C05_04_Attachment_6_-_Risk_Assessment-Value_Add_7_14_2026.docx

DOCX document 22 KB Posted

Attached to
Folsom Warehouse Bridge Crane Replacement
Solicitation number
140R2026R0017
Issued by

About this file

This is a Risk Assessment/Value Added attachment for Solicitation No. 140R2026R0017 concerning the Folsom Dam Warehouse Bridge Crane Replacement project in Folsom, California. The document serves as a template for contractors to identify project risks and propose value-added solutions, with examples provided to guide contractor submissions.

The template contains two primary sections. The Risk Assessment section instructs contractors to identify up to five potential risks associated with the 30-ton bridge crane replacement project and propose solutions with supporting data demonstrating past successful implementation. The example provided addresses design errors, showing how Company "A" successfully minimized design error costs from 10% to 2% on three similar $50M-scope projects, achieving a 9.0 out of 10 customer satisfaction rating. The Value Added section allows contractors to propose up to five value-added alternatives or enhancements beyond base requirements, with quantified impacts on cost and schedule. The example demonstrates an alternate sound wall construction method for school projects that reduced costs by 4.2% and schedule by 30 calendar days while achieving 9.8 out of 10 customer satisfaction and zero noise-related complaints. Contractors are required to provide specific data including number of projects implemented, average scope, performance metrics (cost and time deviations), and customer ratings to substantiate their proposed risk mitigation strategies and value-added offerings.

View the file

Other files

File Type Posted
Sol_140R2026R0017_Amd_0006.pdf PDF
Attachment_4_-_Wage_Determination_9_3_2026_0006.pdf PDF
Section_J_10_2_2026_0006.pdf PDF
Attachment_11_-_RFP_Checklist_10_2_2026_0006.pdf PDF
Attachment_14_-_Breaker_10_2_2026_0006.pdf PDF
Section_L_10_2_2026_0006.pdf PDF
Amendment_No__5_Questions-Answers_9_25_2026_0005.pdf PDF
Sol_140R2026R0017_Amd_0005.pdf PDF
Folsom_Warehouse_Crane_-_Site_Visit_2_Attendance_0005.pdf PDF
Section_J_9_25_2026_0005.pdf PDF
Sol_140R2026R0017_Amd_0004.pdf PDF
Attachment_12_Questions_and_Answers_9_1_2026_0004.pdf PDF
01_33_00_-_Submittals_Amend_0004_0004.pdf PDF
Attachment_13_-_Folsom_Warehouse_Crane_Site_Visit_0004.pdf PDF
52_00_00_-_Drawings_Amend_0004_0004.pdf PDF
Attachment_2_-_FolsomCraneMod_11x17_Amend_0004_0004.pdf PDF
41_22_14_-_Bridge_Crane_Amend_0004_0004.pdf PDF
00_01_10_-_Table_of_Contents_Amend_0004_0004.pdf PDF
Attachment_11_-_RFP_Checklist_9_1_2026_0004.pdf PDF
26_08_00_-_Commissioning_of_Electrical_Equipment_Amend_0004_0004.pdf PDF
41_22_13_-_Removal_of_Existing_Cranes_Amend_0004_0004.pdf PDF
41_22_15_-_Bridge_Crane_Electrical_Components_Amend_0004_0004.pdf PDF
RFQ-140R2026R0017_SF1442_9_2_2026_0004.pdf PDF
25_00_01_-_Automation_Control_System_Amend_0004_0004.pdf PDF
25_12_10_-_Programmable_Logic_Controller_Amend_0004_0004.pdf PDF
26_05_02_-_Basic_Electrical_Materials_and_Methods_Amend_0004_0004.pdf PDF
C06_01_Attachment_10_Virtual_Folsom_Dam_Warehouse_Crane_8_5_2026_0003.pdf PDF
C06_01_Attachment_9_-_Pre-Proposal_Meeting_Agenda_8_5_2026_0003.pdf PDF
Sol_140R2026R0017_Amd_0003.pdf PDF
Sol_140R2026R0017_Amd_0002.pdf PDF
Sol_140R2026R0017_Amd_0001.pdf PDF
Sol_140R2026R0017.pdf PDF
C05_04_Attachment_7_-_PPQ_6_30_2026.docx DOCX document
C05_04_Attachment_3_-_Wage_Determination_6_22_2026.pdf PDF
C05_04_Attachment_5_-_LOS_6_24_2026.xlsx XLSX spreadsheet
C05_04_Attachment_4_-_Release_of_Claims_6_23_2026.pdf PDF
C05_04_Attachment_8_-_RFP_Checklist_7_11_2026.pdf PDF
C05_04__Attachment_1_-_SOW_7_1_2026.pdf PDF
C05_04_RFP-140R2026R0017_SF1442_7_31_2026.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No.: 140R2026R0017 Folsom Dam Warehouse – Bridge Crane Replacement Folsom, California

Risk Assessment/Value Added Risk Assessment Risk No. Example

Contractor Identified Risk:
The drawings have signification design errors that amounts to 10% of the project cost. The contractor can correct the design errors decreasing the Government’s cost from 10% to 2%.
Solution: (what data does the Contractor have to show they have been successful with the proposed solution?)
Company “A” has successfully corrected and minimized design errors on similar projects:

· # of project implemented: 3

· Average Scope: $50M

· Average design error cost minimized: 7%

· Deviation rate cost and time due to design errors: 1%

· Customer rating of vendors ability to react and minimize design errors: 9.0 (out of 10)

Impact:
Decreased Government’s cost from 10% to 2% for design errors. Reduced Modifications.

Risk No. 1 Contractor Identified Risk:

Solution:

Impact:

Risk No. 2 Contractor Identified Risk:

Solution:

Impact:

Risk No. 3 Contractor Identified Risk:

Solution:

Impact:

Risk No. 4 Contractor Identified Risk:

Solution:

Impact:

Risk No. 5 Contractor Identified Risk:

Solution:

Impact:

Risk Assessment/Value Added Value Added

Value Add No. Example

Contractor Value Add:
Contractor has an alternate method to the sound wall specific at the school construction site during the school year that minimizes cost by -4.2%.

Option used on 2 similar school projects with construction during school year:

· The average cost and time deviation: -0.2% and 1.4%

· The # of complaints due to construction noise: 0

· The customer satisfaction: 9.8 out of 10

Cost Impact:
Reduced project cost by 4.2%.
Schedule Impact:
Reduced schedule by 30 calendar days.

Value Add No. 1 Contractor Value Add:

Cost Impact:

Schedule Impact:

Value Add No. 2 Contractor Value Add:

Cost Impact:

Schedule Impact:

Value Add No. 3 Contractor Value Add:

Cost Impact:

Schedule Impact:

Value Add No. 4 Contractor Value Add:

Cost Impact:

Schedule Impact:

Value Add No. 5 Contractor Value Add:

Cost Impact:

Schedule Impact: