Attachment_2_-_FolsomCraneMod_11x17_Amend_0004_0004.pdf

PDF 32 MB Posted

Attached to
Folsom Warehouse Bridge Crane Replacement
Solicitation number
140R2026R0017
Issued by

About this file

This file is a technical drawing and site plan document for the Folsom Dam Warehouse Bridge Crane Replacement project under Specifications No. 20-C0942, Amendment No. 0004. The document includes a Site Map and Contractor Use Areas Plan showing the Folsom Warehouse facility layout, located at the Central Valley Project's American River Division near Denver, Colorado. The drawing (reference 485-D-61367) designates contractor staging areas, access roads, existing multi-use pathways, reclamation property boundaries, and roadway configurations surrounding the warehouse facility on Folsom Lake.

The document contains standard electrical equipment support specifications and detailed technical drawings (reference 40-D-60001) for Type I electrical equipment supports with an estimated weight of 135 pounds. The specifications include fabrication requirements using ASTM A36 steel, electro-galvanized finishes per ASTM A385, combination channels from approved manufacturers (Globe Strut, Unistrut Corporation, or Cooper B-Line), bolted connections with five-hole or seven-hole connection plates, and welding per AWS D1.1 standards. Key contractor responsibilities noted include locating and protecting all utilities within work areas, maintaining warehouse access for government personnel via east-side doors, and coordinating space usage with government representatives. The design accommodates three-second gust basic wind speeds of 90 mph in accordance with ASCE 7-05 standards, and foundation design engineers must verify stability, concrete strength, reinforcement, and anchorage requirements.

View the file

Other files

File Type Posted
Attachment_4_-_Wage_Determination_9_3_2026_0006.pdf PDF
Section_J_10_2_2026_0006.pdf PDF
Section_L_10_2_2026_0006.pdf PDF
Sol_140R2026R0017_Amd_0006.pdf PDF
Attachment_11_-_RFP_Checklist_10_2_2026_0006.pdf PDF
Attachment_14_-_Breaker_10_2_2026_0006.pdf PDF
Amendment_No__5_Questions-Answers_9_25_2026_0005.pdf PDF
Sol_140R2026R0017_Amd_0005.pdf PDF
Folsom_Warehouse_Crane_-_Site_Visit_2_Attendance_0005.pdf PDF
Section_J_9_25_2026_0005.pdf PDF
26_08_00_-_Commissioning_of_Electrical_Equipment_Amend_0004_0004.pdf PDF
25_12_10_-_Programmable_Logic_Controller_Amend_0004_0004.pdf PDF
26_05_02_-_Basic_Electrical_Materials_and_Methods_Amend_0004_0004.pdf PDF
Attachment_13_-_Folsom_Warehouse_Crane_Site_Visit_0004.pdf PDF
00_01_10_-_Table_of_Contents_Amend_0004_0004.pdf PDF
RFQ-140R2026R0017_SF1442_9_2_2026_0004.pdf PDF
25_00_01_-_Automation_Control_System_Amend_0004_0004.pdf PDF
52_00_00_-_Drawings_Amend_0004_0004.pdf PDF
41_22_14_-_Bridge_Crane_Amend_0004_0004.pdf PDF
01_33_00_-_Submittals_Amend_0004_0004.pdf PDF
41_22_15_-_Bridge_Crane_Electrical_Components_Amend_0004_0004.pdf PDF
Attachment_12_Questions_and_Answers_9_1_2026_0004.pdf PDF
Sol_140R2026R0017_Amd_0004.pdf PDF
41_22_13_-_Removal_of_Existing_Cranes_Amend_0004_0004.pdf PDF
Attachment_11_-_RFP_Checklist_9_1_2026_0004.pdf PDF
C06_01_Attachment_9_-_Pre-Proposal_Meeting_Agenda_8_5_2026_0003.pdf PDF
Sol_140R2026R0017_Amd_0003.pdf PDF
C06_01_Attachment_10_Virtual_Folsom_Dam_Warehouse_Crane_8_5_2026_0003.pdf PDF
Sol_140R2026R0017_Amd_0002.pdf PDF
Sol_140R2026R0017_Amd_0001.pdf PDF
C05_04_Attachment_8_-_RFP_Checklist_7_11_2026.pdf PDF
C05_04_RFP-140R2026R0017_SF1442_7_31_2026.pdf PDF
C05_04__Attachment_1_-_SOW_7_1_2026.pdf PDF
C05_04_Attachment_7_-_PPQ_6_30_2026.docx DOCX document
C05_04_Attachment_3_-_Wage_Determination_6_22_2026.pdf PDF
Sol_140R2026R0017.pdf PDF
C05_04_Attachment_6_-_Risk_Assessment-Value_Add_7_14_2026.docx DOCX document
C05_04_Attachment_5_-_LOS_6_24_2026.xlsx XLSX spreadsheet
C05_04_Attachment_4_-_Release_of_Claims_6_23_2026.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

5.

