About this file
Task Assignment Notification for North Beach Parking Lot Repair
This is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP), Bureau of Design and Construction, for a design services project at Honeymoon Island State Park. The project involves FDEP as the owner and contract authority, CPH, Inc. as the primary consultant, with supporting firms including AREHNA Engineering, Inc., Humiston & Moore Engineering, and American Structural Engineering. The contract is designated CN210, Task Assignment TA2, with project number 61123C, and is managed by Brian Miller (FDEP Project Manager) and Mae Roth (FDEP Contract Manager).
The scope of work encompasses survey, geotechnical engineering, environmental, drainage, structural, and permitting services for the North Beach Parking Lot Repair project, with proposed improvements including stormwater management, retaining walls, sidewalk design, and parking lot design. The project is structured in eight subtasks: topographic survey ($5,532.06), 60% design plans ($6,213.79), permit applications ($8,286.42), permit issuance ($4,626.46), 90% design plans ($4,444.98), 100% design plans ($3,505.93), geotechnical services ($2,124.17), and structural design ($5,246.00). The total fixed price cost is $36,549.87 with reimbursable costs not to exceed $3,429.94, resulting in an overall total task amount of $39,979.81. The project runs from execution through June 30, 2017, with staggered subtask schedules beginning August 1, 2016, and payment upon approval of deliverables for each subtask.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .