brady Date: 2019.08.2611:09:20-04'00'
Signature �y1io,,edbyJasonlToole
Jason L Toole�';;iJ�=•-.c,.,-_,,oo• Renor,:lam\MeLtllorollhisdocutr>et>I I.Oc:a1ion:
Date:20\9,08..2614,..:01 Fo.kPhantomPDFVersion:9.2.0
Signature�
Signa'ff!!;.
Date
Date
Date
Da
Date
Pf/4- Cat/Year Fund Module Ob_ject Code EO Amount
080039/19 675002 U3200 131500 XR $ 56,135.60
Total: $ 56,135.60
August 1, 2018
Ms. Theresa Carron
Pre-Construction Project Manager
Bureau of Design and Construction
Florida Department of Environmental Protection
3800 Commonwealth Boulevard 260M, MS 520 Tallahassee, FL 32399
RE: Wekiwa Springs State Park- #61188C Park Entrance CN210 TA07
Dear Theresa:
1031-C W. 23rd Street Panama City, FL 32405
Phone; 850.563 1490 Fax: 850.563.1495
For your review, CPH, Inc., has provided a proposal summary and man-hour documentation for the services tasks identified below:
Please review the attached Proposal Summary and deliverables.
Sincerely, Jason Toole, P.E.
CPH, Inc.
w w w , ph c u , p c o m
Wekiwa Springs State Park #61188C Park Entrance CN210 TA07
Evaluation and Conce tual Site Plans
• Site Evaluation - Site Visits (two) to observe the existing entry impr ements and to deter ·ne the possibility of environmental concerns with wetlands o Threatened and Endange d Species.
• 1B - Cone tual Site Plans - Preparation of up to four (4) conceptual si plan option, including conceptual-p se cost estimates, for improving the entry road from W iwa Springs Road to the Ranger Station ompound area. All 4 conceptual site plans will p vide an optional vehicular egress from the eue, with the appropriate signage. This scope · dudes ongoing coordination support with local akeholders and regulatory agencies. BO Staff will participate with the stakeholder coordinat n and will provide comment on the co cepts. This task will be performed after the survey is receiv in Subtask 2.
Deliverable:
Performance Measure: Deliverables will be r accurate, and timely.
he Department to confirm they are complete, Fixed Price Cost:
Subtask lA - Site Evaluation
Firm Name Hours Total Fixed Price Cost
CPH, Inc. '4 $530.44 CPH, Inc. 8 $789.84
1A Total $1,320.28
Firm Name Hourly Total Fixed Price Rate Cost
CPH, Inc. l $98.73 I $789.84 ! CPH, Inc. , $132.61 $530.44 CPH, Inc. i Senior Desi n Technician $73.34 2,053.52 CPH, Inc. Project Engineer 73.37 10 3.70
Total $4,107.50
$32.96 (16 Sheets x $0.96/Sheet:::: $15.36; 32 Sheets x $0.
$1.60; 64 Sheets x $0.25/Sheet:::: $16)
Subta 1A- Mileage(@ $0. 5 per mile) tal for Subtask l: $5,496.34
80 Miles= $35.60
$68.56 w w w c p h c o 1· p c o -m
D cription: Perform Topographic Survey to include the location of visible above ground improvem ts and isible utilities within the project area lying north of Weldwa Springs Road to north of the Ra er Statio compound. 50' topographic overlap East and West of the existing roadway will be surv ed.
Existing uilding envelope only will be located with no dimensions inside the building due to schedule building changes. 8" {and as per the local tree ordinance) DBH and greater. Tre will be located wit in the survey limits. The limited topographic survey will be used in design.
Deliverable: P /CAD file of survey area to be delivered electronically to BDC. lnclu s 3 signed/sealed copies.
Performance Meas e: Deliverables will be reviewed by the Department to c accurate, and timely.
Fixed Price Cost:
Firm Name Posit, n Classification
CPH, Inc.
CPH, Inc.
CPH, Inc.
CPH, Inc.
CPH, Inc.
CPH, Inc.
