CN-370000-CN210-T18CO3.pdf
PDF 377 KB Posted
- Contract number
- CN210
- Issued by
- Florida
About this file
This is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for Contract CN210, Task Assignment No. 18, Change Order No. 03. The consultant is CPH, Inc., represented by Ariel Elvambuena. FDEP's project manager is C.B. Hewitt, and the contract manager is Jack Brady. The project involves headspring erosion control work at Weeki Wachee Springs State Park.
The scope of work requires CPH, Inc. to provide architectural and structural design drawings for four sets of wood ramps and stairs within Weeki Wachee Park. Subtask 17A covers architectural design services with a fixed price cost of $3,045.80, including 2 hours of Senior Architectural Manager time at $87.45/hour, 26 hours of Architect time at $76.78/hour, and 26 hours of Architectural Designer time at $63.17/hour. Subtask 17B covers structural design services with a fixed price cost of $3,030.32, including 8 hours of Senior Structural Engineer time at $112.39/hour and 24 hours of Project Designer time at $88.80/hour. The total change order amount is $6,076.12, bringing the cumulative task total to $98,922.78. The task execution period extends from December 5, 2018, to August 31, 2020, with a net extension of 62 days. Payment will be made upon FDEP's approval of deliverables, which shall be in PDF/CAD format.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .