This is a specification document (Section 26 05 02 - Basic Electrical Materials and Methods) for the Folsom Warehouse Bridge Crane Replacement project under Amendment No. 0004, Solicitation No. 140R2026R0017, issued by the American River Division of the U.S. Bureau of Reclamation for the Folsom Unit of the Central Valley Project in California.

The specification establishes requirements for electrical materials, installation methods, and quality standards for the bridge crane replacement project. Key requirements include: all basic electrical materials and methods costs must be included in Price Schedule line items; equipment manufacturing facilities must be ISO-9001 certified; all welders must be qualified per ASME BPVC-IX; field testing personnel must meet NETA ATS Section 3 qualifications; and all materials and equipment must conform to NFPA 70 and IEEE C2 standards. Galvanized mounting brackets, bolts, nuts, and washers must be provided per ASTM A 123 and A 153 for major equipment items, while minor items require galvanized steel or non-corrosive metal; cadmium-plated hardware is prohibited. The contractor must provide all testing equipment, calibration, and programming for crane electrical systems, deliver special tools and spare parts to Folsom Dam prior to commissioning, provide pad-lockable circuit breakers and disconnect switches, and coordinate manufacturer expert engineers with 30 days advance notice for on-site support during testing and commissioning. The contractor must notify the Contracting Officer in writing at least 45 days prior to Factory Checkout Testing (60 days for international suppliers). Final acceptance is contingent upon complete system installation and operational status, with the Government reserving inspection rights at the supplier's manufacturing plant. Contractor-caused damage or installation failures must be corrected at contractor expense, and all as-built drawings must be submitted per project record document requirements.

View the file

Other files

File Type Posted
Attachment_11_-_RFP_Checklist_10_2_2026_0006.pdf PDF
Sol_140R2026R0017_Amd_0006.pdf PDF
Attachment_4_-_Wage_Determination_9_3_2026_0006.pdf PDF
Section_J_10_2_2026_0006.pdf PDF
Attachment_14_-_Breaker_10_2_2026_0006.pdf PDF
Section_L_10_2_2026_0006.pdf PDF
Sol_140R2026R0017_Amd_0005.pdf PDF
Folsom_Warehouse_Crane_-_Site_Visit_2_Attendance_0005.pdf PDF
Amendment_No__5_Questions-Answers_9_25_2026_0005.pdf PDF
Section_J_9_25_2026_0005.pdf PDF
52_00_00_-_Drawings_Amend_0004_0004.pdf PDF
Attachment_2_-_FolsomCraneMod_11x17_Amend_0004_0004.pdf PDF
41_22_14_-_Bridge_Crane_Amend_0004_0004.pdf PDF
00_01_10_-_Table_of_Contents_Amend_0004_0004.pdf PDF
Sol_140R2026R0017_Amd_0004.pdf PDF
Attachment_12_Questions_and_Answers_9_1_2026_0004.pdf PDF
01_33_00_-_Submittals_Amend_0004_0004.pdf PDF
Attachment_13_-_Folsom_Warehouse_Crane_Site_Visit_0004.pdf PDF
Attachment_11_-_RFP_Checklist_9_1_2026_0004.pdf PDF
26_08_00_-_Commissioning_of_Electrical_Equipment_Amend_0004_0004.pdf PDF
41_22_13_-_Removal_of_Existing_Cranes_Amend_0004_0004.pdf PDF
41_22_15_-_Bridge_Crane_Electrical_Components_Amend_0004_0004.pdf PDF
RFQ-140R2026R0017_SF1442_9_2_2026_0004.pdf PDF
25_00_01_-_Automation_Control_System_Amend_0004_0004.pdf PDF
25_12_10_-_Programmable_Logic_Controller_Amend_0004_0004.pdf PDF
C06_01_Attachment_10_Virtual_Folsom_Dam_Warehouse_Crane_8_5_2026_0003.pdf PDF
C06_01_Attachment_9_-_Pre-Proposal_Meeting_Agenda_8_5_2026_0003.pdf PDF
Sol_140R2026R0017_Amd_0003.pdf PDF
Sol_140R2026R0017_Amd_0002.pdf PDF
Sol_140R2026R0017_Amd_0001.pdf PDF
Sol_140R2026R0017.pdf PDF
C05_04_Attachment_7_-_PPQ_6_30_2026.docx DOCX document
C05_04_Attachment_3_-_Wage_Determination_6_22_2026.pdf PDF
C05_04_Attachment_6_-_Risk_Assessment-Value_Add_7_14_2026.docx DOCX document
C05_04_Attachment_5_-_LOS_6_24_2026.xlsx XLSX spreadsheet
C05_04_Attachment_4_-_Release_of_Claims_6_23_2026.pdf PDF
C05_04_Attachment_8_-_RFP_Checklist_7_11_2026.pdf PDF
C05_04__Attachment_1_-_SOW_7_1_2026.pdf PDF
C05_04_RFP-140R2026R0017_SF1442_7_31_2026.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Folsom Warehouse – Bridge Crane Replacement Amendment No. 0004 American River Division Solicitation No. 140R2026R0017 Folsom Unit - Central Valley Project, California Specifications No. 20-C0942

Basic Electrical Materials and Methods

Revised 26 05 02 - 1

SECTION 26 05 02

BASIC ELECTRICAL MATERIALS AND METHODS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include the cost of basic electrical materials and methods in prices offered in the

Price Schedule for applicable items of work.

a. Includes but not limited to the following:

1) Furnishing, handling, and storing spare parts for electrical equipment.

2) Furnishing special tools and appliances for maintenance and adjustment of equipment

3) Making electrical connections.

1.02 REFERENCE STANDARDS

A. American Society of Mechanical Engineers (ASME)

1. ASME BPVC-IX 2019 Boiler and Pressure Vessel Code, Section IX –

Welding and Brazing Qualifications

B. ASTM International (ASTM)

1. ASTM A 123/A 123M-2020 Zinc (Hot-Dip Galvanized) Coatings on Iron and

Steel Products

2. ASTM A 153/A 153M-2015 Zinc Coatings (Hot-Dip) on Iron and Steel

Hardware

C. International Electrical Testing Association, Inc. (NETA)

1. NETA ATS-2021 Acceptance Testing Specifications for Electrical

Power Equipment and Systems

D. International Organization for Standardization (ISO)

1. ISO 9001 – 2015 Quality Management Systems - Requirements

E. Institute of Electrical and Electronics Engineers (IEEE)

1. IEEE C2-2023 National Electrical Safety Code (NESC)

F. National Fire Protection Association (NFPA)

Revised 26 05 02 - 2

1. NFPA 70-2023 National Electrical Code (NEC)

1.03 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals and Section 01 33 26 – Electrical Drawings and Data.

B. RSN 26 05 02-1, Equipment Layout Plan and Coordination Approval Drawings:

1. Provide dimensioned drawing showing actual equipment being supplied. Show equipment sizes, location centerline dimensions, equipment maintenance clearance required, and bus supports in accordance with the following Sections:

a. 25 00 01 – Automation Control Systems

b. 26 24 42 – Distribution Panelboards

c. 41 22 15 – Bridge Crane Electrical Components

d. Deleted

C. RSN 26 05 02-2, Resumes:

1. Technical installation supervisor’s or CO’s resume.

2. Registered Engineer’s resume.

3. Electrician’s resume.

1.04 QUALIFICATIONS

A. Welder Qualifications: In accordance with ASME BPVC-IX.

B. Field testing personnel: As specified in NETA ATS, Section 3, except may be accredited by other than NETA.

1.05 DESIGN REQUIREMENTS

A. Contractor is responsible for providing a complete integral system and proper coordination between equipment manufacturers to ensure equipment is properly designed for connection to each other.

1.06 QUALITY

A. Certifications:

1. Equipment manufacturing facilities to be ISO-9001 certified.

B. Qualifications and Responsibilities:

1. Field testing organization and personnel: As specified in NETA ATS, Section 3, except may be accredited by other than NETA.

Revised 26 05 02 - 3

a. Technically qualified to supervise installation and testing work, with experience of similar work, and meets Government approval.

b. Responsible for installation and testing/commissioning of each new crane electrical system, interface circuits and its corresponding distribution circuits.

c. May have multiple responsibilities at work site.

d. Present or represented at work site for all shifts during entire removal, installation and testing period.

e. Report immediately, in writing to Government, work not in accordance with manufacturer’s recommendation or other conditions which may result in an unsatisfactory job.

f. Maintain daily log of accomplished work.

2. Welder Qualifications: in accordance with ASME BPVC-IX.

1.07 SITE CONDITIONS

A. These facilities are over 50 years old and as such the drawings, especially layout drawings, included in these specifications, shall be field verified by the contractor.

1.08 MAINTENANCE

A. Provide special tools and accessories required for installation or normal operation and maintenance of equipment and installations. Studs, bolts, and nuts other than United States Standard provided anywhere in the equipment or installation will be considered as requiring special tools.

B. Deliver special tools and spare parts for equipment to Folsom Dam, Central California Area Office. Provide shipments with item list(s).

C. Special tools and spare parts must be onsite prior to commissioning of newly installed equipment.

1.09 EXTRA MATERIALS

A. Provide to Government special tools and equipment necessary to properly install, adjust, test, and check operation of electrical equipment.

PART 2 PRODUCTS

2.01 MATERIALS AND EQUIPMENT

A. Conform to NFPA 70 and IEEE C2.

Revised 26 05 02 - 4

B. Galvanize mounting brackets, bolts, nuts, and washers for major items of electrical equipment such as crane electrical components, transformers, circuit breakers, instrument transformers, instrumentation cable and conductors, control cable, power cable, cable trays, disconnecting switches, resistors, capacitors, in accordance with ASTM A 123 and A 153.

C. Provide galvanized steel or non-corrosive metal for mounting bolts, nuts, and washers for minor items of electrical equipment and lighter weight items. Do not use cadmium-plated mounting hardware.

D. Change designs as required where Contractor-furnished electrical equipment and materials differ in size, type, ratings, or other physical properties from designs in these specifications. COR will approve changes at Contractor’s expense, unless Contractor can demonstrate that changes are necessary regardless of manufacturer.

E. Contractor shall provide all testing equipment for testing/commissioning each new crane electrical system which includes calibrating and programming corresponding meters and relays.

F. Provide anchors and mounting hardware for busway, conduit, and other major equipment.

G. Provide pad-lockable circuit breakers, disconnect switches, and energy isolating devices.

2.02 SOURCE QUALITY ASSURANCE

A. Government reserves the right to inspect equipment, hardware and components at supplier’s manufacturing plant during fabrication and testing. Final acceptance will not be made until the complete electrical system has been installed and is operational.

B. Notify COR in writing prior to beginning the Factory Checkout Test:

1. United States: At least 45 days prior to testing.

2. International: At least 60 days prior to testing.

PART 3 EXECUTION

3.01 INSTALLATION

A. Do not install electrical equipment until approval drawings and data for associated equipment have been approved by the Government.

B. Electrical Installations, Assembly Operations, and Adjustments: Comply with NFPA 70 and IEEE C2.

C. Make electrical installations complete and ready for service.

Revised 26 05 02 - 5

D. Install electrical equipment in accordance with directions furnished by manufacturer’s instruction books and manufacturer’s expert engineer.

E. Assemble, checkout, adjust, and prepare following equipment for service under direction of manufacturer’s expert engineer.

F. Coordinate with manufacturer for obtaining services of manufacturer’s expert engineer for Contractor-furnished equipment. Provide CO 30 days advance notice of date when manufacturer’s expert engineer will be needed on site, during testing/commissioning of each crane.

G. Calibrate and program each crane electrical system and their corresponding devices.

H. Tighten nuts used in electrical equipment assembly with torque wrenches to torque values recommended by equipment manufacturers.

I. Drill holes in bolted steel structures and provide fastenings required for mounting or installing electrical equipment and materials.

J. Installation of electrical equipment includes:

1. Leveling and grouting channel bases.

2. Drilling holes, furnishing hardware, and assembling components to each other.

3. Furnishing materials for and making all connections correctly in accordance with final wiring diagrams.

4. Tagging wires and cables at each end.

5. Correcting any errors made by the Contractor in the installation at no expense to the Government.

K. Grout electrical equipment installed on concrete foundations to fill voids. Use adjusting nuts to bear weight of electrical equipment.

3.02 REPAIR

A. Repair damaged painted surfaces of equipment to match original finish.

B. Correct by repair or replacement, at the Contractor’s expense, damage to or failure of any part of the items of material and equipment which in the opinion of the COR was caused by faulty installation, faulty mechanical assembly, or mishandling.

3.03 FINAL AND AS-BUILT DRAWINGS

A. Final and As-built Drawings Government Format: refer to Section 01 78 30 – Project Record Documents.

1. Marked prints of specification drawings indicating “Final As-Built” changes made to electrical conduit during construction.

Revised 26 05 02 - 6

3.04 FIELD QUALITY CONTROL

A. Coordinate with manufacturers and sub-contractors for obtaining services of an installation supervisor as well as expert engineers for Contractor-furnished equipment.

Follow instruction of the installation supervisor.

B. Assemble, checkout, adjust and prepare new equipment for service under direction of the Contractor’s or manufacturer’s installation supervisor.

3.05 FIELD QUALITY ASSURANCE

A. Coordinate with manufacturers and sub-contractors for obtaining services of an installation supervisor as well as expert engineers for Contractor-furnished equipment.

Follow instructions of installation supervisor.

B. Field test, (static & functional), installed equipment to ensure proper operation as well as sequencing of control and protection system.

C. The Government will inspect major electrical equipment and complete electrical system during construction. Acceptance of equipment will be made after equipment is operational.

END OF SECTION