Reimbursable Cost:
Postage Printing Overnight Travel (if applicable) Mileage(@ $0.445 per mile) Reimbursable Total Cost
Total for Subtask 2: $4,779.67
80.47 $146.66 $62.43 $121.41
$47.36
Subtask 3: Geotechnical P se I - Lead Based Paint and Asbe Description:
Hours
Total Fixed Price Cost $2,144.88 $1,126.58 $586.64 $187.29 $485.64 $189.44
2 Total $4,720.47
Paint and Asbestos Survey - Complete fie work and laboratory testing on all demolished as part of the proposed entr ce road widening and signage
• 38 - G tech - Complete field work and laboratory testing to be p rformed on the entrance road of W iwa Springs State Park (Approx. 530 LF from North Wekiw prings Road to the Ranger
Report will include pavement design recomm dations for the roadway
• 3A- PDF file of the final LBP/Asbestos Report will be delivered digitally to BD
W W W ( rh r o r p c o m
• 38 - PDF file of final geotechnical report and 3 hard copies signed/sealed will be deliver. d digitally to BOC.
nee Measure: Deliverables will be reviewed by the Department to confirm they d timely.
Firm Name Position Classification Hourly Total Fixed Price .,, Rate Cost j Universal $127.41 .1 $254.82 i Engineering 1 Sciences, Inc. (UES) I
UES . $234.48
UES I $1,119.36
UES :2 $108.00
UES $44.55
UES $125.00
· UES $375.00
3A Total $2,261.21
Subtask 3B- Geotech Firm Name Hourly : Hours Total Fixed Price
Rate Cost ; Universal 1 Engineering
$127.41 1 $127.41
Sciences, Inc. (UES)
UES 8 I $937.92
UES 3 $162.00
UES 2 $89.10
UES I Mobiliz ion - Truck Drill Rig $400.00
UES
I SPT rings (4 @ 15') $720.00
I
UES s ior Engr. Tech I $54,63 $218.52 UES ' ash #200 Sieve Test $30.00 $120
3B Total $2,774.95
50 Sheets x $0.25 = $12.50
1 50 Sheets x $0.25 = $12.50
$25.00 w w w . c ph c o r p c o m
• Gopher Tortoise Survey and Report: The burrows will be marked in the field with flagging ta a or stakes. The location of the tortoise burrows will also be located with a hand-held GP nit.
Appr imate burrow locations (if observed) will be plotted on an aerial photo h and designa as potentially occupied for use in project permitting and FFWC reporti purposes.
This scope es not include any coordination, meeting, or permitting with IVCC or other regulatory sta . ased on the results of the survey, additional services may b equired to include the permitting and ocation of Gopher Tortoises.
Deliverable:
• Digital copy of the Gopher To
Performance Measure: Deliverables will be accurate, and timely.
Fixed Price Cost:
firm Name
CPH, Inc.
CPH, Inc.
CPH, Inc.
CPH, Inc.
Rate $120.51 $101.64 $76.67 $59.24
50 Sheets x $0.05/Sheet = $2.50
40 miles = $17.80
$20.30
Subtask 5: 30% Park Entrance Plans Description:
ent to confirm they are complete, Hours Total Fixed Price Cost $482.04 $813.12 otal $1,838.80
• 30% Park Entrance Plans - Cover Sheet, General Notes, SWPPP E&S Control Plans, Grading, Paving and Drainage Plans, and General Details based upon the selected conceptual site plan option from Task 18.
Deliverable:
• Digital copies in PDF/CAD format of the 30% Park Entrance Plans will be delivered to BOC.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 5 - 30% Park Entrance Plans
Firm Name Position Classification Hourly Hours Total Fixed Price Rate Cost
CPH, Inc. Principal $178.23 2 $356.46 s w w w . c- ph , o rp . r o m
I CPH, Inc. : Sr. Project Manager I $132.61 I CPH, Inc. \ Senior Design Technician I $73.34 I CPH, Inc. I Administrative i $59.24 I CPH, Inc. I Project Engineer I $73.37
Reimbursable Cost:
Printing 30 Sheets x $0.96/Sheet = $28.80
Reimbursable Total Cost $28.80 Total for Subtask 5: $3,940.12
Subtask 6: 60% Park Entrance Plans Description:
16 I $795.66 i 20 ! $1,466.80 i2 I s11s.4s
I 16 ! $1,173.92 S Total $3,911.32
• GA-Civil/Transportation Services• Prepare 60% Park Entrance Plans: Cover Sheet, General Notes, SWPPP E&S Control Plans, Grading, Paving and Drainage Plans, General Details, Drainage Details, Pavement, Signage and Marking Details. Prepare a construction cost estimate.
• 68 -Architecture/Structural/Electrical (MEP) Services for one (1) new check in booth - Prepare 60% plans for the construction of one new check in booth to service park guests. Booths shall be minimal to include an area for a Park employee to collect fees and check in park guests. In addition, CPH will coordinate with BOC regarding existing Electric/Key Card/Sunpass Access and possible changes/relocation of that feature.
• 6C · Architecture/Structural/Electrical (MEP) Services for a second check in booth (in addition to Task 6B) - Prepare 60% plans for the construction of a second check in booth to service park guests.
Deliverable:
• 6A · PDF digital copies of 60% plans and a draft Opinion of Probable (OPC) construction cost to be will be delivered to BOC. OPC will include Arch/MEP/Structural OPC from task 6B and/or 6C.
• 6B - PDF digital copies of 60% plans will be delivered to BOC.
• 6C - PDF digital copies of 60% plans will be delivered to BOC.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and tlmely.
Fixed Price Cost:
Subtask 6A • 60% Construction Documents
Firm Name Position Classification Hourly J Hours Total Fixed Price Rate I Cost
CPH, Inc. Principal $178.23 !2 $356.46 CPH, Inc. Sr. Project Manager ! $132.61 12 $1,591.32 CPH, Inc. Senior Design Technician : $73.34 72 $5,280.48 i CPH, Inc. Administrative ! $59.24 4 $236.96 CPH, Inc. Project Engineer $73.37 20 I $1,467.40 l
6A Total $8,932.62 w w w . c ph c o rp . c o m
Subtask 68 -Archttectural/Structural/Electrlcal (MEP} Services
Firm Name
CPH, Inc.
CPH, Inc.
CPH, Inc.
CPH, Inc.
CPH, Inc.
_QH, Inc.
CP H, _!!!�. _
�,Inc.
CPH, Inc.
CPH, Inc.
Position Classification Hourly Rate
Principal_ Architect $130.60 Senior Architectural Manager $87.45 Architectural Designer $63.17 Project Coordinator $56.68 Administrative $59.24 Senior Structural Engineer $112.39 Seni�r Design Technician $73.34 Principal MEP Engineer $125.59 MEP Project Designer $69.44 MEP Design Technician $52.88
Subtask 6C-Architectural/Structural/Electrical (MEP) Services
Firm Name Position Classification Hourly Rate
CPH, Inc. Principal Architect $130.60 CPH, Inc. Senior Architectural Manager $87.45 CPH, Inc. Architectural Designer $63.17
CPH, Inc. Project Coordinator $56.68 CPH, Inc. Administrative $59.24 CPH, Inc. Senior Structural Engineer $112.39 CPH, Inc. Senior Design Technician $73.34 CPH, Inc. Principal MEP Engineer $125.59 CPH, Inc. MEP Project Designer $69.44 CPH, Inc. MEP Design Technician $52.88
Reimbursable Cost:
Subtask 6A- Printing 70 Sheets x $0.96/Sheet = $67.20
Subtask 6A - Mileage (@ $0.445 per mile} Subtask 68 - Printing Subtask 6C- Printing Subtask 68- Mileage(@ $0.445 per mile) Reimbursable Total Cost
Total for Subtask 6: $13,361.41
Subtask 7: Signage Design Description:
40 Miles= $17.80
15 Sheets x $0.96/Sheet = $14.40
15 Sheets x $0.96/Sheet = $14.40
80 Miles= $35.60
$149.40
Hours Total Fixed Price Cost
.5 $65.30 6 $524.70 4 $252.68 8 $453.44 2 $118.48 4 $449.56 - ---- 4 $293.36 2 . $251.18 5 I $347.20 10 $528.80
68 Total $3,284.70
Hours Total Fixed Price Cost
.s $65.30 1 $87.45 2 $126.34
1 $56.68 .5 $29.62 1 $112.39 2 $146.68 1 $125.59 2 $138.88 2 $105.76
6C Total $994.69
• 7A - Architecture/Structural/Electrical (MEP) Services for the conceptual design of two new entrance signs in the State Park. Signage Plans will be coordinated with the BDC for conceptual phase prior to preparing 60% Design Plans.
w w w c ph , o T p c o m
• 7B - Architecture/Structural/Electrical (MEP)/Landscape Services - 60% Design Plans of the two new entrance signs based on the approved concept option from Phase 7 A. Foundation landscaping will be designed around the signs.
• 7C - Architecture/Structural/Electrical (MEP) Services - Final Design Plans of the two new entrance signs based on comments/feedback received from Phase 7B submittal. Foundation landscaping will be designed around the signs.
Deliverable:
• 7A- PDF digital copies of Conceptual Signage Options will be delivered to BDC.
• 7B - PDF digital copies of 60% plans will be delivered to BOC.
• 7C - PDF digital copies of 100% plans will be delivered to BOC.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 7 A- Architectural/Structural/Electrical (MEP} Services firm Name Position Classification Hourly Rate
CPH, Inc. Principal Architect $130.60 CPH, Inc. Architectural Designer $63.17
Subtask 7B - Architectural/Structural/Electrical (MEP) Services
Firm Name I Position Classification J Hourly l Rate
CPH, Inc. i Principal Architect $130.60 i CPH, Inc. Senior Architectural Manager $87.45 i CPH, Inc. Architectural Designer $63.17 ! CPH, Inc. Senior Structural Engineer $112.39 i CPH, Inc. Senior Design Technician $73.34 ! CPH, Inc. i Principal MEP Engineer $125.59
CPH, Inc. MEP Project Designer ! $69.44 ! CPH, Inc. I MEP Design Technician l $52.88 I CPH, Inc. J Principal Landscape Architect ! $126.83 I l $105.74I CPH, Inc. 1 Senior Landscape Architect l CPH, Inc. i Senior Landscape Designer i $71.20 l
Subtask 7C-Architectural/Structural/Electrical (MEP) Services
Firm Name
CPH, Inc.
CPH, Inc.
CPH, Inc.
CPH, Inc.
CPH, Inc.
Position Classification Hourly Rate
Principal Architect I $130.60 Senior Architectural Manager I $87.45 Architectural Designer $63.17 Senior Structural Engineer $112.39 Senior Design Technician $73.34
· w \\' w c p h c n r p c o m
Hours Total Fixed Price Cost
1 $130.60 4 i $252.68
7A Total $383.28
Hours ' Total Fixed Price Cost
.5 $65.30 1 $87.45
12 $126.34 14 $449.56 !8 $586.72 !6 $753.54 i8 $555.52
16 $846.08 1 $126.83 6 $634.44 12 ' $854.40
7B Total $5,086.18
Hours I Total Fixed Price l Cost
.25 i $32.65
.s i $43.73 1 I $63.17 2 I $224.78 4 i $293.36
CPH, Inc. Principal MEP Engineer $125.59 CPH, Inc. MEP Project Designer $69.44 CPH, Inc. MEP Design Technician $52.88
CPH, Inc. Principal Landscape Architect I $126.83 CPH, Inc.
I Senior Landsc�e Architect l $105.74
CPH, Inc. 1 Senior Landscape Designer $71.20
Reimbursable Cost:
Subtask 7C - Printing 20 Sheets x $0.96/Sheet = $19.20 f--------=----1-- ·----
Reimbursable Total Cost $19.20 Total for Subtask 7: $7,969.58
Subtask 8: Permitting and Utility Coordination Description:
2 $251.18 4 $277.76 8 $423.04 1 ; $126.83
3 • $317.22 6 $427.20
7C Total $2,480.92
• BA-Orange County Right of Way Permit-Submit Proposed Park Entrance Plans to Orange County for review and approval of the widening of the access point. This scope includes meetings, coordination, initial submittal and revision and resubmittal to one round of comments from the County. Estimate application fees of $150.
• 8B - Orange County Drainage Connection Permit - Submit Proposed Park Entrance Plans to Orange County for review and approval of a potential Drainage Connection. This scope includes meetings, coordination, initial submittal and revision and resubmittal to one round of comments from the County. Estimate application fees of $150
• 8C-Water Management District (WMD) Permit Exemption- Prepare for and submit for a formal exemption to stormwater requirements for the entrance road widening project. Estimate application fees of $100.
• 8D - Utility Coordination - Coordinate with appropriate utility companies to have the existing utility poles relocated for the entrance road widening. This scope does not cover any fees that will be charged by the utility company for the actual work of relocating.
Deliverable:
• 8A- PDF copies of all applications and responses to Request for Additional Information (RAl's) submitted to Orange County. PDF copy of Permit Approval will be delivered to BOC.
• 88 - PDF copies of all applications and RAl's submitted to Orange County. PDF copy of Permit Approval will be delivered to BDC.
• SC- POF copies of all applications and RAl's submitted to WMD. PDF copy of Permit Exemption.
• 8D - Email coordination regarding relocation will be delivered to BOC.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 8A - Orange County Right of Way Permit Firm Name Position Classification Hourly Hours Total Fixed Price
Rate Cost
CPH, Inc. Project Manager $98.73 10 $987.30 CPH, Inc. Sr. Design Technician $73.34 24 $1,760.16 w w w < phc n r p . c o ir
CPH, Inc. • Administrative CPH, Inc. Project Engineer
Subtask 8B - Orange County Drainage Connection Permit firm Name Position Classification
CPH, Inc. Project Manager i CPH, Inc. Sr. Design Technician ! CPH, Inc. Administrative
CPH, Inc. Project Engineer
Subtask 8C - WMD Permit Exemption Firm Name I Position Classification
CPH, Inc. I Project Manager CPH, Inc. 1 Sr. Design Technician CPH, Inc. i Administrative CPH, Inc. Project Engineer
Subtask 8D - Utility Coordination Firm Name Position Classification
CPH, Inc. Project Manager CPH, Inc. Sr. Design Technician CPH, Inc. Administrative CPH, Inc. Project Engineer
Reimbursable Cost·
Subtask 8A- Postage I $30.00
$59.24 4
$73.37 24
I Hourly Hours Rate i $98.73 10 I $73.34 24 i $59.24 4
_l $73.37 24 ..
Hourly Hours Rate $98.73 4
; $73.34 8 1 $59.24 4
$73.37 8
Hourly Hours Rate $98.73 2
I $73.34 4 $59.24 10 $73.37 8 j $236.96 1 $1,760.88 --�
8A Total $4,745.30
Total Fixed Price Cost $987.30 $1,760.16 $236.96
• $1,760.88 8B Total $4,745.30
I Total Fixed Price Cost
: $394.92 j $586.72 i $236.96 ! $586.96
8C Total $1,805.56
Total Fixed Price Cost $197.46 $293.36
, $592.40 $586.96
80 Total $1,670.18
Subtask 8A - Printing ! $25.00 (300 Sheets x $0.05/Sheet = $15; 40 Sheets x $0.25 = $10)
Subtask SA-Application Fees 1 $150
Subtask 8B - Postage $35.00 Subtask 8B - Printing $25.00 (300 Sheets x $0.05/Sheet = $15; 40 Sheets x $0.25 = $10)
Subtask 8B • Application Fees $150 Subtask 8C - Postage $35.00 Subtask SC- Printing $15.00 {200 Sheets x $0.05/Sheet = $10; 20 Sheets x $0.25 = $5)
Subtask 8C • Application Fees $100
I Reimbursable Total Cost I $565.00 Total for Subtask 8: $1.3,531..34 w w w cph c o rp c o m
Subtask 9: Final Construction Documents Description:
• 9A-Civil/Transportation Services - Prepare Final Park Entrance Plans: Cover Sheet, General Notes, SWPPP E&S Control Plans, Grading, Paving and Drainage Plans, General Details, Drainage Details, Pavement, Signage and Marking Details. Prepare cost estimate for the proposed improvements shown in the Park Entrance Plans.
• 98 - Architecture/Stmctural/Electrical (MEP) Services for one (1) new check in booth - Prepare Final plans for the construction of one new check in booth to service park guests. Booths shall be minimal to include an area for a Park employee to collect fees and check in park guests.
• 9C - Architecture/Structural/Electrical (MEP) Services for a second check in booth {in addition to Task 98) - Prepare Final plans for the construction of a second check in booth to service park guests.
Deliverable:
• 9A - Five (5) hard copy signed/sealed sets of Final Construction Plans, Supplemental Specifications not covered by FOOT Specifications, and Permits. PDF file copies of Opinion of Probable (OPC) construction cost, Final Plans, Specifications and Permits. CD containing final CAD Drawings, pdfs, reports and permits will be delivered to BOC.
• 9B- Five (5) hard copy signed/sealed sets of Final Construction Plans for Proposed Check in Booth.
CD containing final CAD Drawings, pdfs, reports and permits will be delivered to BDC.
• 9C - Five (5) hard copy signed/sealed sets of Final Construction Plans for Proposed Additional Check in Booth. CO containing final CAO Drawings, pdfs, reports and permits will be delivered to
BOC.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 9A-Final Construction Documents
Firm Name Position Classification Hourly Rate
CPH, Inc. Principal $178.23 CPH, Inc. Sr. Project Manager $132.61 CPH, Inc. Senior Design Technician $73.34 CPH, Inc. Administrative $59.24 CPH, Inc. Project Engineer $73.37
Subtask 9B -Architectural/Structural/Electrical {MEP) Services
Firm Name
CPH, Inc.
CPH, Inc.
CPH, Inc.
Position Classification Hourly Rate
Principal Architect $130.60 Senior Architectural Manager $87.45
Architectural Designer
'"-' \'\' \V
$63.17 ph o r p c; o m
Hours Total Fixed Price Cost
2 $356.46 12 $1,591.32 60 $4,400.40 4 $236.96 20 $1,467.40
9ATotal $8,052.54
Hours Total Fixed Price Cost
.5 $65.30 3 $262.35 2 $126.34
CPH, Inc. Project Coordinator I $56.68 !2 I
$113,36 CPH, Inc. Administrative i $59.24 i 1 I $59.24
CPH, Inc. Senior Structural Engineer i $112.39 12 I $224.78 , CPH, Inc. Senior Design Technician 1 $73.34 12 I $146.68 i CPH, Inc. Principal MEP Engineer i $125.59 I 1 I $125.59 1 CPH, Inc. I MEP Project Designer j $69.44 !2 $138.88
CPH, Inc. MEP Design Technician I $52.ss 14 $211.52 9B Total $1,474.04
Subtask 9C - Architectural/Structural/Electrical {MEP) Services
Firm Name I
: CPH, Inc.
, CPH, Inc.
I CPH, Inc.
I CPH, Inc.
l CPH, Inc.
CPH, Inc.
! CPH, Inc.
! CPH, Inc.
CPH, Inc.
CPH, Inc.
Position Classification
Principal Architect
Senior Architectural Manager Architectural Designer Project Coordinator
: Administrative : Senior Structural Engineer : Senior Design Technician 1 Principal MEP Engineer 1 MEP Project Designer
MEP Design Technician
I Hourly Rate
' $130.60
; $87.45 i $63.17 i $56.68 : $59.24 i $112.39 I $73.34 I $125.59 ! $69.44 I $52.88
Hours Total Fixed Price Cost
.25 : $32.65 : .5 $43.73 I
1 I $63.17 .5 $28.34 .25 ! $14.81
I .5 $56.20 1 $73.34 .s \ $62.80 1 l $69.44 1 i $52.88
9C Total $497.35
Reimbursable Cost· Subtask 9A • Printing 40 Sheets x $0.96/Sheet = $38.40
Subtask 9A- Mile.age(@ 40 Miles.: $17.80 $0.445 per mile) Reimbursable Total Cost $56.20
Total for Subtask 9: $10�080.13
Subtask 10: Construction Administration Services Description: Provide bidding assistance, responses to requests for information and shop drawing reviews. Conduct the minimum number of site inspections necessary to certify the construction. Three
(3) site inspections are included within this scope.
Deliverable: Provide digital copies of shop drawing reviews, RFI responses, bidding correspondence, and site inspection reports will be delivered to BOC, as performed as part of the Construction Administration Services task.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
I Subtask 10 - Construction Administration Services w w w c ph , o r p c o m
Firm Name Position Classification Hourly Hours Total Fixed Price Rate Cost
CPH, Inc. Principal $178.23 1 $178.23 CPH, Inc. Sr. Project M�nager $132.61 22 $2,917.42 CPH, Inc. Senior Design Technician $73.34 24 $1,760.16 CPH, Inc. Administrative $59.24 5 $296.20 CPH, Inc. Project Engineer $73.37 28 $2,054.36
9C Total $7,206.37
Reimbursable Cost:
Printing $11.25 (100 Sheets x $0.05/Sheet = $5.00; 25 Sheets@ $0.25/Sheet =
$6.25)
Mileage{@ $0.445 per mile) 120 Miles (3 trips) = $53.40
Reimbursable Total Cost $64.65 Total for Subtask 5: $7,271.02
Project Schedule: (Assumes Release to Start on Aug\.lst pt, 2018) Start date TBD for CN210 TA23
Activity ,. .I, 1 A c- I -, r -
C .L.• -. �I, 'JD
-.,UU1.uo�n .._
Subtask 5 * Subtask 6A • Subtask 6B • Subtask 6C * Subtask 7A Subtask 78 Subtask 7C
Duration (Calendar Days)
1 A I A.C...- c- L.-.
A1'1� -· ...... • : ... 1... -,o, 42 (Concurrent) 42 (Concurrent) 42 (Concurrent)
14 (Start after Subtask 2)
21 (After Subtask 8)
Dates ""',,,. ,,. n
0 , .... • /1 0 n/1n/10
"I•,.. I• n
10/29/18
12/10/18 12/10/18
12/10/18 9/24/18
10/29/18 3/31/19
Subtask 8A 90 (Concurrent) 3/10/19 Subtask88 90 (Concurrent) 3/10/19 Subtask 8C 90 (Concurrent} 3/10/19 Subtask SD 90 (Concurrent) 3/10/19 Subtask 9A 21 (Concurrent) 3/31/19 Subtask 98 21 (Concurrent) 3/31/19 Subtask 9C 21 (Concurrent) 3/31/19 Subtask 10 TBD
*Duration for these items includes a 14-day review time for BDC between Subtask 1B and 5 and between Subtask 5 and 6.
Summary of Fees:
I Subtask Subtask Fixed Price Cost
W W W 1 ph O l p C O il
Reimbursable
I �UOI8SK .lA
I -
- _,.,�"'.,J ,, ...
JUUla;)I\ �•
--- LU,;J" .,JIJ
,- .I A l Subtask 5 Subtask 6A Subtask 6B Subtask 6C i Subtask 7A Subtask 7B Subtask 7C Subtask 8A Subtask 8B Subtask SC Subtask 8D Subtask9A Subtask 9B Subtask 9C Subtask 10 Total Fixed Price Cost:
Total Reimbursable Cost:
I
I i
Overall Total Cost: I
;;,1.,::>Lu;Lo
.... A 1,'\-,r-" ! ..,.,.., nc
Y , &..u,"'9 ! y.J::J,LV
I
-,14...,6...0J ..... "" .,.,..._Lo ,..IU
,,.._ -- • Ar" ..... ....... ---
,,.., n"\n ,..,.. ,,__ - - -
$3,911.32 $28.80 $8,932.62 $85.00 $3,284.70 $50.00 $994.69 $14.40 $383.28 0
$5,086 .. 18 0
$2,480.92 i $19.20 $4,745.30 i $205.00
$4,745.30 I $210.00 $1,805.56 I $150.00 $1,670.18 I 0 $8,052.54 $S6.20 $1,474.04 I 0
$497.35 ! 0 $7,206.37 i $64.65
$55,270.35
I $883.25
$56,153.60
Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.