This is a specification section for the removal of an existing 30-ton bridge crane at the Folsom Dam Warehouse, part of the Folsom Warehouse Bridge Crane Replacement project under Solicitation No. 140R2026R0017, Amendment No. 0004 (Specifications No. 20-C0942).
The contractor must remove and dispose of the existing 30-ton bridge crane and associated equipment for a lump-sum price offered in the Price Schedule. Scope includes removal and disposal of used oil, coatings and equipment containing regulated metals, the crane access ladder cage mounted on the South wall of the warehouse, and existing electrical equipment including the conductor rail electrification system and main power disconnect switches. An optional scope item (Optional Price Schedule 2) covers removal and disposal of the 30-ton bridge crane runway rails, including rail clips, nuts, bolts, sole plates, splice bars, and associated hardware. The contractor must comply with hazardous materials handling requirements including asbestos abatement per applicable sections, drain and disposal of oil and brake fluid, and recycling of scrap metal with hazardous coatings. Following equipment removal, the contractor must thoroughly clean and degrease areas by steam vapor or pressure washing while protecting remaining equipment from damage and properly containing and disposing of non-hazardous cleaning waste. Prior to work, the contractor must submit a plan for equipment removal describing required equipment, estimated weights, removal procedures with step-by-step instructions, and a removal schedule. Historical items including manufacturer identification markings and rated load markings must be preserved and coordinated with the Contracting Officer's Representative for storage. The Government will establish clearance and lock-out/tag-out of equipment in accordance with safety procedures.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Folsom Warehouse – Bridge Crane Replacement Amendment No. 0004 American River Division Solicitation No. 140R2026R0017 Folsom Unit - Central Valley Project, California Specifications No. 20-C0942
Removal of Existing Crane
Revised 41 22 13 - 1
SECTION 41 22 13
REMOVAL OF EXISTING CRANE
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Remove Existing 30 Ton Bridge Crane:
1. Payment: Lump sum price offered in the Price Schedule.
a. Includes, but not limited to the following:
1) Removal and disposal of used oil.
2) Coatings and Equipment with coatings Containing Regulated
Metals.
3) Crane access ladder cage.
4) Removal and disposal of existing electrical equipment.
B. Remove and Dispose 30 Ton Bridge Crane Runway Rails:
1. Payment: Lump-sum price offered in Optional Price Schedule 2.
1.02 SUBMITTALS
A. Submit the following in accordance with Section 01 33 00 – Submittals.
B. RSN 41 22 13-1, Plan for Equipment Removal:
1. Describe equipment required for removal of crane equipment.
2. Include estimated crane equipment weights and removal equipment weights.
3. Provide a procedure including the methods and step by step instructions on removal of crane and crane equipment.
4. Submit a removal schedule.
C. Deleted
1.03 GENERAL
A. In accordance with Section 26 05 02 – Basic Electrical Materials and Methods.
B. Remove and dispose of existing crane equipment, distribution equipment, conductors and cables.
Revised 41 22 13 - 2
1.04 PROJECT CONDITIONS
A. Hazardous materials:
1. Asbestos: See Table 51 02 82-A for a listing of equipment with materials containing non-friable asbestos.
2. Equipment with coatings contain regulated metals. See Table 51 02 82-A.
PART 2 PRODUCTS
2.01 MATERIALS AND EQUIPMENT
A. Provide equipment, materials, and containers required for disassembly and removal of equipment.
PART 3 EXECUTION
3.01 EXAMINATION
A. Perform survey and inspection in advance of other on-site work.
B. Notify the COR immediately upon finding defective or damaged equipment so that corrective actions can be started quickly.
3.02 REMOVAL AND DISPOSAL OF MATERIALS
A. Comply with requirements of:
1. Section 02 82 20 – Removal and Disposal of Asbestos Containing Materials.
2. Section 02 83 33 – Recycling of Scrap Metal with Coatings Containing
Hazardous Materials.
3. Section 02 87 20 – Removal and Disposal of Used Oil.
B. Obtain electrical outage in accordance with Section 01 14 30 – Interruption of Service.
1. Government will establish clearance and lock-out, tag-out of equipment in accordance with RSHS.
C. Remove and dispose the following existing equipment:
1. Perform asbestos abatement for crane per Section 02 80 10 – General
Requirements for Hazardous Materials and Section 02 82 20 - Removal and Disposal of Asbestos Containing Materials.
2. Drain and dispose of oil and brake fluid in accordance with Section 02 87 20 – Disposal of Used Oil.
Revised 41 22 13 - 3
3. Dispose of coated metal equipment in accordance with Section 02 83 33 – Recycling of Scrap Metal with Coatings Containing Hazardous Materials.
4. 30-Ton capacity bridge crane in the Folsom Dam Warehouse. Include ancillary materials.
a. Includes the cage on the crane access ladder mounted on the South wall of the Warehouse.
5. Conductor rail electrification system up to and including their main power disconnect switches on the South wall of the Warehouse.
6. If deemed necessary by the rail survey, see Sections 41 22 14 – Bridge Crane, remove and dispose of the existing runway rails.
a. Includes rail clips, nuts, bolts, sole plates, splice bars and other associated hardware.
b. Dispose of removed equipment in accordance with Section 02 83 33 –
Recycling of Scrap Metal with Coatings Containing Hazardous Materials.
c. Reuse existing mounting bolts where possible.
D. Preserve the following existing equipment for historical purposes:
1. Manufacturer identification markings.
2. Rated load markings.
3. Coordinate with COR on storage location.
E. Following removal of existing equipment, thoroughly clean and degrease areas by steam vapor or pressure washing:
1. Protect remaining equipment from fouling damage during cleaning.
2. Contain, collect, and dispose of non-hazardous waste from cleaning operations in accordance with Section 01 74 00 – Cleaning and Waste Management.
Deleted
END OF SECTION
Revised 41 22 13 - 4
This page intentionally left blank.