0S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

5- D

_C

O N

TR

A C

TO

R U

S E.

D W

G

LA

S T

S A V

ED

D A

TE

-0 8-

LA

S T

S A V

ED

B Y

M B

EC

K

ER

¦D_DT¦

¦STATUS¦

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

A M

ER

IC

A N

R

IV

ER

D

IV

IS

IO

N

FO

LS

O M

D A M

W A R

EH

O U

S E

B R

ID

G E

C R A N

E

SITE MAP AND

CONTRACTOR USE

AREAS

PLAN

DENVER, CO

485-D-61367

2026-08-21

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

ADMIN APPROVAL -

£TT£

£AT£

£AA£

£TA£

M. BECKER

M. BECKER

Z. CEPAK

MATTHEW BECKER, P.E.

A. HAYLEY

MECHANICAL SUPERVISOR, P.E.

SITE MAP AND CONTRACTOR USE AREAS

Folsom Warehouse

LEGEND

Contractor use/staging areas

Access road

Existing multi-use pathway

Reclamation Property Boundary

Roadway

NOTES

1. Contractor is responsible for locating, staking, and protecting all utilities and instruments within work areas.

2. Access to the Warehouse must be maintained for Government

Personnel via the East side doors.

3. Contractor must coordinate with Government for space within the Warehouse.

Main Security Gate

Security Gate

Security Gate

Folsom Lake Crossing

Fo ls om A ub ur n R d

Folsom D am Rd

Fo lso m D am R d

Facility Entrance

Digitally signed by MATTHEW BECKER Date: 2026.08.21 15:16:19 -06'00'

ALLISON HAYLEY

2026.08.21 15:23:52 -06'00'

Amendment No. 0004 1

Specifications No. 20-C0942

Amendment No. 0004 2

Amendment No. 0004 3

Amendment No. 0004 4

Amendment No. 0004 5

Amendment No. 0004 6

Amendment No. 0004 7

Amendment No. 0004 8

Amendment No. 0004 9

Amendment No. 0004 10

Amendment No. 0004 11

Amendment No. 0004 12

Amendment No. 0004 13

Amendment No. 0004 14

Amendment No. 0004 15

Amendment No. 0004 16

R el ea se d

Amendment No. 0004 17

A

B

C

D

5 4

3 2 1

A

B

3 2

C

D

ALWAYS THINK SAFETY

R el ea se d

Amendment No. 0004 18

LAR M TA IOCE N

R el ea se d

Amendment No. 0004 19

Base plate (Typ.)

B

"Y

(6

0" M ax

Combination channel (Typ.)

Connection plate, each side. Provide 5 bolts as shown (Typ.)

Electrical cabinet, bolt to frame as required

"Y" (4'-0" Max.)

"Y

(3

0" M ax

1"

N on sh ri nk g ro ut

TOC

Foundation, see Note 3

ELECTRICAL EQUIPMENT SUPPORT, TYPE I

(Est. Wt. 135 lbs.)

B

AA

3/

8"

7/

8"

3/

8"

CL. Drain hole

R1 /2

Combination channel

Connection plate, each side

Combination channel

CL. 13/16"Ø Holes in base plate, see Note 2

CL. 9/16"Ø Holes for 1/2"Ø bolts

7 1/2"

1/

2"

8" Pl.

5"

1/

2"

1/ 2"

5"

7/ 8"

7/8"

2 1/2"2 1/2"

2 1/2"

7/8"

5 3/4"

2 7/8" 2 7/8"

CL. 9/16"Ø Holes in plates and combination channel as required

3/8" Pl.

Combination channel

3/8" Pl. (Typ.)

VIEW

A

SECTION

B BASE PLATE DETAIL

VIEW

C

VIEW

D

D

D

CC 1

7/

8"

3/8" Pl. (Typ.)

3/8" Pl.

1/

4"

1/ 4"

7/8"

1 3/4"

1 1/4" 1 1/4"

TOC

Foundation, see Note 31' -6

(M in

3"

M in

Bottom of foundation

Fill combination channel with concrete

Combination channel

DETAIL - ALTERNATE ANCHORAGE A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

0S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

-D -6

-R D

-1 .D

W G

LA

S T

S A V

ED

D A

TE

-0 4-

LA

S T

S A V

ED

B Y

TR

YA

N

¦D_DT¦

¦STATUS¦

S

TA

N D

A R D

D R A W

IN

G

S

S

TA

N D

A R D

A N

D T

YP

IC

A L

D

ES

IG

N

S

M

IS

C

EL

LA

N

EO

U

S M

ET

A

LW

O R K

ELECTRICAL EQUIPMENT

SUPPORT, TYPE I

SECTIONS AND DETAIL

DENVER, CO

40-D-60001

2015-03-23

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

ADMIN APPROVAL

£TT£

£AT£

£AA£

£TA£

Bernard Lajimodiere

RBarthel

Olaff G. Huerta

Barthel, Rodney J P.E.

Bernstein, Alfred I P.E.

Plant Structures Group

NOTES

1. Contractor determines final size of electrical equipment support based on electrical cabinet furnished.

2. Unless noted otherwise, or as directed by the foundation design engineer, install 5/8"Ø post-installed anchors with a minimum embedment of 6" or 5/8"Ø cast-in-place threaded anchors with a minimum embedment of 1'-6" having a minimum projection of 2".

3. Foundation design engineer shall verify foundation stability, concrete and reinforcement strength requirements, and anchorage requirements.

4. Install electrical equipment supports at locations shown on specifications drawings and/or as directed by COR.

5. Estimated electrical equipment support weight shown is based on maximum dimensions and five hole connection plates.

ASCE denotes American Society of Civil Engineers

ASTM denotes American Society for Testing and Materials

AWS denotes American Welding Society

COR denotes Contracting Officer's Representative

Max. denotes maximum

Min. denotes minimum

Pl. denotes plate

TOC denotes top of concrete

Typ. denotes typical

All welds, sections and details are typical for all similar conditions.

Electro-galvanized finish combination channels.

Unless noted otherwise, galvanize base plate and plates after fabrication per ASTM A385.

Unless noted otherwise, galvanize hardware per ASTM A123.

Metal framing combination channels shall be as manufactured by Globe Strut, United Gypsum Corporation, 101 South Wacker Drive, Chicago, IL 60606; Unistrut Corporation, 35660 Clinton Street, Wayne, MI 48184; or Cooper B-Line, 509 West Monroe Street, Highland, IL 62249.

Combination Channels: Globe Strut No. G7612A, B-Line B12A, or Unistrut P5501; or equal, having the following essential characteristics: No. 12 gauge steel and channel 1 5/8-inch wide by 4 7/8-inch deep with 7/8-inch openings.

Connection Plates:

With five holes per Globe Strut G2057, B-Line B532, Unistrut P1726; or equal.

With seven holes per Globe Strut G2068, B-Line B334, Unistrut P1950; or equal.

Connection hardware shall be suitable for combination channel strut attachments.

Fabricated Metalwork:

Plates and bars_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ASTM A36

Length of bolt threads per ASME B18.2.1 and thread class 2 free-fit, American National coarse-thread series.

Unless noted otherwise, make all welds continuous and in the shop.

Start and stop all welds at center of member or tubing.

Unless noted otherwise, fabricator shall determine edge preparation and root opening for groove welds. Shop detail drawing shall show edge preparation.

Arc-Welding Electrodes: Filler metal and required shielding gases or fluxes shall be per AWS D1.1 with filler metal for steel having a minimum tensile strength of 70,000 psi.

Unless noted otherwise, all bolted connection bolt holes are standard 1/16" oversize.

"Y" dimensions are the responsibility of the Contractor and are based on the electrical cabinet furnished.

DESIGN CRITERIA

Electrical equipment support is designed to withstand a three-second gust basic wind speed of 90 mph in accordance with ASCE 7-05.

It is assumed that no electrical cabinets will be installed in lower portion of frame.

GENERAL NOTES

R

EV

N O

¦R_DT¦ £RA£

D

U

PD

A

TE

D D

R A W

IN

G

T

EX

T S

TY

LE

T

O C

U R R

EN

T D

R A W

IN

G

R

EC

O R D

S S

YS

TE

M

M

IN

O R R

EV

IS

IO

N

S

-0

4-

D

BA

RT

HE

L, R O

D

NE

Y J.

P .E

M

IN

O R M

O D

IF

IC

A

TI

O N

S

Amendment No. 0004 20

File details come from the government source that posted it. Updated .