C05_04_Attachment_7_-_PPQ_6_30_2026.docx
DOCX document 38 KB Posted
- Attached to
- Folsom Warehouse Bridge Crane Replacement
- Solicitation number
- 140R2026R0017
About this file
This is a Past Performance Questionnaire template designed for offerors to collect performance evaluations from previous clients and customers whose records are not available in the Contractor Performance Assessment Reporting System (CPARS). The questionnaire is associated with Solicitation 140R2026R0017 for the Folsom Warehouse Bridge Crane Replacement project, a Department of the Interior Bureau of Reclamation requirement to design, build, furnish, and install one 30-ton bridge crane.
The template evaluates contractor performance across five rating factors: Quality, Schedule, Cost Control, Management, and Regulatory Compliance. Each factor uses a standardized five-level rating scale (Exceptional, Very Good, Satisfactory, Marginal, and Unsatisfactory) with corresponding definitions aligned to FAR Part 42.1503(h)(4) standards. The questionnaire requests evaluator contact information and reference contract details, followed by narrative assessment areas for each rating factor. Quality evaluations address quality control systems, defect identification and correction, and material reviews. Schedule assessments examine timeliness against milestones and adverse actions such as liquidated damages or cure notices. Cost Control ratings evaluate forecasting and resource efficiency. Management assessments cover coordination, subcontract oversight, and customer satisfaction. Regulatory Compliance evaluations address adherence to contract terms, financial and environmental regulations, safety requirements, and labor compliance. The questionnaire includes space for supporting narrative comments and evaluator attestation.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAST PERFORMANCE QUESTIONNAIRE
This Past Performance Questionnaire is provided for Offerors to send to clients and customers for whom work has been performed and that Past Performance records are not listed in the Contractor Performance Assessment Reporting System (CPARS).
The evaluation criteria ratings and ratings definitions mirror the ratings utilized in CPARS for:
1. Quality
2. Schedule
3. Cost Control
4. Management
5. Regulatory
Each Rating factor listed above has a rating table that correlates with the factor. Mark the rating box next to the adjectival rating assigned for the contract/project under review/evaluation.
Each Rating factor has additional space under the rating table to include a narrative that supports the assigned rating.
REFERENCE CONTRACT #:
(the contract the evaluation is based on)
Evaluator’s Name: __________________________ Evaluator’s email:______________________________________________________ Evaluator’s Phone Number: __________________________ Evaluator’s Agency or Company Name: _____________________________________
1. QUALITY. Quality reflects the Contractor's management of the quality control program, as well as the quality of the work itself. Questions which should be addressed are as follows: Has a quality product been provided? Specifically describe the Contractor's quality control system responsible for it. For example:
- Ability to maintain quality control
- Performance of accessory testing
- Implementation of 3-phase inspection process
- CQC (Contractor Quality Control) documentation
- Identification and correction of deficient work
- Reviews of materials and shop drawings
- Whether there was incorporation of unspecified materials
(Check the appropriate rating box.)
| RATING |
| ADJECTIVAL RATING |
| DEFINITION |
EXCEPTIONAL
Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
VERY GOOD
Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
SATISFACTORY
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
MARGINAL
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
UNSATISFACTORY
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Comments:
Solicitation: 140R2026R0017
Source Selection Information
1. SCHEDULE
Assess the timeliness of the contractor against the completion of the contract, task orders, milestones, delivery schedules, and administrative requirements (e.g. efforts that contribute to or affect the schedule variance). Instances of adverse actions such as the evaluation of liquidated damages or issuance of Cure Notices, Show Cause Notices, and Delinquency Notices are indicators of problems which may have resulted in variance to the contract/order schedule and should, therefore, be noted in the evaluation.
(Check the appropriate rating box.)
| RATING |
| ADJECTIVAL RATING |
| DEFINITION |
Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
2. COST CONTROL
Assess the contractor’s effectiveness in forecasting, managing, and controlling cost. If the contractor is experiencing cost growth or underrun, discuss the causes and contractor-proposed solutions for the cost overruns or underruns. In addition, the extent to which the contractor demonstrates a sense of cost responsibility, through the efficient use of resources, in each work effort should be assessed.
(Check the appropriate rating box.)
| RATING |
| ADJECTIVAL RATING |
| DEFINITION |
Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
3. MANAGEMENT
Assess the integration and coordination of all activities needed to execute the contract, specifically the timeliness, completeness and quality of problem identification, corrective action plans, proposal submittals, the contractor’s history of reasonable and cooperative behavior (to include timely identification of issues in controversy), customer satisfaction, timely award and management of subcontracts. Consider Management Responsiveness, Subcontract Management, and Program Management.
(Check the appropriate rating box.)
| RATING |
| ADJECTIVAL RATING |
| DEFINITION |
Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
4. REGULATORY COMPLIANCE
Assess compliance with all terms and conditions in the contract/order relating to regulatory clauses, terms and conditions (e.g. failure to report in accordance with contract terms and conditions, late or nonpayment to subcontractors, trafficking violations, tax delinquency, defective cost or pricing data, terminations, suspension and debarments) Assess compliance with all terms and conditions in the contract/order relating to applicable regulations and codes, using the Evaluation Ratings Definitions in FAR Part 42.1503(h)(4) Table 42-1. Consider aspects of performance such as compliance with financial, environmental (example: Clean Air Act, Clean Water Act), safety, and labor regulations as well as any other reporting requirements in the contract terms and conditions.
(Check the appropriate rating box.)
| RATING |
| ADJECTIVAL RATING |
| DEFINITION |
Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
ADDITIONAL COMMENTS, IF ANY:
Evaluator’s Name: Evaluator’s Signature: Date: